Portable dust-raising-preventing water conservancy and hydropower engineering investigation drilling machine
By designing protective cartridges, lifting mechanisms and blowing mechanisms on the survey drilling rig of water conservancy and hydropower engineering, the dust problem when drilling into the soil is solved, and effective protection of survey personnel and improvement of the working environment is achieved.
Patent Information
- Application Number
- CN202411382472.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2025-01-03
AI Technical Summary
During the survey of water conservancy and hydropower engineering, the dust generated by the drilling rig when drilling into the soil is easily scraped into the face, eyes, nose and mouth of the surveyor, seriously affecting the user experience of the operator and causing damage. The existing technology has not effectively solved this question.
A portable dust-proof water conservancy and hydropower engineering survey drilling rig was designed, using protective cartridges, lifting mechanisms, downward mechanisms and blowing mechanisms. The protective cartridges cover the surface of the soil layer to block dust. The downward mechanism ensures that the protective cartridges and soil layer are bonded. The blower mechanism provides cleaning rings and airflow to clean the drill rod and achieve effective protection against dust.
It effectively prevents dust from overflowing, protects the health of survey personnel, improves the safety and portability of the working environment, and reduces the use of power sources, making it easier to carry and use the equipment.
Smart Images

Figure CN119244146A_ABST
Abstract
Description
Technical Field
[0001] The invention discloses a portable dust-proof water conservancy and hydropower engineering survey drill rig, which relates to the field of survey drill rig equipment. Background Art
[0002] Survey drilling rigs are an indispensable and important equipment in the construction of water conservancy and hydropower projects. In the practice of water conservancy and hydropower projects, they are widely used in the survey operations of reservoirs, hydropower stations, embankments, river management and other projects. At this stage, many survey drilling rig technologies have also emerged.
[0003] The utility model patent "A Portable Geological Exploration Drilling Rig" with application number 202222233158.6 provides a solution to the problem that traditional exploration drilling rigs are bulky, inconvenient to move and carry. The exploration drilling rig includes an outer cylinder, a sliding box, a support leg assembly and a lifting and adjusting assembly; the outer cylinder: the left and right inner walls are provided with slide grooves, the left and right outer sides of the sliding box are provided with dovetail sliders, and the dovetail sliders are respectively slidably connected with the adjacent inner walls of the slide grooves, and the upper surface of the bottom plate of the sliding box is provided with a motor, the output shaft of the motor passes through the through hole set in the bottom plate of the sliding box, and the lower end of the output shaft of the motor is provided with a drill rod, and the lower end of the side wall of the outer cylinder is rotatably connected with a support leg; the support leg assembly: rotatably connected to the lower end of the support leg; the lifting and adjusting assembly: rotatably connected to the lower end of the front side wall of the outer cylinder, and the lifting and adjusting assembly is fixedly connected to the front side of the sliding box; the portable geological exploration drilling rig can not only reduce the vibration of the drill rod during drilling and reduce the labor of personnel, but also can be folded for easy carrying.
[0004] In order to further improve the portability of the exploration drilling rig, the utility model patent "A portable drilling rig for geological exploration" with application number 202323451768.4 provides a solution. The drilling rig includes a box body, a portable component and a lifting and fixing component, wherein the portable component includes a plurality of fixed blocks arranged at one end of the box body, and two shoulder straps are arranged at one end of the plurality of fixed blocks. Connecting blocks are arranged at both edges of one end of the box body, and connecting belts are arranged on one side of the two connecting blocks, and a Japanese-shaped buckle is arranged on one side of one of the connecting belts. Through the above design, when carrying it, the user can carry the drilling rig on the back through the shoulder strap, and use one of the connecting belts to penetrate the Japanese-shaped buckle and tie it to the Japanese-shaped buckle, so that the connecting belt can be further bound to the user's waist during use, so that the user can carry the drilling rig on his back without shaking when moving, and can carry the drilling rig more tightly, thereby achieving more convenient portability and further improving portability.
[0005] The above technical solutions are all technical advances in terms of portability. However, when the drill rod of the drilling rig drills into the soil, a large amount of dust may be generated. In windy weather, the dust is easily blown into the face, eyes, nose and mouth of the surveyor with the airflow, seriously affecting the user experience of the operator and even causing injury. Summary of the invention
[0006] In view of the above problems, the present invention designs a portable dust-proof water conservancy and hydropower engineering survey drilling rig, which, while maintaining portability, aims to solve the technical problem of easily generating dust when drilling into the soil layer.
[0007] The object of the present invention is achieved in that:
[0008] A portable dust-proof water conservancy and hydropower engineering survey drilling rig, comprising a protective cylinder, a first motor, a control box, a filter screen, a grip, a fixed plate, a drill rod, a lifting mechanism, a movable plate, a blower mechanism, an insert cylinder and a pressing mechanism;
[0009] The top of the protective tube is closed and the bottom is open; a lifting mechanism is arranged inside the protective tube, the lifting mechanism is connected to a movable disk, and the top of the drill rod is rotatably connected to the middle of the movable disk; a first motor is fixedly mounted on the outer wall of the top of the protective tube, and the first motor is used to drive the drill rod to rotate;
[0010] A control box is fixedly mounted on the outer wall of the protective tube; handles are fixedly connected to both sides of the top of the protective tube; a through slot is opened on the wall of the protective tube and is located below the fixed plate, and a filter screen is installed in the through slot;
[0011] The bottom end of the protective tube is provided with a bottom circular groove, the insert tube is connected to the bottom circular groove, and the bottom end of the insert tube is provided with a bottom blade; a downward pressing mechanism for driving the insert tube to move downward and upward to reset is provided in the protective tube, and the downward pressing mechanism is connected to the first motor;
[0012] The blower mechanism is connected with a cleaning ring, which is arranged at the middle of the bottom end of the protective tube, and the cleaning ring is coaxially arranged with the drill rod.
[0013] In this technical solution, the protective tube is used for shielding and protection, and the insertion tube is inserted into the soil layer to avoid the soil depression at the bottom of the protective tube, which causes dust overflow and improves the effect of shielding and dust prevention; the handle makes it convenient to hold and carry the entire device.
[0014] The above-mentioned portable dust-proof water conservancy and hydropower engineering survey drilling rig, the lifting mechanism includes a protective shell, a first screw, a first nut, a guide bar and a second motor; the protective shell is fixedly connected to the inner wall of the protective cylinder, and a guide groove is opened on one side of the protective shell, the guide groove is slidably connected with the guide bar, one end of the guide bar is fixedly connected to the movable disk, and the other end of the guide bar is fixedly connected to the first nut located in the protective shell, the first screw is rotatably installed in the protective shell, the first nut is threadedly connected to the first screw, one end of the first screw is fixedly connected to the output shaft end of the second motor, and the second motor is fixedly connected to the outer wall of one end of the protective shell.
[0015] In this technical solution, the lifting mechanism is used to drive the movable plate to move up and down, thereby driving the drill rod to move up and down.
[0016] The above-mentioned portable dust-proof water conservancy and hydropower engineering survey drilling rig, the pressing mechanism comprises a second screw, a second nut, a pressure plate, a guide part, a pressure strip and a second spring; one end of the second screw is fixedly connected to the output shaft end of the first motor, the second nut is threadedly connected to the second screw, the middle part of the pressure plate is provided with a middle hole, the second nut is fixedly embedded in the middle hole on the pressure plate, one side of the pressure plate is provided with an embedding groove, the embedding groove is connected with the guide part, the pressure strip is matched with the vertical groove opened in the wall of the protective cylinder, and the vertical groove is connected with the bottom circular groove, the bottom end of the pressure strip is fixedly connected to the top of the insertion cylinder, the top end of the pressure strip is bent at ° toward the axial direction of the protective cylinder, and the bent part of the pressure strip is slidably connected with the side groove opened on the inner wall of the protective cylinder, and the side groove is connected with the vertical groove, the top of the pressure strip is elastically connected to the top end surface of the vertical groove by the second spring, and the bent part of the pressure strip is in contact with the bottom surface of the pressure plate.
[0017] In this technical solution, the pressing mechanism is used to drive the insert tube to be inserted into the soil layer.
[0018] The guide part can move left and right, and includes a guide rod, a positioning column and a first spring; the guide rod passes through the embedded groove, and at least one positioning column is fixedly connected to one side of the guide rod, the positioning column is matched and connected with a positioning hole opened on the inner wall of the protective tube, the first spring is sleeved on the positioning column, and the guide rod is elastically connected to the inner wall of the protective tube through the first spring.
[0019] In the present technical solution, the guide part is designed to be movable left and right, so as to release or re-establish the connection between the pressing mechanism and the first motor.
[0020] The bottom end of the guide rod is fixedly connected with a second permanent magnet, the second permanent magnet is magnetically connected with the first permanent magnet, the first permanent magnet is fixedly connected with a support frame, and the support frame is fixedly connected to the top surface of the movable disk.
[0021] In the present technical solution, the magnetic attraction of the first permanent magnet and the second permanent magnet provides power for the left and right movement of the guide part, and the approach or separation of the two is achieved by the lifting and lowering movement of the movable plate, so that the left and right movement of the guide part does not require manual operation and does not require an additional power source.
[0022] A fixed plate is fixedly installed inside the protective tube, and a groove is provided on the fixed plate for the guide rod to pass through; the second screw is rotatably connected to the middle part of the fixed plate, and a prism is fixedly connected to the bottom end of the second screw, a hole with a top opening is provided at the axis of the drill rod, and the prism is cooperatively connected to the hole.
[0023] In the technical solution, a telescopic structure is formed between the prism and the hole body to ensure that the drill rod is always connected to the prism during the lifting and lowering process and can rotate with the rotation of the prism.
[0024] The portable dust-proof water conservancy and hydropower engineering survey drilling rig mentioned above, the blowing mechanism includes a first cylinder fixedly mounted on the top surface of a movable disk, a first corrugated airbag, a second cylinder fixedly mounted on the bottom surface of a fixed disk, a second corrugated airbag and an air pipe, the movable disk is provided with a through hole aligned with the first cylinder, the top end of the first corrugated airbag passes through the through hole, and the top end of the first corrugated airbag extends into the first cylinder, a first inner plate is fixedly mounted in the first cylinder, the top end of the first corrugated airbag is fixedly connected to the bottom surface of the first inner plate, a first one-way valve is installed on the top end of the first corrugated airbag, the first one-way valve is connected to a first air inlet pipe, and the end of the first air inlet pipe away from the first one-way valve is located in a protective tube; the bottom end of the first corrugated airbag is fixedly connected to a base frame, the base frame is fixedly connected to the inner wall of the bottom end of the protective tube, the first corrugated A fourth one-way valve is installed at the bottom end of the airbag, the bottom end of the second corrugated airbag is fixedly connected to the top surface of the movable disk, and the top end of the second corrugated airbag extends into the second cylinder, a second inner plate is fixedly installed in the second cylinder, the top end of the second corrugated airbag is fixedly connected to the bottom surface of the second inner plate, the top end of the second corrugated airbag is connected to the second air inlet pipe and the third one-way valve, the second air inlet pipe is connected to the second one-way valve located in the protective cylinder; filters are installed at one end of the first air inlet pipe away from the first one-way valve and the second one-way valve, the third one-way valve is connected to one end of the air supply pipe, the air supply pipe is fixed to the inner wall of the protective cylinder, and one end of the air supply pipe away from the third one-way valve is connected to the fourth one-way valve, the first air outlet pipe and the second air outlet pipe are fixed to the pipe wall of the air supply pipe, the first air outlet pipe and the second air outlet pipe are both connected to the air supply pipe.
[0025] In the present technical solution, the hair blowing mechanism is used to generate an outlet air flow.
[0026] The first air outlet pipe is fixedly connected to a connecting pipe, and the connecting pipe is fixedly connected to the protective shell.
[0027] In the technical solution, the blowing airflow of the blowing mechanism flows into the protective shell, so as to form a positive pressure, reduce the dust in the protective shell from entering the lifting mechanism, and play a protective role.
[0028] The second air outlet pipe is fixedly connected to the cleaning ring, and a circular groove connected to the second air outlet pipe is arranged inside the cleaning ring; a circular air blowing port is arranged on the inner wall of the cleaning ring, and the air blowing port is connected to the circular groove; a connecting frame is fixedly connected to one side of the cleaning ring, and one end of the connecting frame is fixedly connected to the inner wall of the protective tube.
[0029] In this technical solution, the blowing airflow of the blowing mechanism flows into the cleaning ring, and the cleaning ring is used to clean the drill rod.
[0030] The portable dust-proof water conservancy and hydropower engineering survey drilling rig of the present invention has the following beneficial effects:
[0031] First, the entire drilling rig is stored in a protective cylinder after use. The cylindrical design makes it easy to carry on the body, and the handle is designed to facilitate carrying.
[0032] Second, by setting up the protective tube, the bottom port of the protective tube covers the surface of the soil layer, and the protective tube and the surface of the soil layer form a closed construction space. When the drill rod is drilling into the soil layer, the dust generated is blocked inside the protective tube, preventing the dust from overflowing and harming the surveyors;
[0033] Third, through the setting of the downward pressure mechanism and the inserting tube, after the protective tube is placed on the soil layer, the downward pressure mechanism drives the inserting tube downward, so that the bottom of the inserting tube is inserted into the soil layer through the bottom blade, which provides fixation for the protective tube and is suitable for use as a protective shield at the position of the ground potholes, so as to avoid the poor fit between the bottom of the protective tube and the soil layer in the case of the ground potholes, and the soil depressions and the bottom of the protective tube cannot fit together, forming a gap, and causing dust overflow;
[0034] Fourth, the first motor is used to drive the drill rod to rotate, and the first motor can also provide drive for the pressing mechanism, so that the pressing mechanism does not need to be equipped with an additional power source, reducing the use of the power source, and the pressing mechanism is provided with a guide part that can move left and right. By moving the guide part left and right, it enters or leaves the embedded groove to establish or release the driving connection between the first motor and the pressing mechanism. After the pressing mechanism moves the insert tube into place, the connection can be released, so that the first motor can provide drive for the drill rod alone, which is convenient to use as a whole; at the same time, the left and right movement of the guide part is powered by the magnetic attraction of the first permanent magnet and the second permanent magnet and the elastic force of the first spring, so that when the pressing mechanism releases the driving connection with the first motor or reconnects, there is no need for manual operation, and the drill rod can be driven to move by moving the movable disk up and down;
[0035] Fifth, by setting up the blower mechanism and the cleaning ring, the drill rod is provided with blowing cleaning when it leaves the ground, so as to remove the dirt attached to the surface and avoid subsequent manual cleaning. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a schematic diagram of the overall external structure of the portable dust-proof water conservancy and hydropower engineering survey drilling rig of the present invention.
[0037] Figure 2 Schematic diagram of the structure inside the protective tube.
[0038] Figure 3 It is a schematic diagram of the overall cross-sectional structure of the portable dust-proof water conservancy and hydropower engineering survey drill rig of the present invention.
[0039] Figure 4 It is a schematic diagram of the structure on the pressing mechanism and the movable plate.
[0040] Figure 5 for Figure 4 Schematic diagram of the structure with the A part in the middle enlarged.
[0041] Figure 6 It is a schematic diagram of the connection structure between the drill rod and the second screw rod.
[0042] Figure 7 It is a structural diagram of the lifting mechanism.
[0043] Figure 8 It is a structural schematic diagram of the upper part of the hair dryer.
[0044] Fig. 9 It is a schematic diagram of the structure of the lower part of the hair dryer.
[0045] Fig.10 Schematic diagram of the structure inside the cleaning ring.
[0046] Description of Reference Numerals
[0047] 1. Protective tube; 101. Bottom circular groove; 102. Vertical groove; 103. Side groove; 104. Through groove;
[0048] 2. The first motor;
[0049] 3. Control box;
[0050] 4. Filter;
[0051] 5. Grip;
[0052] 6. fixed plate; 601. tank body;
[0053] 7. Drill rod; 701. Hole body;
[0054] 8. lifting mechanism; 801. protective shell; 8011. guide groove; 802. first screw rod; 803. first nut; 804. guide bar; 805. second motor;
[0055] 9. Activity disk;
[0056] 10. Blowing mechanism; 1001. First cylinder; 1002. First corrugated airbag; 1003. First inner plate; 1004. First one-way valve; 1005. First air inlet pipe; 1006. Second cylinder; 1007. Second corrugated airbag; 1008. Second inner plate; 1009. Second air inlet pipe; 1010. Second one-way valve; 1011. Air delivery pipe; 1012. Third one-way valve; 1013. Fourth one-way valve; 1014. First air outlet pipe; 1015. Second air outlet pipe; 1016. Base frame;
[0057] 11. Insertion tube; 1101. Bottom blade;
[0058] 12. Pressing mechanism; 1201. Second screw rod; 1202. Second nut; 1203. Pressing plate; 12031. Embedding groove; 1204. Guide rod; 1205. Positioning column; 1206. First spring; 1207. Positioning hole; 1208. Pressing strip; 1209. Second spring;
[0059] 13. Support frame;
[0060] 14. a first permanent magnet;
[0061] 15. A second permanent magnet;
[0062] 16. Prism;
[0063] 17. Cleaning ring; 1701. Circular ring groove; 1702. Air outlet;
[0064] 18. Connecting pipe;
[0065] 19. Connecting frame. DETAILED DESCRIPTION
[0066] The specific embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.
[0067] like Figure 1-10 As shown, the portable dust-proof water conservancy and hydropower engineering survey drilling rig includes a protective tube 1, a first motor 2, a control box 3, a filter 4, a handle 5, a fixed plate 6, a drill rod 7, a lifting mechanism 8, a movable plate 9, a blower mechanism 10, an inserting tube 11 and a pressing mechanism 12;
[0068] The top of the protective tube 1 is closed and the bottom is open; a lifting mechanism 8 is arranged inside the protective tube 1, the lifting mechanism 8 is connected to a movable disk 9, and the top of the drill rod 7 is rotatably connected to the middle of the movable disk 9; a first motor 2 is fixedly mounted on the outer wall of the top of the protective tube 1, and the first motor 2 is used to drive the drill rod 7 to rotate;
[0069] A control box 3 is fixedly mounted on the outer wall of the protective tube 1; handles 5 are fixedly connected to both sides of the top of the protective tube 1; a through slot 104 is opened on the wall of the protective tube 1 and is located below the fixed plate 6, and a filter screen 4 is installed in the through slot 104;
[0070] The bottom end of the protective tube 1 is provided with a bottom circular groove 101, the insert tube 11 is connected to the bottom circular groove 101, and the bottom end of the insert tube 11 is provided with a bottom blade 1101; a pressing mechanism 12 for driving the insert tube 11 to move downward and upward to reset is provided in the protective tube 1, and the pressing mechanism 12 is connected to the first motor 2;
[0071] The air blowing mechanism 10 is connected with a cleaning ring 17 , which is arranged at the middle of the bottom end of the protective tube 1 , and the cleaning ring 17 is coaxially arranged with the drill rod 7 .
[0072] The entire drilling rig is stored in the protective tube 1 after use. The cylindrical design makes it easy to carry on the body, and the handle 5 is designed to facilitate carrying.
[0073] A power supply and a controller are arranged in the control box 3, and a control switch is arranged on the outer wall of the control box 3 for power supply and electrical control of the entire drilling rig.
[0074] The design of the through slot 104 and the filter screen 4 provides a ventilation position for the protective tube 1, and the filter screen 4 is provided to prevent dust from being discharged.
[0075] like Figure 7 As shown, the lifting mechanism 8 includes a protective shell 801, a first screw rod 802, a first nut 803, a guide bar 804 and a second motor 805; the protective shell 801 is fixedly connected to the inner wall of the protective tube 1, and a guide groove 8011 is opened on one side of the protective shell 801, and the guide groove 8011 is slidably connected with the guide bar 804, one end of the guide bar 804 is fixedly connected to the movable disk 9, and the other end of the guide bar 804 is fixedly connected to the first nut 803 located in the protective shell 801, the first screw rod 802 is rotatably installed in the protective shell 801, the first nut 803 is threadedly connected to the first screw rod 802, one end of the first screw rod 802 is fixedly connected to the output shaft end of the second motor 805, and the second motor 805 is fixedly connected to the outer wall of one end of the protective shell 801.
[0076] The operation of the lifting mechanism 8 is as follows: the first screw 802 is driven to rotate by the second motor 805, and the first screw 802 and the first nut 803 are threaded together, and the guiding effect of the guide bar 804 and the guide groove 8011 is cooperated to drive the first nut 803, the guide bar 804 and the movable disk 9 to move up and down together, and the drill rod 7 will move with the movable disk 9 to achieve the adjustment of the up and down position, so that the drill rod 7 can be inserted into the soil layer or leave the soil layer.
[0077] like Figure 2-5 as well as Fig. 9As shown, the pressing mechanism 12 includes a second screw rod 1201, a second nut 1202, a pressure plate 1203, a guide portion movable left and right, a pressure strip 1208 and a second spring 1209; one end of the second screw rod 1201 is fixedly connected to the output shaft end of the first motor 2, the second nut 1202 is threadedly connected to the second screw rod 1201, a middle hole is provided in the middle of the pressure plate 1203, the second nut 1202 is fixedly engaged in the middle hole on the pressure plate 1203, a side of the pressure plate 1203 is provided with an embedding groove 12031, and the embedding groove 12031 is connected to the guide portion, The pressure strip 1208 is cooperatively connected with the vertical groove 102 opened in the wall of the protective tube 1, and the vertical groove 102 is connected with the bottom circular groove 101, the bottom end of the pressure strip 1208 is fixedly connected to the top of the insertion tube 11, the top end of the pressure strip 1208 is bent 90° toward the axial direction of the protective tube 1, and the bent portion of the pressure strip 1208 is slidingly connected with the side groove 103 opened on the inner wall of the protective tube 1, and the side groove 103 is connected with the vertical groove 102, the top of the pressure strip 1208 is elastically connected to the top end surface of the vertical groove 102 by the second spring 1209, and the bent portion of the pressure strip 1208 is in contact with the bottom surface of the pressure plate 1203.
[0078] The guide portion includes a guide rod 1204, a positioning column 1205 and a first spring 1206; the guide rod 1204 passes through the embedding groove 12031, and at least one positioning column 1205 is fixedly connected to one side of the guide rod 1204, the positioning column 1205 is matched and connected with a positioning hole 1207 opened on the inner wall of the protective tube 1, the first spring 1206 is sleeved on the positioning column 1205, and the guide rod 1204 is elastically connected to the inner wall of the protective tube 1 through the first spring 1206.
[0079] The bottom end of the guide rod 1204 is fixedly connected with a second permanent magnet 15 , the second permanent magnet 15 is magnetically connected with a first permanent magnet 14 , the first permanent magnet 14 is fixedly connected with a support frame 13 , and the support frame 13 is fixedly connected to the top surface of the movable disk 9 .
[0080] In the initial state of the entire drilling rig, the position of the movable plate 9 is as follows Figure 4 As shown, it is in the highest position, the drill rod 7 is received in the protective tube 1, wherein the first permanent magnet 14 and the second permanent magnet 15 are in contact with each other, the two are magnetically attracted together, and the first spring 1206 is in a stretched state, and the guide rod 1204 passes through the embedding groove 12031.
[0081] When in use as a whole, the bottom end of the protective tube 1 is placed on the soil layer, and then the first motor 2 is started. The first motor 2 drives the second screw 1201 to rotate forward, and the second screw 1201 and the second nut 1202 are threaded, and the guiding effect provided by the guide rod 1204 and the embedded groove 12031 makes the second nut 1202 and the pressure plate 1203 move downward together, and the pressure plate 1203 pushes the bent part of the pressure strip 1208 downward, and the pressure strip 1208 is guided by the vertical groove 102 and moves downward, thereby pushing the insertion tube 11 to move downward, so that the insertion tube 11 is inserted into the soil layer, and at the same time the pressure strip 1208 stretches the second spring 1209.
[0082] After the above operations, the protective tube 1 is connected to the soil layer, especially the insertion tube 11 is inserted into the soil layer to avoid pits and there is a gap between the protective tubes 1.
[0083] Then, turn off the first motor 2, and then drive the movable disk 9 downward through the lifting mechanism 8. The movable disk 9 drives the first permanent magnet 14 downward through the support frame 13. The first permanent magnet 14 is separated from the second permanent magnet 15, and the two lose magnetic attraction. At this time, the drill rod 7 is still in the protective tube 1, and then start the first motor 2.
[0084] After the above operation, the second permanent magnet 15 loses the magnetic attraction of the first permanent magnet 14, and pulls the guide rod 1204 through the elastic force of the first spring 1206, so that the guide rod 1204 is separated from the embedded groove 12031, so that when the first motor 2 drives the second screw rod 1201 to rotate, the nut and the pressure plate 1203 rotate together, and the pressure plate 1203 does not move up and down. The driving connection between the first motor 2 and the pressing mechanism 12 is released, and the height position of the pressure plate 1203 remains unchanged, and the pressing state of the pressure strip 1208 is always maintained.
[0085] Subsequently, the first motor 2 drives the drill rod 7 to rotate, and the lifting mechanism 8 drives the drill rod 7 downward, so that the drill rod 7 drills into the soil layer. After drilling, the lifting mechanism 8 drives the drill rod 7 upward, so that the drill rod 7 leaves the soil layer, until the first permanent magnet 14 is aligned with the second permanent magnet 15, so that the first permanent magnet 14 provides magnetic attraction for the second permanent magnet 15. When the guide rod 1204 is aligned with the embedded groove 12031, the guide rod 1204 directly enters the embedded groove 12031. When the guide rod 1204 is not aligned with the embedded groove 12031, the guide rod 1204 is pressed on the circumferential surface of the pressure plate 1203 by the action of magnetic attraction, and the first motor 2 drives the pressure plate 1203. After 203 is reversed to align the embedding groove 12031 with the guide rod 1204, the guide rod 1204 enters the embedding groove 12031, and at the same time the guide rod 1204 stretches the first spring 1206 to generate a stretching elastic force, and then the first motor 2 is driven in the reverse direction, in conjunction with the guidance of the guide rod 1204 and the embedding groove 12031, so that the pressure plate 1203 is reset upward, the pressure rod loses the downward pressure, and the elastic force of the second spring 1209 drives the pressure rod and the insert cylinder 11 to reset, and the insert cylinder 11 is pulled out of the soil layer, and then the first motor 2 is turned off.
[0086] Through the above design, the pressing mechanism 12 and the rotation drive of the drill rod 7 share the drive of the first motor 2, and both use one power source. The left and right movement of the guide part in the pressing mechanism 12 is used to establish or disconnect the connection with the first motor 2, so that the pressing mechanism 12 is disconnected during the process of the drill rod 7 drilling into or leaving the soil layer. The pressing mechanism 12 will not affect the drive of the drill rod 7 by the first motor 2.
[0087] Furthermore, the left and right driving of the guide part is achieved by the movable disk 9 driving the first permanent magnet 14 to leave the second permanent magnet 15 and reset, so that the left and right movement of the guide part does not require additional power source and manual operation.
[0088] When implemented, a ball structure can be provided on the top surface of the bent portion of the pressure rod, and the ball can fit with the bottom surface of the pressure plate 1203 to ensure rolling friction when the pressure plate 1203 rotates, thereby reducing wear.
[0089] like Figure 6 As shown, a fixed plate 6 is fixedly installed inside the protective tube 1, and a groove 601 for the guide rod 1204 to pass through is opened on the fixed plate 6; the second screw rod 1201 is rotatably connected to the middle part of the fixed plate 6, and a prism 16 is fixedly connected to the bottom end of the second screw rod 1201, and a hole body 701 with a top opening is opened at the axis center of the drill rod 7, and the prism 16 is cooperatively connected to the hole body 701.
[0090] The drill rod 7 is connected to the prism 16 through the hole 701 thereon, so that after the drill rod 7 is lifted or lowered, the hole 701 and the prism 16 slide, and the two are always connected. When the first motor 2 drives the second screw 1201 to rotate, the drill rod 7 is driven to rotate through the prism 16.
[0091] like Figure 8-9 As shown, the hair dryer mechanism 10 includes a first cylinder 1001 fixedly mounted on the top surface of the movable disk 9, a first corrugated airbag 1002, a second cylinder 1006 fixedly mounted on the bottom surface of the fixed disk 6, a second corrugated airbag 1007 and an air pipe 1011, the movable disk 9 is provided with a through hole aligned with the first cylinder 1001, the top end of the first corrugated airbag 1002 passes through the through hole, and the top end of the first corrugated airbag 1002 extends into the first cylinder 1001, the first cylinder 1001 is fixedly mounted with a first inner plate 1003, the The top of the first corrugated airbag 1002 is fixedly connected to the bottom surface of the first inner plate 1003, and a first one-way valve 1004 is installed on the top of the first corrugated airbag 1002. The first one-way valve 1004 is connected to a first air inlet pipe 1005, and one end of the first air inlet pipe 1005 away from the first one-way valve 1004 is located in the protective tube 1; the bottom end of the first corrugated airbag 1002 is fixedly connected to a base frame 1016, and the base frame 1016 is fixedly connected to the inner wall of the bottom end of the protective tube 1, and a fourth one-way valve 1013 is installed on the bottom end of the first corrugated airbag 1002 The bottom end of the second corrugated airbag 1007 is fixedly connected to the top surface of the movable disk 9, and the top end of the second corrugated airbag 1007 extends into the second cylinder 1006, a second inner plate 1008 is fixedly installed in the second cylinder 1006, the top end of the second corrugated airbag 1007 is fixedly connected to the bottom surface of the second inner plate 1008, the top end of the second corrugated airbag 1007 is connected to a second air inlet pipe 1009 and a third one-way valve 1012, the second air inlet pipe 1009 is connected to a second one-way valve 1010 located in the protective tube 1; the first air inlet pipe 1 005, one end away from the first one-way valve 1004 and the second one-way valve 1010 are both installed with filters, the third one-way valve 1012 is connected to one end of the air pipe 1011, the air pipe 1011 is fixed to the inner wall of the protective tube 1, and the end of the air pipe 1011 away from the third one-way valve 1012 is connected to the fourth one-way valve 1013, the first air outlet pipe 1014 and the second air outlet pipe 1015 are fixed to the pipe wall of the air pipe 1011, and the first air outlet pipe 1014 and the second air outlet pipe 1015 are both connected to the air pipe 1011.
[0092] The first air outlet pipe 1014 is fixedly connected to a connecting pipe 18 , and the connecting pipe 18 is fixedly connected to the protective shell 801 .
[0093] The second air outlet pipe 1015 is fixedly connected to the cleaning ring 17, and a circular groove 1701 connected to the second air outlet pipe 1015 is arranged inside the cleaning ring 17; a circular blowing port 1702 is arranged on the inner wall of the cleaning ring 17, and the blowing port 1702 is connected to the circular groove 1701, and a connecting frame 19 is fixedly connected to one side of the cleaning ring 17, and one end of the connecting frame 19 is fixedly connected to the inner wall of the protective tube 1.
[0094] Figure 8-9 The middle movable disk 9 is in a high position, wherein the second corrugated airbag 1007 is in a compressed state, and the first corrugated airbag 1002 is in a stretched state. When the movable disk 9 descends to a low position, it drives the drill rod 7 into the soil layer, and the movable disk 9 descends to pull the bottom of the second corrugated airbag 1007, so that the second corrugated airbag 1007 is extended and increased in volume. External air enters the second corrugated airbag 1007 through the second one-way valve 1010 and the second air inlet pipe 1009 to replenish air. When the movable disk 9 descends, it presses down the top of the first corrugated airbag 1002, reducing the volume of the first corrugated airbag 1002 to press out the air inside it. The air enters the air supply pipe 1011 through the fourth one-way valve 1013, and then is discharged through the first outlet pipe 1014 and the second outlet pipe 1015.
[0095] After the movable disk 9 moves to the low position, it moves to the high position again, that is, it drives the drill rod 7 to leave the soil layer. The movable disk 9 pulls the top of the first corrugated airbag 1002 to increase the volume of the first corrugated airbag 1002, and the external air enters the first corrugated airbag 1002 through the first air inlet pipe 1005 and the first one-way valve 1004 to replenish the air. At the same time, the movable disk 9 presses the bottom end of the second corrugated airbag 1007 to reduce the volume of the second corrugated airbag 1007, which is used to press the air out. The air enters the air supply pipe 1011 through the third one-way valve 1012, and then is discharged through the first air outlet pipe 1014 and the second air outlet pipe 1015.
[0096] Through the above design, the driving of the air blowing mechanism 10 is provided by the up and down movement of the movable disk 9; at the same time, whether the movable disk 9 moves up or down, it provides airflow to the first air outlet pipe 1014 and the second air outlet pipe 1015.
[0097] The airflow in the first air outlet pipe 1014 can enter the protective shell 801 through the connecting pipe 18, providing a positive pressure environment therein, thereby preventing dust from entering and playing a dust-proof role.
[0098] The airflow in the second air outlet pipe 1015 enters the annular groove 1701 and is then blown out through the blowing port 1702 . When the drill rod 7 moves up and down with the movable disk 9 , it passes through the cleaning ring 17 , and the blowing port 1702 can provide clean air for the drill rod 7 .
[0099] It should be noted that the present invention is not limited to the above-mentioned specific embodiments, and any changes in shape or structure are within the protection scope of the present invention. The protection scope of the present invention is defined by the attached claims, and those skilled in the art can make various changes or modifications to these specific embodiments without departing from the principle and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.
Claims
1. Portable dust-proof water conservancy and hydropower engineering survey drilling rig, characterized by: It comprises a protective tube (1), a first motor (2), a control box (3), a filter screen (4), a handle (5), a fixed plate (6), a drill rod (7), a lifting mechanism (8), a movable plate (9), a blower mechanism (10), an inserting tube (11) and a pressing mechanism (12); The top end of the protective tube (1) is closed and the bottom end is open; a lifting mechanism (8) is arranged inside the protective tube (1), the lifting mechanism (8) is connected to a movable disk (9), and the top end of the drill rod (7) is rotatably connected to the middle of the movable disk (9); a first motor (2) is fixedly mounted on the outer wall of the top end of the protective tube (1), and the first motor (2) is used to drive the drill rod (7) to rotate; A control box (3) is fixedly mounted on the outer wall of the protective tube (1); handles (5) are fixedly connected to both sides of the top of the protective tube (1); a through groove (104) is opened on the wall of the protective tube (1) and is located below the fixed plate (6); a filter screen (4) is installed in the through groove (104); The bottom end of the protective tube (1) is provided with a bottom circular groove (101), the insert tube (11) is connected to the bottom circular groove (101), and the bottom end of the insert tube (11) is provided with a bottom blade (1101); a downward pressing mechanism (12) for driving the insert tube (11) to move downward and upward to reset is provided in the protective tube (1), and the downward pressing mechanism (12) is connected to the first motor (2); The blower mechanism (10) is connected to a cleaning ring (17), which is arranged at the middle of the bottom end of the protective tube (1), and the cleaning ring (17) is coaxially arranged with the drill rod (7).
2. The portable dust-proof water conservancy and hydropower engineering survey drilling rig according to claim 1, characterized in that: The lifting mechanism (8) comprises a protective shell (801), a first screw rod (802), a first nut (803), a guide bar (804) and a second motor (805); the protective shell (801) is fixedly connected to the inner wall of the protective tube (1), and a guide groove (8011) is provided on one side of the protective shell (801), the guide bar (804) is slidably connected to the guide groove (8011), one end of the guide bar (804) is fixedly connected to the movable disk (9), and the other end of the guide bar (804) is fixedly connected to the first nut (803) located in the protective shell (801), the first screw rod (802) is rotatably installed in the protective shell (801), the first nut (803) is threadedly connected to the first screw rod (802), one end of the first screw rod (802) is fixedly connected to the output shaft end of the second motor (805), and the second motor (805) is fixedly connected to the outer wall of one end of the protective shell (801).
3. The portable dust-proof water conservancy and hydropower engineering survey drilling rig according to claim 1, characterized in that: The pressing mechanism (12) comprises a second screw rod (1201), a second nut (1202), a pressure plate (1203), a guide portion, a pressure strip (1208) and a second spring (1209); one end of the second screw rod (1201) is fixedly connected to the output shaft end of the first motor (2); the second nut (1202) is threadedly connected to the second screw rod (1201); a middle hole is provided in the middle of the pressure plate (1203); the second nut (1202) is fixedly engaged in the middle hole on the pressure plate (1203); a groove (12031) is provided on one side of the pressure plate (1203); the groove (12031) is connected to the guide portion; the pressure strip (1208) is threadedly connected to the second screw rod (1201); ) is connected with a vertical groove (102) provided in the wall of the protective tube (1), and the vertical groove (102) is connected with the bottom circular groove (101), the bottom end of the pressure strip (1208) is fixedly connected with the top of the insert tube (11), the top end of the pressure strip (1208) is bent 90° toward the axial direction of the protective tube (1), and the bent portion of the pressure strip (1208) is slidably connected with the side groove (103) provided on the inner wall of the protective tube (1), and the side groove (103) is connected with the vertical groove (102), the top of the pressure strip (1208) is elastically connected with the top end surface of the vertical groove (102) through a second spring (1209), and the bent portion of the pressure strip (1208) is in contact with the bottom surface of the pressure plate (1203).
4. The portable dust-proof water conservancy and hydropower engineering survey drilling rig according to claim 3, characterized in that: The guide portion is capable of moving left and right, and comprises a guide rod (1204), a positioning column (1205) and a first spring (1206); the guide rod (1204) passes through the embedded groove (12031), and at least one positioning column (1205) is fixedly connected to one side of the guide rod (1204); the positioning column (1205) is matched and connected with a positioning hole (1207) provided on the inner wall of the protective tube (1); the first spring (1206) is sleeved on the positioning column (1205); and the guide rod (1204) is elastically connected to the inner wall of the protective tube (1) via the first spring (1206).
5. The portable dust-proof water conservancy and hydropower engineering survey drilling rig according to claim 4, characterized in that: The bottom end of the guide rod (1204) is fixedly connected to a second permanent magnet (15), the second permanent magnet (15) is magnetically connected to a first permanent magnet (14), the first permanent magnet (14) is fixedly connected to a support frame (13), and the support frame (13) is fixedly connected to the top surface of the movable disk (9).
6. The portable dust-proof water conservancy and hydropower engineering survey drilling rig according to claim 5, characterized in that: A fixing plate (6) is fixedly installed inside the protective tube (1), and a groove (601) is provided on the fixing plate (6) for the guide rod (1204) to pass through; the second screw rod (1201) is rotatably connected to the middle of the fixing plate (6), and a prism (16) is fixedly connected to the bottom end of the second screw rod (1201); a hole (701) with a top opening is provided at the axis of the drill rod (7), and the prism (16) is cooperatively connected to the hole (701).
7. The portable dust-proof water conservancy and hydropower engineering survey drilling rig according to claim 1, characterized in that: The air blowing mechanism (10) comprises a first cylinder (1001) fixedly mounted on the top surface of a movable disk (9), a first corrugated airbag (1002), a second cylinder (1006) fixedly mounted on the bottom surface of a fixed disk (6), a second corrugated airbag (1007) and an air delivery pipe (1011); the movable disk (9) is provided with a through hole aligned with the first cylinder (1001); the top end of the first corrugated airbag (1002) passes through the through hole, and the top end of the first corrugated airbag (1002) extends into the first cylinder (1001); a first inner plate (1003) is fixedly mounted in the first cylinder (1001); the first corrugated airbag (1007) is provided with a second corrugated airbag (1007) and an air delivery pipe (1011); The top end of the corrugated airbag (1002) is fixedly connected to the bottom surface of the first inner plate (1003); a first one-way valve (1004) is installed at the top end of the first corrugated airbag (1002); the first one-way valve (1004) is connected to a first air intake pipe (1005); an end of the first air intake pipe (1005) away from the first one-way valve (1004) is located in the protective tube (1); the bottom end of the first corrugated airbag (1002) is fixedly connected to a base frame (1016); the base frame (1016) is fixedly connected to the inner wall of the bottom end of the protective tube (1); a fourth one-way valve (1013) is installed at the bottom end of the first corrugated airbag (1002); The bottom end of the second corrugated airbag (1007) is fixedly connected to the top surface of the movable disk (9), and the top end of the second corrugated airbag (1007) extends into the second cylinder (1006), a second inner plate (1008) is fixedly installed in the second cylinder (1006), the top end of the second corrugated airbag (1007) is fixedly connected to the bottom surface of the second inner plate (1008), the top end of the second corrugated airbag (1007) is connected to a second air inlet pipe (1009) and a third one-way valve (1012), the second air inlet pipe (1009) is connected to a second one-way valve (1010) located in the protective tube (1); the first air inlet pipe (10 05) One end away from the first one-way valve (1004) and the second one-way valve (1010) are both installed with filters, the third one-way valve (1012) is connected to one end of the air supply pipe (1011), the air supply pipe (1011) is fixed to the inner wall of the protective tube (1), and the end of the air supply pipe (1011) away from the third one-way valve (1012) is connected to the fourth one-way valve (1013), and the first air outlet pipe (1014) and the second air outlet pipe (1015) are fixed to the pipe wall of the air supply pipe (1011), and the first air outlet pipe (1014) and the second air outlet pipe (1015) are both connected to the air supply pipe (1011).
8. The portable dust-proof water conservancy and hydropower engineering survey drilling rig according to claim 7, characterized in that: The first air outlet pipe (1014) is fixedly connected to a connecting pipe (18), and the connecting pipe (18) is fixedly connected to the protective shell (801).
9. The portable dust-proof water conservancy and hydropower engineering survey drilling rig according to claim 7, characterized in that: The second air outlet pipe (1015) is fixedly connected to the cleaning ring (17), and a circular groove (1701) connected to the second air outlet pipe (1015) is arranged inside the cleaning ring (17); a circular blowing port (1702) is arranged on the inner wall of the cleaning ring (17), and the blowing port (1702) is connected to the circular groove (1701); a connecting frame (19) is fixedly connected to one side of the cleaning ring (17), and one end of the connecting frame (19) is fixedly connected to the inner wall of the protective tube (1).
Citation Information
Cited By
Earthquake disaster monitoring engineering measuring device with positioning module
CN121048593A
