Construction formwork and construction method for retaining wall graded broken stone inverted filter

By using formwork with vertical ribs and functional holes in the construction of retaining walls, the problem of uneven thickness of the filter layer is solved, the construction efficiency and economy are improved, and the construction quality and material savings are ensured.

CN119287973APending Publication Date: 2025-01-10CHINA METALLURGICAL CONSTR ENG GRP
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411744213.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-30
Publication Date
2025-01-10

AI Technical Summary

Technical Problem

During the construction of existing retaining walls, the thickness of the graded gravel anti-filtration layer is uneven, resulting in waste of materials and low construction efficiency, and low support efficiency, making it difficult to control construction costs.

Method used

A construction formwork including the formwork body and vertical rib plate was designed. The width of the rib plate is consistent with the thickness of the filter layer, with functional holes and a detachable structure. Through the right triangle structure and dislocation design, the thickness of the filter layer is consistent and the construction is simplified. step.

Benefits of technology

Strict control of the thickness of the filter layer is achieved, material waste and construction difficulty are reduced, construction efficiency and economy are improved, construction quality and formwork recyclability are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119287973A_ABST
    Figure CN119287973A_ABST
Patent Text Reader

Abstract

The construction formwork comprises a formwork body and a rib plate arranged on one side of the end face of the formwork body, and the rib plate is provided with a reference part with the width consistent with the thickness of a to-be-constructed inverted filter; the thickness consistency of the inverted filter layer can be guaranteed, the construction quality is guaranteed, the construction difficulty is reduced, the construction efficiency is improved, resource waste is reduced, and the construction cost is controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of retaining wall construction, and in particular to a construction template and a construction method for a graded crushed stone filter layer of a retaining wall. Background Art

[0002] Before backfilling the back of the retaining wall, it is generally necessary to build a 50cm thick graded crushed stone filter layer to facilitate the drainage of accumulated water on the back of the wall through the drainage holes. Since the thickness of the filter layer is relatively thin, a forklift or excavator is generally used to pile up water on the back of the wall during the backfilling process to form a water filter layer, resulting in uneven thickness of the water filter layer, with some parts being too thick and some parts being too thin, and easily resulting in material waste. In addition, the formwork efficiency is low, and even some formwork is directly backfilled to waste the formwork, which is not conducive to saving construction costs.

[0003] Therefore, in order to solve the above problems, a construction template and construction method for the graded crushed stone filter layer of the retaining wall are needed, which can ensure the consistency of the thickness of the filter layer, ensure the construction quality, reduce the construction difficulty, improve the construction efficiency, reduce resource waste, and control the construction cost. Summary of the invention

[0004] In view of this, the purpose of the present invention is to overcome the defects in the prior art and provide a construction template and construction method for a graded crushed stone filter layer of a retaining wall, which can ensure the consistency of the thickness of the filter layer, ensure the construction quality, reduce the construction difficulty, improve the construction efficiency, reduce resource waste, and control the construction cost.

[0005] The construction template for graded crushed stone filter layer of retaining wall comprises a template body and a rib plate arranged on one side of the end surface of the template body, wherein the rib plate has a reference part with a width consistent with the thickness of the filter layer to be constructed.

[0006] Furthermore, the ribs are fixed on the template body, and the ribs are in a plate-like structure perpendicular to the template.

[0007] Furthermore, the rib is in the form of a right triangle, the long side connected to the hypotenuse of the right triangle is fixed on the template body, and the short side connected to the hypotenuse of the right triangle is consistent with the thickness of the filter layer to be constructed.

[0008] Furthermore, functional holes are provided on the ribs.

[0009] Furthermore, there are a plurality of functional holes, and the plurality of functional holes are located at the rear side of the middle portion in the width direction of the rib plate.

[0010] Furthermore, a connecting line of the plurality of functional holes is in the shape of an arc convex outward away from the template body.

[0011] Furthermore, the ribs are at least two pieces arranged on the template body, and the two ribs are arranged at intervals in the height direction of the template body.

[0012] Furthermore, the ribs are arranged in a plurality on the template body, the plurality of the ribs are parallel, and the plurality of the ribs are staggered in height direction.

[0013] Furthermore, the ribs are detachably arranged on the template body, and the template body has a plurality of installation positions for assembling the ribs.

[0014] This solution also discloses a construction method based on the construction template for the graded crushed stone filter layer of the retaining wall, comprising the following construction steps:

[0015] S1. Compact the bottom of the filter layer and the backfill layer at the back of the wall to obtain a flat bearing surface;

[0016] S2. Select a preset width and a preset number of ribs to be installed at a set position of the template body;

[0017] S3. Position the formwork body with ribs on the rear side of the retaining wall, with the shortest side of the right-angled triangular ribs facing upward;

[0018] S4. Fill the filter layer filler and the wall back filler on the front and rear sides of the formwork body respectively;

[0019] S5. Remove the formwork body with ribs;

[0020] S6. Repeat steps S3-S5 until the filter layer and the back wall are filled.

[0021] The beneficial effects of the present invention are as follows: the present invention discloses a construction template and a construction method for a graded crushed stone filter layer of a retaining wall, which can be constructed on both sides at the same time through the set template, can strictly control the construction thickness of the filter layer, has excellent construction quality, can greatly save construction materials, and has simple construction steps and convenient operation. The used template can be completely recycled and is highly economical. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0023] Figure 1 It is a structural schematic diagram of the present invention;

[0024] Figure 2 It is a schematic diagram of the template structure of the present invention;

[0025] Figure 3 It is a schematic diagram of the rib structure of the present invention. DETAILED DESCRIPTION

[0026] Figure 1It is a structural schematic diagram of the present invention. As shown in the figure, the construction template for the graded crushed stone filter layer 002 of the retaining wall in this embodiment includes a template body 1 and a rib plate 2 arranged on one side of the end face of the template body 1, wherein the rib plate 2 has a reference portion whose width is consistent with the thickness of the filter layer 002 to be constructed, and then the thickness of the filter layer 002 is guaranteed by the reference portion, thereby improving the construction quality; when the template body 1 is in use, one side of the rib plate 2 faces the retaining wall 001, and the rib plate 2 is detachably arranged on the template body 1, and the template body 1 has a plurality of groups of mounting positions for assembling the rib plate 2; more specifically, the rib plate 2 can be arranged according to the conventional filter layer 001. 02 There are many types of thickness settings, which can be directly assembled on the template body 1 when used. The template body 1 described in this solution is a hole plate with a plurality of holes. The hole diameters of the hole plate are consistent, and the rib plate 2 is assembled on the hole plate in a detachable manner by bolts, so that the rib plate 2 can be fixed at any position of the template body 1, and the construction reliability is excellent. A reasonable number of rib plates 2 can be set according to the length of the template body 1 to improve the construction reliability. The template body 1 with a plurality of holes can stir the joint materials of the filter layer 002 and the back filling layer when taken out after construction, so that the joint position of the two is more secure under the condition of continuous stirring of the holes, and the construction quality is better.

[0027] In this embodiment, the ribs 2 are at least two pieces arranged on the template body 1, and the two ribs 2 are spaced apart in the height direction of the template body 1; the thickness of the filter layer 002 can be further ensured to prevent the deflection of the template body 1 caused by the later construction; more specifically, the ribs 2 are several pieces arranged on the template body 1, several of the ribs 2 are parallel, and several of the ribs 2 are staggered in the height direction; the ribs 2 in this solution are roughly in two layers, and the ribs 2 are staggered in the horizontal position. The structure forms several triangular supporting structures, which can ensure the stability of the structure and thus ensure the construction quality, and the resistance is lower when pulling, which is more convenient for removing the template body 1.

[0028] In this embodiment, the rib plate 2 is detachably fixed on the template body 1, and the rib plate 2 is a plate-shaped structure perpendicular to the template. More specifically, in this solution, the rib plate 2 is a right triangle, the long side connected to the hypotenuse of the right triangle is fixed on the template body 1, and the short side connected to the hypotenuse of the right triangle is consistent with the thickness of the filter layer 002 to be constructed, that is, the short side connected to the hypotenuse of the right triangle is used as a reference part, the overall structure is simple, and the subsequent pulling resistance can be reduced.

[0029] In this embodiment, the rib plate 2 is provided with a plurality of functional holes 21, which are located at the middle rear side of the rib plate 2 in the width direction, and the connecting line of the plurality of functional holes 21 is in an arc shape that bulges outward away from the template body 1. The opening of the functional holes 21 has the function of stirring the filler of the filter layer 002, and also prevents the root of the rib plate 2 from separating from the template body 1. In particular, the functional holes 21 are arranged closer to the root of the rib plate 2, so that the pulling force is dispersed to the filler pressed against it due to the arrangement of the functional holes 21, thereby playing an auxiliary function.

[0030] In this embodiment, this solution also discloses a construction method based on the construction template for the graded crushed stone filter layer 002 of the retaining wall, comprising the following construction steps:

[0031] S1. Compact the bottom of the filter layer 002 and the backfill layer at the bottom of the wall to obtain a flat bearing surface;

[0032] S2. Select a preset width and a preset number of ribs 2 to be installed at a set position of the template body 1;

[0033] S3. The formwork body 1 with ribs 2 is positioned on the rear side of the retaining wall 001, with the shortest side of the right-angled triangle rib 2 facing upward;

[0034] S4. The filter layer 002 filler and the wall back 003 filler are filled on the front and rear sides of the template body 1 respectively; the filter layer filler is 500mm high-grade gravel, and the wall back filler is backfill soil;

[0035] S5. Remove the template body 1 with ribs 2;

[0036] S6. Repeat steps S3-S5 until the filter layer 002 and the back wall are filled.

[0037] The templates set up can be used for construction on both sides at the same time, and the construction thickness of the filter layer 002 can be strictly controlled. The construction quality is excellent, and construction materials can be greatly saved. The construction steps are simple and the operation is convenient. The templates used can be completely recycled, and the economy is high.

[0038] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A construction template for a graded crushed stone filter layer of a retaining wall, characterized by: The template comprises a template body and a rib plate arranged on one side of the end surface of the template body. The rib plate has a reference portion whose width is consistent with the thickness of the filter layer to be constructed.

2. The construction template for the graded crushed stone filter layer of the retaining wall according to claim 1 is characterized in that: The rib plate is fixed on the template body, and the rib plate is in a plate-shaped structure perpendicular to the template.

3. The construction template for the graded crushed stone filter layer of the retaining wall according to claim 2 is characterized in that: The rib plate is in the form of a right triangle, the long side connected to the hypotenuse of the right triangle is fixed on the template body, and the short side connected to the hypotenuse of the right triangle is consistent with the thickness of the filter layer to be constructed.

4. The construction template for the graded crushed stone filter layer of a retaining wall according to claim 2, characterized in that: Functional holes are provided on the ribs.

5. The construction template for the graded crushed stone filter layer of the retaining wall according to claim 4 is characterized in that: There are a plurality of functional holes, and the plurality of functional holes are located at the rear side of the middle portion in the width direction of the rib plate.

6. The construction template for the graded crushed stone filter layer of the retaining wall according to claim 5, characterized in that: The connecting line of the plurality of functional holes is in an arc shape convex outward away from the template body.

7. The construction template for the graded crushed stone filter layer of a retaining wall according to claim 2, characterized in that: The ribs are at least two pieces arranged on the template body, and the two ribs are spaced apart in the height direction of the template body.

8. The construction template for the graded crushed stone filter layer of a retaining wall according to claim 7, characterized in that: The ribs are arranged in a plurality on the template body, the plurality of ribs are parallel, and the plurality of ribs are staggered in height direction.

9. The construction template for the graded crushed stone filter layer of a retaining wall according to claim 2, characterized in that: The ribs are detachably arranged on the template body, and the template body is provided with a plurality of installation positions for assembling the ribs.

10. A construction method for the construction template for the graded crushed stone filter layer of a retaining wall according to any one of claims 1 to 9, characterized in that: The construction steps include: S1. Compact the bottom of the filter layer and the backfill layer at the back of the wall to obtain a flat bearing surface; S2. Select a preset width and a preset number of ribs to be installed at a set position of the template body; S3. Position the formwork body with ribs on the rear side of the retaining wall, with the shortest side of the right-angled triangular ribs facing upward; S4. Fill the filter layer filler and the wall back filler on the front and rear sides of the formwork body respectively; S5. Remove the formwork body with ribs; S6. Repeat steps S3-S5 until the filter layer and the back wall are filled.

Citation Information

Patent Citations

  • Construction method for excavation slope retaining wall reversed filter layer

    CN105002927A

  • Concrete rib belt and strengthened body strengthening type barricade construction structure and method

    CN107354953A

  • Construction method of drainage opening of rear-mounted retaining wall

    CN110344439A

  • Anti-liquefaction rigid-flexible composite retaining wall based on high polymer material and construction method of anti-liquefaction rigid-flexible composite retaining wall

    CN116201166A

  • Construction method of retaining wall graded broken stone inverted filter

    CN117513341A