Device for controlling concentricity in penetration piece welding process
By designing a device that includes an installation mechanism, a connecting mechanism and a positioning mechanism, the problem of concentricity deviation during the welding process of penetration parts and civil engineering sleeves during nuclear power installation is solved, achieving the effect of reducing deviation and improving welding efficiency.
Patent Information
- Application Number
- CN202411486374.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-23
- Publication Date
- 2025-01-24
AI Technical Summary
During the installation of nuclear power, the through-piece and the civil engineering sleeve are prone to concentricity deviation during the welding process, resulting in multiple adjustments required, reducing welding efficiency and affecting quality.
Design a device that includes an installation mechanism, a connection mechanism and a positioning mechanism. Through the connection mechanism evenly spaced in the circumferential direction on the upper surface of the installation mechanism and the positioning mechanism that passes through the connection mechanism and alternately offsets the penetration piece or the side wall of the civil sleeve, the adjustment The distance between the penetration piece and the installation mechanism and the distance between the civil sleeve and the installation mechanism to ensure concentricity.
Effectively reduce the concentric shift during the construction process, reduce the deformation problem caused by lack of control during the welding process, and improve work efficiency.
Smart Images

Figure CN119347307A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of nuclear power installation, and in particular to a device for controlling concentricity during a penetration welding process. Background Art
[0002] The internal and external structures of the nuclear reactor building are double-layer containment shells. The penetration pieces are key components that ensure that the inside and outside can be tightly connected when the pipeline passes through the double-layer containment shell, and can meet the system pipeline design requirements under various working conditions while ensuring the airtightness and integrity of the containment shell.
[0003] The installation of pipeline penetrations includes two parts: the penetration body and the sealing ring. At present, the dome penetration is usually first fixed by the civil construction unit to the civil sleeve and the double-layer shell of the nuclear island, and then the penetration body is introduced into the civil sleeve, and then the body and the civil sleeve are welded, or after the dome penetration and the civil sleeve are welded, the upstream and downstream pipelines are welded to connect the inside and outside of the nuclear island. However, the above scheme will cause the concentricity offset of the penetration and the civil sleeve during the welding process, which will result in the need for multiple adjustments during the welding process, reducing the welding efficiency and having a certain impact on the welding quality. Summary of the invention
[0004] (I) The present invention provides a device for controlling the concentricity of a penetration piece during welding, thereby alleviating the technical problem in the prior art of concentricity deviation between the penetration piece and the civil engineering sleeve during welding.
[0005] (II) Technical solution
[0006] In order to solve the above technical problems, an embodiment of the present invention provides a device for controlling concentricity during a penetration welding process, comprising a mounting mechanism, a connecting mechanism and a positioning mechanism;
[0007] The mounting mechanism is provided with a through hole, and the mounting mechanism is sleeved on the outside of the penetration member through the through hole, and is located between the penetration member and the civil engineering sleeve;
[0008] There are multiple connecting mechanisms, which are evenly spaced along the circumferential direction of the upper surface of the mounting mechanism. The positioning mechanisms correspond to the connecting mechanisms one by one. The ends of the positioning mechanisms pass through the connecting mechanisms and alternately abut against the side walls of the penetration piece or the civil engineering sleeve.
[0009] Furthermore, the connecting mechanism includes a connecting seat, which is fixed on the upper surface of the mounting mechanism and is evenly spaced along the circumference of the upper surface of the mounting mechanism.
[0010] Furthermore, a connecting hole is provided on the connecting seat, and the end of the positioning mechanism passes through the connecting hole and abuts against the side wall of the penetration piece or the civil engineering sleeve.
[0011] Furthermore, there are at least four connecting seats, and the number is an even number, which are evenly distributed along the circumference of the upper surface of the mounting mechanism.
[0012] Furthermore, the positioning mechanism includes a positioning piece, and the end of the positioning piece passes through the connecting hole and abuts against the side wall of the penetration piece or the civil engineering sleeve.
[0013] Furthermore, the positioning member is a positioning bolt.
[0014] Furthermore, the positioning bolt includes a bolt body and a bolt head, one end of the bolt body is connected to one side of the bolt head, and the other end of the bolt body passes through the connecting seat and abuts against the side wall of the penetration piece or the civil engineering sleeve.
[0015] Furthermore, the mounting mechanism comprises a mounting ring, the through hole is formed on the inner side of the mounting ring, and the mounting ring is sleeved between the penetration piece and the civil engineering sleeve.
[0016] Furthermore, the connecting seats are arranged on the upper surface of the mounting ring and are arranged at intervals in the circumferential direction along the edge of the mounting ring.
[0017] Furthermore, there are eight connecting seats, which are evenly distributed along the edge of the upper surface of the mounting ring.
[0018] Beneficial effects of the present invention:
[0019] The present invention provides a device for controlling the concentricity of a penetration welding process, comprising an installation mechanism, a connecting mechanism and a positioning mechanism. When in use, the installation mechanism is sleeved on the outside of the penetration and is located at the portion overlapping with the civil engineering sleeve. The connection mechanism is evenly spaced circumferentially on the upper surface of the installation mechanism, and the positioning mechanism passes through the connecting mechanism and alternately abuts against the side wall of the penetration or the civil engineering sleeve. The two cooperate to adjust the distance between the penetration and the installation mechanism, and the distance between the civil engineering sleeve and the installation mechanism, so as to achieve the effect of ensuring concentricity. The device can reduce the concentricity deviation during the construction process, thereby reducing the problem of deformation caused by lack of control during the welding process, and can also effectively improve work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1A schematic diagram of the structure of a device for controlling concentricity during a penetration welding process provided by an embodiment of the present invention;
[0022] Figure 2 A schematic diagram of the use of a device for controlling concentricity in a penetration welding process provided by an embodiment of the present invention.
[0023] icon:
[0024] 100-penetration piece; 101-civil construction sleeve;
[0025] 200-connection seat;
[0026] 300- positioning piece;
[0027] 400 - Mounting ring. DETAILED DESCRIPTION
[0028] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] In the description of the present invention, it should be noted that the terms "upper", "lower", etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0030] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the inside of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. In addition, in the description of the present invention, unless otherwise specified, "plurality" means two or more.
[0031] like Figure 1 to Figure 2As shown, the present invention provides a device for controlling the concentricity of a penetration welding process, comprising a mounting mechanism, a connecting mechanism and a positioning mechanism; the mounting mechanism is provided with a through hole, and the mounting mechanism is sleeved on the outside of the penetration 100 through the through hole, and is located between the penetration 100 and the civil sleeve 101; there are multiple connecting mechanisms, and they are evenly spaced along the circumferential direction of the upper surface of the mounting mechanism, the positioning mechanism corresponds to the connecting mechanism one by one, and the ends of the positioning mechanism pass through the connecting mechanism and alternately abut against the side walls of the penetration 100 or the civil sleeve 101.
[0032] In this embodiment, the device includes an installation mechanism, a connecting mechanism and a positioning mechanism. When in use, the installation mechanism is sleeved on the outside of the penetration piece 100 and is located at the portion overlapping with the civil sleeve 101. The connection mechanism is evenly spaced circumferentially on the upper surface of the installation mechanism, and the positioning mechanism passes through the connecting mechanism and alternately abuts against the side walls of the penetration piece 100 or the civil sleeve 101. The two cooperate to adjust the distance between the penetration piece 100 and the installation mechanism and the distance between the civil sleeve 101 and the installation mechanism to ensure concentricity. This can reduce the concentricity deviation during construction, thereby reducing the deformation problem caused by lack of control during welding, and can also effectively improve work efficiency.
[0033] According to an embodiment provided by the present invention, Figure 1 and Figure 2 As shown, the connection mechanism includes a connection seat 200, which is fixed on the upper surface of the mounting mechanism and is evenly spaced along the circumference of the upper surface of the mounting mechanism.
[0034] In this embodiment, the connecting mechanism includes a connecting seat 200, wherein, preferably, the connecting seat 200 is fixed on the upper surface of the mounting mechanism and fixed by welding, and is evenly spaced along the circumference of the surface of the mounting mechanism, so that after the positioning mechanism passes through, the distance between the penetration piece 100 and the mounting mechanism and the distance between the civil sleeve 101 and the mounting mechanism can be accurately controlled.
[0035] According to an embodiment provided by the present invention, Figure 1 and Figure 2 As shown, a connecting hole is provided on the connecting seat 200 , and the end of the positioning mechanism passes through the connecting hole and abuts against the side wall of the penetration piece 100 or the civil engineering sleeve 101 .
[0036] In this embodiment, a connecting hole is provided on the connecting seat 200, and the end of the positioning mechanism is used to pass through the connecting hole and abut against the side wall of the penetration piece 100 or the civil sleeve 101, so that the protruding end length of the positioning mechanism after passing through the connecting seat 200 can be adjusted to be consistent to ensure the concentricity of the penetration piece 100 and the civil sleeve 101. It can be adjusted into place at one time, which can effectively reduce labor intensity and improve work efficiency.
[0037] According to an embodiment provided by the present invention, Figure 1 and Figure 2 As shown, there are at least four connecting seats 200, and the number is an even number, which are evenly distributed along the circumferential direction of the upper surface of the mounting mechanism.
[0038] In this embodiment, at least four connecting seats 200 are provided, and the number is set to an even number. Since the ends of the positioning mechanism pass through the connecting seats 200 and alternately abut against the side walls of the penetration piece 100 or the civil sleeve 101, it is necessary to ensure that the positioning mechanism on the connecting seat 200 arranged diagonally passes through and then abuts against the side wall of the same component, that is, the end of the positioning mechanism on the connecting seat 200 arranged diagonally along the installation mechanism is straight after passing through the connecting seat 200.
[0039] According to an embodiment provided by the present invention, Figure 1 and Figure 2 As shown, the positioning mechanism includes a positioning member 300 , and the end of the positioning member 300 passes through the connecting hole and abuts against the side wall of the penetration member 100 or the civil engineering sleeve 101 .
[0040] In this embodiment, the positioning mechanism includes a positioning member 300, and the end of the positioning member 300 directly passes through the connecting hole and abuts against the side wall of the penetration member 100 or the civil sleeve 101. It is only necessary to keep the end length of the positioning member 300 abutting against the side wall of the penetration member 100 or the civil sleeve 101 after passing through the connecting seat 200 consistent, so as to achieve a concentric effect, clear distance, simple operation, and can be adjusted into place at one time, thereby improving the operation accuracy.
[0041] According to an embodiment provided by the present invention, Figure 1 and Figure 2 As shown, the positioning member 300 is a positioning bolt.
[0042] In this embodiment, preferably, the positioning member 300 is set as a positioning bolt, and correspondingly, the connecting seat 200 is set as a nut that can be used in conjunction with the positioning bolt. The nut is welded and fixed on the surface of the mounting mechanism, and the length of the end of the positioning bolt protruding from the nut can be accurately controlled by cooperating with the thread at the end of the positioning bolt and the thread on the inside of the nut, which can effectively improve the operation accuracy and ensure the quality of the operation.
[0043] According to an embodiment provided by the present invention, Figure 1 and Figure 2 As shown, the positioning bolt includes a bolt body and a bolt head, one end of the bolt body is connected to one side of the bolt head, and the other end of the bolt body passes through the connecting seat 200 and abuts against the side wall of the penetration piece 100 or the civil engineering sleeve 101.
[0044] In this embodiment, the positioning bolt includes a bolt body and a bolt head, wherein one end of the bolt body is welded and fixed to the bolt head, and the other end is used to pass through the connecting seat 200 and then abut against the side wall of the penetration piece 100 or the civil sleeve 101. Therefore, it is only necessary to measure the length of the end of the bolt body that abuts against the side wall of the penetration piece 100 or the civil sleeve 101 after passing through the connecting seat 200 and keep it consistent to achieve a concentric effect. The operation is simple, can reduce labor intensity, and improve subsequent welding efficiency.
[0045] According to an embodiment provided by the present invention, Figure 1 and Figure 2 As shown, the installation mechanism includes a mounting ring 400 , a through hole is formed inside the mounting ring 400 , and the mounting ring 400 is sleeved between the penetration piece 100 and the civil engineering sleeve 101 .
[0046] In this embodiment, the mounting mechanism includes a mounting ring 400, and a through hole is formed on the inner side of the mounting ring 400. The mounting ring 400 is sleeved on the outer side of the penetration piece 100 by using the through hole, and is located at the overlapping portion of the penetration piece 100 and the civil engineering sleeve 101, so that the connecting seat 200 arranged thereon can cooperate with the positioning piece 300 to adjust the concentricity of the penetration piece 100 and the civil engineering sleeve 101.
[0047] According to an embodiment provided by the present invention, Figure 1 and Figure 2 As shown, the connection seats 200 are disposed on the upper surface of the mounting ring 400 and are arranged at intervals along the circumferential direction of the edge of the mounting ring 400 .
[0048] In this embodiment, the connecting seat 200 is arranged on the upper surface of the mounting ring 400, and the connecting seat 200 is arranged at equal intervals along the circumferential edge of the mounting ring 400, that is, the connecting seat 200 is symmetrically arranged, and the two symmetrically arranged connecting seats 200 are symmetrical along the diameter of the mounting ring 400, and the ends of the positioning members 300 passing through the two symmetrical connecting seats 200 are oriented in the same direction, ensuring that the ends of the positioning members 300 pass through the connecting mechanism and alternately abut against the side walls of the through-piece 100 or the civil sleeve 101. When adjustment is needed, only the two adjacent positioning members 300 need to be adjusted, which makes the operation simpler.
[0049] According to an embodiment provided by the present invention, Figure 1 and Figure 2 As shown, there are eight connecting seats 200 , which are evenly distributed along the edge of the upper surface of the mounting ring 400 .
[0050] In this embodiment, preferably, 8 connecting seats 200 are provided, and the 8 connecting seats 200 are equally spaced axially along the upper surface of the mounting ring 400. It is only necessary to keep the end length of the positioning member 300 that abuts against the side wall of the through-piece 100 or the civil sleeve 101 after passing through the connecting seat 200 consistent, so as to achieve a concentric effect.
[0051] Among them, optionally, the number of the connecting sockets 200 can also be six, ten or other even numbers greater than four, and the purpose thereof does not deviate from the design concept of the present invention and should fall within the protection scope of the present invention.
[0052] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A device for controlling concentricity during welding of a through-piece, characterized in that: It includes a mounting mechanism, a connecting mechanism and a positioning mechanism; The installation mechanism is provided with a through hole, and the installation mechanism is sleeved on the outside of the penetration piece (100) through the through hole, and is located between the penetration piece (100) and the civil engineering sleeve (101); The connecting mechanisms are provided in plurality and are evenly spaced along the circumferential direction of the upper surface of the mounting mechanism. The positioning mechanisms correspond to the connecting mechanisms one by one, and the ends of the positioning mechanisms respectively pass through the connecting mechanisms and alternately abut against the side walls of the penetration piece (100) or the civil engineering sleeve (101).
2. The device for controlling concentricity of a penetration welding process according to claim 1, characterized in that: The connection mechanism comprises a connection seat (200), the connection seat (200) being fixed on the upper surface of the installation mechanism and arranged at even intervals along the circumference of the upper surface of the installation mechanism.
3. The device for controlling concentricity of penetration welding process according to claim 2, characterized in that: The connection seat (200) is provided with a connection hole, and the end of the positioning mechanism passes through the connection hole and abuts against the side wall of the penetration piece (100) or the civil engineering sleeve (101).
4. The device for controlling concentricity of a penetration welding process according to claim 2, characterized in that: The connection seats (200) are provided in at least four numbers, and the number is an even number, and are evenly distributed along the circumference of the upper surface of the installation mechanism.
5. The device for controlling concentricity of a penetration welding process according to claim 3, characterized in that: The positioning mechanism comprises a positioning member (300), and the end of the positioning member (300) passes through the connection hole and abuts against the side wall of the penetration member (100) or the civil engineering sleeve (101).
6. The device for controlling concentricity during welding of penetration pieces according to claim 5, characterized in that: The positioning member (300) is a positioning bolt.
7. The device for controlling concentricity of a penetration welding process according to claim 6, characterized in that: The positioning bolt comprises a bolt body and a bolt head, one end of the bolt body is connected to one side of the bolt head, and the other end of the bolt body passes through the connecting seat (200) and abuts against the side wall of the penetration piece (100) or the civil engineering sleeve (101).
8. The device for controlling concentricity during welding of penetration pieces according to claim 2, characterized in that: The mounting mechanism comprises a mounting ring (400), the through hole being formed inside the mounting ring (400), and the mounting ring (400) is sleeved between the penetration piece (100) and the civil engineering sleeve (101).
9. The device for controlling concentricity during welding of penetration pieces according to claim 8, characterized in that: The connecting seats (200) are arranged on the upper surface of the mounting ring (400) and are arranged at intervals in the circumferential direction along the edge of the mounting ring (400).
10. The device for controlling concentricity during penetration welding according to claim 9, characterized in that: The connecting seats (200) are provided in eight equal distributions along the edge of the upper surface of the mounting ring (400).
Citation Information
Patent Citations
Nuclear power large penetration piece weld and postweld treatment method and application thereof
CN110303227A
Penetration piece installation concentricity detection device
CN115077430A
Sleeve positioning device for through-wall pipeline
CN212004609U
Device for centering installation pipeline in sleeve
CN217153313U
Multipurpose concrete panel for construction
JP1999050592A