Application method of autonomous controllable technology in GIL power transmission line comprehensive monitoring system
By implementing autonomous and controllable technology in GIL transmission line monitoring systems, the system reliability and controllability are enhanced, addressing vulnerabilities and ensuring safer operation through data interface determination and infrastructure control.
Patent Information
- Application Number
- CN202311716862.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2043-12-13
AI Technical Summary
Existing GIL transmission line monitoring systems rely on traditional hardware devices and Windows operating systems with Oracle databases, leading to insufficient system reliability, controllability, and security vulnerabilities.
Implement an autonomous and controllable technology system by determining data acquisition interfaces, building an autonomous and controllable network transmission link, and constructing independent and controllable basic support and platform services based on project requirements, using semantic extraction and network design to enhance data collection and infrastructure control.
Improves the reliability and controllability of GIL systems, ensuring safer and more efficient operation by enabling autonomous control of infrastructure and underlying software.
Smart Images

Figure CN119134633A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of distributed control technology, and in particular to an application method and system of autonomous controllable technology in a GIL power transmission line integrated monitoring system. Background Art
[0002] GIL transmission line is a high-voltage power transmission line that uses gas insulation technology and is commonly used for large-capacity power transmission and long-distance power transmission. The main purpose of the GIL transmission line comprehensive monitoring system is to monitor the operating status and performance of the GIL line in real time to ensure its safe and reliable operation. By using the GIL transmission line comprehensive monitoring system, power companies and operation and maintenance personnel can monitor the line status in a timely manner, detect potential problems in advance, and take appropriate measures to improve the reliability, safety and operation efficiency of the line.
[0003] The invention patent with application number: CN202310655212.2 discloses a method, device, computer equipment and storage medium for handling power transmission line faults, wherein the method includes: in the case of monitoring the existence of a fault loop in the power transmission line, according to the fault location sensor arranged on the power transmission line, confirming the fault node associated with the fault loop in the power transmission line; obtaining the line operation data of the fault node; inputting the line operation data of the fault node into a pre-built fault diagnosis model to obtain the fault diagnosis result of the fault loop; inputting the line operation data of the fault node and the fault diagnosis result of the fault loop into a pre-built operation and maintenance decision model to obtain the operation and maintenance information of the fault loop. The above invention can improve the operational stability of the power system, thereby ensuring the stable operation of the power system.
[0004] However, the above-mentioned existing technologies are based on traditional hardware devices, Windows operating system and Oracle database to build the infrastructure required for system operation, which has insufficient system reliability and controllability, and also has security vulnerabilities and potential risks.
[0005] In view of this, there is an urgent need for an application method and system for autonomous controllable technology in a comprehensive monitoring system for GIL transmission lines to at least solve the above-mentioned deficiencies. Summary of the invention
[0006] One of the purposes of the present invention is to provide an application method of autonomous and controllable technology in a GIL transmission line comprehensive monitoring system. According to the project demand report of the target hydropower station obtained, the data acquisition interface is determined and an autonomous and controllable network transmission link collection front-end is built to collect data; in addition, autonomous and controllable basic support and platform services are built, and according to the front-end collected data, basic support and platform services, the corresponding application of autonomous and controllable technology is carried out in the GIL transmission line comprehensive monitoring system, so as to realize autonomous control of infrastructure and underlying software, promote the process of domestic substitution of equipment control, improve the reliability and controllability of the GIL system, and at the same time, make it safer.
[0007] The application method of the autonomous controllable technology in the GIL transmission line comprehensive monitoring system provided by the embodiment of the present invention includes:
[0008] Step 1: Obtain the project requirements report of the target hydropower station;
[0009] Step 2: According to the project requirements report, determine the data acquisition interface in the GIL transmission line comprehensive monitoring system, and build an autonomous and controllable network transmission link collection front-end to collect data based on the data acquisition interface;
[0010] Step 3: Build independent and controllable basic support according to the project demand report;
[0011] Step 4: Build an autonomous and controllable platform service based on the project requirements report;
[0012] Step 5: Based on the front-end collected data, basic support and platform services, the corresponding application of autonomous and controllable technology is carried out in the GIL transmission line comprehensive monitoring system.
[0013] Preferably, step 1: obtaining a project demand report of a target hydropower station, including:
[0014] Obtain on-site investigation records of the target hydropower station;
[0015] Analyze on-site survey records and determine survey information, including: GIL equipment information, site environment information and communication facility information;
[0016] Obtain project requirement report generation rules;
[0017] Generate a project requirement report based on the project requirement report generation rules and survey information.
[0018] Preferably, step 2: according to the project demand report, determine the data acquisition interface in the GIL transmission line comprehensive monitoring system, and build an autonomous and controllable network transmission link collection front end to collect data according to the data acquisition interface, including:
[0019] Based on semantic extraction technology, generate report semantics according to project demand report;
[0020] Determine the data collection interface based on the report semantics;
[0021] Get the interface communication of the data acquisition interface;
[0022] Build an autonomous and controllable network transmission link;
[0023] The access interface communicates through the access switch in the autonomous and controllable network transmission link, and the front-end collected data is transmitted through the autonomous and controllable network transmission link.
[0024] Preferably, building an autonomous and controllable network transmission link includes:
[0025] Obtain network design requirements for autonomous and controllable network transmission links;
[0026] Determine the overall architecture and topology of the autonomous and controllable network based on network design requirements;
[0027] According to the overall architecture and topology, select switch devices that support autonomous controllable functions. Switch devices include: core switches, aggregation switches, and access switches;
[0028] Determine the configuration parameters of the switch equipment according to network design requirements;
[0029] Perform corresponding configuration of the switch device according to the configuration parameters;
[0030] When all switch devices that need to be configured are configured, the construction of the autonomous and controllable network transmission link is completed.
[0031] Preferably, step 3: build an independent and controllable basic support according to the project demand report, including:
[0032] Obtain target resources required for basic support based on project requirements report;
[0033] Based on the target resources, determine the hardware configuration of autonomous and controllable servers, storage devices, and backup devices.
[0034] Preferably, step 4: build an autonomous and controllable platform service according to the project demand report, including:
[0035] Obtain the service requirements of the comprehensive monitoring and early warning platform based on the project demand report;
[0036] Based on service requirements, determine the software configuration of the autonomous and controllable operating system, middleware and database.
[0037] Preferably, step 5: according to the front-end collected data, basic support and platform services, corresponding application of autonomous controllable technology in the GIL transmission line comprehensive monitoring system includes:
[0038] Conduct simulation applications based on front-end collected data, basic support and platform services to obtain simulation application results;
[0039] Conduct compatibility testing based on simulation application results;
[0040] If the compatibility test result is passed, the corresponding application of autonomous and controllable technology will be carried out in the GIL transmission line comprehensive monitoring system based on the front-end collected data, basic support and platform services;
[0041] If the compatibility test result is failure, a compatibility anomaly analysis is performed to obtain the anomaly analysis result;
[0042] Conduct analysis on the necessity of candidate selection based on the abnormal analysis results;
[0043] If the analysis result of the candidate selection necessity analysis is that it is not necessary, the anomaly analysis result is input into a preset anomaly resolution strategy determination model to determine the anomaly resolution strategy, and the compatible anomaly is resolved according to the anomaly resolution strategy;
[0044] If the analysis result of the necessity analysis of candidate selection is necessary, the corresponding candidate selection is carried out and applied.
[0045] Preferably, if the analysis result of the candidate selection necessity analysis is necessary, corresponding candidate selection is performed and applied, including:
[0046] Obtaining the basic support candidate node sequence and the platform service candidate node sequence;
[0047] Selecting a target basic support candidate node or a target platform service candidate node from the basic support candidate node sequence and the platform service candidate node sequence;
[0048] According to the target infrastructure support candidate node or the target platform service candidate node, the target infrastructure support or the target platform service is determined, and the corresponding application of autonomous and controllable technology is carried out in the GIL transmission line comprehensive monitoring system.
[0049] Preferably, selecting a target basic support candidate node or a target platform service candidate node from the basic support candidate node sequence and the platform service candidate node sequence includes:
[0050] Determine the first traversal path according to the sequence of candidate nodes of basic support and platform services;
[0051] Determine a candidate platform service provided by the platform service candidate node being traversed on the first traversal path;
[0052] Perform compatibility verification on basic support and candidate platform services, determine the first candidate platform service that passes compatibility verification, and use it as the target candidate platform service;
[0053] Obtaining a first difference value between the target candidate platform service and the platform service, and at the same time, determining a preset first difference value-impact value comparison library corresponding to the platform service, and determining the first impact value;
[0054] Determine a second traversal path based on the platform service and basic support candidate node sequence;
[0055] Determine a candidate basic support provided by a basic support candidate node being traversed on the second traversal path;
[0056] Perform compatibility verification on platform services and candidate basic supports, determine the first candidate basic support that passes compatibility verification, and use it as the target candidate basic support;
[0057] Obtaining a second difference value between the target candidate basic support and the basic support, and at the same time, determining a preset second difference value-influence value comparison library corresponding to the basic support to determine the second influence value;
[0058] If the first impact value is less than or equal to the second impact value, the platform service candidate node providing the target candidate platform service is used as the target platform service candidate node;
[0059] If the first influence value is greater than the second influence value, the basic support candidate node that provides the target candidate basic support is used as the target basic support candidate node;
[0060] The path range of the first traversal path is greater than that of the second traversal path.
[0061] An application system of the autonomous controllable technology in the GIL transmission line comprehensive monitoring system provided by the embodiment of the present invention includes:
[0062] The project requirement report acquisition subsystem is used to obtain the project requirement report of the target hydropower station;
[0063] The front-end data acquisition subsystem is used to determine the data acquisition interface in the GIL transmission line integrated monitoring system according to the project demand report, and to build an autonomous and controllable network transmission link to collect front-end data according to the data acquisition interface;
[0064] The basic support construction subsystem is used to build independent and controllable basic support according to the project demand report;
[0065] The platform service construction subsystem is used to build an autonomous and controllable platform service based on project demand reports;
[0066] The application subsystem is used to carry out corresponding applications of autonomous and controllable technologies in the GIL transmission line comprehensive monitoring system based on front-end collected data, basic support and platform services.
[0067] The beneficial effects of the present invention are:
[0068] The present invention determines the data acquisition interface and builds an autonomous and controllable network transmission link to collect front-end data based on the acquired project demand report of the target hydropower station. In addition, it builds autonomous and controllable basic support and platform services, and applies autonomous and controllable technology to the GIL power transmission line comprehensive monitoring system based on the front-end collected data, basic support and platform services, so as to realize autonomous control of infrastructure and underlying software, promote the process of domestic substitution of equipment control, improve the reliability and controllability of the GIL system, and make it safer.
[0069] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures specifically pointed out in the present application documents.
[0070] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0071] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0072] Figure 1 A schematic diagram of an application method of the autonomous controllable technology in the GIL power transmission line comprehensive monitoring system according to an embodiment of the present invention;
[0073] Figure 2 Schematic diagram of an application system of the autonomous controllable technology in the GIL transmission line comprehensive monitoring system in an embodiment of the present invention. DETAILED DESCRIPTION
[0074] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0075] The embodiment of the present invention provides an application method of the autonomous controllable technology in the GIL transmission line comprehensive monitoring system, such as Figure 1 As shown, including:
[0076] Step 1: Obtain the project demand report of the target hydropower station; the project demand report is: the project establishment report for the construction of the integrated monitoring system for the transmission lines of the target hydropower station, including: project background and objectives, project content and construction period, normative reference documents and technical requirements;
[0077] Step 2: According to the project demand report, determine the data acquisition interface in the GIL transmission line comprehensive monitoring system, and build an autonomous and controllable network transmission link to collect front-end data according to the data acquisition interface; GIL transmission line is: gas-insulated metal-enclosed transmission line; data acquisition interface is: data reading interface of contact sensor and data reading interface of dual-spectrum thermal imaging temperature measurement camera; autonomous and controllable network transmission link refers to the data transmission link that can realize autonomous management and control during the data transmission process of the GIL transmission line comprehensive monitoring system; front-end collected data is: multi-dimensional equipment parameters such as voiceprint data and visual data;
[0078] Step 3: Build an independent and controllable basic support according to the project demand report; the basic support includes: the demand for hardware equipment;
[0079] Step 4: Build an autonomous and controllable platform service based on the project requirements report; the platform service is: the required software configuration;
[0080] Step 5: Based on the front-end collected data, basic support and platform services, the corresponding application of autonomous and controllable technology is carried out in the GIL transmission line comprehensive monitoring system.
[0081] The working principle and beneficial effects of the above technical solution are:
[0082] This application determines the data acquisition interface and builds an autonomous and controllable network transmission link to collect front-end data based on the project demand report of the target hydropower station. In addition, it builds autonomous and controllable basic support and platform services, and applies autonomous and controllable technologies to the GIL transmission line comprehensive monitoring system based on the front-end collected data, basic support and platform services, to achieve autonomous control of infrastructure and underlying software, promote the process of domestic substitution of equipment control, improve the reliability and controllability of the GIL system, and at the same time, make it safer.
[0083] In one embodiment, step 1: obtaining a project requirement report of a target hydropower station includes:
[0084] Obtain the on-site investigation records of the target hydropower station; the target hydropower station is a hydropower station that needs to apply the autonomous and controllable technology of the GIL transmission line monitoring system; the on-site investigation records are the process records of the on-site investigation conducted by the staff before the project is established;
[0085] Analyze the on-site survey records and determine the survey information, which includes: GIL equipment information, site environment information and communication facility information; among which, GIL equipment information is: power equipment in gas-insulated metal-enclosed transmission lines; site environment information is: geographical information of the GIL equipment installation location; communication facility information is: communication equipment information and communication signal information at the GIL equipment installation location, etc.;
[0086] Obtaining a project demand report generation rule; wherein the project demand report generation rule is manually preset, for example: several contact voiceprint sensors are set in each air chamber;
[0087] Generate a project demand report based on the project demand report generation rules and survey information. The project demand report is a report that includes the construction requirements of the hydropower station.
[0088] The working principle and beneficial effects of the above technical solution are:
[0089] This application parses and obtains the on-site survey records of the target hydropower station to obtain on-site survey information. The project demand report generation rules are introduced, and the project demand report is generated according to the project demand report generation rules and survey information. The generation process of the project demand report is more accurate.
[0090] In one embodiment, step 2: according to the project requirement report, determine the data acquisition interface in the GIL transmission line integrated monitoring system, and build an autonomous and controllable network transmission link acquisition front end to collect data according to the data acquisition interface, including:
[0091] Based on semantic extraction technology, report semantics are generated according to the project requirement report; wherein the report semantics refers to the meaning, information or implications conveyed in the project requirement report;
[0092] Determine the data collection interface based on the report semantics;
[0093] Obtaining interface communication of the data acquisition interface; wherein the interface communication is: interface parameters of the data acquisition interface;
[0094] Build an autonomous and controllable network transmission link; the autonomous and controllable network transmission link includes: core communication layer, data aggregation layer, the backbone network uses a gigabit aggregation network structure, and the aggregation network uses a gigabit aggregation network structure;
[0095] The access interface communicates through the access switch in the autonomous and controllable network transmission link, and the front-end collected data is transmitted through the autonomous and controllable network transmission link.
[0096] The working principle and beneficial effects of the above technical solution are:
[0097] This application introduces semantic extraction technology to determine the report semantics corresponding to the project demand report. According to the report semantics, the data collection interface is determined. An autonomous and controllable network transmission link is built and the access switch is connected to the interface communication. The front-end collected data is transmitted through the autonomous and controllable network transmission link, which improves the security of data transmission and the data transmission speed is also higher.
[0098] In one embodiment, building an autonomous and controllable network transmission link includes:
[0099] Obtain the network design requirements of the autonomous and controllable network transmission link; the network design requirements are: where and what type of data collection interface needs to be connected;
[0100] According to the network design requirements, determine the overall architecture and topology of the autonomous and controllable network; the overall architecture includes: network equipment, control plane and management plane, etc.; the topology includes: the connection method and layout between each node and device in the network;
[0101] According to the overall architecture and topology, select switch devices that support autonomous controllable functions. Switch devices include: core switches, aggregation switches and access switches. Among them, core switches are switches located at the core of the network architecture; aggregation switches are switches located at the aggregation layer in the network architecture, connecting core switches and access switches; access switches are the access layer of the network architecture, connecting terminal devices (such as computers, IP phones, cameras, etc.) and aggregation switches.
[0102] Determine the configuration parameters of the switch equipment according to the network design requirements; the configuration parameters include: the configuration parameters of the core switch, the configuration parameters of the aggregation switch, the configuration parameters of the access switch, and the configuration parameters of the forward isolation device;
[0103] The configuration parameters of the core switch are as follows:
[0104] (1) To meet the requirements of independent control, recommended brands: Unisplendour, H3C, Huawei;
[0105] (2) Switching capacity ≥ 336 Gbps;
[0106] (3) Forwarding performance ≥ 154 Mpps;
[0107] (4) Provide proof that the CPU and forwarding chip are made in China, provide a letter of certification stamped by the CPU and forwarding chip manufacturers, and also provide chip certification documents issued by a third-party authoritative laboratory under the Ministry of Industry and Information Technology;
[0108] (5) Provide no less than 24*1G Gigabit SFP optical ports + 4*10G optical ports;
[0109] (6) Provide at least 1 expansion slot, supporting at least 4*10G interfaces;
[0110] Configuration parameters of the aggregation switch, specifically:
[0111] (1) To meet the requirements of independent control, recommended brands: Unisplendour, H3C, Huawei;
[0112] (2) Switching capacity ≥ 336 Gbps;
[0113] (3) Forwarding performance ≥ 154 Mpps;
[0114] (4) Provide proof that the CPU and forwarding chip are made in China, provide a letter of certification stamped by the CPU and forwarding chip manufacturers, and also provide chip certification documents issued by a third-party authoritative laboratory under the Ministry of Industry and Information Technology;
[0115] (5) Provide no less than 24*1G Gigabit SFP optical ports + 4*10G optical ports;
[0116] (6) Expanded support for no less than 4*10G interfaces;
[0117] Configuration parameters of the access switch, specifically:
[0118] (1) To meet the requirements of independent control, recommended brands: Unisplendour, H3C, Huawei;
[0119] (2) Provide no less than 24 Gigabit electrical ports;
[0120] Configuration parameters of the forward isolation device are:
[0121] (1) Network interface: 2 100 / 1000M interfaces for the external network, 2 100 / 1000M interfaces for the internal network, and 1 dual-machine hot standby 100 / 1000M interface (or multiplexed with the communication interface);
[0122] (2) Peripheral interface: no less than 2 terminal management interfaces (RS-232);
[0123] (3) Effective network throughput of data packets: greater than or equal to 446.382 Mbit / s;
[0124] (4) Log specification: meet the requirements of NARI Relay Protection's "Power Secondary System Safety Alarm Log Format Specification";
[0125] Perform corresponding configuration of the switch device according to the configuration parameters;
[0126] When all switch devices that need to be configured are configured, the construction of the autonomous and controllable network transmission link is completed.
[0127] The working principle and beneficial effects of the above technical solution are:
[0128] Based on the network design requirements obtained, this application determines the overall architecture and topology of the autonomous and controllable network, and selects core switches, aggregation switches, and access switches that support autonomous and controllable functions. According to the network design requirements, the configuration parameters of the switch equipment are determined and configured accordingly, which improves the rationality of the construction of the autonomous and controllable network transmission link.
[0129] In one embodiment, step 3: building an autonomous and controllable basic support according to the project requirement report, including:
[0130] According to the project requirements report, obtain the target resources required for basic support; the target resources are: hardware equipment parameters such as server parameters, storage device parameters and backup device parameters that meet the project requirements report, including: configuration parameters of instrument data acquisition unit, configuration parameters of thermal imaging temperature acquisition unit, configuration parameters of data storage device, configuration parameters of voiceprint sensor unit, configuration parameters of voiceprint signal acquisition unit, configuration parameters of application server configuration and configuration parameters of platform server;
[0131] Configuration parameters of the instrumentation data acquisition unit, including:
[0132] (1) High-definition, low-light, wide dynamic range camera with a pixel count of no less than 4 million; collects data such as video, images, and temperature;
[0133] (2) Using ≥1 / 1.8″ image sensor and built-in 2.8~12mm electric zoom lens;
[0134] (3) Minimum illumination: color ≤ 0.0005 lx, black and white ≤ 0.0001 lx, horizontal resolution ≥ 1400 lines, wide dynamic range 120 dB;
[0135] (4) H.265, H.264, MJPEG encoding, support for five streams, main stream image format 2688×1520@30fps;
[0136] (5) Supports enabling the visual content protection function for visual code streams that comply with the coding specifications in GB / T28181;
[0137] (6) DC12V / PoE power supply, protection grade IP67;
[0138] The configuration parameters of the thermal imaging temperature acquisition unit include:
[0139] (1) Visible light thermal imaging dual-spectrum camera, with a pixel of not less than 4 million; supporting the fusion display of thermal imaging vision and visible light vision;
[0140] (2) Thermal imaging: resolution not less than 256×192, focal length 3.2 mm;
[0141] (3) Visible light: no less than 2688×1520@30fps, focal length 4mm;
[0142] (4) Support high-precision temperature anomaly detection and linkage alarm, and the alarm image can be superimposed with temperature information;
[0143] (5) Temperature measurement range: -20℃~150℃, temperature measurement accuracy: ±2℃;
[0144] (6) DC12V / PoE power supply, protection level not less than IP67;
[0145] Configuration parameters of data storage devices, including:
[0146] (1) 4U height, 48 disk slots, all hard disks are placed horizontally and support front panel hot-swap maintenance, no less than 10 Gigabit network ports, 4 4x12Gbps MiniSASHD ports, 4 USB3.0 ports, 4 RS232 ports, 4 digital tube displays, 2 PCI-E3.0 slots, and the PCI-E3.0 slot can be expanded to a four-port 10 Gigabit network card;
[0147] (2) The system supports free switching between fully symmetric and asymmetric architectures, supports seamless expansion, and multi-tenant space deployment; in a fully symmetric architecture, there is no metadata server and it can be composed of pure data nodes (storage nodes). The minimum system networking configuration can be a single data node working independently, that is, a single node becomes a cloud, and can be expanded to a maximum of 4096 nodes;
[0148] (3) Supports direct writing of audio and video, pictures, structured information, files and other data to storage nodes in the form of stream direct storage or block direct storage, without the need to deploy a media server;
[0149] (4) Supports cross-resource pool migration. After migration, new video files are stored in the new resource pool, and the space in the original resource pool can be released;
[0150] (5) Storage services support cross-resource pool and cross-cluster protection. When the original resource pool or cluster fails, the service can be taken over by other resource pools or clusters. The switching time is less than 1s, and the video recording is not lost during the switching.
[0151] The configuration parameters of the voiceprint sensor unit include:
[0152] (1) Measurement range (peak): ±50g;
[0153] (2) Sensitivity (25°C): not less than 100mv / g;
[0154] (3) Frequency response: 0.1~20000Hz;
[0155] The configuration parameters of the voiceprint signal collection unit include:
[0156] (1) Input interface: BNC / LEMO or compatible multi-core push-pull connector;
[0157] (2) Frequency range: 10Hz~20kHz(±0.1dB);
[0158] (3) Sampling frequency: 16kHz~48kHz;
[0159] (4) Noise measurement range (with -26dB microphone): 126dB~30dB;
[0160] Configuration parameters for application server configuration, including:
[0161] (1) Brand requirements: meet the requirements of independent control, and the brand should not be lower than Sugon, Zhongke Controllable, or Super Fusion;
[0162] (2) CPU specifications: configured with no less than 2 domestic X86 architecture processors, with a main frequency of ≥ 2.2 GHz and a single CPU core number of ≥ 24;
[0163] (3) Memory: Configure no less than 128 GB DDR4 2933 RDIMM memory;
[0164] (4) Hard disk: configured with ≥2 600GB10KSAS hard disks and ≥60T data disks, supporting hot-swappable hard disk expansion;
[0165] (5) Disk array card: configure independent RAID0 / 1 / 5 / 6 / 50 / 60;
[0166] (6) I / O expansion: Total number of PCI-E I / O slots ≥ 12, supporting 4 double-width or 8 single-width GPU accelerator cards;
[0167] (7) Temperature: Supports working temperature of 5℃-40℃;
[0168] Configuration parameters of the platform server, including:
[0169] (1) Brand requirements: meet the requirements of independent control, recommended brands: Sugon, Zhongke Controllable, Super Fusion;
[0170] (2) CPU specifications: no less than 2 processors, main frequency ≥ 2.2 GHz, single CPU core number ≥ 20;
[0171] (3) Memory: no less than 64 GB DDR4 memory;
[0172] (4) Hard disk: no less than two 4TB hard disks;
[0173] (5) Network port: no less than 2 Gigabit network ports;
[0174] Based on the target resources, determine the hardware configuration of autonomous and controllable servers, storage devices, and backup devices.
[0175] The working principle and beneficial effects of the above technical solution are:
[0176] This application determines the hardware configuration of the target resources required for basic support based on the project requirements report, and the construction of basic support is more appropriate.
[0177] In one embodiment, step 4: building an autonomous and controllable platform service according to the project requirement report, including:
[0178] According to the project requirements report, obtain the service requirements of the comprehensive monitoring and early warning platform; the service requirements include: the functions that the comprehensive monitoring platform needs to achieve, such as: software development and testing, as well as multi-dimensional data monitoring, analysis and early warning, etc.;
[0179] Based on service requirements, determine the software configuration of the autonomous and controllable operating system, middleware and database; among which, the software configuration is: the configuration requirements of the operating system and database, including:
[0180] (1) Adopt an independent and controllable secure operating system. Recommended brands: Kylin, Tongxin, and Ningsi;
[0181] (2) It comes with an operating system security reinforcement package that meets the requirements of Level Protection 2.0;
[0182] (3) Support x86 / x86-64 / IA64 / PowerPC hardware architecture, compatible with mainstream hardware products such as Huawei, Sugon, Lenovo, and Inspur;
[0183] (4) Adopt domestic genuine databases, support databases such as DAMO, Huawei GaussDB, ZTE GoldenDB, and middleware such as WebSphere, WebLogic, JBoss, TongWeb, Kingdee Apusic, and InforWeb.
[0184] The working principle and beneficial effects of the above technical solution are:
[0185] This application determines the service requirements of the comprehensive monitoring and early warning platform based on the project requirements report, and determines the software configuration based on the service requirements, so that the determination of the software configuration is more reasonable.
[0186] In one embodiment, step 5: Based on the front-end collected data, basic support and platform services, corresponding applications of autonomous controllable technology are performed in the GIL transmission line integrated monitoring system, including:
[0187] According to the front-end collected data, basic support and platform services, simulated applications are performed to obtain simulated application results; wherein, simulated applications are: simulation and simulated operation are performed according to the front-end collected data, basic support and platform services; simulated application results are: the results of the above simulation or simulated operation;
[0188] Compatibility testing is performed based on the simulation application results. Compatibility testing includes: compatibility analysis of basic support and platform services;
[0189] If the compatibility test result is passed, the corresponding application of autonomous and controllable technology will be carried out in the GIL transmission line comprehensive monitoring system based on the front-end collected data, basic support and platform services;
[0190] If the compatibility test result is that the test fails, a compatibility exception analysis is performed to obtain the exception analysis result; wherein the compatibility exception analysis is: for the case where the compatibility test fails, the exception is analyzed and diagnosed to find out the cause and solution of the exception; the exception analysis result is: the process data of the exception analysis;
[0191] According to the abnormal analysis results, the necessity analysis of candidate selection is carried out; wherein the necessity analysis of candidate selection is: analyzing the abnormal analysis results to determine whether candidate selection is needed to solve the abnormal situation;
[0192] If the analysis result of the candidate selection necessity analysis is not necessary, the abnormality analysis result is input into the preset abnormality resolution strategy determination model to determine the abnormality resolution strategy, and the compatible abnormality is resolved according to the abnormality resolution strategy; wherein the preset abnormality resolution strategy determination model is: an intelligent model that replaces manual work to determine the resolution strategy for the compatible abnormality according to the abnormal situation; the abnormality resolution strategy is: a strategy and method for resolving the compatible abnormality;
[0193] If the analysis result of the necessity analysis of candidate selection is necessary, the corresponding candidate selection is carried out and applied.
[0194] The working principle and beneficial effects of the above technical solution are:
[0195] When applying autonomous and controllable technologies, you may face compatibility challenges with existing systems or components. There may be mismatches or conflicts between different hardware, software, and communication protocols, which require compatibility testing and verification. This application conducts simulation applications based on front-end collection data, basic support, and platform services, and performs compatibility testing on the simulation application results of the simulation application. If the compatibility test result is a pass, a GIL transmission line comprehensive monitoring platform is directly built based on the corresponding front-end collection data, basic support, and platform services; otherwise, a compatibility anomaly analysis is performed.
[0196] When performing compatibility anomaly analysis, determine whether it is necessary to select other software and hardware support nodes for corresponding technical support based on the anomaly analysis results of the compatibility anomaly analysis. If the above compatibility anomaly can be solved by simple adjustment, the analysis result of the candidate selection necessity analysis is not necessary, and the anomaly analysis result is input into the preset anomaly resolution strategy determination model to determine the anomaly resolution strategy and solve the corresponding compatibility anomaly problem. If the analysis result of the candidate selection necessity analysis is necessary, other software and hardware support nodes are selected as candidates for corresponding technical support, which improves the rationality and comprehensiveness of the application.
[0197] In one embodiment, if the analysis result of the candidate selection necessity analysis is necessary, corresponding candidate selection is performed and applied, including:
[0198] Obtain a basic support candidate node sequence and a platform service candidate node sequence; wherein, the basic support candidate node sequence is: a node sequence for providing candidate basic supports in the candidate selection stage, and the basic support candidate node sequence sorts the nodes according to the suitability of the provided candidate basic supports; the platform service candidate node sequence is: a node sequence for providing candidate platform services in the candidate selection stage, and the platform service candidate node sequence sorts the nodes according to the suitability of the provided platform services.
[0199] Selecting a target basic support candidate node or a target platform service candidate node from the basic support candidate node sequence and the platform service candidate node sequence; wherein the target basic support candidate node is: a node selected through the candidate selection process for providing the target basic support; the target platform service candidate node is: a node selected through the candidate selection process for providing the target platform service;
[0200] According to the target infrastructure support candidate node or the target platform service candidate node, the target infrastructure support or the target platform service is determined, and the corresponding application of autonomous and controllable technology is carried out in the GIL transmission line comprehensive monitoring system.
[0201] The working principle and beneficial effects of the above technical solution are:
[0202] After obtaining the basic support candidate node sequence and the platform service candidate node sequence, the present application selects the target basic support candidate node or the target platform service candidate node from the basic support candidate node sequence and the platform service candidate node sequence to determine the target basic support or target platform service for supplementation, and performs corresponding application, so that the application scope is wider.
[0203] In one embodiment, selecting a target basic support candidate node or a target platform service candidate node from a basic support candidate node sequence and a platform service candidate node sequence includes:
[0204] Determine a first traversal path according to the basic support and platform service candidate node sequence; wherein the first traversal path is: a path that traverses the platform service candidate nodes in the platform service candidate node sequence in sequence from beginning to end;
[0205] Determine a candidate platform service provided by the platform service candidate node being traversed on the first traversal path;
[0206] Perform compatibility verification on basic support and candidate platform services, determine the first candidate platform service that passes compatibility verification, and use it as the target candidate platform service;
[0207] Obtaining the first dissimilarity value between the target candidate platform service and the platform service, and at the same time, determining a preset first dissimilarity value-influence value comparison library corresponding to the platform service, and determining the first influence value; wherein the first dissimilarity value is: a quantitative representation of the degree of dissimilarity between the candidate platform service and the platform service; the first dissimilarity value-influence value comparison library includes a plurality of manually preset correspondences between the first dissimilarity values and the first influence values, and the larger the first influence value is, the less the corresponding candidate platform service meets the project requirements;
[0208] Determine a second traversal path according to the platform service and the basic support candidate node sequence; wherein the second traversal path is: a path that traverses the basic support candidate nodes in the basic support candidate node sequence from the beginning to the end in sequence;
[0209] Determine a candidate basic support provided by a basic support candidate node being traversed on the second traversal path;
[0210] Perform compatibility verification on platform services and candidate basic supports, determine the first candidate basic support that passes compatibility verification, and use it as the target candidate basic support;
[0211] The second dissimilarity value between the target candidate basic support and the basic support is obtained, and at the same time, a preset second dissimilarity value-influence value comparison library corresponding to the basic support is determined to determine the second influence value; wherein the second dissimilarity value is: a quantitative representation of the degree of dissimilarity between the candidate basic support and the basic support; the second dissimilarity value-influence value comparison library includes a correspondence between multiple manually preset second dissimilarity values and second influence values, and the smaller the second influence value, the more the corresponding basic support meets the project requirements;
[0212] If the first impact value is less than or equal to the second impact value, the platform service candidate node providing the target candidate platform service is used as the target platform service candidate node;
[0213] If the first influence value is greater than the second influence value, the basic support candidate node that provides the target candidate basic support is used as the target basic support candidate node;
[0214] The path range of the first traversal path is greater than that of the second traversal path.
[0215] The working principle and beneficial effects of the above technical solution are:
[0216] The present application determines the candidate platform service provided by the platform service candidate node being traversed on the first traversal path, performs compatibility verification on the basic support and the candidate platform service, determines the first candidate platform service that passes the compatibility verification, and uses it as the target candidate platform service. Next, the first difference value between the target candidate platform service and the platform service is obtained, and at the same time, a first difference value-impact value comparison library is introduced to determine the first impact value by comparison.
[0217] Based on the same principle, the second traversal path of the basic support candidate node is determined. It should be noted that the path range of the first traversal path is larger than the second traversal path. Due to the difficulty in obtaining hardware configuration, it is not as convenient as software configuration, so a larger tolerance is given to the platform service candidate node sequence. Then, according to the second difference value between the target candidate basic support and the basic support obtained and the second difference value-influence value comparison library introduced, the second influence value is determined. When the first influence value is less than or equal to the second influence value, the platform service candidate node that provides the target candidate platform service is used as the target platform service candidate node. Otherwise, the basic support candidate node that provides the target candidate basic support is used as the target basic support candidate node. When there is a compatibility exception, the appropriate target platform service candidate node or target basic support candidate node is adaptively selected to improve the rationality of the candidate.
[0218] The embodiment of the present invention provides an application system of autonomous controllable technology in a GIL transmission line comprehensive monitoring system, such as Figure 2 As shown, including:
[0219] A project requirement report acquisition subsystem 1 is used to acquire a project requirement report of a target hydropower station;
[0220] The front-end data acquisition subsystem 2 is used to determine the data acquisition interface in the GIL transmission line integrated monitoring system according to the project demand report, and to build an autonomous and controllable network transmission link to collect front-end data according to the data acquisition interface;
[0221] Basic support construction subsystem 3 is used to build independent and controllable basic support according to project demand report;
[0222] The platform service construction subsystem 4 is used to build an autonomous and controllable platform service according to the project demand report;
[0223] Application subsystem 5 is used to carry out corresponding application of autonomous and controllable technology in the GIL transmission line comprehensive monitoring system based on front-end collected data, basic support and platform services.
[0224] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. The application method of autonomous controllable technology in the GIL transmission line comprehensive monitoring system is characterized by: include: Step 1: Obtain the project requirements report of the target hydropower station; Step 2: According to the project requirements report, determine the data acquisition interface in the GIL transmission line comprehensive monitoring system, and build an autonomous and controllable network transmission link collection front-end to collect data based on the data acquisition interface; Step 3: Build independent and controllable basic support according to the project demand report; Step 4: Build an autonomous and controllable platform service based on the project requirements report; Step 5: Based on the front-end collected data, basic support and platform services, the corresponding application of autonomous and controllable technology is carried out in the GIL transmission line comprehensive monitoring system.
2. The method for applying the autonomous controllable technology in the GIL transmission line comprehensive monitoring system according to claim 1, characterized in that: Step 1: Obtain the project requirements report of the target hydropower station, including: Obtain on-site investigation records of the target hydropower station; Analyze on-site survey records and determine survey information, including: GIL equipment information, site environment information and communication facility information; Obtain project requirement report generation rules; Generate a project requirement report based on the project requirement report generation rules and survey information.
3. The method for applying the autonomous controllable technology in the GIL transmission line comprehensive monitoring system according to claim 1, characterized in that: Step 2: According to the project demand report, determine the data acquisition interface in the GIL transmission line comprehensive monitoring system, and build an autonomous and controllable network transmission link collection front-end to collect data based on the data acquisition interface, including: Based on semantic extraction technology, generate report semantics according to project demand report; Determine the data collection interface based on the report semantics; Get the interface communication of the data acquisition interface; Build an autonomous and controllable network transmission link; The access interface communicates through the access switch in the autonomous and controllable network transmission link, and the front-end collected data is transmitted through the autonomous and controllable network transmission link.
4. The method for applying the autonomous controllable technology in the GIL transmission line comprehensive monitoring system according to claim 3, characterized in that: Build an autonomous and controllable network transmission link, including: Obtain network design requirements for autonomous and controllable network transmission links; Determine the overall architecture and topology of the autonomous and controllable network based on network design requirements; According to the overall architecture and topology, select switch devices that support autonomous controllable functions. Switch devices include: core switches, aggregation switches, and access switches; Determine the configuration parameters of the switch equipment according to network design requirements; Perform corresponding configuration of the switch device according to the configuration parameters; When all switch devices that need to be configured are configured, the construction of the autonomous and controllable network transmission link is completed.
5. The method for applying the autonomous controllable technology in the GIL transmission line comprehensive monitoring system according to claim 1, characterized in that: Step 3: Build independent and controllable basic support according to the project requirements report, including: Obtain target resources required for basic support based on project requirements report; Based on the target resources, determine the hardware configuration of autonomous and controllable servers, storage devices, and backup devices.
6. The method for applying the autonomous controllable technology in the GIL transmission line comprehensive monitoring system according to claim 1, characterized in that: Step 4: Build an autonomous and controllable platform service based on the project requirements report, including: Obtain the service requirements of the comprehensive monitoring and early warning platform based on the project demand report; Based on service requirements, determine the software configuration of the autonomous and controllable operating system, middleware and database.
7. The method for applying the autonomous controllable technology in the GIL transmission line comprehensive monitoring system according to claim 1, characterized in that: Step 5: Based on the front-end collected data, basic support and platform services, the corresponding application of autonomous and controllable technologies in the GIL transmission line comprehensive monitoring system includes: Conduct simulation applications based on front-end collected data, basic support and platform services to obtain simulation application results; Conduct compatibility testing based on simulation application results; If the compatibility test result is passed, the corresponding application of autonomous and controllable technology will be carried out in the GIL transmission line comprehensive monitoring system based on the front-end collected data, basic support and platform services; If the compatibility test result is failure, a compatibility anomaly analysis is performed to obtain the anomaly analysis result; Conduct analysis on the necessity of candidate selection based on the abnormal analysis results; If the analysis result of the candidate selection necessity analysis is that it is not necessary, the anomaly analysis result is input into a preset anomaly resolution strategy determination model to determine the anomaly resolution strategy, and the compatible anomaly is resolved according to the anomaly resolution strategy; If the analysis result of the necessity analysis of candidate selection is necessary, the corresponding candidate selection is carried out and applied.
8. The method for applying the autonomous controllable technology in the GIL transmission line comprehensive monitoring system according to claim 7, characterized in that: If the result of the analysis of the necessity of candidate selection is necessary, the corresponding candidate selection will be carried out and applied, including: Obtaining the basic support candidate node sequence and the platform service candidate node sequence; Selecting a target basic support candidate node or a target platform service candidate node from the basic support candidate node sequence and the platform service candidate node sequence; According to the target infrastructure support candidate node or the target platform service candidate node, the target infrastructure support or the target platform service is determined, and the corresponding application of autonomous and controllable technology is carried out in the GIL transmission line comprehensive monitoring system.
9. The method for applying the autonomous controllable technology in the GIL transmission line comprehensive monitoring system according to claim 8, characterized in that: Selecting a target basic support candidate node or a target platform service candidate node from the basic support candidate node sequence and the platform service candidate node sequence includes: Determine the first traversal path according to the sequence of candidate nodes of basic support and platform services; Determine a candidate platform service provided by the platform service candidate node being traversed on the first traversal path; Perform compatibility verification on basic support and candidate platform services, determine the first candidate platform service that passes compatibility verification, and use it as the target candidate platform service; Obtaining a first difference value between the target candidate platform service and the platform service, and at the same time, determining a preset first difference value-impact value comparison library corresponding to the platform service, and determining the first impact value; Determine a second traversal path based on the platform service and basic support candidate node sequence; Determine a candidate basic support provided by a basic support candidate node being traversed on the second traversal path; Perform compatibility verification on platform services and candidate basic supports, determine the first candidate basic support that passes compatibility verification, and use it as the target candidate basic support; Obtaining a second difference value between the target candidate basic support and the basic support, and at the same time, determining a preset second difference value-influence value comparison library corresponding to the basic support to determine the second influence value; If the first impact value is less than or equal to the second impact value, the platform service candidate node providing the target candidate platform service is used as the target platform service candidate node; If the first influence value is greater than the second influence value, the basic support candidate node that provides the target candidate basic support is used as the target basic support candidate node; The path range of the first traversal path is greater than that of the second traversal path.
10. The application system of autonomous controllable technology in the comprehensive monitoring system of GIL transmission line is characterized by: include: The project requirement report acquisition subsystem is used to obtain the project requirement report of the target hydropower station; The front-end data acquisition subsystem is used to determine the data acquisition interface in the GIL transmission line integrated monitoring system according to the project demand report, and to build an autonomous and controllable network transmission link to collect front-end data according to the data acquisition interface; The basic support construction subsystem is used to build independent and controllable basic support according to the project demand report; The platform service construction subsystem is used to build an autonomous and controllable platform service based on project demand reports; The application subsystem is used to carry out corresponding applications of autonomous and controllable technologies in the GIL transmission line comprehensive monitoring system based on front-end collected data, basic support and platform services.
Citation Information
Patent Citations
Basic platform test method, test terminal, host and test system
CN115567422A
Hydropower station computer monitoring system configuration structure
CN217113063U
System and method for software program generation using genetic programming
US20230334335A1