Preparation process of polyurethane elastomer material
By designing the positioning clamping and simulation table mechanism of the performance detection equipment, the problem of the arc-shaped structure of the sole of the polyurethane elastomer material is difficult to clamp, real wear resistance test for the sole is realized, and the detection results are more representative.
Patent Information
- Application Number
- CN202410300449.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-12-06
AI Technical Summary
The wear resistance detection of the existing polyurethane elastomer materials is difficult to clamp the irregular curved structure of the sole, and the detection results are not representative because the existing detection methods cannot simulate the actual situation of the human body walking in the shoes.
A performance detection device is designed, including a positioning clamping mechanism and a simulation table mechanism, which simulates human walking through three-point clamping and reciprocating swing. Combining the detachable pavement simulation block and mobile table, it can adaptively clamp the arc structure of the sole. And simulate wear at different road surfaces and speeds.
The stable clamping and real test of polyurethane elastomer soles are achieved, and the test results are more representative, which can effectively evaluate the wear of the soles by different road surfaces and speeds.
Smart Images

Figure CN119086326A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of preparation of polyurethane elastomer materials, in particular to a preparation process of polyurethane elastomer materials. Background Art
[0002] Polyurethane elastomer is a common plastic material with good wear resistance, bending resistance and fatigue resistance.
[0003] It is usually used in the manufacture of sole materials. During the production process, a part of samples will be taken for quality inspection. One of the inspections is to test the wear resistance of the soles made of polyurethane elastomer materials. However, the existing wear resistance inspections have the following problems: First, due to the irregular arc shape of the side of the sole and a certain elasticity, it is not convenient to clamp the sole for wear resistance inspection; second, during the inspection process, the soles are made of the same material and are located on the same plane for friction. After the human body puts on the shoes, the soles contact the ground with a certain arc, which makes the existing wear resistance inspection not representative. Summary of the invention
[0004] The present invention provides a preparation process of a polyurethane elastomer material, which solves the problems existing in the background technology.
[0005] The present invention provides a preparation process of a polyurethane elastomer material, comprising the following steps:
[0006] S1. Mould making: Make corresponding sole mould according to the design requirements of the sole.
[0007] S2. Preparation of fillers: polyurethane raw materials are mixed in a certain ratio, reacted under certain conditions to form a polyurethane prepolymer, and pigments and fillers are added to the prepolymer, and the fillers are obtained after being fully mixed.
[0008] S3, injection molding: inject the mixed filler into the sole mold made in step S1 by injection molding, and solidify and mold after a certain period of time.
[0009] S4, post-molding treatment: demoulding, trimming and cleaning the molded sole to obtain a polyurethane elastomer sole.
[0010] S5. Quality testing: The obtained polyurethane elastomer sole is subjected to quality testing by using performance testing equipment.
[0011] The S5 quality inspection process involves performance inspection equipment, which includes a workbench base, with a vertical plate fixedly connected to the rear side of the upper end of the workbench base; a swing mechanism, arranged on the front side of the vertical plate; a positioning clamping mechanism, arranged below the swing mechanism, for limiting the clamping of the polyurethane elastomer sole; a simulation table mechanism, arranged in a groove opened in the workbench base, for performance inspection of the polyurethane elastomer sole.
[0012] Among them, the simulation table mechanism includes a moving table slidably connected in the groove, and extension columns are integrally formed on the left and right sides of the bottom end of the moving table. Balls are rotatably arranged at the bottom ends of the two extension columns, and the balls are rotatably arranged in a limit groove connected to the bottom end of the groove. One of the left and right sides of the moving table is fixedly connected to the inner wall of the groove by a tension spring, and the other side of the moving table is contacted with a cam, one end of the cam rotating shaft is rotatably connected to the electric slider, and the other end of the cam rotating shaft is connected to the first motor, and the first motor is fixedly connected to the moving slider, and the electric slider and the moving slider are respectively slidably connected to the moving grooves opened on the front and rear inner walls of the groove.
[0013] In one possible implementation, the swing mechanism includes a rotating disk rotatably connected to the vertical plate, the rotating shaft of the rotating disk passes through the vertical plate and is connected to the second motor, a connecting column is fixedly connected to the front side of the rotating disk away from the center, a limiting column is fixedly connected to the front side of the vertical plate and below the rotating disk, a swing rod is rotatably connected to the limiting column, a clearance groove is provided on the swing rod, the connecting column is slidably connected in the clearance groove, and the bottom end of the swing rod is fixedly connected to a swing frame.
[0014] In a possible implementation, a through slot is provided inside the swing frame and the opening of the through slot is set downward, side slots connected to the through slot are provided on the left and right sides of the swing frame, and guide rods are fixedly connected to the front and rear sides of the through slot of the swing frame.
[0015] In one possible implementation, the positioning and clamping mechanism includes a third motor fixedly connected to the top of the through slot, the third motor is connected to a threaded rod, the threaded rod is threadedly connected to a threaded hole opened at the top of the moving rod, the front and rear ends of the moving rod are both provided with rectangular slots, the guide rod in the through slot is slidably connected in the rectangular slot, the left and right sides of the moving rod are both provided with gear teeth evenly arranged up and down, the gear teeth are meshed with a transition gear, the transition gear is rotatably connected in the through slot, the transition gear is meshed with an arc gear, the arc gear is also rotatably connected in the through slot, the other side of the arc gear is fixedly connected to an extension rod, and the bottom ends of the moving rod and the extension rod are both provided with adsorption components.
[0016] In one possible implementation, the adsorption assembly includes a connecting block fixedly connected to the bottom end of the moving rod, the connecting block on the moving rod is a rectangular structure, and clamping blocks are symmetrically arranged on the left and right extension rods. The clamping blocks are in an arc-shaped structure, and a plurality of cylindrical grooves are evenly opened at the bottom end of the connecting block. A suction cup is fixedly connected to the cylindrical groove by a compression spring, and the opposite sides of the two clamping blocks are provided with the same structure as the bottom end of the connecting block.
[0017] In one possible implementation, a placement groove is provided at the upper end of the mobile platform, a positioning rod is fixedly connected to the bottom end of the placement groove, a road surface simulation block is placed in the placement groove, a positioning groove is provided at the bottom end of the road surface simulation block corresponding to the position of the positioning rod, and a snap-in groove is provided on the left and right sides of the road surface simulation block, and a shifting block is fixedly connected to the upper and lower sides of the snap-in groove and close to the rear side, and a toggle groove connected to the placement groove is provided on the left and right sides of the mobile platform, and a snap-in assembly is arranged in the toggle groove.
[0018] In one possible implementation, the snap-on assembly includes a moving frame slidably connected in the toggle slot, a snap-on block is connected in the moving frame via a tension spring, the opposite sides of the snap-on blocks on both sides are V-shaped elastic structures, the V-shaped elastic structure is fixedly connected to the column structure, and a connecting spring is fixedly connected to the front side of the moving frame.
[0019] The above one or more technical solutions in the embodiments of the present invention have at least one of the following technical effects:
[0020] 1. According to a preparation process of a polyurethane elastomer material provided by an embodiment of the present invention, a positioning and clamping mechanism is provided to perform three-point centered alignment clamping on the polyurethane elastomer sole, and a clamping portion in contact with the polyurethane elastomer sole is provided with a plurality of suction cups, which can adaptively fit to the arc structure on the side of the sole, thereby achieving a more stable effect on the clamping of the sole.
[0021] 2. According to a preparation process of a polyurethane elastomer material provided in an embodiment of the present invention, a swing mechanism is provided to drive a positioning clamping mechanism to swing back and forth, simulating a human body walking in shoes, which is more in line with actual tests and makes the test results more representative.
[0022] 3. According to a preparation process of a polyurethane elastomer material provided in an embodiment of the present invention, different road surface simulation blocks can be installed through the setting of a simulation table mechanism, and the installation and disassembly operations are convenient through the setting of a snap-on component, so that the road surface simulation block has a detachable structure, and different materials can be set on the upper end surface to simulate the existing road conditions of different materials, so as to make the detection result more perfect. At the same time, the simulation table mechanism can reciprocate at different speeds through the movable setting of the mobile table, further simulating the wear test of the sole of the human body at different speeds. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a process flow diagram of a preparation process of a polyurethane elastomer material provided in an embodiment of the present invention.
[0024] Figure 2 It is a structural schematic diagram of a performance testing device in a preparation process of a polyurethane elastomer material provided by an embodiment of the present invention (viewed from front to back).
[0025] Figure 3 It is a partial structural cross-sectional view of a performance testing device in a preparation process of a polyurethane elastomer material provided by an embodiment of the present invention.
[0026] Figure 4 yes Figure 3 Enlarged view of point A in the middle.
[0027] Figure 5 It is a top view of the structure of the simulation table mechanism part of the performance detection equipment provided by the embodiment of the present invention.
[0028] Figure 6 It is a partial structural cross-sectional view of an adsorption component of a performance testing device provided in an embodiment of the present invention.
[0029] Figure 7 It is a schematic diagram of the connection between the road surface simulation block and the mobile station of the performance detection equipment provided by the embodiment of the present invention.
[0030] Figure 8 yes Figure 7 Enlarged view of point B in the middle.
[0031] Fig. 9 It is a side view of the road surface simulation block structure of the performance testing equipment provided by an embodiment of the present invention.
[0032] Fig.10 It is a side view of the mobile station structure of the performance detection device provided by an embodiment of the present invention.
[0033] In the figure: 1. workbench base; 11. vertical plate; 12. groove; 13. limit groove; 14. moving groove; 2. swing mechanism; 21. rotating disk; 22. connecting column; 23. limit column; 24. swing rod; 241. give way groove; 25. swing frame; 26. side groove; 27. guide rod; 3. positioning clamping mechanism; 31. threaded rod; 32. moving rod; 33. rectangular groove; 34. gear teeth; 35. transition gear; 36. arc gear; 37. extension rod; 38. adsorption assembly; 381. connecting block; 382. clamping block ; 383, cylindrical groove; 384, compression spring; 385, suction cup; 4, simulation platform mechanism; 41, moving platform; 411, placement groove; 412, positioning rod; 413, toggle groove; 414, snap-fit assembly; 4141, moving frame; 4142, tension spring; 4143, snap-fit block; 4144, connecting spring; 42, extension column; 43, ball; 44, tension spring; 45, cam; 46, electric slider; 47, moving slider; 5, road simulation block; 51, positioning groove; 52, snap-fit groove; 53, shift block. DETAILED DESCRIPTION
[0034] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways different from those described below, and those skilled in the art can make similar improvements without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0035] See also Figure 1 and Figure 2 , a preparation process of a polyurethane elastomer material, comprising the following steps:
[0036] S1. Mould making: Make corresponding sole mould according to the design requirements of the sole.
[0037] S2. Preparation of fillers: polyurethane raw materials are mixed in a certain ratio, reacted under certain conditions to form a polyurethane prepolymer, and pigments and fillers are added to the prepolymer, and the fillers are obtained after being fully mixed.
[0038] S3, injection molding: inject the mixed filler into the sole mold made in step S1 by injection molding, and solidify and mold after a certain period of time.
[0039] S4, post-molding treatment: demoulding, trimming and cleaning the molded sole to obtain a polyurethane elastomer sole.
[0040] S5. Quality testing: The obtained polyurethane elastomer sole is subjected to quality testing by using performance testing equipment.
[0041] The S5 quality inspection process involves performance inspection equipment, wherein the performance inspection equipment includes a workbench base 1, and a vertical plate 11 is fixedly connected to the rear side of the upper end of the workbench base 1; a swing mechanism 2 is arranged on the front side of the vertical plate 11; a positioning clamping mechanism 3 is arranged below the swing mechanism 2, and is used for limiting the clamping of the polyurethane elastomer sole; a simulation table mechanism 4 is arranged in a groove 12 opened in the workbench base 1, and is used for performance inspection of the polyurethane elastomer sole, and the simulation table mechanism 4 includes a moving table 41 slidably connected in the groove 12, and a placement groove 411 is opened at the upper end of the moving table 41, and a positioning rod 412 is fixedly connected to the bottom end of the placement groove 411, and a road surface simulation block 5 is placed in the placement groove 411.
[0042] During operation, the polyurethane elastomer sole is placed on the positioning and clamping mechanism 3 for clamping, and the road surface simulation block 5 is placed on the simulation platform mechanism 4. It should be noted here that there are multiple road surface simulation blocks 5, and each road surface simulation block 5 has the same structure. The upper end surface is composed of a variety of different materials, such as cement surface, wooden surface, floor tile surface, gravel surface, etc., so as to facilitate the simulation of different road surfaces and observe the wear degree of the polyurethane elastomer sole on different road surfaces to detect the influence of different road surfaces on the quality of the polyurethane elastomer sole. Under the same road surface simulation block 5, the reciprocating speed of the simulation platform mechanism 4 can also be adjusted to simulate the wear degree of the polyurethane elastomer sole caused by the change of walking speed on the same road surface to detect the influence of different speeds on the quality of the polyurethane elastomer sole. At the same time, the swing mechanism 2 is started to drive the positioning and clamping mechanism 3 to swing back and forth, thereby driving the polyurethane elastomer sole to reciprocate and rub on the upper end surface of the road surface simulation block 5 that moves back and forth left and right.
[0043] Continue reading Figure 1 and Figure 2 The swing mechanism 2 includes a rotating disk 21 rotatably connected to the vertical plate 11, the rotating shaft of the rotating disk 21 passes through the vertical plate 11 and is connected to the second motor, a connecting column 22 is fixedly connected to the front side of the rotating disk 21 away from the center, a limiting column 23 is fixedly connected to the front side of the vertical plate 11 and below the rotating disk 21, a swing rod 24 is rotatably connected to the limiting column 23, a clearance groove 241 is opened on the swing rod 24, the connecting column 22 is slidably connected in the clearance groove 241, and a swing frame 25 is fixedly connected to the bottom end of the swing rod 24.
[0044] During operation, the second motor is started to drive the rotating disk 21 to rotate on the vertical plate 11, and the connecting column 22 on the rotating disk 21 will drive the swing rod 24 to swing back and forth around the limit column 23, and the swing rod 24 will then drive the swing frame 25 to swing synchronously.
[0045] Continue reading Figure 3 and Figure 4 A through groove is provided inside the swing frame 25 and the opening of the through groove is set downward. Side grooves 26 connected to the through groove are provided on the left and right sides of the swing frame 25. The side grooves 26 are set so as not to hinder the normal rotation of the arc gear 36. Guide rods 27 are fixedly connected to the front and rear sides of the through groove of the swing frame 25. The positioning and clamping mechanism 3 includes a third motor fixedly connected to the top of the through slot, the third motor is connected to a threaded rod 31, the threaded rod 31 is threadedly connected to a threaded hole opened at the top of the moving rod 32, the front and rear ends of the moving rod 32 are both provided with rectangular slots 33, the guide rod 27 in the through slot is slidably connected in the rectangular slot 33, the left and right sides of the moving rod 32 are both provided with gear teeth 34 evenly arranged up and down, the gear teeth 34 are meshed with a transition gear 35, the transition gear 35 is rotatably connected in the through slot, the transition gear 35 is meshed with an arc gear 36, the arc gear 36 is also rotatably connected in the through slot, the other side of the arc gear 36 is fixedly connected to an extension rod 37, the bottom ends of the moving rod 32 and the extension rod 37 are both provided with an adsorption assembly 38.
[0046] During operation, when it is necessary to position and clamp the polyurethane elastomer sole, the two ends of the polyurethane elastomer sole are respectively placed between the extension rods 37 on both sides, and the third motor is started to drive the threaded rod 31 to rotate in the moving rod 32. Since the moving rod 32 can only move up and down in the through groove under the action of the guide rod 27, when the threaded rod 31 rotates, it will drive the moving rod 32 to move downward. During the downward movement of the moving rod 32, the gear teeth 34 on both sides will engage the transition gear 35 to rotate, and the rotation of the transition gear 35 will drive the arc gear 36 to rotate. The arc gears 36 on both sides synchronously drive the extension rods 37 to rotate closer. When the bottom end of the moving rod 32 contacts the upper end of the polyurethane elastomer sole, the extension rods 37 on both sides will also contact the two ends of the polyurethane elastomer sole until the polyurethane elastomer sole is positioned and clamped at three positions.
[0047] See also Figure 3 and Figure 6 The adsorption component 38 includes a connecting block 381 fixedly connected to the bottom end of the moving rod 32. The connecting block 381 on the moving rod 32 is a rectangular structure. The left and right extension rods 37 are symmetrically provided with clamping blocks 382. The clamping blocks 382 are arc-shaped structures. A plurality of cylindrical grooves 383 are evenly opened at the bottom end of the connecting block 381. A suction cup 385 is fixedly connected to the cylindrical groove 383 through a compression spring 384. The opposite sides of the two clamping blocks 382 are provided with the same structure as the bottom end of the connecting block 381.
[0048] During operation, when the connecting block 381 and the clamping block 382 contact the polyurethane elastomer sole, multiple suction cups 385 will adsorb the contact surface. Since the contact surface with the polyurethane elastomer sole is uneven, the suction cup 385 can adaptively adjust the contact height with the polyurethane elastomer sole under the action of the compression spring 384. The setting of multiple suction cups 385 makes the adsorption of the polyurethane elastomer sole more stable.
[0049] Continue to refer to the attached Figure 3 and Figure 5 , wherein, extension columns 42 are integrally formed on the left and right sides of the bottom end of the moving platform 41, and balls 43 are rotatably set at the bottom ends of the two extension columns 42. The balls 43 are rotatably set in the limit grooves 13 connected to the bottom end of the groove 12. One side of the moving platform 41 located on the left and right sides is fixedly connected to the inner wall of the groove 12 through a tension spring 44, and the other side of the moving platform 41 is contacted with a cam 45. One end of the rotating shaft of the cam 45 is rotatably connected to the electric slider 46, and the other end of the rotating shaft of the cam 45 is connected to the first motor, and the first motor is fixedly connected to the moving slider 47. The electric slider 46 and the moving slider 47 are respectively slidably connected to the moving grooves 14 opened on the front and rear inner walls of the groove 12.
[0050] During operation, under the natural force of the tension spring 44, the end of the cam 45 away from the protrusion contacts one side of the moving platform 41, and the first motor is started to drive the cam 45 to rotate. Under the action of the ball 43, the moving platform 41 moves back and forth left and right in the groove 12 to simulate the fast walking mode. When the electric slider 46 is started, the cam 45 is driven to move in the direction away from the moving platform 41, but at this time, the end of the cam 45 away from the protrusion cannot contact the moving platform 41, but the protruding end of the cam 45 will still contact the moving platform 41, and the first motor is started again. At this time, the reciprocating speed of the moving platform 41 is slower than the previous moving speed, simulating the slow walking mode, so as to realize the movement at different speeds to perform quality inspection on the polyurethane elastomer sole. It should be noted here that the swing direction of the swing frame 25 is always in the opposite direction to the movement direction of the moving platform 41.
[0051] Continue reading Figure 7 , Figure 8 , Fig. 9 and Fig.10 A positioning groove 51 is provided at the bottom end of the road simulation block 5 corresponding to the position of the positioning rod 412, and a clamping groove 52 is provided on the left and right sides of the road simulation block 5. A shift block 53 is fixedly connected to the upper and lower sides of the notch of the clamping groove 52 and close to the rear side. A toggle groove 413 connected to the placement groove 411 is provided on the left and right sides of the moving platform 41, and a clamping assembly 414 is arranged in the toggle groove 413.
[0052] The snap-on assembly 414 includes a moving frame 4141 slidably connected in the toggle slot 413, and a snap-on block 4143 is connected to the moving frame 4141 via a tension spring 4142. The opposite sides of the snap-on blocks 4143 on both sides are V-shaped elastic structures, and the V-shaped elastic structure is fixedly connected to the column structure. The front side of the moving frame 4141 is fixedly connected to a connecting spring 4144.
[0053] During operation, when it is necessary to install and clamp different road simulation blocks 5, a road simulation block 5 of corresponding material is selected, and the clamping block 4143 on the moving platform 41 is first moved in a direction away from the toggle slot 413, and the tension spring 4142 will be squeezed. In this state, the V-shaped elastic structure of the clamping block 4143 will not block the movement of the road simulation block 5, and at the same time, the clamping block 4143 is moved in the direction of the connecting spring 4144, driving the moving frame 4141 to move synchronously in the direction of the connecting spring 4144, and the connecting spring 4144 will be in a squeezed state. At this time, the road simulation block 5 is moved to the placement slot 411, and the positioning slot 51 is correspondingly inserted into the positioning rod 41 2, perform preliminary limiting, then move the clamping block 4143 in the direction of the toggle slot 413, one end of the V-shaped elastic structure of the clamping block 4143 will enter the clamping slots 52 on the left and right sides of the road simulation block 5, and the tension spring 4142 will return to its natural state, and then move the clamping block 4143 away from the connecting spring 4144, the V-shaped elastic structure of the clamping block 4143 will enter the position where the stop block 53 is located at the notch of the clamping slot 52, at this time the connecting spring 4144 is in its natural state, the stop block 53 will limit the V-shaped elastic structure of the clamping block 4143, thereby realizing the limiting and fixing of the road simulation block 5 by the clamping assembly 414.
[0054] In the embodiments of the present invention, unless otherwise clearly specified and limited, the first feature being "above" or "below" the second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, the first feature being "above", "above" and "above" the second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. The first feature being "below", "below" and "below" the second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0055] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "connect", "install", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, an integral connection, or a sliding connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0056] The embodiments of this specific implementation method are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, all equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A process for preparing a polyurethane elastomer material, characterized in that: The following steps are involved: S1. Mould making: Make corresponding sole mould according to the design requirements of the sole; S2. Preparation of filler: polyurethane raw materials are mixed in a certain ratio, reacted under certain conditions to form a polyurethane prepolymer, and pigments and fillers are added to the prepolymer, and the filler is obtained after being fully mixed; S3, injection molding: injecting the mixed filler into the sole mold made in step S1 by injection molding, and solidifying and molding after a certain period of time; S4, post-molding treatment: demoulding, trimming and cleaning the molded sole to obtain a polyurethane elastomer sole; S5. Quality inspection: The obtained polyurethane elastomer sole is subjected to quality inspection by a performance inspection device; The S5 quality inspection process involves a performance inspection device, wherein the performance inspection device comprises a workbench base (1), and a vertical plate (11) is fixedly connected to the rear side of the upper end of the workbench base (1); A swing mechanism (2) is arranged on the front side of the vertical plate (11); A positioning clamping mechanism (3) is arranged below the swinging mechanism (2) and is used to limit and clamp the polyurethane elastomer sole; A simulation table mechanism (4) is arranged in a groove (12) provided on the workbench base (1) and is used for testing the performance of a polyurethane elastomer sole; The simulation platform mechanism (4) comprises a moving platform (41) slidably connected in the groove (12), and the bottom end of the moving platform (41) is integrally provided with extension columns (42) on the left and right sides, and the bottom ends of the two extension columns (42) are rotatably provided with balls (43), and the balls (43) are rotatably provided in the limit groove (13) connected to the bottom end of the groove (12). One side of the moving platform (41) located on the left and right sides is fixedly connected to the inner wall of the groove (12) through a tension spring (44), and the other side of the moving platform (41) is contacted with a cam (45), one end of the rotating shaft of the cam (45) is rotatably connected to the electric slider (46), and the other end of the rotating shaft of the cam (45) is connected to the first motor, and the first motor is fixedly connected to the moving slider (47), and the electric slider (46) and the moving slider (47) are respectively slidably connected to the moving groove (14) opened on the front and rear inner walls of the groove (12).
2. The process for preparing a polyurethane elastomer material according to claim 1, characterized in that: The swing mechanism (2) comprises a rotating disk (21) rotatably connected to the vertical plate (11), the rotating shaft of the rotating disk (21) passes through the vertical plate (11) and is connected to the second motor, a connecting column (22) is fixedly connected to the front side of the rotating disk (21) away from the center, a limiting column (23) is fixedly connected to the front side of the vertical plate (11) and below the rotating disk (21), a swing rod (24) is rotatably connected to the limiting column (23), a clearance groove (241) is provided on the swing rod (24), the connecting column (22) is slidably connected in the clearance groove (241), and a swing frame (25) is fixedly connected to the bottom end of the swing rod (24).
3. The process for preparing a polyurethane elastomer material according to claim 2, characterized in that: A through slot is provided inside the swing frame (25) and the opening of the through slot is arranged downward, side slots (26) communicating with the through slot are provided on the left and right sides of the swing frame (25), and guide rods (27) are fixedly connected to the front and rear sides of the through slot of the swing frame (25).
4. The process for preparing a polyurethane elastomer material according to claim 3, characterized in that: The positioning clamping mechanism (3) comprises a third motor fixedly connected to the top of the through slot, the third motor being connected to a threaded rod (31), the threaded rod (31) being threadedly connected to a threaded hole provided at the top of the moving rod (32), the front and rear ends of the moving rod (32) being provided with rectangular slots (33), the guide rod (27) in the through slot being slidably connected to the rectangular slot (33), the left and right sides of the moving rod (32) being provided with gear teeth (34) evenly arranged up and down, the gear teeth (34) being meshed with a transition gear (35), the transition gear (35) being rotatably connected to the through slot, the transition gear (35) being meshed with an arc gear (36), the arc gear (36) also being rotatably connected to the through slot, the other side of the arc gear (36) being fixedly connected to an extension rod (37), the bottom ends of the moving rod (32) and the extension rod (37) being provided with an adsorption assembly (38).
5. The process for preparing a polyurethane elastomer material according to claim 4, characterized in that: The adsorption assembly (38) includes a connecting block (381) fixedly connected to the bottom end of the moving rod (32); the connecting block (381) on the moving rod (32) is in a rectangular structure; the left and right extension rods (37) are symmetrically provided with clamping blocks (382); the clamping blocks (382) are in an arc-shaped structure; a plurality of cylindrical grooves (383) are evenly arranged at the bottom end of the connecting block (381); a suction cup (385) is fixedly connected to the cylindrical groove (383) via a compression spring (384); and the opposite sides of the two clamping blocks (382) are provided with structures identical to the bottom end of the connecting block (381).
6. The process for preparing a polyurethane elastomer material according to claim 1, characterized in that: The upper end of the mobile platform (41) is provided with a placement groove (411), the bottom end of the placement groove (411) is fixedly connected with a positioning rod (412), a road surface simulation block (5) is placed in the placement groove (411), a positioning groove (51) is provided at the bottom end of the road surface simulation block (5) at a position corresponding to the positioning rod (412), the left and right sides of the road surface simulation block (5) are provided with clamping grooves (52), the notch of the clamping groove (52) is fixedly connected with a stop block (53) at the upper and lower sides and close to the rear side, the left and right sides of the mobile platform (41) are provided with a toggle groove (413) connected with the placement groove (411), and a clamping assembly (414) is arranged in the toggle groove (413).
7. The process for preparing a polyurethane elastomer material according to claim 6, characterized in that: The snap-fit assembly (414) comprises a moving frame (4141) slidably connected in the toggle slot (413); a snap-fit block (4143) is connected in the moving frame (4141) via a tension spring (4142); opposite sides of the snap-fit blocks (4143) on both sides are V-shaped elastic structures, the V-shaped elastic structures are fixedly connected to the column structure, and a connecting spring (4144) is fixedly connected to the front side of the moving frame (4141).
