Mobile energy storage electrical box large-current bus plugging device and bridging method

By designing a high-current bus plug-in device for mobile energy storage electrical boxes, data of bus contacts can be collected and analyzed in real time, abnormal factors are identified and cross-connection solutions are optimized, and the insufficient power supply safety assessment during the cross-over process of high-current buses in the prior art is solved. The problem of this has achieved a more efficient and safe cross-connection process.

CN119482937AInactive Publication Date: 2025-02-18AOWEI TECH (NANJING) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411588260.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-08
Publication Date
2025-02-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology lacks a comprehensive assessment of power supply safety during the high-current bus crossover process, resulting in connections that do not meet safety standards, increasing the risk of power failure and equipment damage, and lacks real-time monitoring and abnormal analysis, making decisions that are not scientific enough or objective.

Method used

A mobile energy storage electrical box high-current bus plug-in device is designed, including plug-in control terminal, data acquisition unit, abnormality analysis module, user input module, demand analysis module, capability evaluation module, available analysis module, recommended application module, Monitoring verification module and alarm isolation module. The device collects and analyzes the image data and power supply data of bus contacts in real time, identifies abnormal factors, automatically alarms, and generates a bus contact recommendation list based on power supply requirements and jumper capability scoring data to optimize the jumper solution.

Benefits of technology

Through real-time monitoring and abnormal analysis, we ensure power supply safety, reduce the risk of power failure and equipment damage, improve jumper efficiency and safety, and reduce overall jumper cost and time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119482937A_ABST
    Figure CN119482937A_ABST
Patent Text Reader

Abstract

The invention discloses a large-current bus plugging device and a bridging method for a mobile energy storage electrical box, and relates to the field of cable plugging, and the bus plugging device comprises a plugging control end which is used for abutting an energy storage electrical box, obtaining power supply and operation data access collection authority after the energy storage electrical box is connected, and controlling the start and stop of each functional module and functional unit; the data acquisition unit is used for acquiring image data and power supply data of a bus power supply network and an access point in real time, and periodically packaging and submitting a data set; the exception analysis module is used for carrying out threshold comparison on the submitted data set and a preset standard data set, identifying exception factors exceeding a threshold and outputting an exception factor set; through analysis based on power supply demands and bridging capability score data, the score analysis of constructors, tools and environments ensures that electrical bridging is performed under appropriate conditions, the overall efficiency and safety are improved, the availability of multiple bus contacts is intelligently evaluated, and the optimal selection is recommended.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cable plugging, and in particular to a high-current busbar plugging device and a jumper method for a mobile energy storage electrical box. Background Art

[0002] The plugging of high-current busbars in mobile energy storage electrical boxes is an important part of ensuring the safe and reliable operation of power equipment. This plugging usually involves the access of high-voltage electrical equipment, especially during the busbar jumper work process during equipment maintenance, new construction or expansion of line intervals. In order to ensure that other running equipment does not lose power, it is necessary to connect and fix the high-current busbars of different parts to the busbar connection points in a live state to ensure that the jumper wires are firmly connected and in good contact. Special attention should be paid to safety and standardized operation.

[0003] However, the existing technology lacks a comprehensive assessment of power supply safety when performing busbar bridging, which can easily lead to connections that do not meet safety standards, thereby causing power failures or equipment damage. In addition, traditional methods usually rely on static data collection and personnel experience, lack real-time monitoring and abnormality analysis, and the decision-making is not scientific or objective, resulting in failure to timely discover potential faults or abnormalities, thereby increasing the risk of bridging;

[0004] In addition, the existing technology fails to fully consider the impact of changes in construction personnel, tools and environment on the bridging effect, which sometimes leads to unforeseen construction delays or cost increases. It is unable to comprehensively consider multiple factors such as bridging time, bridging cost and power supply safety, resulting in the selected unused busbar contacts may not have the best availability. There is a lack of dynamic monitoring and verification of the completed busbar contacts, and the bridging effect and power supply stability cannot be confirmed in time. Summary of the invention

[0005] 1. Technical issues to be resolved

[0006] In view of the above-mentioned shortcomings of the prior art, the present invention provides a high-current busbar plug-in device and a jumper method for a mobile energy storage electrical box, which can effectively solve the problems of the prior art.

[0007] (II) Technical solution

[0008] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0009] The invention discloses a high-current busbar plug-in device for a mobile energy storage electrical box, comprising:

[0010] The plug-in control terminal is used to connect to the energy storage electrical box. After connection, it obtains the access and collection authority for power supply and operation data, and controls the start and stop of each functional module and functional unit;

[0011] The data acquisition unit is used to collect image data and power supply data of the bus power supply network and access points in real time, and package and submit the data set in stages;

[0012] The abnormal analysis module is used to compare the submitted data set with the preset standard data set by threshold, identify abnormal factors exceeding the threshold, output the abnormal factor set, and provide real-time alarm feedback for the abnormal factor set exceeding the alarm threshold;

[0013] A user input module is used to provide an interface for the user to input power supply setting data and crossover status data of the device to be connected;

[0014] A demand analysis module, used to receive the input power supply setting data and analyze the available power supply demand parameters of the equipment to be connected in the current bus power supply network;

[0015] A capability evaluation module is used to receive the input crossover status data for analysis, and to score the crossover capability of the device to be connected, and input the crossover capability score data;

[0016] An availability analysis module is used to analyze the bridging time, bridging cost and power supply safety factor according to power supply demand, bridging capacity score, abnormal factor set and the status of several unused busbar joints, and generate a recommended list of busbar joints sorted by availability;

[0017] The recommended application module is used to push the busbar connection recommendation list to the user end, and the user selects the recommended busbar connection for cross-connection and records the selection;

[0018] The monitoring and verification module is used to collect and verify data at a preset frequency after cross-connection, and to provide alarm information feedback for busbar contacts that fail to pass the verification;

[0019] The alarm isolation module is used to receive alarm information from the abnormal analysis module and the monitoring verification module, send alarm notifications to users or managers, and automatically cut off the power supply to the abnormal bus contacts and isolate them.

[0020] Furthermore, the data acquisition unit is deployed with sub-modules at the lower level, including an image acquisition module, an operation acquisition module and a preprocessing module, and the image acquisition module, the operation acquisition module and the preprocessing module are interactively connected through a wireless network, wherein the image acquisition module is used to collect image status data of the bus connection point, the operation acquisition module is used to collect current, voltage and temperature power supply data of the bus connection point, and the preprocessing module is used to filter and convert the collected data obtained by the image acquisition module and the operation acquisition module, and integrate them into a data set according to a preset period.

[0021] Furthermore, the plug-in control terminal is interactively connected to a data management module via a wireless network, and the data management module is used to save all collection, analysis and alarm records to a database, and provide a query point for past power supply status and fault records.

[0022] Furthermore, the monitoring and verification module increases the collection and verification frequency of the cross-bus contacts according to the preset frequency level, and obtains the abnormal analysis data of the bus contact for the next preset period through the abnormal analysis module to judge the change of the abnormal factor. If the change fluctuation is lower than the preset threshold, it is judged to be normal, and the bus contact is restored to the default collection and verification frequency. Otherwise, if it is abnormal, an alarm is triggered and the power supply isolation of the cross-bus contact is executed.

[0023] Furthermore, the plug-in control end is interactively connected to the data acquisition unit through a wireless network, the alarm isolation module is connected to the plug-in control end through an electrical medium, the data acquisition unit is interactively connected to the abnormality analysis module through a wireless network, the user input module is interactively connected to the demand analysis module and the capability assessment module through a wireless network, the available analysis module is interactively connected to the abnormality analysis module, the demand analysis module, the capability assessment module and the recommended application module through a wireless network, the recommended application module is interactively connected to the monitoring verification module through a wireless network, and the monitoring verification module is interactively connected to the alarm isolation module through a wireless network.

[0024] A method for high-current busbar jumper connection of a mobile energy storage electrical box comprises the following steps:

[0025] Step 1: Monitor several used bus contacts and unused bus contacts, collect relevant image data, use image processing technology to identify the connection status of the bus contacts, and collect power supply data including current, voltage and load;

[0026] Step 2: Compare the collected image data and power supply data with the preset standard power supply indicators and contact status. Based on the results of the data comparison, perform an abnormal analysis, identify the abnormal factors and output them as an abnormal factor set. For each parameter in the abnormal factor set, determine whether it exceeds the preset standard threshold. If so, trigger an alarm mechanism.

[0027] Step 3: Collect the user's power supply needs, including the power supply setting parameters of the equipment at the power connection point and the power supply operation parameters and cross-connection capacity scoring data of the current power grid;

[0028] Step 4: Based on the power supply demand input by the user, the bridging capacity score data and the current abnormal factor set, the bridging time, bridging cost and power supply safety of the bridging scheme are analyzed to evaluate the availability of each unused busbar connection point;

[0029] Step 5: Obtain several unused busbar points for comprehensive availability analysis to assess whether they meet power supply requirements and safety standards. Based on the assessment results, sort the unused busbar points by availability, generate a recommendation list, and display it to the user.

[0030] Step 6: Use the unused bus contacts recommended by the user to complete the jumper connection and connect to the target device;

[0031] Step 7: After the cross connection is completed, enter the preset cycle and increase the acquisition and verification frequency of the busbar contact according to the set frequency level;

[0032] Step 8: Within the preset period, determine whether the power supply status after cross-connection is stable through regular monitoring and data verification. If the verification passes, restore the default collection and verification frequency of the bus. If the verification fails, trigger the alarm mechanism in time and isolate the power supply of the bus contact.

[0033] Furthermore, the bridging capability scoring data in step 3 includes the skill level of construction workers, the availability of construction tools and the safety data of the construction environment, and is applied through manual custom editing and historical data recognition and matching.

[0034] Furthermore, the evaluation calculation formula for the availability of each unused busbar connection point in step 4 is:

[0035]

[0036] Where U i Represents the final usability score, T i Represents the estimated bridging time, C i represents the estimated bridging cost, S i represents the power supply security score, R represents the power supply demand score input by the user, K represents the cross-connection capability score, represents the impact score of the jth abnormal factor, and A j represents the number of abnormal factors, and N represents the number of abnormal factors.

[0037] Furthermore, the evaluation calculation formula uses time consumption and cost as denominators to reflect the negative impact of such parameters on the availability of the docking point. Time consumption and cost are inversely proportional to the overall availability score. The positive impact on availability is expressed by multiplying user demand, cross-connection capability and security scores. The availability of the docking point is corrected by calculating the average score of the abnormal factor to calculate the availability score U i Used to sort the unused bus contacts.

[0038] (III) Beneficial effects

[0039] Compared with the known prior art, the technical solution provided by the present invention has the following beneficial effects:

[0040] 1. Through real-time collection and analysis of image data and power supply data of busbar joints, potential abnormalities can be discovered in time. Once abnormal factors are identified and exceed the standard threshold, the device will automatically alarm. By timely responding to abnormal situations and dynamically adjusting the collection frequency, the safety and stability of the entire power supply device are ensured. Users can input power supply parameters and cross-connection capacity scoring data according to actual needs, making supply decisions more personalized and accurate, and effectively performing adaptability analysis of busbar joints for access equipment.

[0041] 2. Through the analysis of power supply demand and bridging capacity scoring data, the scoring analysis of construction personnel, tools and environment ensures that electrical bridging is carried out under appropriate circumstances, improves overall efficiency and safety, intelligently evaluates the availability of multiple busbar contacts, and recommends the best option, reduces manual intervention and decision-making errors, and optimizes the use of existing resources, improves power supply efficiency, and reduces overall bridging costs and time by sorting availability and selecting high-availability busbar contacts.

[0042] 3. By adjusting the busbar collection and verification frequency according to the real-time situation, for the newly connected busbar contacts, the safety of the new connection is ensured by increasing the collection and verification frequency, and then restoring to the default frequency after confirming safety, the flexibility of the device is increased. In abnormal situations, it can automatically alarm and isolate the faulty busbar. Continuous data verification and monitoring improve the reliability and operation efficiency of the device, and reduce the risk of unexpected power outages and equipment damage. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0044] Figure 1 It is a schematic diagram of the framework of a high-current busbar plug-in device for a mobile energy storage electrical box in the present invention;

[0045] Figure 2 The present invention is a flowchart of a method for high-current busbar bridging of a mobile energy storage electrical box.

[0046] The numbers in the figure represent respectively, 1. Plug-in control terminal; 2. Data acquisition unit; 21. Image acquisition module; 22. Operation acquisition module; 23. Preprocessing module; 3. Abnormal analysis module; 4. User input module; 5. Demand analysis module; 6. Capability assessment module; 7. Available analysis module; 8. Recommended application module; 9. Monitoring and verification module; 10. Alarm isolation module; 11. Data management module. DETAILED DESCRIPTION

[0047] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0048] The present invention will be further described below in conjunction with the embodiments.

[0049] Example 1

[0050] A mobile energy storage electrical box high current busbar plug-in device of this embodiment, such as Figure 1 As shown, including:

[0051] The plug-in control terminal 1 is used to connect to the energy storage electrical box. After the connection, it obtains the power supply and operation data access collection authority, and controls the start and stop of each functional module and functional unit; the plug-in control terminal 1 is interactively connected to the data management module 11 through a wireless network. The data management module 11 is used to save all collection, analysis and alarm records to the database, and provide past power supply status and fault record query points; ensure that after the energy storage electrical box is connected, the power supply information and operation data can be obtained and stored in real time, so as to realize efficient management and control of each functional module;

[0052] The data acquisition unit 2 is used to collect image data and power supply data of the bus power supply network and access points in real time, and to package and submit data sets in stages; the data acquisition unit 2 is deployed with submodules at the lower level, including an image acquisition module 21, an operation acquisition module 22 and a preprocessing module 23, and the image acquisition module 21, the operation acquisition module 22 and the preprocessing module 23 are interactively connected through a wireless network, wherein the image acquisition module 21 is used to collect image status data of the bus connection point, the operation acquisition module 22 is used to collect current, voltage and temperature power supply data of the bus connection point, and the preprocessing module 23 is used to filter and convert the collected data obtained by the image acquisition module 21 and the operation acquisition module 22, and integrate them into a data set according to a preset period; providing comprehensive data support, which is helpful to timely reflect the operation status of the device;

[0053] Abnormal analysis module 3 is used to compare the submitted data set with the preset standard data set by threshold, identify abnormal factors exceeding the threshold, output abnormal factor sets, and provide real-time alarm feedback for abnormal factor sets exceeding the alarm threshold; timely discover potential safety hazards and enhance device reliability;

[0054] The user input module 4 is used to provide an interface for the user to input the power supply setting data and the crossover status data of the device to be connected; the user can conveniently perform customized settings, enhance the user's sense of participation, and improve the flexibility of device configuration;

[0055] The demand analysis module 5 is used to receive the input power supply setting data and analyze the available power supply demand parameters of the equipment to be connected in the current bus power supply network; analyze the power supply demand of the equipment to be connected to ensure its availability in the existing network, which helps to avoid overload and improve power supply safety;

[0056] The capability evaluation module 6 is used to receive the input crossover status data for analysis, and to perform a crossover capability score based on the device to be connected, and input the crossover capability score data; evaluate the crossover capability of the device to be connected, and provide detailed feedback so that the user can make a more informed decision and reduce risks;

[0057] The availability analysis module 7 is used to analyze the bridging time, bridging cost and power supply safety factor according to the power supply demand, bridging capacity score, abnormal factor set and the status of several unused bus contacts, and generate a recommended list of bus contacts sorted by availability; so that users can respond quickly, optimize operations, improve access efficiency and simplify operation procedures;

[0058] The recommendation application module 8 is used to push the busbar connection recommendation list to the user end, and the user selects the recommended busbar connection for cross-connection and records the selection;

[0059] The monitoring and verification module 9 is used to collect and verify data at a preset frequency after the cross-connection, and to provide alarm information feedback for bus contacts that have not passed the verification; the monitoring and verification module 9 increases the collection and verification frequency of the cross-connected bus contacts according to the preset frequency level, and obtains the abnormal analysis data of the bus contacts in the next preset cycle through the abnormal analysis module 3 to judge the abnormal factor change. If the change fluctuation is lower than the preset threshold, it is judged to be normal, and the bus contacts are restored to the default collection and verification frequency. In any case, if it is abnormal, an alarm is triggered and power supply isolation of the cross-connected bus contacts is executed; verification is performed after the cross-connection to ensure the stability and safety of each contact. If an abnormality occurs, an alarm can be issued in the first time and power supply isolation can be implemented to ensure the overall safety of the device;

[0060] The alarm isolation module 10 is used to receive alarm information from the abnormal analysis module 3 and the monitoring verification module 9, send alarm notifications to users or managers, automatically cut off the power supply to abnormal bus contacts and isolate them, provide a quick response mechanism, reduce the probability of accidents, and ensure the safe operation of the device.

[0061] As an implementation method in this embodiment, Figure 1 As shown, the plug-in control terminal 1 is interactively connected to the data acquisition unit 2 through a wireless network, the alarm isolation module 10 is connected to the plug-in control terminal 1 through an electrical medium, the data acquisition unit 2 is interactively connected to the abnormality analysis module 3 through a wireless network, the user input module 4 is interactively connected to the demand analysis module 5 and the capability assessment module 6 through a wireless network, the available analysis module 7 is interactively connected to the abnormality analysis module 3, the demand analysis module 5, the capability assessment module 6 and the recommended application module 8 through a wireless network, the recommended application module 8 is interactively connected to the monitoring verification module 9 through a wireless network, and the monitoring verification module 9 is interactively connected to the alarm isolation module 10 through a wireless network.

[0062] In the specific implementation of this embodiment, each module and unit is controlled by the plug-in control terminal 1, connected to the bus grid, and data is stored and backed up through the data management module 11. The image acquisition module 21 is used to acquire images of bus contacts, and the operation acquisition module 22 is used to acquire operation data of bus contacts. The preprocessing module 23 preprocesses the acquired data, and the abnormality analysis module 3 performs abnormality analysis on the acquired data. When an abnormality exceeding the threshold value occurs, the alarm isolation module 10 is fed back. The user inputs the power supply setting parameters of the equipment at the power connection point, the construction personnel, the construction tools and the construction personnel through the user input module 4. The power supply demand is analyzed through the demand analysis module 5, the cross-connection capacity score data is analyzed through the capacity evaluation module 6, and the availability of each unused bus contact is analyzed and sorted through the available analysis module 7. The user selects the recommended bus contact through the recommended application module 8. After the cross-connection work is performed, the acquisition and verification frequency of the bus is increased according to the preset frequency level within the next preset period through the monitoring verification module 9. If the verification is passed within the preset period, the default acquisition and verification frequency is restored. If the verification is not passed, an alarm is issued through the alarm isolation module 10, and the power supply of the bus contact is isolated;

[0063] Through a series of sophisticated module designs, efficient power supply monitoring and intelligent management are achieved, the safety and reliability of power supply are significantly improved, and a comprehensive and intelligent power plug device is built, which has great application value and market potential.

[0064] Example 2

[0065] In other aspects, this embodiment also provides a method for bridging high-current busbars of a mobile energy storage electrical box, such as Figure 2 As shown, the following steps are included:

[0066] Step 1: Monitor several used bus contacts and unused bus contacts, collect relevant image data, use image processing technology to identify the connection status of the bus contacts, and collect power supply data including current, voltage and load;

[0067] Step 2: Compare the collected image data and power supply data with the preset standard power supply indicators and contact status. Based on the results of the data comparison, perform an abnormal analysis, identify the abnormal factors and output them as an abnormal factor set. For each parameter in the abnormal factor set, determine whether it exceeds the preset standard threshold. If so, trigger an alarm mechanism.

[0068] Step 3: Collect the power supply needs of users, including the power supply setting parameters of the equipment at the power connection point, the power supply operation parameters of the current power grid, and the cross-connection capacity scoring data; the cross-connection capacity scoring data includes the skill level of construction workers, the availability of construction tools, and the safety data of the construction environment, which are applied through manual custom editing and historical data identification and matching;

[0069] Step 4: Based on the power supply demand input by the user, the bridging capacity score data and the current abnormal factor set, the bridging time, bridging cost and power supply safety of the bridging scheme are analyzed to evaluate the availability of each unused busbar connection point;

[0070] Step 5: Obtain several unused busbar points for comprehensive availability analysis to assess whether they meet power supply requirements and safety standards. Based on the assessment results, sort the unused busbar points by availability, generate a recommendation list, and display it to the user.

[0071] Step 6: Use the unused bus contacts recommended by the user to complete the jumper connection and connect to the target device;

[0072] Step 7: After the cross connection is completed, enter the preset cycle and increase the acquisition and verification frequency of the busbar contact according to the set frequency level;

[0073] Step 8: Within the preset period, determine whether the power supply status after cross-connection is stable through regular monitoring and data verification. If the verification passes, restore the default collection and verification frequency of the bus. If the verification fails, trigger the alarm mechanism in time and isolate the power supply of the bus contact.

[0074] Compared with the prior art, this embodiment ensures the safety of each bus interface through real-time monitoring, data collection and abnormal analysis, significantly reduces the risk of power failure and equipment damage, improves the stability of the power supply system, and provides data-driven decision support by combining user power supply demand, cross-connection capacity score and comprehensive evaluation of abnormal factors. The decision-making process is more objective and scientific, and the wrong choice caused by human factors is reduced.

[0075] After the jumper is connected, the frequency of data acquisition and verification of the busbar is increased, and dynamic monitoring is performed to timely discover potential problems and isolate the power supply when necessary to effectively protect the system safety. The jumper time, jumper cost and power supply safety are comprehensively considered, and the availability of unused busbar interfaces is analyzed and sorted to optimize resource allocation and select the most suitable interface for jumper connection, thereby improving jumper efficiency and reducing costs.

[0076] Taking into account the variables of cross-connection capacity, adaptive adjustments can be made through flexible cross-connection capacity scoring to adapt to different construction conditions and needs, ensure the execution effect of the cross-connection, systematize various data and scores, so that managers can understand the status and risks of each interface at a glance, improve management efficiency, and facilitate subsequent maintenance and decision-making.

[0077] Example 3

[0078] In this embodiment, a calculation formula for evaluating the availability of each unused busbar connection point is provided, which is specifically:

[0079] Where U i Represents the final availability score. The higher the value, the more available the busbar joint is. i Represents the expected spanning time. The smaller the span, the higher the availability score. It is used in the denominator to penalize long spans. i Represents the estimated cross-connection cost. The higher the cost, the lower the availability score. i represents the power supply safety score, which measures the safety of the power supply of the busbar junction in the current state. The higher the score, the safer the power supply. R represents the power supply demand score input by the user, which reflects the power supply required by the equipment at the power connection point. The higher the score, the stronger the demand. K represents the bridging capacity score, which represents the comprehensive capacity coefficient of the construction personnel, tools and environment. The higher the score, the smoother the bridging process can be guaranteed. It represents the impact score of the jth abnormal factor, which indicates the potential negative impact of each abnormal factor on the availability of the connection point, ranging from 0 no impact to 1 great impact. A j represents the number of abnormal factors, which is used to calculate the average impact of abnormal factors on availability. N represents the number of abnormal factors, that is, the total number of different abnormal factors identified during abnormal analysis.

[0080] The evaluation calculation formula uses time and cost as the denominator to reflect the negative impact of such parameters on the availability of the connection point. Time and cost are inversely proportional to the overall availability score. The positive impact on availability is expressed by multiplying user demand, cross-connection capability and security score. All three need to be within a suitable range to improve the availability of the connection point. By calculating the average score of the abnormal factors, the availability of the connection point is corrected to ensure that the availability score of the connection point is appropriately reduced when there are multiple abnormal factors. The calculated availability score U i It is used to sort the unused busbar points and recommend the best cross-connection solution.

[0081] In summary, the present invention can timely discover potential abnormal situations by real-time collection and analysis of image data and power supply data of used bus contacts and unused bus interfaces, which not only improves safety, but also reduces human errors and ensures stable power supply. By analyzing the power supply demand and bridging capacity scoring data input by the user, the present invention provides users with availability analysis and sorting based on multiple factors such as bridging time, cost and safety, and provides a data-driven decision-making method to select appropriate bus interfaces faster and more accurately, optimize the construction process, and reasonably allocate resources, improve construction efficiency and reduce bridging costs by scoring construction personnel, tools and environmental data.

[0082] After completing the cross-connection, the system will dynamically adjust the data collection and verification frequency according to the verification results. This feedback mechanism can timely reflect the working status of the busbar, ensure the safety of power supply, and quickly take isolation measures when abnormalities occur. The abnormal alarm and power supply isolation mechanism can minimize power supply interruptions caused by abnormalities and improve the reliability and availability of the system.

[0083] Improve power supply safety, ensure the safety and stability of the entire power supply system through timely response to abnormal situations and dynamic adjustment of collection frequency, reduce manpower and time costs, reduce unnecessary human resource consumption with intelligent recommendation and analysis algorithms, shorten bridging time, and improve construction efficiency. Through accurate assessment of power supply demand and construction capacity, the bridging process is optimized to make the construction plan more scientific and reasonable. Continuous data verification and monitoring improve the reliability and operating efficiency of the device, and reduce the risk of unexpected power outages and equipment damage.

[0084] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A high-current busbar plug-in device for a mobile energy storage electrical box, characterized in that: include: A plug-in control terminal (1) is used to connect to the energy storage electrical box, obtain power supply and operation data access and collection authority after connection, and control the start and stop of each functional module and functional unit; A data acquisition unit (2) is used to collect image data and power supply data of the bus power supply network and access points in real time, and to package and submit the data set in stages; An abnormality analysis module (3) is used to compare the submitted data set with a preset standard data set by threshold, identify abnormal factors exceeding the threshold, output an abnormal factor set, and provide real-time alarm feedback for the abnormal factor set exceeding the alarm threshold; A user input module (4), used for providing an interface for the user to input power supply setting data and cross-connection status data of the device to be connected; A demand analysis module (5), used for receiving the input power supply setting data and analyzing the available power supply demand parameters of the equipment to be connected in the current bus power supply network; A capability evaluation module (6) is used to receive the input cross-connection status data for analysis, and to score the cross-connection capability of the device to be connected, and input cross-connection capability scoring data; An availability analysis module (7) is used to analyze the bridging time, bridging cost and power supply safety factor according to power supply demand, bridging capacity score, abnormal factor set and the status of several unused busbar joints, and generate a recommended list of busbar joints sorted by availability; A recommendation application module (8) is used to push the busbar connection recommendation list to the user end, and the user selects the recommended busbar connection for cross-connection and records the selection; A monitoring and verification module (9) is used to collect and verify data at a preset frequency after the cross connection, and to provide alarm information feedback for busbar contacts that fail to pass the verification; The alarm isolation module (10) is used to receive alarm information from the abnormal analysis module (3) and the monitoring verification module (9), send an alarm notification to the user or the management personnel, and automatically cut off the power supply to isolate the abnormal busbar contact.

2. A mobile energy storage electrical box high current busbar plug-in device according to claim 1, characterized in that: The data acquisition unit (2) is provided with submodules at a lower level, including an image acquisition module (21), an operation acquisition module (22) and a preprocessing module (23); the image acquisition module (21), the operation acquisition module (22) and the preprocessing module (23) are interactively connected via a wireless network; the image acquisition module (21) is used to acquire image status data of a bus connection point; the operation acquisition module (22) is used to acquire current, voltage and temperature power supply data of the bus connection point; and the preprocessing module (23) is used to filter and convert the acquired data obtained by the image acquisition module (21) and the operation acquisition module (22) into a data set according to a preset period.

3. A mobile energy storage electrical box high current busbar plug-in device according to claim 1, characterized in that: The plug-in control terminal (1) is interactively connected to a data management module (11) via a wireless network. The data management module (11) is used to store all collection, analysis and alarm records in a database and provide a query point for past power supply status and fault records.

4. A mobile energy storage electrical box high current busbar plug-in device according to claim 1, characterized in that: The monitoring and verification module (9) increases the acquisition and verification frequency of the cross-busbar contact according to the preset frequency level, obtains the abnormal analysis data of the busbar contact in the next preset cycle through the abnormal analysis module (3) to judge the abnormal factor change, and if the change fluctuation is lower than the preset threshold, it is judged to be normal, and the busbar contact is restored to the default acquisition and verification frequency. Otherwise, if it is abnormal, an alarm is triggered and the power supply isolation of the cross-busbar contact is executed.

5. A mobile energy storage electrical box high current busbar plug-in device according to claim 1, characterized in that: The plug-in control terminal (1) is interactively connected to the data acquisition unit (2) via a wireless network; the alarm isolation module (10) is connected to the plug-in control terminal (1) via an electrical medium; the data acquisition unit (2) is interactively connected to the abnormality analysis module (3) via a wireless network; the user input module (4) is interactively connected to the demand analysis module (5) and the capability evaluation module (6) via a wireless network; the available analysis module (7) is interactively connected to the abnormality analysis module (3), the demand analysis module (5), the capability evaluation module (6) and the recommended application module (8) via a wireless network; the recommended application module (8) is interactively connected to the monitoring verification module (9) via a wireless network; and the monitoring verification module (9) is interactively connected to the alarm isolation module (10) via a wireless network.

6. A method for bridging a high-current busbar of a mobile energy storage electrical box, the method being an implementation method of a high-current busbar plug-in device of a mobile energy storage electrical box based on any one of claims 1-5, characterized in that: The following steps are involved: Step 1: Monitor several used bus contacts and unused bus contacts, collect relevant image data, use image processing technology to identify the connection status of the bus contacts, and collect power supply data including current, voltage and load; Step 2: Compare the collected image data and power supply data with the preset standard power supply indicators and contact status. Based on the results of the data comparison, perform an abnormal analysis, identify the abnormal factors and output them as an abnormal factor set. For each parameter in the abnormal factor set, determine whether it exceeds the preset standard threshold. If so, trigger an alarm mechanism. Step 3: Collect the user's power supply needs, including the power supply setting parameters of the equipment at the power connection point and the power supply operation parameters and cross-connection capacity scoring data of the current power grid; Step 4: Based on the power supply demand input by the user, the bridging capacity score data and the current abnormal factor set, the bridging time, bridging cost and power supply safety of the bridging scheme are analyzed to evaluate the availability of each unused busbar connection point; Step 5: Obtain several unused busbar points for comprehensive availability analysis to assess whether they meet power supply requirements and safety standards. Based on the assessment results, sort the unused busbar points by availability, generate a recommendation list, and display it to the user. Step 6: Use the unused bus contacts recommended by the user to complete the jumper connection and connect to the target device; Step 7: After the cross connection is completed, enter the preset cycle and increase the acquisition and verification frequency of the busbar contact according to the set frequency level; Step 8: Within the preset period, determine whether the power supply status after cross-connection is stable through regular monitoring and data verification. If the verification passes, restore the default collection and verification frequency of the bus. If the verification fails, trigger the alarm mechanism in time and isolate the power supply of the bus contact.

7. A method for high current busbar bridging of a mobile energy storage electrical box according to claim 6, characterized in that: The bridging capability scoring data in step 3 includes the skill level of construction workers, the availability of construction tools and the safety data of the construction environment, and is applied through manual custom editing and historical data identification and matching.

8. A method for high-current busbar bridging of a mobile energy storage electrical box according to claim 6, characterized in that: The evaluation calculation formula for the availability of each unused busbar joint in step 4 is: Where U i Represents the final usability score, T i Represents the estimated bridging time, C i represents the estimated bridging cost, S i represents the power supply security score, R represents the power supply demand score input by the user, K represents the cross-connection capability score, represents the impact score of the jth abnormal factor, and A j represents the number of abnormal factors, and N represents the number of abnormal factors.

9. A method for high-current busbar bridging of a mobile energy storage electrical box according to claim 8, characterized in that: The evaluation calculation formula uses time consumption and cost as denominators to reflect the negative impact of such parameters on the availability of the docking point. Time consumption and cost are inversely proportional to the overall availability score. The positive impact on availability is expressed by multiplying user demand, cross-connection capability and security scores. The availability of the docking point is corrected by calculating the average score of the abnormal factor to calculate the availability score U i Used to sort the unused bus contacts.