Real stone paint closing-up method for glue line position of prefabricated wallboard

By hanging alkali-resistant fiberglass mesh cloth at the prefabricated wall panel glue joints and performing secondary glue, the problem of hollowing and falling off in the PC joints is solved, ensuring the firm adhesion of the real stone paint and putty. The risk of large-scale fall off is avoided and an excellent facade construction effect is achieved.

CN119243962AInactive Publication Date: 2025-01-03CHINA MCC5 GROUP CORP LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411519769.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-29
Publication Date
2025-01-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The real stone paint is prone to hollow-off at the glue joints of prefabricated wall panels, and it is difficult to effectively solve the problem of the existing technology. Especially when the PC joint error is large, the bonding performance of flexible putty and silicone is poor, resulting in the curling and falling off of the real stone paint.

Method used

Install alkali-resistant fiberglass mesh cloth at the PC seams of the prefabricated wall panels, and perform secondary glue after the construction of the real stone paint is completed. Press the mesh cloth into the newly polished glue to ensure that the real stone paint at the seam does not curl. The edges or hollows fall off.

Benefits of technology

By hanging alkali-resistant fiberglass mesh cloth at the glue joints of prefabricated wall panels and performing secondary glue, the hollowing of the real stone paint is effectively avoided, ensuring the firm adhesion of the real stone paint and putty on the two sides of the glue joints is reduced. The impact of uniform settlement on the glue joints has achieved an excellent facade construction effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119243962A_ABST
    Figure CN119243962A_ABST
Patent Text Reader

Abstract

The invention discloses a real stone paint closing-up method for a glue line position of a prefabricated wallboard. The method comprises the steps that the prefabricated wallboard is installed, so that a PC seam and a real stone paint dividing seam are the same; the PC seam of the prefabricated wallboard is checked, and if the error of the PC seam is too large, the PC seam is cut and repaired to reduce the error of the PC seam; gluing is conducted on the PC seam; alkali-resisting glass fiber gridding cloth is hung at the glue line position; masking paper is pasted at the dividing joint position of the real stone paint; flexible putty is scraped on the outer side of the prefabricated wall panel in batches, and then real stone paint is sprayed; after the real stone paint construction is completed, the masking paper at the glue seam position is torn off; cutting off the alkali-resistant glass fiber gridding cloth at the glue seam position; and secondary gluing is carried out on the glue line position, and the alkali-resisting glass fiber gridding cloth is pressed into newly-glued glue. According to the real stone paint closing-up method for the glue line position of the prefabricated wall panel, operation is easy, the process can ensure that real stone paint and putty on the two sides of the glue line are firmly pasted, hollowing and falling of the real stone paint can be avoided, and the application prospect is good.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building decoration construction, in particular to a method for closing a prefabricated wall panel glue joint with real stone paint, and in particular to a method for closing a prefabricated wall panel glue joint with real stone paint, which is simple to operate and not prone to hollowing and falling of the real stone paint. Background Art

[0002] Real stone paint is a kind of paint with decorative effect similar to marble and granite. It is mainly made of natural stone powder of various colors. It is applied to the imitation stone effect of building exterior walls, so it is also called liquid stone. At present, prefabricated wall panels are mostly used as exterior wall surfaces as decorative panels, and real stone paint is applied on the decorative panels to achieve the imitation stone effect. The real stone paint on the exterior wall of prefabricated wall panels mostly uses a full batch of putty to cover the PC seams, and the real stone paint splits the seams and re-divides them. This operation has the following problems: the real stone paint at the PC seam position bulges over time, and even falls off. Except for some projects, the PC seams are open seams. Generally, the width of the PC glue seam is 2cm. However, due to the errors of components and hoisting, the glue seam may reach 3~5cm in order to correct the deviation. If the putty is directly scraped and the real stone paint is sprayed, the flexible putty and silicone cannot be effectively bonded. The real stone paint on both sides of the glue seam is likely to warp and fall off. The mutual adhesion performance of putty and glue seams is poor, which is easy to cause hollowing and falling off.

[0003] Therefore, it is of great practical significance to develop a method for sealing the glue joints of prefabricated wall panels with real stone paint, which is simple to operate and not prone to hollowing and falling of real stone paint. Summary of the invention

[0004] Due to the above defects in the prior art, the present invention provides a method for closing the real stone paint at the glue seams of prefabricated wall panels which is simple to operate and not prone to hollowing and falling of the real stone paint, thereby overcoming the defect that the real stone paint is prone to hollowing and falling at the glue seams of prefabricated wall panels.

[0005] In order to achieve the above object, the present invention provides the following technical solutions:

[0006] A method for closing the glue joints of prefabricated wall panels with real stone paint, comprising the following steps:

[0007] (1) Install prefabricated wall panels so that the PC seams and the natural stone paint partition seams are the same;

[0008] (2) Check the PC seams of the prefabricated wall panels. If the PC seam error is too large, cut and repair the PC seams to reduce the PC seam error. Gluing cannot achieve a large range of correction.

[0009] (3) Apply glue to the PC seams;

[0010] (4) Hang alkali-resistant glass fiber mesh cloth at the glue seam;

[0011] (5) Paste masking tape on the joints of the real stone paint;

[0012] (6) Apply flexible putty on the outside of the prefabricated wall panels and then spray real stone paint;

[0013] (7) After the real stone paint is applied, tear off the masking tape at the glue joint;

[0014] (8) Cut off the alkali-resistant glass fiber mesh cloth at the glue seam position;

[0015] (9) Apply glue to the glue joint for the second time and press the alkali-resistant glass fiber mesh cloth into the newly applied glue to prevent the real stone paint at the seam edge from curling, hollowing or falling off.

[0016] The second application of glue will cover the flexible putty and the first application of glue with the alkali-resistant glass fiber mesh cloth hung on it, which can effectively solve the problem of hollowing and falling of real stone paint at the glue seam.

[0017] The method for sealing the natural stone paint at the glue joint of a prefabricated wall panel disclosed by the present invention is simple to operate, and glue is applied once before the construction of the exterior wall decoration layer, and an alkali-resistant glass fiber mesh cloth is hung at the glue joint. After the paint surface construction is completed, the alkali-resistant glass fiber mesh cloth is cut off and glue is applied again. The presence of the alkali-resistant glass fiber mesh cloth can ensure that the natural stone paint and putty on both sides of the glue joint are firmly adhered, and can prevent the natural stone paint from hollowing and falling off. The operation of cutting off the alkali-resistant glass fiber mesh cloth can prevent the alkali-resistant glass fiber mesh cloth from shrinking and contracting synchronously with other parts and causing the natural stone paint to fall off, and reduce the influence of uneven settlement on the glue joint, and the application prospect is good.

[0018] As the preferred technical solution:

[0019] As described above, a method for finishing the glue joints of prefabricated wall panels with real stone paint, the excessive error of the PC joint means that the width of the PC joint is ≥2.5cm. Of course, those skilled in the art can set the error of the PC joint according to actual needs. Only a feasible technical solution is given here, and the width of the exposed glue joint can be adjusted appropriately.

[0020] In the method for applying real stone paint to glue joints of prefabricated wall panels as described above, the requirement for applying glue in step (3) is that the glue joints are straight up and down and left and right.

[0021] As described above, in a method for closing the glue joint of a prefabricated wall panel with real stone paint, when hanging the alkali-resistant glass fiber mesh cloth, both sides of the alkali-resistant glass fiber mesh cloth are hung on two prefabricated wall panels on both sides of the glue joint and the alkali-resistant glass fiber mesh cloth completely covers the glue joint.

[0022] In the method for closing the glue joint of a prefabricated wall panel with real stone paint as described above, the cutting of the alkali-resistant glass fiber mesh cloth at the glue joint refers to cutting the alkali-resistant glass fiber mesh cloth at the glue joint along the length direction of the glue joint.

[0023] In the method for closing the glue joints of prefabricated wall panels with real stone paint as described above, the width of the alkali-resistant glass fiber mesh cloth is 300 mm.

[0024] The above technical solution is only a feasible technical solution of the present invention, and the protection scope of the present invention is not limited thereto. Those skilled in the art can reasonably adjust the specific design according to actual needs.

[0025] The above invention has the following advantages or beneficial effects:

[0026] (1) The method for closing the glue joint of the prefabricated wall panel with real stone paint is simple to operate. Before the construction of the exterior wall decoration layer, glue is applied once, and an alkali-resistant glass fiber mesh cloth is hung at the glue joint. After the paint surface construction is completed, the alkali-resistant glass fiber mesh cloth is cut off and glue is applied again. The presence of the alkali-resistant glass fiber mesh cloth can ensure that the real stone paint and putty on both sides of the glue joint are firmly adhered, and can prevent the real stone paint from falling off due to hollowing;

[0027] (2) The method for closing the natural stone paint at the glue joint of the prefabricated wall panel of the present invention can prevent the alkali-resistant glass fiber mesh cloth from shrinking asynchronously with other parts and causing the natural stone paint to fall off, and reduce the influence of uneven settlement on the glue joint;

[0028] (3) The method for closing the glue joint of the prefabricated wall panel with natural stone paint of the present invention makes it easier to repair the PC joint and the natural stone paint joint at the same time;

[0029] (4) The method for finishing the glue joints of prefabricated wall panels with real stone paint of the present invention can achieve one-time perfection, avoid the risk of large-scale hollowing and falling off of the facade, and has good application prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] The present invention and its features, appearance and advantages will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings. The same reference numerals indicate the same parts in all the drawings. The drawings are not drawn to scale, and emphasis is placed on illustrating the subject matter of the present invention.

[0031] Figure 1 This is the construction plan of the glue joint position of the prefabricated wall panel;

[0032] Among them, 1 is the prefabricated wall panel, 2 is the PC glue seam, 3 is the secondary glue seam, and 4 is the alkali-resistant glass fiber mesh cloth. DETAILED DESCRIPTION

[0033] The structure of the present invention is further described below in conjunction with the accompanying drawings and specific embodiments, but is not intended to limit the present invention.

[0034] Example 1

[0035] A method for closing the glue joints of prefabricated wall panels with real stone paint, comprising the following steps:

[0036] (1) Install the prefabricated wall panel 1 so that the PC seam and the natural stone paint partition seam are the same;

[0037] (2) Check the PC seam of the prefabricated wall panel 1. If the PC seam error is too large (the width of the PC seam is ≥ 2.5 cm), cut and repair the PC seam to reduce the PC seam error;

[0038] (3) Glue the PC seam, i.e., PC glue seam 2. The gluing requirements are: the glue seam should be straight up and down and left and right;

[0039] (4) Hang a 300 mm wide alkali-resistant glass fiber mesh cloth 4 at the PC glue seam 2. Both sides of the alkali-resistant glass fiber mesh cloth 4 are hung on the two prefabricated wall panels 1 on both sides of the PC glue seam 2, and the alkali-resistant glass fiber mesh cloth 4 completely covers the PC glue seam 2;

[0040] (5) Paste masking tape on the joints of the real stone paint;

[0041] (6) Applying flexible putty on the outer side of the prefabricated wall panel 1 and then spraying real stone paint;

[0042] (7) After the real stone paint is applied, tear off the masking tape at the glue joint;

[0043] (8) Cut the alkali-resistant glass fiber mesh cloth 4 at the position of the PC glue seam 2 along the length direction of the PC glue seam 2;

[0044] (9) Apply glue to the PC glue joint 2 for the second time (i.e., the second glue joint 3). Press the alkali-resistant glass fiber mesh cloth 4 into the newly applied glue (i.e., the second glue joint 3). At this time, the construction plan of the glue joint position of the prefabricated wall panel is as follows: Figure 1 shown.

[0045] The above-mentioned method of applying real stone paint to the glue joints of prefabricated wall panels has been actually applied during the construction of the fifth phase of the Nicheng resettlement housing project, with good results.

[0046] It has been verified that the method for closing the natural stone paint at the glue joint of the prefabricated wall panel of the present invention is simple to operate, and glue is applied once before the construction of the exterior wall decoration layer, and an alkali-resistant glass fiber mesh cloth is hung at the glue joint. After the paint surface construction is completed, the alkali-resistant glass fiber mesh cloth is cut off for a second glue application. The presence of the alkali-resistant glass fiber mesh cloth can ensure the firm adhesion of the natural stone paint and putty on both sides of the glue joint, and can prevent the natural stone paint from hollowing out and falling off; the operation of cutting off the alkali-resistant glass fiber mesh cloth can prevent the alkali-resistant glass fiber mesh cloth from shrinking and contracting synchronously with other parts and causing the natural stone paint to fall off, and reduce the influence of uneven settlement on the glue joint; it is relatively easy to repair the PC joint and the natural stone paint joint at the same time; it can achieve one-time excellence, avoid the risk of large-area hollowing and falling off on the facade, and has good application prospects.

[0047] Those skilled in the art should understand that those skilled in the art can implement variations by combining the prior art and the above embodiments, which will not be described in detail here. Such variations do not affect the essential content of the present invention, and will not be described in detail here.

[0048] The above describes the preferred embodiments of the present invention. It should be understood that the present invention is not limited to the above-mentioned specific embodiments, and the devices and structures that are not described in detail should be understood to be implemented in a common manner in the art; any technician familiar with the art can use the above-disclosed methods and technical contents to make many possible changes and modifications to the technical solutions of the present invention without departing from the scope of the technical solutions of the present invention, or modify them into equivalent embodiments of equivalent changes, which does not affect the essential content of the present invention. Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solutions of the present invention are still within the scope of protection of the technical solutions of the present invention.

Claims

1. A method for closing the glue joints of prefabricated wall panels with real stone paint, characterized in that: The following steps are involved: (1) Install prefabricated wall panels so that the PC seams and the natural stone paint partition seams are the same; (2) Check the PC seams of prefabricated wall panels. If the PC seam error is too large, cut and repair the PC seams to reduce the PC seam error; (3) Apply glue to the PC seams; (4) Hang alkali-resistant glass fiber mesh cloth at the glue seam; (5) Paste masking tape on the joints of the real stone paint; (6) Apply flexible putty on the outside of the prefabricated wall panels and then spray real stone paint; (7) After the real stone paint is applied, tear off the masking tape at the glue joint; (8) Cut off the alkali-resistant glass fiber mesh cloth at the glue seam position; (9) Apply glue to the glue joint for the second time and press the alkali-resistant glass fiber mesh cloth into the newly applied glue.

2. A method for closing the glue joints of prefabricated wall panels with real stone paint according to claim 1, characterized in that: The PC seam error is too large means that the width of the PC seam is ≥ 2.5 cm.

3. A method for closing the glue joints of prefabricated wall panels with real stone paint according to claim 1, characterized in that: The requirement for gluing in step (3) is that the glue seam should be straight vertically and horizontally.

4. A method for closing the glue joints of prefabricated wall panels with real stone paint according to claim 1, characterized in that: When hanging the alkali-resistant glass fiber mesh cloth, both sides of the alkali-resistant glass fiber mesh cloth are hung on the two prefabricated wall panels on both sides of the glue joint and the alkali-resistant glass fiber mesh cloth completely covers the glue joint.

5. The method for closing the glue joints of prefabricated wall panels with real stone paint according to claim 1, characterized in that: The alkali-resistant glass fiber mesh cloth at the glue seam position cut-off refers to the alkali-resistant glass fiber mesh cloth at the glue seam position cut-off along the length direction of the glue seam.

6. A method for closing the glue joints of prefabricated wall panels with real stone paint according to claim 2, characterized in that: The width of the alkali-resistant glass fiber mesh cloth is 300 mm.

Citation Information

Patent Citations

  • Construction method of extruded polystyrene foamed plastic insulation boards in house energy-saving materials

    CN102561685A

  • Real stone paint construction process

    CN104775575A

  • Construction method of post-built wall and formwork protecting integrated plate

    CN115182470A

  • Plasterboard wall panel seam batch coating system and method

    CN117627393A

  • Construction method for external wall panel joint of prefabricated sandwich heat-preservation shear wall

    CN118087719A