Converter station converter transformer load simulation type vector checking method
Patent Information
- Application Number
- CN202411137911.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-29
AI Technical Summary
The prior art is difficult to effectively carry out load simulation vector inspection of converter transformers in converter stations, especially during the process of new construction, expansion and reconstruction, the correctness and safety of the relay protection device cannot be ensured, resulting in grid safety risks and commissioning. Inefficient.
A load simulation vector inspection method is adopted, and the three-phase voltage of the process frequency is applied at the line edge and middle switch of the converter current through the converter current through the converter current, simulating the conversion current through the converter current, combined with the sampling value of the protection device. and phase information, check whether the relative polarity and change ratio of the current loop are correct.
This method improves the accuracy and adaptability of the inspection, can effectively verify the correctness and conductivity of the secondary circuit of the converter transformer, reduces the safety risks of the power grid, shortens maintenance time, improves the operation efficiency, and reduces the operation Maintenance cost.
Smart Images

Figure CN119044627A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of vector inspection of power transmission and transformation equipment, and in particular to a load simulation vector inspection method for a converter transformer of a converter station. Background Art
[0002] The load simulation relay protection vector inspection method refers to the use of a test device to apply a fixed-phase primary voltage and current to the primary side (or busbar) and primary current system of the converter transformer of the converter station before the relay protection and safety automatic devices in the converter station use the actual primary voltage and load current of the power grid system for load testing. Through the voltage transformer, current transformer and their respective complete secondary circuits, the secondary voltage value, secondary current value, secondary voltage angle, secondary current angle, and the correspondence between the angle values of voltage and current and the primary side voltage and current sampled by the protection device are checked to verify the correctness of the phase, phase difference, polarity, etc. of the secondary circuit wiring of the relay protection and safety automatic devices in the converter station, thereby completing the voltage and current phasor inspection before the converter station is put into operation.
[0003] At present, load simulation vector inspection of converter stations or substations adopts two methods: short-circuit method and large current generator method. The short-circuit method includes direct short-circuit method and step-up method through step-up transformer.
[0004] The direct short-circuit test method is to short-circuit the valve side of the converter transformer to ground first, and connect a dedicated test power supply (usually 380 V test power supply) to the grid side of the converter transformer. In this way, short-circuit current will flow through the grid side and valve side of the converter transformer, and the connection polarity of the differential protection can be verified through this current. A very important point in the test is to select a test power supply with sufficient capacity. Before the test, the magnitude of the short-circuit current on the grid side and valve side of the converter transformer can be calculated by the test voltage and the rated parameters of the converter transformer, and then the theoretical test capacity can be calculated by the grid side short-circuit current. However, considering safety, the capacity of the test power supply should generally be enlarged by more than 1.5 times based on the theoretical test capacity.
[0005] The step-up transformer step-up method increases the primary current generated by the step-up transformer step-up method, but the requirements for the test power supply and step-up transformer are too high, and it is difficult to implement on site. The step-up transformer step-up method and the short-circuit test method are basically the same. The step-up transformer step-up method increases the current value by increasing the voltage at both ends of the UHV and flexible DC converter transformers. To achieve the purpose of vector inspection of the CT secondary current, the test device weighs several tons and the test power supply power also requires hundreds of kilowatts, so the economy and technicality are poor.
[0006] The large current generator method has the advantage of generating a large primary current. A large current generator is used to conduct a current through the independent CTs in turn. This method can effectively check whether the CT secondary transformation ratio is correct, whether the three-phase polarity is the same, whether the current circuit is open, and whether the wiring is wrong. The current value meets the secondary relay protection requirements and has a good test effect on independent CTs. However, this method cannot be used to test bushing CTs such as converter transformers. This method has obvious disadvantages. It cannot verify the correctness of the overall secondary circuit of the installed converter transformer, cannot verify the protection function of the converter transformer, cannot intuitively verify the correctness of the relevant protection function circuit, and cannot verify the correctness of the converter transformer connection. Summary of the invention
[0007] The technical problem to be solved by the present invention is to provide a load simulation vector inspection method for a converter transformer in a converter station, which is used for relay protection vector inspection test before the relay protection of a converter transformer in a newly built, expanded or rebuilt converter station is officially put into operation, thereby reducing the power grid safety risk during the commissioning of new equipment and improving the commissioning efficiency.
[0008] In order to solve the above technical problems, the technical solution adopted by the present invention is: a load simulation vector inspection method for converter transformers in a converter station, comprising the following steps: Pull open the grounding switch of the converter transformer incoming line interval, and short-circuit the ends of the bushings on the valve sides of the A, B, and C phases of the Y / Y or Y / △ converter transformer; Use the commutation transformer current flow test device to generate a three-phase power frequency voltage with a certain amplitude and phase sequence, and apply it to the three-phase CT winding or grid-side lead of the commutation transformer incoming line side and middle switch to simulate the primary load current passing through the commutation transformer, combined with the sampling value of the commutation transformer protection device, the differential current and the effective value and phase angle displayed by the external phase meter; Check whether the relative polarity relationship and transformation ratio between the side and middle switch parts of the converter transformer protection device and the Y / Y or Y / △ converter transformer wiring current loop are correct.
[0009] Preferably, the wiring steps of the current conversion and flow test device are as follows: 1) Use three-phase voltage wires to connect the AC380V / 32A circuit breaker of the test power box and the input terminal A / X of the single-phase isolation voltage regulator respectively; 2) Use single-phase voltage lines to connect the output terminal a / x of the single-phase isolation voltage regulator and the voltage input terminal UX / UN of the parallel compensation device respectively; 3) Use single-phase current cascade wire to connect the voltage output terminal UP / UN of the parallel compensation device and the voltage input terminal UP / UN of the series compensation device respectively; 4) Use the communication control line to connect the online communication port of the parallel compensation device and the online communication port of the series compensation device respectively; 5) Use a single-phase power line to connect the control power supply end of the parallel compensation device to the AC220V station power supply as the working power supply of the device; 6) Use grounding wire to connect each device to reliable grounding; 7) Use a single-phase current line to connect the voltage output of the series compensation device to the pressurized flow injection point of the test transformer.
[0010] Preferably, after wiring is completed, adjust the voltage of the three isolation voltage regulating devices to the starting point and turn on the parallel compensation device; after setting the parameters, input the voltage and slowly adjust the voltage regulating devices of the three isolation devices to increase the voltage. At the same time, observe the output voltage and current displayed on the display until the output voltage and current reach the primary injection current value. Note that the maximum output voltage or current should not exceed the maximum value marked on the device (UT / UN terminal mark). If the voltage or current reaches more than 105% of the marked value, the device will protect itself and disconnect the voltage input switch to stop the test.
[0011] Preferably, the steps for checking the current loop of the incoming line side, middle switch and Y / Y converter transformer wiring part are as follows: a) Remove the neutral bushing lead of pole IY / D converter transformer and open the YY and YD winding grounding switches in pole I valve hall; b) Short-circuit the a and b ends of the YY bushings on the valve side of the A, B and C phases of the IY / Y converter transformer respectively; c) The test equipment passes a primary current through the three-phase CT windings of the incoming line side and middle switch close to the busbar side to simulate the primary load current passing through the converter transformer; d) Combined with the differential current and winding phase information of the commutation transformer protection device, determine whether the relative polarity relationship and transformation ratio of each group of current loops connected to the protection circuit are correct.
[0012] Preferably, the steps for checking the current loop of the incoming line side, middle switch and Y / △ commutation transformer wiring part are as follows: a) Pull open the YY winding grounding switch in the pole I valve hall; b) Short-circuit the a and b ends of the Y / △ bushings on the valve side of the A, B, and C phases of the pole I Y / D commutator transformer respectively (since the winding is a triangle, the actual process is to close the grounding knife switch on the YD side of the pole I valve hall to simulate the winding short circuit); c) The test equipment passes a primary current through the three-phase CT windings of the incoming line side and middle switch close to the busbar side to simulate the primary load current passing through the commutation transformer; d) Combined with the differential current and winding phase information of the commutation transformer protection device, determine whether the relative polarity relationship and transformation ratio of each group of current loops connected to the protection circuit are correct.
[0013] The present invention provides a load simulation vector inspection method for a converter transformer in a converter station, which has the following beneficial effects: 1. The application of this method on site effectively solves the problem that the converter transformer of the converter station is difficult to complete the load simulation injection test requirements due to its large impedance value, and provides strong support for the relay protection vector inspection test work before the relay protection of the converter transformer of the newly built, expanded and rebuilt converter station is officially put into operation.
[0014] 2. This method is to add current to the primary equipment through the corresponding device to simulate the actual operation, so that the primary current is induced into secondary current by CT and then sent to various protection, measurement and control and metering devices to measure the secondary current and verify the correctness and integrity of the secondary circuit. The test can also verify the conductivity of the high-voltage switch, knife switch and earth knife through which the primary current flows. The effect produced by this method is closer to the actual operation, with higher accuracy, stronger adaptability, and more suitable for promotion and application, providing a strong guarantee for the smooth completion of the converter station system commissioning.
[0015] 3. This method realizes the relay protection vector inspection test work before the relay protection of the newly built, expanded and rebuilt converter station is officially put into operation, improves the maintenance efficiency, shortens the maintenance time and power outage time, reduces the power grid safety risk during the commissioning of new equipment, improves the commissioning efficiency, greatly reduces the operation and maintenance costs, and improves the maintenance and operation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 This is a schematic diagram of simulated wiring of the current conversion and flow test device of the present invention; Figure 2 It is a parameter setting diagram of the current conversion and flow test device of the present invention; Figure 3 This is a test diagram for checking the current loop of the incoming line side and middle switches and the Y / Y commutation transformer wiring part of the present invention; Figure 4 This is a test diagram for checking the current loop of the incoming line side and middle switches and the Y / △ commutation transformer wiring part of the present invention. DETAILED DESCRIPTION
[0017] A load simulation vector checking method for a converter transformer in a converter station comprises the following steps: Pull open the grounding switch of the converter transformer incoming line interval, and short-circuit the ends of the bushings on the valve sides of the A, B, and C phases of the Y / Y or Y / △ converter transformer; Use the commutation transformer current flow test device to generate a three-phase power frequency voltage with a certain amplitude and phase sequence, and apply it to the three-phase CT winding or grid-side lead of the commutation transformer incoming line side and middle switch to simulate the primary load current passing through the commutation transformer, combined with the sampling value of the commutation transformer protection device, the differential current and the effective value and phase angle displayed by the external phase meter; Check whether the relative polarity relationship and transformation ratio between the side and middle switch parts of the converter transformer protection device and the Y / Y or Y / △ converter transformer wiring current loop are correct.
[0018] Preferably, Figure 1 As shown, the wiring steps of the current conversion and flow test device are as follows: 1) Use three-phase voltage wires to connect the AC380V / 32A circuit breaker of the test power box and the input terminal A / X of the single-phase isolation voltage regulator respectively; 2) Use single-phase voltage lines to connect the output terminal a / x of the single-phase isolation voltage regulator and the voltage input terminal UX / UN of the parallel compensation device respectively; 3) Use single-phase current cascade wire to connect the voltage output terminal UP / UN of the parallel compensation device and the voltage input terminal UP / UN of the series compensation device respectively; 4) Use the communication control line to connect the online communication port of the parallel compensation device and the online communication port of the series compensation device respectively; 5) Use a single-phase power line to connect the control power supply end of the parallel compensation device to the AC220V station power supply as the working power supply of the device; 6) Use grounding wire to connect each device to reliable grounding; 7) Use a single-phase current line to connect the voltage output of the series compensation device to the pressurized flow injection point of the test transformer.
[0019] Preferably, after wiring is completed, adjust the voltage of the three isolation voltage regulating devices to the starting point and turn on the parallel compensation device; after setting the parameters, input the voltage and slowly adjust the voltage regulating devices of the three isolation devices to increase the voltage. At the same time, observe the output voltage and current displayed on the display until the output voltage and current reach the primary injection current value. Note that the maximum output voltage or current should not exceed the maximum value marked on the device (UT / UN terminal mark). If the voltage or current reaches more than 105% of the marked value, the device will protect itself and disconnect the voltage input switch to stop the test.
[0020] The parameters are as follows Figure 2 As shown: Test side: medium-high side, medium-low side, high-pressure side, serving as an indicator; Rated capacity: rated short-circuit capacity; Rated voltage: rated voltage on the pressurized side; Maximum output current: It is the reference value for overcurrent protection of the device.
[0021] Preferably, Figure 3 As shown in the figure, the steps for checking the current loop of the incoming line side, middle switch and Y / Y converter transformer wiring are as follows: a) Remove the neutral bushing lead of pole IY / D converter transformer and open the YY and YD winding grounding switches in pole I valve hall; b) Short-circuit the a and b ends of the YY bushings on the valve side of the A, B and C phases of the IY / Y converter transformer respectively; c) The test equipment passes a primary current through the three-phase CT windings of the incoming line side and middle switch close to the busbar side to simulate the primary load current passing through the converter transformer; d) Combined with the differential current and winding phase information of the commutation transformer protection device, determine whether the relative polarity relationship and transformation ratio of each group of current loops connected to the protection circuit are correct.
[0022] Preferably, Figure 4 As shown in the figure, the steps for checking the current loop of the incoming line side, middle switch and Y / △ commutation transformer wiring are as follows: a) Pull open the YY winding grounding switch in the pole I valve hall; b) Short-circuit the a and b ends of the Y / △ bushings on the valve side of the A, B, and C phases of the pole I Y / D commutator transformer respectively (since the winding is a triangle, the actual process is to close the grounding knife switch on the YD side of the pole I valve hall to simulate the winding short circuit); c) The test equipment passes a primary current through the three-phase CT windings of the incoming line side and middle switch close to the busbar side to simulate the primary load current passing through the converter transformer; d) Combined with the differential current and winding phase information of the commutation transformer protection device, determine whether the relative polarity relationship and transformation ratio of each group of current loops connected to the protection circuit are correct.
[0023] The present invention provides a load simulation vector inspection method for converter transformers in converter stations, designs how to connect and operate a new converter transformer flow test device, how to set the state of the primary equipment of the incoming line side and middle switches and the current loop of the Y / △ converter transformer connection part, and discusses the steps and detailed implementation methods of the vector inspection in detail, by changing the state of the primary equipment of the converter transformer incoming line interval grounding knife switch and the artificial operation of the A, B, C phase valve side bushing ends of the Y / Y or Y / D converter transformer, to determine the overlap position of the new converter transformer flow device test line, and finally generate a current with a determined phase relationship after the converter transformer load, and then carry out the converter transformer protection vector inspection. The method can realize the load simulation vector inspection of the converter transformer in the converter station, and provides an effective implementation means to ensure the accurate and reliable polarity of the converter transformer winding.
[0024] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A load simulation vector inspection method for converter transformers in a converter station, characterized in that: The following steps are involved: Pull open the grounding switch of the converter transformer incoming line interval, and short-circuit the ends of the bushings on the valve sides of the A, B, and C phases of the Y / Y or Y / △ converter transformer; Use the commutation transformer current flow test device to generate a three-phase power frequency voltage with a certain amplitude and phase sequence, and apply it to the three-phase CT winding or grid-side lead of the commutation transformer incoming line side and middle switch to simulate the primary load current passing through the commutation transformer, combined with the sampling value of the commutation transformer protection device, the differential current and the effective value and phase angle displayed by the external phase meter; Check whether the relative polarity relationship and transformation ratio between the side and middle switch parts of the converter transformer protection device and the Y / Y or Y / △ converter transformer wiring current loop are correct.
2. According to claim 1, a converter transformer load simulation vector inspection method for a converter station is characterized in that: The wiring steps of the current conversion test device are as follows: 1) Use three-phase voltage wires to connect the AC380V / 32A circuit breaker of the test power box and the input terminal A / X of the single-phase isolation voltage regulator respectively; 2) Use single-phase voltage lines to connect the output terminal a / x of the single-phase isolation voltage regulator and the voltage input terminal UX / UN of the parallel compensation device respectively; 3) Use single-phase current cascade wire to connect the voltage output terminal UP / UN of the parallel compensation device and the voltage input terminal UP / UN of the series compensation device respectively; 4) Use the communication control line to connect the online communication port of the parallel compensation device and the online communication port of the series compensation device respectively; 5) Use a single-phase power line to connect the control power supply end of the parallel compensation device to the AC220V station power supply as the working power supply of the device; 6) Use grounding wire to connect each device to reliable grounding; 7) Use a single-phase current line to connect the voltage output of the series compensation device to the pressurized flow injection point of the test transformer.
3. According to claim 2, a converter transformer load simulation vector inspection method for a converter station is characterized in that: After the wiring is completed, adjust the voltage of the three isolation voltage regulators to the starting point and turn on the parallel compensation device; after setting the parameters, input the voltage and slowly adjust the voltage regulators of the three isolation devices to increase the voltage. At the same time, observe the output voltage and current displayed on the display until the output voltage and current reach the primary injection current value.
4. According to claim 1, a converter transformer load simulation vector inspection method for a converter station is characterized in that: The steps for checking the current loop of the incoming line side, middle switch and Y / Y converter transformer wiring are as follows: a) Remove the neutral bushing lead of pole IY / D converter transformer and open the YY and YD winding grounding switches in pole I valve hall; b) Short-circuit the a and b ends of the YY bushings on the valve side of the A, B and C phases of the IY / Y converter transformer respectively; c) The test equipment passes a primary current through the three-phase CT windings of the incoming line side and middle switch close to the busbar side to simulate the primary load current passing through the converter transformer; d) Combined with the differential current and winding phase information of the commutation transformer protection device, determine whether the relative polarity relationship and transformation ratio of each group of current loops connected to the protection circuit are correct.
5. According to claim 1, a converter transformer load simulation vector inspection method for a converter station is characterized in that: The steps for checking the current loop of the incoming line side, middle switch and Y / △ commutation transformer wiring are as follows: a) Pull open the YY winding grounding switch in the pole I valve hall; b) Short-circuit the a and b ends of the Y / △ bushings on the valve side of the A, B, and C phases of the pole I Y / D commutator transformer respectively (since the winding is a triangle, the actual process is to close the grounding knife switch on the YD side of the pole I valve hall to simulate the winding short circuit); c) The test equipment passes a primary current through the three-phase CT windings of the incoming line side and middle switch close to the busbar side to simulate the primary load current passing through the commutation transformer; d) Combined with the differential current and winding phase information of the commutation transformer protection device, determine whether the relative polarity relationship and transformation ratio of each group of current loops connected to the protection circuit are correct.
Citation Information
Cited By
Testing method of three-phase primary co-current and co-voltage simulation on-load relay protection vector inspection device
CN121540967A