Municipal relocation project construction reporting method and device based on CIM technology
By collecting and analyzing the data of urban underground pipeline transformation, calculating and evaluating indexes and adjusting the transformation plan, building a CIM urban underground pipeline model, solving the problem of incomplete data evaluation in urban underground pipeline transformation, and improving the municipal government The reliability of the relocation project construction and the optimization effect of the transformation plan.
Patent Information
- Application Number
- CN202411524411.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-30
- Publication Date
- 2025-02-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the prior art, CIM technology has incomplete data assessment in urban underground pipeline renovation, resulting in insufficient safety assessment of urban underground pipeline renovation, which may lead to insufficient pipeline leakage risk assessment, thereby making the accuracy of municipal relocation project reporting and Insufficient reliability.
By collecting and analyzing urban underground pipeline transformation data, calculating pipeline leakage risk assessment index and safety assessment index, comprehensively analyzing the reliability assessment index, adjusting the transformation plan, building a CIM urban underground pipeline model, and generating transformation project reporting.
It improves the reliability of the municipal relocation project application method, ensures the safety of urban underground pipeline renovation and the accuracy of leakage risk assessment, optimizes the transformation plan, extends the service life of the pipeline network, and improves energy utilization efficiency.
Smart Images

Figure CN119475513A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of project application data processing, and in particular to a method and device for applying for application for a municipal relocation project based on CIM technology. Background Art
[0002] With the acceleration of urbanization, the aging and inadaptability of urban infrastructure are becoming increasingly prominent, and they need to be renovated and upgraded. Municipal relocation projects usually involve the renovation of urban roads, bridges, water supply, drainage, gas, electricity and other infrastructure. These projects are highly complex and involve multiple departments and stakeholders. Municipal relocation projects are often large-scale, long-term, and wide-ranging, requiring efficient project management tools and methods. The application, approval, and construction of municipal relocation projects need to comply with strict regulatory requirements. With the improvement of environmental awareness, green buildings and sustainable development have become important goals of urban construction. In the context of rapid urbanization, in order to cope with the complexity and challenges of infrastructure renovation, information and intelligent technologies are used.
[0003] An existing method and device for reporting and approving municipal relocation projects based on CIM technology uses building information modeling technology to create and manage digital models of construction projects, thereby improving the efficiency of design, construction, and operation; uses a geographic information system to analyze and manage geographic spatial data, which is crucial for the site selection, planning, and environmental impact assessment of municipal relocation projects; and uses the Internet of Things technology to achieve real-time monitoring and remote management of municipal relocation projects.
[0004] For example, the invention patent application with publication number: CN114417458A discloses an online multi-dimensional construction project application collaborative system based on CIM technology, including: a client, which is connected to the server in communication, and the client includes: a data acquisition module, which is used to obtain the CIM data and planning and construction application BIM model of the specified construction application plan from the server; an auxiliary self-review module, which is used to visualize the CIM data and load the planning and construction application BIM model to the selected location; analyze the set planning indicators and determine whether the indicator requirements are met.
[0005] For example, the invention patent application with publication number: CN114417457A discloses an online multi-dimensional collaborative site selection system for planning projects based on CIM technology, including: an indicator editing module, a data acquisition module and a site selection evaluation module, the site selection evaluation module is used to perform visual display based on the CIM data of the target address, and based on the visual display result, the control planning indicators of the target address are checked by expert evaluation method to determine the optimal site selection result; the business server includes a data acquisition module and a multi-dimensional site selection module, and the multi-dimensional site selection module is used to perform step-by-step screening of the target address from the acquired CIM data based on the control planning indicators in the site selection strategy.
[0006] However, in the process of implementing the technical solution of the invention in the embodiments of the present application, the present application found that the above technology has at least the following technical problems:
[0007] In the existing technology, CIM technology does not comprehensively evaluate underground pipeline data in urban underground pipeline reconstruction, resulting in insufficient safety assessment of urban underground pipeline reconstruction, which may lead to insufficient risk assessment of urban underground pipeline leakage. The simulation results of urban underground pipeline reconstruction deviate from the actual situation, making the municipal relocation project reporting method inaccurate. There is a problem of insufficient reliability of the municipal relocation project reporting method using CIM technology. Summary of the invention
[0008] The embodiments of the present application provide a method and device for reporting and approving municipal relocation projects based on CIM technology, thereby solving the problem of insufficient reliability of the method and device for reporting and approving municipal relocation projects based on CIM technology in the prior art, and improving the reliability of the method and device for reporting and approving municipal relocation projects based on CIM technology.
[0009] The embodiment of the present application provides a method for reporting and approving a municipal relocation project based on CIM technology, comprising the following steps: collecting urban underground pipe network reconstruction data of the municipal relocation project; obtaining an urban underground pipe network reconstruction pipeline leakage risk assessment index and an urban underground pipe network reconstruction pipeline safety assessment index by analyzing the urban underground pipe network reconstruction data of the municipal relocation project; obtaining an urban underground pipe network reconstruction reliability assessment index by comprehensive analysis; adjusting the urban underground pipe network reconstruction plan according to the analysis results of the urban underground pipe network reconstruction data of the municipal relocation project; constructing a CIM urban underground pipe network model by adjusting the urban underground pipe network reconstruction plan; and generating a report and approving a municipal underground pipe network reconstruction project according to the CIM urban underground pipe network model.
[0010] Furthermore, the specific steps of collecting the urban underground pipeline renovation data of the municipal relocation project are: extracting the normal flow of the urban underground pipeline renovation pipeline, the normal pressure of the underground pipeline renovation pipeline, the normal water quality concentration of the underground pipeline renovation pipeline, the normal soil dry density of the underground pipeline renovation pipeline, the standard value of the buried depth of the urban underground pipeline renovation pipeline, the standard value of the actual pipeline elevation of the urban underground pipeline renovation, the soil moisture threshold value and the pipeline pressure bearing threshold value of the urban underground pipeline renovation from the underground pipeline database; the urban underground pipeline renovation data of the municipal relocation project includes the pipeline leakage data and pipeline safety data of the urban underground pipeline renovation.
[0011] Furthermore, the specific steps for obtaining the urban underground pipe network renovation pipeline leakage risk assessment index are as follows: recording the urban underground pipe network renovation pipeline leakage risk detection time as the first preset time urban underground pipe network renovation pipeline leakage risk detection point; obtaining the urban underground pipe network renovation pipeline flow at the first preset time urban underground pipe network renovation pipeline leakage risk detection point through a turbine flowmeter; obtaining the urban underground pipe network renovation pipeline pressure at the first preset time urban underground pipe network renovation pipeline leakage risk detection point through a differential pressure transmitter; obtaining the urban underground pipe network pollutant concentration at the first preset time urban underground pipe network renovation pipeline leakage risk detection point through a water quality analyzer; obtaining the urban underground pipe network renovation soil dry density at the first preset time urban underground pipe network renovation pipeline leakage risk detection point through a nuclear water density meter; the urban underground pipe network renovation pipeline leakage data includes the urban underground pipe network renovation pipeline flow, urban underground pipe network renovation pipeline pressure, urban underground pipe network pollutant concentration and urban underground pipe network renovation soil dry density at the first preset time urban underground pipe network renovation pipeline leakage risk detection point; and obtaining the urban underground pipe network renovation pipeline leakage risk assessment index according to the urban underground pipe network renovation pipeline leakage data analysis.
[0012] Furthermore, the specific steps of obtaining the urban underground pipeline network renovation pipeline safety assessment index are: recording the urban underground pipeline network renovation pipeline safety detection time as the urban underground pipeline network renovation pipeline safety detection point at the second preset time; obtaining the actual buried depth of the urban underground pipeline network renovation pipeline at the urban underground pipeline network renovation pipeline safety detection point at the second preset time through the GPS positioning system; obtaining the actual pipeline elevation of the urban underground pipeline network renovation pipeline at the urban underground pipeline network renovation pipeline safety detection point at the second preset time through the GPS positioning system; obtaining the urban underground pipeline network renovation soil dry density at the urban underground pipeline network renovation pipeline safety detection point at the second preset time through a nuclear moisture density meter; obtaining the urban underground pipeline network renovation pipeline safety detection point at the second preset time through a soil moisture meter the soil moisture of the urban underground pipe network renovation at the measuring point; the urban underground pipe network renovation pipeline pressure at the urban underground pipe network renovation pipeline safety detection point at the second preset time is obtained by a differential pressure transmitter; the urban underground pipe network pollutant concentration at the urban underground pipe network renovation pipeline safety detection point at the second preset time is obtained by a water quality analyzer; the pipeline safety data include the actual pipeline burial depth of the urban underground pipe network renovation at the urban underground pipe network renovation pipeline safety detection point at the second preset time, the actual pipeline elevation of the urban underground pipe network renovation, the urban underground pipe network renovation soil dry density, the urban underground pipe network renovation soil moisture, the urban underground pipe network renovation pipeline pressure and the urban underground pipe network pollutant concentration; the urban underground pipe network renovation pipeline safety assessment index is obtained through pipeline safety data analysis.
[0013] Furthermore, the specific steps of comprehensively analyzing and obtaining the reliability assessment index of urban underground pipeline network reconstruction are: comprehensively analyzing the pipeline leakage risk assessment index of urban underground pipeline network reconstruction and the pipeline safety assessment index of urban underground pipeline network reconstruction to obtain the reliability assessment index of urban underground pipeline network reconstruction.
[0014] Furthermore, the specific steps for adjusting the urban underground pipeline network renovation plan are: extracting the prediction accuracy threshold of the urban underground pipeline network renovation reliability assessment index from the underground pipeline network database, and comparing the urban underground pipeline network renovation reliability assessment index with the urban underground pipeline network renovation reliability assessment index prediction accuracy threshold; if the urban underground pipeline network renovation reliability assessment index is greater than or equal to the urban underground pipeline network renovation reliability assessment index prediction accuracy threshold, then the urban underground pipeline network renovation is reasonable; if the urban underground pipeline network renovation reliability assessment index is less than the urban underground pipeline network renovation reliability assessment index prediction accuracy threshold, then the urban underground pipeline network renovation is unreasonable.
[0015] Furthermore, the adjustment to the urban underground pipeline renovation plan also includes: if the urban underground pipeline renovation pipeline leakage risk assessment index is higher than the first threshold value of the urban underground pipeline renovation pipeline leakage risk assessment index, then adding an underground pipeline protection layer, upgrading the real-time monitoring system, and regularly inspecting and maintaining the monitoring equipment; if the urban underground pipeline renovation pipeline safety assessment index is lower than the second threshold value of the urban underground pipeline renovation pipeline safety assessment index, then regularly analyzing the urban underground pipeline renovation pipeline monitoring data, and using more corrosion-resistant underground pipeline renovation pipeline materials.
[0016] Furthermore, the specific steps of constructing the CIM urban underground pipe network model are: setting the geographic coordinate system through CIM software, creating a surface model according to terrain data, and establishing the pipe network infrastructure according to the urban underground pipe network data; the basic structure of the urban underground pipe network includes pipelines, valves, and pump stations; integrating the terrain data and the urban underground pipe network data through geographic information system software; creating a new municipal relocation project urban underground pipe network renovation project file in the CIM software, and drawing a three-dimensional model of the urban underground pipe network in the CIM software based on the integrated urban underground pipe network renovation data to obtain the CIM urban underground pipe network model.
[0017] Furthermore, the specific steps of generating the application for construction of the urban underground pipeline network renovation project are as follows: based on the CIM urban underground pipeline network model, the documents and materials for the application for construction of the urban underground pipeline network renovation project are generated through the CIM software to realize online application, and the documents and materials for the application for construction of the urban underground pipeline network renovation project include the optimized urban underground pipeline network renovation pipeline leakage risk assessment and the urban underground pipeline network renovation pipeline safety assessment; the application for construction of the urban underground pipeline network renovation project is converted into PDF electronic format, and the application document for construction of the urban underground pipeline network renovation project is submitted online through the project declaration and approval system.
[0018] The embodiment of the present application provides a municipal relocation project reporting and construction device based on CIM technology, including an information collection module, a CIM processing center module, a communication module, an underground pipe network information management module and a user terminal module: Information collection module: used to collect information on urban underground pipe network renovation projects; CIM processing center module: including a server and a database, used to store, process and display urban underground pipe network renovation project information; Communication module: ensuring data transmission between the information collection device, the CIM processing center and the user terminal; Underground pipe network information management module: used to store, manage and analyze data on urban underground pipe network renovation; User terminal module: including computers, tablet computers, etc., for use by urban underground pipe network renovation project managers and approvers.
[0019] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
[0020] 1. By collecting, evaluating and analyzing the urban underground pipeline reconstruction data of municipal relocation projects, adjusting the urban underground pipeline reconstruction plan according to the evaluation and analysis results, constructing a CIM urban underground pipeline model and generating an urban underground pipeline reconstruction project application, the municipal relocation project application method and device reliability of CIM technology are improved.
[0021] 2. By constructing a CIM urban underground pipeline network model and conducting simulation analysis, the performance of the urban underground pipeline network under different working conditions can be predicted, thereby optimizing the allocation of materials and resources. Through CIM urban underground pipeline network model simulation analysis, the urban underground pipeline network maintenance plan can be optimized, the service life of the urban underground pipeline network can be extended, and energy utilization efficiency can be improved.
[0022] 3. Through the simulation analysis results of the CIM urban underground pipeline network model, optimization and adjustment are carried out to improve the performance of the underground pipeline network, optimize the layout and structure of the urban underground pipeline network, improve the transportation efficiency of water, electricity, gas and other resources, identify potential fault points in the system, repair or reinforce them in advance, and reduce the risk of system failure, thereby realizing the municipal relocation project application method and device safety of CIM technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 A flow chart of a method for reporting and applying for a municipal relocation project based on CIM technology provided in an embodiment of the present application;
[0024] Figure 2 A schematic diagram of a reliability evaluation index function for urban underground pipe network reconstruction provided in an embodiment of the present application;
[0025] Figure 3 A structural diagram of a municipal relocation project application device based on CIM technology provided in an embodiment of the present application. DETAILED DESCRIPTION
[0026] The embodiments of the present application provide a method and device for reporting and approving municipal relocation projects based on CIM technology, thereby solving the problem of insufficient reliability of the method and device for reporting and approving municipal relocation projects based on CIM technology in the prior art. By collecting, evaluating and analyzing the urban underground pipeline network reconstruction data of municipal relocation projects, adjusting the urban underground pipeline network reconstruction plan according to the evaluation and analysis results, constructing a CIM urban underground pipeline network model and generating an urban underground pipeline network reconstruction project report, the reliability of the method and device for reporting and approving municipal relocation projects based on CIM technology is improved.
[0027] The technical solution in the embodiment of the present application is to solve the above-mentioned problem that the construction application method and device of the municipal relocation project with CIM technology are not reliable enough. The overall idea is as follows:
[0028] Collect, evaluate and analyze the urban underground pipeline reconstruction data of municipal relocation projects, adjust the urban underground pipeline reconstruction plan according to the evaluation and analysis results, build a CIM urban underground pipeline model and generate urban underground pipeline reconstruction project application, which improves the reliability of the municipal relocation project application method and device of CIM technology.
[0029] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0030] like Figure 1As shown, it is a flow chart of a method for reporting and approving a municipal relocation project based on CIM technology provided in an embodiment of the present application. The method is applied to a device for reporting and approving a municipal relocation project based on CIM technology. The method includes the following steps: collecting urban underground pipe network reconstruction data of municipal relocation projects; obtaining an urban underground pipe network reconstruction pipeline leakage risk assessment index and an urban underground pipe network reconstruction pipeline safety assessment index by analyzing the urban underground pipe network reconstruction data of municipal relocation projects; obtaining an urban underground pipe network reconstruction reliability assessment index by comprehensive analysis; adjusting the urban underground pipe network reconstruction plan according to the analysis results of the urban underground pipe network reconstruction data of municipal relocation projects; constructing a CIM urban underground pipe network model by adjusting the urban underground pipe network reconstruction plan; and generating a report and approving a project for reporting and approving an urban underground pipe network reconstruction according to the CIM urban underground pipe network model.
[0031] Furthermore, the specific steps for collecting urban underground pipe network renovation data of municipal relocation projects are as follows: extracting normal flow of urban underground pipe network renovation pipelines, normal pressure of underground pipe network renovation pipelines, normal water quality concentration of underground pipe network renovation pipelines, normal soil dry density of underground pipe network renovation pipelines, standard value of buried depth of urban underground pipe network renovation pipelines, standard value of actual pipeline elevation of urban underground pipe network renovation, soil moisture threshold and pipeline pressure threshold of urban underground pipe network renovation from the underground pipe network database; urban underground pipe network renovation data of municipal relocation projects include pipeline leakage data and pipeline safety data of urban underground pipe network renovation.
[0032] Furthermore, the specific steps for obtaining the urban underground pipe network renovation pipeline leakage risk assessment index are as follows: recording the urban underground pipe network renovation pipeline leakage risk detection time as the first preset time urban underground pipe network renovation pipeline leakage risk detection point; obtaining the urban underground pipe network renovation pipeline flow at the first preset time urban underground pipe network renovation pipeline leakage risk detection point through a turbine flowmeter; obtaining the urban underground pipe network renovation pipeline pressure at the first preset time urban underground pipe network renovation pipeline leakage risk detection point through a differential pressure transmitter; obtaining the urban underground pipe network pollutant concentration at the first preset time urban underground pipe network renovation pipeline leakage risk detection point through a water quality analyzer; obtaining the urban underground pipe network renovation soil dry density at the first preset time urban underground pipe network renovation pipeline leakage risk detection point through a nuclear water density meter; the urban underground pipe network renovation pipeline leakage data includes the urban underground pipe network renovation pipeline flow, urban underground pipe network renovation pipeline pressure, urban underground pipe network pollutant concentration and urban underground pipe network renovation soil dry density at the first preset time urban underground pipe network renovation pipeline leakage risk detection point; and obtaining the urban underground pipe network renovation pipeline leakage risk assessment index according to the urban underground pipe network renovation pipeline leakage data analysis.
[0033] In this embodiment, the specific method for analyzing and obtaining the pipeline leakage risk assessment index for urban underground pipeline network reconstruction is as follows:
[0034]
[0035] μ1+μ2+μ3=1;
[0036] The preset urban underground pipeline network renovation pipeline leakage risk detection points are numbered in sequence, S0 represents the number of the urban underground pipeline network renovation pipeline leakage risk detection point under the T0th urban underground pipeline network renovation pipeline leakage risk detection section, S0 = 1, 2, ..., S, S represents the total number of urban underground pipeline network renovation pipeline leakage risk detection points.
[0037] The preset underground pipeline network renovation pipeline leakage risk time is divided into urban underground pipeline network renovation pipeline leakage risk detection sections of the same time length, T0 represents the number of the urban underground pipeline network renovation pipeline leakage risk detection section, T0 = 1, 2, ..., T, T represents the total number of urban underground pipeline network renovation pipeline leakage risk detection sections.
[0038] It represents the urban underground pipeline network renovation pipeline leakage risk assessment index of the T0th urban underground pipeline network renovation pipeline leakage risk detection section.
[0039] It represents the underground pipeline flow rate at the pipeline leakage risk detection point of the underground pipeline network renovation in the S0th city.
[0040] A1 represents the normal flow standard value of the urban underground pipe network renovation pipeline, which is the preset normal flow standard value of the underground pipe network renovation pipeline obtained from the underground pipe network database.
[0041] It represents the underground pipeline pressure at the pipeline leakage risk detection point of the underground pipeline network renovation in the S0th city.
[0042] B1 represents the normal pressure standard value of the underground pipe network renovation pipeline, which is the preset normal pressure standard value of the underground pipe network renovation pipeline obtained from the underground pipe network database.
[0043] It represents the pollutant concentration of the urban underground pipeline network at the S0th urban underground pipeline network renovation pipeline leakage risk detection point.
[0044] C1 represents the standard value of pollutant concentration in the urban underground pipe network, which is the preset standard value of pollutant concentration in the urban underground pipe network obtained from the underground pipe network database.
[0045] It represents the soil compaction ratio of the underground pipeline network under the pipeline leakage risk detection section of the T0th urban underground pipeline network transformation.
[0046] It represents the maximum dry density of the underground pipeline network soil under the pipeline leakage risk detection section of the T0th urban underground pipeline network transformation.
[0047] P1 represents the normal soil dry density standard value of the underground pipeline network transformation pipeline, which is the preset normal soil dry density standard value of the underground pipeline network transformation pipeline obtained from the underground pipeline network database.
[0048] It represents the minimum dry density of the underground pipeline network soil under the pipeline leakage risk detection section of the T0th urban underground pipeline network renovation.
[0049] μ1 is the preset underground pipe network pipeline flow impact weight factor obtained from the underground pipe network database.
[0050] μ2 is the preset underground pipe network pipeline pressure influence weight factor obtained from the underground pipe network database.
[0051] μ3 is the influence weight factor of pollutant concentration in the preset urban underground pipeline network obtained from the underground pipeline network database.
[0052] Soil moisture is an influencing factor corresponding to the unit values of underground pipe network flow, underground pipe network pipe pressure and urban underground pipe network pollutant concentration preset in the underground pipe network database, which represents the numerical value of the influence degree of underground pipe network flow, underground pipe network pipe pressure and urban underground pipe network pollutant concentration on the risk of pipeline leakage in urban underground pipe network transformation. When used, the influencing factors corresponding to the underground pipe network flow, underground pipe network pipe pressure and urban underground pipe network pollutant concentration can be directly obtained from the underground pipe network database, and the corresponding relationship can be a pre-set mapping relationship. For example, soil moisture and the unit values of underground pipe network flow, underground pipe network pipe pressure and urban underground pipe network pollutant concentration preset in the underground pipe network database and their corresponding influencing factors form a mapping set, and the real-time underground pipe network flow, underground pipe network pipe pressure and urban underground pipe network pollutant concentration are input into the mapping set to obtain the influencing factors corresponding to the unit values of underground pipe network flow, underground pipe network pipe pressure and urban underground pipe network pollutant concentration, and the mapping relationship can be one-to-one or many-to-one.
[0053] Table 1 is an example table of pipeline leakage risk assessment index for urban underground pipeline network renovation. The example parameters in Table 1 only take the parameters at one urban underground pipeline network renovation pipeline leakage risk detection point as an example, S=1, weight factor μ1 is set to 0.3, weight factor μ2 is set to 0.3, weight factor μ3 is set to 0.4, and the underground pipeline network soil compaction ratio is a fixed value of 1. Table 1 is shown below.
[0054] Table 1 Example of risk assessment index for pipeline leakage in urban underground pipeline network reconstruction
[0055]
[0056]
[0057] The greater the pressure of the underground pipeline network, the increase in the flow rate of the underground pipeline network will cause pollutants in the urban underground pipeline network to penetrate into the surrounding soil or water through defects or cracks in the underground pipeline network, and the concentration of pollutants in the urban underground pipeline network will increase. The higher the dry density of the soil in the underground pipeline network, the less deformation and leakage of the urban underground pipeline network caused by soil subsidence, and the lower the concentration of pollutants in the urban underground pipeline network.
[0058] The greater the flow rate of the underground pipeline network, the faster the wear of the underground pipeline network, thereby increasing the risk of leakage of the urban underground pipeline network renovation pipeline, and the greater the risk assessment index of leakage of the urban underground pipeline network renovation pipeline; the underground pipeline network pressure is greater than the normal pressure standard value of the underground pipeline network renovation pipeline, resulting in leakage or rupture of the urban underground pipeline network renovation pipeline, and the greater the risk assessment index of leakage of the urban underground pipeline network renovation pipeline; the higher the concentration of pollutants in the urban underground pipeline network, the faster the corrosion of the underground pipeline network material, and the greater the risk assessment index of leakage of the urban underground pipeline network renovation pipeline; the lower the dry density of the soil in the underground pipeline network, the more uneven pressure on the pipeline, causing deformation of the underground pipeline network, resulting in leakage or rupture of the urban underground pipeline network renovation pipeline, and the greater the risk assessment index of leakage of the urban underground pipeline network renovation pipeline.
[0059] Furthermore, the specific steps for obtaining the pipeline safety assessment index of the urban underground pipeline network renovation are: recording the pipeline safety inspection time of the urban underground pipeline network renovation as the pipeline safety inspection point of the urban underground pipeline network renovation at the second preset time; obtaining the actual pipeline burial depth of the urban underground pipeline network renovation at the pipeline safety inspection point of the urban underground pipeline network renovation at the second preset time through the GPS positioning system; obtaining the actual pipeline elevation of the urban underground pipeline network renovation at the pipeline safety inspection point of the urban underground pipeline network renovation at the second preset time through the GPS positioning system; obtaining the dry density of the urban underground pipeline network renovation soil at the pipeline safety inspection point of the urban underground pipeline network renovation at the second preset time through the nuclear moisture density meter; obtaining the pipeline safety inspection point of the urban underground pipeline network renovation at the second preset time through the soil moisture meter. The soil moisture of the urban underground pipe network renovation at the point where the urban underground pipe network renovation pipeline safety is detected; the urban underground pipe network renovation pipeline pressure at the urban underground pipe network renovation pipeline safety detection point at the second preset time is obtained through a differential pressure transmitter; the urban underground pipe network pollutant concentration at the urban underground pipe network renovation pipeline safety detection point at the second preset time is obtained through a water quality analyzer; the pipeline safety data include the actual buried depth of the urban underground pipe network renovation pipeline, the actual elevation of the urban underground pipe network renovation pipeline, the dry density of the urban underground pipe network renovation soil, the soil moisture of the urban underground pipe network renovation, the urban underground pipe network renovation pipeline pressure and the urban underground pipe network pollutant concentration at the urban underground pipe network renovation pipeline safety detection point at the second preset time; the urban underground pipe network renovation pipeline safety assessment index is obtained through pipeline safety data analysis.
[0060] In this embodiment, the specific method for analyzing and obtaining the pipeline safety assessment index for urban underground pipeline network reconstruction is as follows:
[0061]
[0062] The preset urban underground pipeline renovation pipeline safety inspection points are numbered in sequence, N0 represents the number of the urban underground pipeline network renovation pipeline safety inspection point in the L0th urban underground pipeline network renovation pipeline safety time period, N0 = 1, 2, ..., N, N represents the total number of urban underground pipeline network renovation pipeline safety inspection points.
[0063] The preset urban underground pipeline network renovation pipeline safety time is divided into urban underground pipeline network renovation pipeline safety time periods of equal length, L0 represents the number of the urban underground pipeline network renovation pipeline safety time period, L0=1,2,...,L, L represents the total number of urban underground pipeline network renovation pipeline safety time periods.
[0064] It represents the urban underground pipeline network renovation pipeline safety assessment index in the L0th urban underground pipeline network renovation pipeline safety time period.
[0065] Q1 represents the actual buried depth of pipelines in urban underground pipeline network reconstruction.
[0066] Q2 represents the standard value of the buried depth of urban underground pipe network renovation pipelines, which is the preset standard value of the buried depth of urban underground pipe network renovation pipelines obtained from the underground pipe network database.
[0067] W1 represents the actual pipeline elevation of the urban underground pipeline network reconstruction.
[0068] W2 represents the actual standard value of the elevation of the urban underground pipe network renovation, which is the preset standard value of the actual standard value of the elevation of the urban underground pipe network renovation obtained from the underground pipe network database.
[0069] It represents the soil compaction ratio of urban underground pipeline network renovation under the L0th urban underground pipeline network renovation pipeline safety time period. The larger the soil compaction ratio of urban underground pipeline network renovation, the denser the urban underground soil, reducing the settlement of urban underground soil. The standard value of the soil compaction ratio of urban underground pipeline network renovation is extracted from the underground official website database. If the underground soil type is sandy soil, the larger the soil compaction ratio of urban underground pipeline network renovation, the higher the safety of urban underground pipeline network renovation.
[0070] It represents the maximum dry density of the soil for urban underground pipeline network renovation under the L0th urban underground pipeline network renovation pipeline safety time period.
[0071] R1 represents the normal soil dry density standard value of the underground pipeline network transformation pipeline, which is the preset normal soil dry density standard value of the underground pipeline network transformation pipeline obtained from the underground pipeline network database.
[0072] It represents the minimum dry density of soil for urban underground pipeline network renovation under the L0th urban underground pipeline network renovation pipeline safety time period.
[0073] It represents the maximum soil humidity of the urban underground pipeline network renovation during the L0th urban underground pipeline network renovation pipeline safety time period.
[0074] It represents the maximum bearing pressure of the urban underground pipeline network during the L0th urban underground pipeline network renovation pipeline safety time period.
[0075] It represents the pollutant concentration of the urban underground pipeline network in the L0th urban underground pipeline network renovation pipeline safety time period.
[0076] H1 represents the soil moisture threshold for urban underground pipe network transformation, which is the preset soil moisture threshold for urban underground pipe network transformation obtained from the underground pipe network database.
[0077] X1 represents the pressure threshold of the urban underground pipe network pipeline, which is the preset pressure threshold of the urban underground pipe network pipeline obtained from the underground pipe network database.
[0078] Z1 represents the pollutant concentration threshold of the urban underground pipe network, which is the preset pollutant concentration threshold of the urban underground pipe network obtained from the underground pipe network database.
[0079] It is the weight factor affecting the actual pipeline burial depth of the preset urban underground pipeline network reconstruction obtained from the underground pipeline network database.
[0080] It is the actual pipeline elevation impact weight factor of the preset urban underground pipeline network reconstruction obtained from the underground pipeline network database.
[0081] It is the influence weight factor of soil compaction ratio of preset urban underground pipeline network transformation obtained from the underground pipeline network database.
[0082] The groundwater level is an influencing factor corresponding to the unit value of the actual pipeline burial depth of the urban underground pipeline network renovation, the actual pipeline elevation of the urban underground pipeline network renovation, and the soil compaction ratio of the urban underground pipeline network renovation preset in the underground pipeline network database, which represents the numerical value of the influence of the actual pipeline burial depth of the urban underground pipeline network renovation, the actual pipeline elevation of the urban underground pipeline network renovation, and the soil compaction ratio of the urban underground pipeline network renovation on the pipeline safety assessment index of the urban underground pipeline network renovation. When used, the influencing factors corresponding to the actual pipeline burial depth of the urban underground pipeline network renovation, the actual pipeline elevation of the urban underground pipeline network renovation, and the soil compaction ratio of the urban underground pipeline network renovation can be directly obtained from the underground pipeline network database, and the corresponding relationship can be preset. A mapping relationship is first set, for example, a mapping set is formed between the groundwater level and the actual pipeline burial depth of the urban underground pipeline transformation, the actual pipeline elevation of the urban underground pipeline transformation and the unit value of the soil compaction ratio of the urban underground pipeline transformation preset in the underground pipeline database and their corresponding influencing factors, and the real-time actual pipeline burial depth of the urban underground pipeline transformation, the actual pipeline elevation of the urban underground pipeline transformation and the soil compaction ratio of the urban underground pipeline transformation are input into the mapping set to obtain the actual pipeline burial depth of the urban underground pipeline transformation, the actual pipeline elevation of the urban underground pipeline transformation and the unit value of the soil compaction ratio of the urban underground pipeline transformation, and the influencing factors corresponding to the unit value, wherein the mapping relationship can be one-to-one or many-to-one.
[0083] The greater the actual pipeline burial depth of the urban underground pipeline network renovation, the lower the actual pipeline elevation of the urban underground pipeline network renovation; the higher the soil moisture of the urban underground pipeline network renovation, the lower the soil dry density of the urban underground pipeline network renovation, thereby reducing the additional pressure on the underground pipeline network pipes, and the lower the pressure on the urban underground pipeline network pipes; the higher the pressure on the urban underground pipeline network pipes, the greater the possibility of leakage of the underground pipeline network pipes, and the higher the concentration of pollutants in the urban underground pipeline network.
[0084] The actual pipeline burial depth of urban underground pipeline network transformation is close to the standard value of pipeline burial depth of urban underground pipeline network transformation, which has a positive impact on the safety assessment index of urban underground pipeline network transformation pipeline. The larger the safety assessment index of urban underground pipeline network transformation pipeline; the actual pipeline elevation of urban underground pipeline network transformation is close to the standard value of actual pipeline elevation of urban underground pipeline network transformation, which has a positive impact on the safety assessment index of urban underground pipeline network transformation pipeline. The larger the safety assessment index of urban underground pipeline network transformation pipeline; the soil dry density is close to the standard value of normal soil dry density of underground pipeline network transformation pipeline. The denser the soil, the positive impact on the safety assessment index of urban underground pipeline network transformation pipeline. The greater the pipeline safety assessment index of urban underground pipeline network renovation, the higher the soil moisture of urban underground pipeline network renovation, the negative impact on the pipeline safety assessment index of urban underground pipeline network renovation, and the lower the pipeline safety assessment index of urban underground pipeline network renovation; the greater the pressure on urban underground pipeline network pipelines, the negative impact on the pipeline safety assessment index of urban underground pipeline network renovation, and the lower the pipeline safety assessment index of urban underground pipeline network renovation; the higher the pollutant concentration in urban underground pipeline network, the higher the possibility of leakage of underground pipeline network, the negative impact on the pipeline safety assessment index of urban underground pipeline network renovation, and the lower the pipeline safety assessment index of urban underground pipeline network renovation.
[0085] Furthermore, the specific steps of comprehensively analyzing and obtaining the reliability assessment index of urban underground pipeline network reconstruction are as follows: comprehensively analyzing the pipeline leakage risk assessment index of urban underground pipeline network reconstruction and the pipeline safety assessment index of urban underground pipeline network reconstruction to obtain the reliability assessment index of urban underground pipeline network reconstruction.
[0086] In this embodiment, the specific method for analyzing and obtaining the reliability evaluation index of the urban underground pipe network reconstruction is as follows:
[0087]
[0088] ρ1+ρ2=1;
[0089] γ represents the reliability assessment index of urban underground pipeline network reconstruction.
[0090] It represents the urban underground pipeline network renovation pipeline safety assessment index in the L0th urban underground pipeline network renovation pipeline safety time period.
[0091] It represents the urban underground pipeline network renovation pipeline leakage risk assessment index of the T0th urban underground pipeline network renovation pipeline leakage risk detection section.
[0092] ρ1 is the influencing weight factor of the pipeline safety assessment index of the preset urban underground pipeline network renovation obtained from the underground pipeline network database.
[0093] ρ2 is the influencing weight factor of the pipeline leakage risk assessment index of the preset urban underground pipeline network renovation obtained from the underground pipeline network database.
[0094] The operating pressure borne by the urban underground pipeline network transformation pipeline is the influencing factor corresponding to the unit value of the urban underground pipeline network transformation pipeline leakage risk assessment index and the urban underground pipeline network transformation pipeline safety assessment index preset in the underground pipeline network database, which represents the numerical value of the influence of the urban underground pipeline network transformation pipeline leakage risk assessment index and the urban underground pipeline network transformation pipeline safety assessment index on the urban underground pipeline network transformation reliability assessment index. When used, the influencing factors corresponding to the urban underground pipeline network transformation pipeline leakage risk assessment index and the urban underground pipeline network transformation pipeline safety assessment index can be directly obtained from the underground pipeline network database. The corresponding relationship can be a preset mapping relationship. For example, the operating pressure borne by the urban underground pipeline network transformation pipeline and the unit value of the urban underground pipeline network transformation pipeline leakage risk assessment index and the urban underground pipeline network transformation pipeline safety assessment index preset in the underground pipeline network database and the corresponding influencing factors form a mapping set. The real-time urban underground pipeline network transformation pipeline leakage risk assessment index and the urban underground pipeline network transformation pipeline safety assessment index are input into the mapping set to obtain the influencing factors corresponding to the unit value of the urban underground pipeline network transformation pipeline leakage risk assessment index and the urban underground pipeline network transformation pipeline safety assessment index. The mapping relationship can be one-to-one or many-to-one.
[0095] like Figure 2 As shown, it is a schematic diagram of the urban underground pipeline reconstruction reliability assessment index function provided in an embodiment of the present application; x is the positive semi-axis of the horizontal coordinate, y is the positive semi-axis of the vertical coordinate, the weight factor ρ1 is set to 0.6, and the weight factor ρ2 is set to 0.4.
[0096] Curve a indicates that if the pipeline leakage risk assessment index of urban underground pipeline network renovation is set to a fixed value of 1, the pipeline safety assessment index of urban underground pipeline network renovation is x, and the reliability assessment index of urban underground pipeline network renovation is y, the reliability assessment index of urban underground pipeline network renovation increases with the increase of the pipeline safety assessment index of urban underground pipeline network renovation.
[0097] Curve b indicates that if the pipeline safety assessment index of urban underground pipeline network renovation is set to a fixed value of 1, the pipeline leakage risk assessment index of urban underground pipeline network renovation is x, and the reliability assessment index of urban underground pipeline network renovation is y, the reliability assessment index of urban underground pipeline network renovation decreases as the pipeline leakage risk assessment index of urban underground pipeline network renovation increases.
[0098] Furthermore, the specific steps for adjusting the urban underground pipeline network renovation plan are as follows: extracting the prediction accuracy threshold of the urban underground pipeline network renovation reliability assessment index from the underground pipeline network database, and comparing the urban underground pipeline network renovation reliability assessment index with the urban underground pipeline network renovation reliability assessment index prediction accuracy threshold; if the urban underground pipeline network renovation reliability assessment index is greater than or equal to the urban underground pipeline network renovation reliability assessment index prediction accuracy threshold, then the urban underground pipeline network renovation is reasonable; if the urban underground pipeline network renovation reliability assessment index is less than the urban underground pipeline network renovation reliability assessment index prediction accuracy threshold, then the urban underground pipeline network renovation is unreasonable.
[0099] Furthermore, adjustments to the urban underground pipeline renovation plan also include: if the urban underground pipeline renovation pipeline leakage risk assessment index is higher than the first threshold value of the urban underground pipeline renovation pipeline leakage risk assessment index, then increase the underground pipeline pipeline protection layer, upgrade the real-time monitoring system, and regularly inspect and maintain the monitoring equipment; if the urban underground pipeline renovation pipeline safety assessment index is lower than the second threshold value of the urban underground pipeline renovation pipeline safety assessment index, then regularly analyze the urban underground pipeline renovation pipeline monitoring data, and use more corrosion-resistant underground pipeline renovation pipeline materials.
[0100] Furthermore, the specific steps of constructing the CIM urban underground pipe network model are as follows: setting the geographic coordinate system through the CIM software, creating a surface model according to the terrain data, and establishing the pipe network infrastructure according to the urban underground pipe network data; the basic structure of the urban underground pipe network includes pipelines, valves, and pump stations; integrating the terrain data and the urban underground pipe network data through the geographic information system software; creating a new municipal relocation project urban underground pipe network reconstruction project file in the CIM software, and drawing a three-dimensional model of the urban underground pipe network in the CIM software according to the integrated urban underground pipe network reconstruction data to obtain the CIM urban underground pipe network model.
[0101] In this embodiment, through CIM software, such as AutoCAD Civil 3D, Bentley Systems, usually terrain data is in DWG or DXF format, imported into CIM software through the file menu, find the geographic coordinate system in CIM software, select the appropriate geographic coordinate system, such as WGS84, CGCS2000, etc., if the urban underground pipe network data contains coordinate information, CIM software automatically identifies and sets the coordinate system, through the terrain modeling tools of CIM software, such as creating terrain surfaces, select the imported urban underground pipe network elevation point data, through the pipe network modeling tools of CIM software, such as creating pipes and pipe networks, set the pipe diameter, material, burial depth and other information according to the urban underground pipe network data, add attribute information to the urban underground pipe network elements, such as pipe number, type, function, etc., display DEM data as the base map, set the appropriate rendering and symbol system to display the terrain, add the urban underground pipe network data layer to the GIS view, adjust the transparency and symbol to overlay with the terrain data, and use GIS spatial analysis tools, such as buffer to analyze the relationship between terrain and urban underground pipe network, draw the center line of the pipe according to the urban underground pipe network data, specify the diameter, material, burial depth and other attributes of the urban underground pipe, and generate the CIM urban underground pipe network model.
[0102] Furthermore, the specific steps for generating the application for construction of the urban underground pipeline network renovation project are as follows: based on the CIM urban underground pipeline network model, the documents and materials for the application for construction of the urban underground pipeline network renovation project are generated through the CIM software to realize online application for construction, wherein the documents and materials for the application for construction of the urban underground pipeline network renovation project include the optimized urban underground pipeline network renovation pipeline leakage risk assessment and the urban underground pipeline network renovation pipeline safety assessment; the application for construction of the urban underground pipeline network renovation project is converted into a PDF electronic format, and the application document for construction of the urban underground pipeline network renovation project is submitted online through the project declaration and approval system.
[0103] In this embodiment, construction drawings are generated according to the design results of the urban underground pipeline network renovation project through CIM software. The construction drawings include plan drawings, cross-section drawings, and detailed drawings. The drawings in the CIM software are exported to PDF format, and the project application and approval system is accessed. A new urban underground pipeline network renovation project file is created in the system, and the basic information of the urban underground pipeline network renovation project is entered. The application form for the urban underground pipeline network renovation project is filled out online, including information such as the project name, location, scale, and investment estimate. The progress of the application for the urban underground pipeline network renovation project is tracked, and additional information or modifications are provided according to the requirements of government departments.
[0104] like Figure 3As shown, it is a structural diagram of a municipal relocation project application and construction reporting device based on CIM technology provided in an embodiment of the present application. A municipal relocation project application and construction reporting device based on CIM technology provided in an embodiment of the present application includes: an information collection module, a CIM processing center module, a communication module, an underground pipe network information management module and a user terminal module: Information collection module: used to collect information on urban underground pipe network renovation projects; CIM processing center module: including a server and a database, used to store, process and display urban underground pipe network renovation project information; Communication module: ensuring data transmission between the information collection device, the CIM processing center and the user terminal; Underground pipe network information management module: used to store, manage and analyze data on urban underground pipe network renovation; User terminal module: including computers, tablet computers, etc., for use by urban underground pipe network renovation project managers and approvers.
[0105] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0106] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0107] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0108] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0109] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0110] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for reporting and approving a municipal relocation project based on CIM technology, characterized in that: The following steps are involved: Collect urban underground pipe network reconstruction data for municipal relocation projects; By analyzing the data of urban underground pipe network reconstruction in municipal relocation projects, the urban underground pipe network reconstruction pipeline leakage risk assessment index and urban underground pipe network reconstruction pipeline safety assessment index were obtained; Comprehensive analysis yields the reliability assessment index for urban underground pipe network reconstruction; Adjust the urban underground pipe network reconstruction plan based on the data analysis results of the municipal relocation project; By adjusting the urban underground pipe network reconstruction plan, a CIM urban underground pipe network model is constructed; Generate construction application for urban underground pipeline network renovation project based on CIM urban underground pipeline network model.
2. A method for reporting and approving a municipal relocation project based on CIM technology as claimed in claim 1, characterized in that: The specific steps for collecting the urban underground pipe network reconstruction data of the municipal relocation project are as follows: Extract the normal flow rate of urban underground pipe network renovation pipelines, the normal pressure of underground pipe network renovation pipelines, the normal water quality concentration of underground pipe network renovation pipelines, the normal soil dry density of underground pipe network renovation pipelines, the standard value of the buried depth of urban underground pipe network renovation pipelines, the standard value of the actual pipeline elevation of urban underground pipe network renovation, the soil moisture threshold of urban underground pipe network renovation and the pressure threshold of pipelines; The urban underground pipeline reconstruction data of municipal relocation projects include pipeline leakage data and pipeline safety data of urban underground pipeline reconstruction.
3. A method for reporting and applying for a municipal relocation project based on CIM technology as claimed in claim 1, characterized in that: The specific steps of obtaining the pipeline leakage risk assessment index for urban underground pipeline network reconstruction are as follows: Record the time of pipeline leakage risk detection for urban underground pipeline network transformation as the first preset time urban underground pipeline network transformation pipeline leakage risk detection point; The flow rate of the urban underground pipe network transformation pipeline at the urban underground pipe network transformation pipeline leakage risk detection point at the first preset time is obtained by a turbine flowmeter; The pressure of the urban underground pipe network renovation pipeline at the urban underground pipe network renovation pipeline leakage risk detection point at the first preset time is obtained through a differential pressure transmitter; The pollutant concentration of the urban underground pipe network at the urban underground pipe network transformation pipeline leakage risk detection point at the first preset time is obtained through the water quality analyzer; The dry density of the urban underground pipe network transformation soil at the urban underground pipe network transformation pipeline leakage risk detection point at the first preset time is obtained by a nuclear moisture density meter; The pipeline leakage data of the urban underground pipeline network transformation includes the urban underground pipeline network transformation pipeline flow rate, urban underground pipeline network transformation pipeline pressure, urban underground pipeline network pollutant concentration and urban underground pipeline network transformation soil dry density at the urban underground pipeline network transformation pipeline leakage risk detection point at the first preset time; Based on the pipeline leakage data analysis of urban underground pipeline network renovation, the pipeline leakage risk assessment index of urban underground pipeline network renovation is obtained.
4. A method for reporting and approving a municipal relocation project based on CIM technology as claimed in claim 1, characterized in that: The specific steps of obtaining the pipeline safety assessment index for urban underground pipeline network reconstruction are as follows: Recording the time of the pipeline safety inspection for the urban underground pipeline network renovation as the second preset time urban underground pipeline network renovation pipeline safety inspection point; The actual buried depth of the urban underground pipe network transformation pipeline at the urban underground pipe network transformation pipeline safety detection point at the second preset time is obtained through the GPS positioning system; The actual elevation of the urban underground pipe network renovation pipeline at the urban underground pipe network renovation pipeline safety detection point at the second preset time is obtained through the GPS positioning system; The dry density of the urban underground pipe network renovation soil at the urban underground pipe network renovation pipeline safety detection point at the second preset time is obtained by a nuclear moisture density meter; The soil moisture of the urban underground pipe network transformation at the urban underground pipe network transformation pipeline safety detection point at the second preset time is obtained by a soil moisture meter; The pressure of the urban underground pipe network renovation pipeline at the urban underground pipe network renovation pipeline safety detection point at the second preset time is obtained through a differential pressure transmitter; The pollutant concentration of the urban underground pipe network at the urban underground pipe network renovation pipeline safety detection point at the second preset time is obtained by a water quality analyzer; The pipeline safety data includes the actual buried depth of the urban underground pipeline network transformation pipeline at the urban underground pipeline network transformation pipeline safety detection point at the second preset time, the actual pipeline elevation of the urban underground pipeline network transformation, the dry density of the urban underground pipeline network transformation soil, the soil moisture of the urban underground pipeline network transformation, the pipeline pressure of the urban underground pipeline network transformation and the pollutant concentration of the urban underground pipeline network; The pipeline safety assessment index for urban underground pipeline network reconstruction is obtained through pipeline safety data analysis.
5. A method for reporting and approving a municipal relocation project based on CIM technology as claimed in claim 1, characterized in that: The specific steps of obtaining the reliability evaluation index of urban underground pipe network reconstruction through comprehensive analysis are as follows: The reliability assessment index of urban underground pipeline network renovation is obtained through comprehensive analysis of the pipeline leakage risk assessment index of urban underground pipeline network renovation and the pipeline safety assessment index of urban underground pipeline network renovation.
6. A method for reporting and approving a municipal relocation project based on CIM technology as claimed in claim 1, characterized in that: The specific steps for adjusting the urban underground pipe network reconstruction plan are as follows: The prediction accuracy threshold of the reliability assessment index of urban underground pipeline network reconstruction is extracted from the underground pipeline network database, and the reliability assessment index of urban underground pipeline network reconstruction is compared with the prediction accuracy threshold of the reliability assessment index of urban underground pipeline network reconstruction. If the reliability assessment index of urban underground pipeline network reconstruction is greater than or equal to the prediction accuracy threshold of the reliability assessment index of urban underground pipeline network reconstruction, then the urban underground pipeline network reconstruction is reasonable; if the reliability assessment index of urban underground pipeline network reconstruction is less than the prediction accuracy threshold of the reliability assessment index of urban underground pipeline network reconstruction, then the urban underground pipeline network reconstruction is unreasonable.
7. A method for reporting and approving a municipal relocation project based on CIM technology as claimed in claim 1, characterized in that: The adjustments to the urban underground pipe network reconstruction plan also include: If the urban underground pipe network renovation pipeline leakage risk assessment index is higher than the first threshold of the urban underground pipe network renovation pipeline leakage risk assessment index, then increase the underground pipe network pipeline protection layer, upgrade the real-time monitoring system, and regularly inspect and maintain the monitoring equipment; If the urban underground pipeline renovation pipeline safety assessment index is lower than the second threshold value of the urban underground pipeline renovation pipeline safety assessment index, the urban underground pipeline renovation pipeline monitoring data shall be analyzed regularly, and more corrosion-resistant underground pipeline renovation pipeline materials shall be used.
8. A method for reporting and approving a municipal relocation project based on CIM technology as claimed in claim 1, characterized in that: The specific steps of constructing the CIM urban underground pipe network model are: Set the geographic coordinate system through CIM software, create a surface model based on terrain data, and establish the pipe network infrastructure based on the city's underground pipe network data; The basic structure of the urban underground pipe network includes pipes, valves, and pump stations; Integrate terrain data and urban underground pipe network data through geographic information system software; A new municipal relocation project urban underground pipe network reconstruction project file is created in the CIM software. According to the integrated urban underground pipe network reconstruction data, a three-dimensional model of the urban underground pipe network is drawn in the CIM software to obtain the CIM urban underground pipe network model.
9. A method for reporting and approving a municipal relocation project based on CIM technology as claimed in claim 1, characterized in that: The specific steps of generating the urban underground pipe network reconstruction project application are as follows: According to the CIM urban underground pipe network model, the documents and materials for the construction application of the urban underground pipe network renovation project are generated through the CIM software to realize online construction application. The documents and materials for the construction application of the urban underground pipe network renovation project include the optimized urban underground pipe network renovation pipeline leakage risk assessment and urban underground pipe network renovation pipeline safety assessment; Convert the urban underground pipeline network renovation project application document into PDF electronic format, and submit the urban underground pipeline network renovation project application document online through the project declaration and approval system.
10. A municipal relocation project application device based on CIM technology, characterized in that: It includes information collection module, CIM processing center module, communication module, underground pipe network information management module and user terminal module: Information collection module: used to collect information on urban underground pipe network reconstruction projects; CIM processing center module: including servers and databases, used to store, process and display urban underground pipe network reconstruction project information; Communication module: ensures data transmission between information collection device, CIM processing center and user terminal; Underground pipe network information management module: used to store, manage and analyze data on urban underground pipe network reconstruction; User terminal module: including computers, tablet computers, etc., for use by urban underground pipeline reconstruction project managers and approval personnel.
Citation Information
Patent Citations
Planning project online multi-dimensional cooperative site selection system based on CIM technology
CN114417457A
CIM technology-based construction project online multi-dimensional construction reporting cooperation system
CN114417458A
Municipal drainage pipe network decision evaluation method
CN102890792A
Water conservancy flood control, drought resistance and waterlogging prevention comprehensive disaster reduction platform system based on CIM platform
CN113434565A
Intelligent decision-making method and system for maintaining urban underground sewer network
US20230195979A1