Bridge newly-added assembly type sidewalk

Through the mortise-and-tenon structure and slot and block design of the new prefabricated sidewalk on the bridge, the problems of complicated construction and inconvenient maintenance of the existing bridge sidewalk are solved, achieving rapid installation and safe use, and improving maintenance efficiency.

CN221822765UActive Publication Date: 2024-10-11TONGJI UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420140676.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-19
Publication Date
2024-10-11
Estimated Expiration
2034-01-19

AI Technical Summary

Technical Problem

The construction of existing bridge walkways is complicated, which makes subsequent maintenance and replacement inconvenient and reduces practicality.

Method used

Design a new prefabricated sidewalk for the bridge, which is fixed on the main body of the bridge and curb stones through the mortise and tenon structure of connectors, brackets, steel longitudinal beams and sidewalk slabs, and adopts a combined structure of slot blocks and extension plate extensions. , achieving quick installation and disassembly.

Benefits of technology

It improves the convenience of installation and repair and replacement of prefabricated sidewalks, enhances the safety of use, and reduces the construction complexity and maintenance difficulty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822765U_ABST
    Figure CN221822765U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of bridge design, in particular to a newly-added assembled sidewalk for a bridge. The assembly type sidewalk is fixed to a bridge body and curbs and comprises a connecting frame, a bracket, multiple sets of steel longitudinal beams and multiple sets of sidewalk plates, the connecting frame is fixedly connected with the bridge body, the bracket is in joggle joint with the connecting frame, the multiple sets of steel longitudinal beams are arranged at intervals and fixedly connected to the bracket, and each set of steel longitudinal beams is perpendicular to the bracket; one end of each sidewalk plate is fixedly connected to one steel longitudinal beam, the other end of each sidewalk plate is fixedly connected to the curb or the adjacent steel longitudinal beam, and the upper surfaces of the bracket, the connecting frame and the bridge body are located on the same plane and abut against the lower surface of the curb. Compared with the prior art, the assembly type sidewalk has the advantages that the convenience degree of disassembly, assembly and maintenance of the assembly type sidewalk is improved, and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge design, in particular to a newly added assembled sidewalk for a bridge. Background Art

[0002] With the rapid development of my country's economy, the continuous advancement of urbanization, and the continuous expansion of urban scale, the original trunk road bridges can no longer meet the pedestrian needs of urban bridges and should be renovated. The conventional renovation method is to add widening bridges on both sides of the original bridge. This method requires the construction of the bridge substructure first, then the erection of the superstructure, and finally the construction of the bridge deck system and auxiliary structures.

[0003] However, the construction of the lower structure involves the processes of drilling holes for pile foundations, hoisting of steel cages, pouring of concrete, tying of steel bars for piers, erection of formwork and pouring, etc. The upper structure involves the processes of setting up brackets, tying of steel bars, pouring of concrete, etc. The sidewalk structure formed by this kind of structural construction is inconvenient to maintain and replace later due to its complicated processes, which reduces its practicality. Therefore, how to improve the convenience of maintenance and replacement while adding new bridge sidewalks has become a problem that needs to be solved in this field. Utility Model Content

[0004] The purpose of the utility model is to provide a newly added assembled sidewalk for a bridge in order to overcome the defect that the existing assembled sidewalk for bridges in the prior art is inconvenient to repair and replace after construction.

[0005] The purpose of the utility model can be achieved through the following technical solutions:

[0006] The utility model provides a newly added assembled sidewalk on a bridge, which is fixed on a bridge body and a curbstone, and comprises a connecting frame, a bracket, a plurality of groups of steel longitudinal beams and a plurality of groups of sidewalk slabs. The connecting frame is fixedly connected to the bridge body, the bracket is mortise-jointed with the connecting frame, the plurality of groups of steel longitudinal beams are arranged at intervals and fixedly connected to the bracket, each group of the steel longitudinal beams is perpendicular to the bracket, one end of each group of the sidewalk slabs is fixedly connected to one group of the steel longitudinal beams, and the other end is fixedly connected to the curbstone or an adjacent steel longitudinal beam, the upper surfaces of the bracket, the connecting frame and the bridge body are located in the same plane, and all abut against the lower surface of the curbstone.

[0007] As a preferred technical solution, the connecting frame is provided with a plurality of first card slots at intervals, the opening of each first card slot is located on the upper surface of the connecting frame, the bracket is provided with a plurality of first card blocks at intervals, the positions and quantities of the first card slots and the first card blocks correspond, and the first card blocks are embedded in the corresponding first card slots.

[0008] As a preferred technical solution, an anti-collision guardrail is provided on the curb.

[0009] As a preferred technical solution, the bottom of the connecting frame includes an extension plate, which extends in a direction away from the upper surface of the bridge body and abuts against the side wall of the bridge body; the bottom of the bracket includes an extension frame, which extends in a direction away from the upper surface of the bridge body and is mortise-jointed with the extension plate.

[0010] As a preferred technical solution, the extension plate is provided with a plurality of second card blocks at intervals, and the extension frame is provided with a plurality of second card slots at intervals, the opening of each second card slot is located on the lower surface of the extension frame, the positions and quantities of the second card blocks and the second card slots correspond, and the second card blocks are embedded in the corresponding second card slots.

[0011] As a preferred technical solution, adjacent steel longitudinal beams are fixedly connected via cross beams.

[0012] As a preferred technical solution, a mortar cushion layer is filled between each group of the sidewalk slabs and the bracket.

[0013] As a preferred technical solution, a pedestrian guardrail is provided at the end of the sidewalk slab farthest from the curb.

[0014] As a preferred technical solution, the connecting frame is welded to the bridge body.

[0015] As a preferred technical solution, the connecting frame is fixedly connected to the bridge body by bolts.

[0016] Compared with the prior art, the utility model has the following beneficial effects:

[0017] 1. When the utility model is in use, the connecting frame is fixedly connected to the bridge body, and then the bracket can be quickly installed from the connecting frame through the mortise and tenon connection between the bracket and the connecting frame, and then multiple groups of steel longitudinal beams are fixed at intervals, and finally the sidewalk slabs are overlapped and fixed on the steel longitudinal beams and the curbstones. The mortise and tenon connection method makes the assembled sidewalk easy to install, and when the assembled sidewalk needs to be disassembled, replaced and repaired, it is only necessary to lift the bracket upward, so that the disassembly, assembly and maintenance of the assembled sidewalk are relatively convenient and quick;

[0018] 2. The utility model can respectively set an extension plate and an extension frame at the bottom of the connecting frame and the bracket. The extension plate and the extension frame are also mortise and tenoned to provide auxiliary support for the bracket, which can increase the stability of the bracket after installation and prevent the bracket from being separated from the connection with the connecting frame. At the same time, an oblique upward supporting force can be applied to the bracket to effectively prevent the bracket from tilting, thereby improving the safety of the assembled sidewalk when in use. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the overall structure of the assembled sidewalk in the embodiment of the utility model;

[0020] Figure 2 It is a schematic diagram of the mortise and tenon joint structure between the bracket of the assembled sidewalk and the bridge body in the embodiment of the utility model;

[0021] Figure 3 It is a schematic diagram of the cross-sectional structure of the assembled sidewalk in the embodiment of the utility model;

[0022] Among them: 1. Bridge body; 2. Curbstone; 3. Connecting frame; 31. First slot; 32. Extension plate; 321. Second block; 4. Bracket; 41. First block; 42. Extension frame; 421. Second slot; 51. First steel longitudinal beam; 52. Second steel longitudinal beam; 61. First sidewalk slab; 62. Second sidewalk slab; 7. Anti-collision guardrail; 8. Pedestrian guardrail; 9. Crossbeam; 10. Mortar cushion. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of them. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the utility model.

[0024] In the description of the present utility model, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the utility model product is usually placed when in use, which are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present utility model. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0025] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0026] Example:

[0027] like Figure 1 As shown, this embodiment provides a newly added assembled sidewalk for a bridge, which is fixed on a bridge body 1 and a curb 2. The assembled sidewalk includes a connecting frame 3, a bracket 4, two sets of steel longitudinal beams, a first steel longitudinal beam 51 and a second steel longitudinal beam 52, and two sets of sidewalk slabs, a first sidewalk slab 61 and a second sidewalk slab 62. The curb 2 is provided with an anti-collision guardrail 7, which is fixedly connected to the curb 2 by bolts, and can also be fixed by other connection methods.

[0028] The connecting frame 3 is fixedly connected to the bridge body 1. During construction, when the bridge body 1 is a steel structure, the connecting frame 3 can be installed by welding, and when the bridge body 1 is a concrete structure, the connecting frame 3 can be installed by bolting.

[0029] The bracket 4 is mortise-jointed with one side of the connecting frame 3. Figure 2 As shown, the specific structure of the mortise and tenon joint includes: three first card slots 31 are provided at intervals on the side wall of the connecting frame 3, and the opening of each first card slot 31 is located on the upper surface of the connecting frame 3; three first card blocks 41 are provided at intervals on the side wall of one end of the bracket 4 close to the connecting frame 3, and the positions of each first card slot 31 and the first card block 41 correspond to each other, and the first card block 41 is embedded in the corresponding first card slot 31, and can also slide upward out of the first card slot 31. After the connection frame 3 is installed, the first card block 41 on the bracket 4 is aligned with the first card slot 31, and the bracket 4 is moved downward to quickly complete the installation of the bracket 4.

[0030] The first steel longitudinal beam 51 and the second steel longitudinal beam 52 are arranged at intervals and fixedly connected to the bracket 4, and each set of steel longitudinal beams is perpendicular to the upper surface of the bracket 4. Figure 1 From the perspective of the first steel longitudinal beam 51 and the second steel longitudinal beam 52, the first sidewalk slab 61 and the second sidewalk slab 62 are arranged from left to right in sequence. The left end of the first sidewalk slab 61 is fixedly connected to the first steel longitudinal beam 51 by bolts, and the right end is fixedly connected to the second steel longitudinal beam 52 by bolts. The left end of the second sidewalk slab 62 is fixedly connected to the second steel longitudinal beam 52 by bolts, and the right end is fixedly connected to the curb 2 by bolts. Among the four ends of the first sidewalk slab 61 and the second sidewalk slab 62, the left end of the first sidewalk slab 61 is farthest from the curb 2, and a pedestrian guardrail 8 is provided there. Pedestrians are protected by the pedestrian guardrail 8 to improve the practicality of the assembled sidewalk.

[0031] The two sets of sidewalk slabs are supported by two sets of steel longitudinal beams and curbstones 2. After the two sets of sidewalk slabs are fixed on the two sets of steel longitudinal beams and curbstones 2, pedestrians can walk on the first sidewalk slab 61 and the second sidewalk slab 62. Figure 3As shown, the first steel longitudinal beam 51 and the second steel longitudinal beam 52 can be fixedly connected by the cross beam 9, and the cross beam 9 can be used to provide auxiliary support between the two sets of steel longitudinal beams to improve the stability of the two sets of steel longitudinal beams after being fixed, and a mortar cushion layer 10 can be filled between the two sets of sidewalk slabs and the bracket 4. The mortar cushion layer 10 can be used to provide auxiliary support for the two sets of sidewalk slabs, which can effectively prevent the two sets of sidewalk slabs from breaking.

[0032] from Figure 1 and Figure 3 It can be seen that after the aforementioned prefabricated sidewalk is installed and fixed, the upper surfaces of the bracket 4, the connecting frame 3 and the bridge body 1 are located in the same plane, and are all in contact with the lower surface of the curb 2. This can increase the stability of the connecting frame 3 and the bracket 4 after they are fixed, further improving the safety of the prefabricated sidewalk, and the anti-collision guardrail 7 is used to protect pedestrians.

[0033] The bottom of the connecting frame 3 also includes an extension plate 32, which extends in a direction away from the upper surface of the bridge body 1 and abuts against the side wall of the bridge body 1; the bottom of the bracket 4 also includes an extension frame 42, which extends in a direction away from the upper surface of the bridge body 1 and the bottom end of the extension frame 42 is mortise-jointed with the extension plate 32. Figure 2 As shown, the specific structure of the mortise and tenon joint includes: three second blocks 321 are spaced apart on the side walls at the bottom end of the extension plate 32, and three second slots 421 are spaced apart at the bottom end of the extension frame 42, and the opening of each second slot 421 is located on the lower surface of the extension frame 42, and the positions of each second block 321 and the second slot 421 correspond to each other, and the second block 321 is embedded in the corresponding second slot 421, and the second slot 421 can also move upward with the bracket 4 to disengage from the second block 321.

[0034] During the installation of the bracket 4, the second slot 421 on the extension frame 42 is clamped on the second block 321 on the extension plate 32 to provide auxiliary support for the bracket 4, so as to increase the stability of the bracket 4 after installation and prevent the bracket 4 from being disconnected from the connecting frame 3. At the same time, an oblique upward supporting force can be applied to the bracket 4 to effectively prevent the bracket 4 from tilting, thereby improving the safety of the assembled sidewalk when in use.

[0035] When the assembled sidewalk is in use, the connecting frame 3 is fixed to the bridge body 1 by bolts or welding, and then the first clamping block 41 on the bracket 4 is aligned with the first clamping groove 31, and the bracket 4 is moved downward so that the first clamping block 41 is clamped in the corresponding first clamping groove 31, so that the installation of the bracket 4 can be quickly completed. In the process of installing the bracket 4, the second clamping groove 421 opened on the bottom extension frame 42 of the bracket 4 is clamped on the second clamping block 321 fixedly installed on the bottom extension plate 32 of the connecting frame 3, so as to increase the stability of the installation of the bracket 4 and improve the safety of the assembled sidewalk when in use. After the bracket 4 is installed, the two groups of steel longitudinal beams are fixed, and finally the two groups of sidewalk slabs are overlapped and fixed, so that the assembled sidewalk can be installed quickly, and when the assembled sidewalk needs to be disassembled, replaced and repaired, it is only necessary to lift the bracket 4 upward so that the first clamping block 41 and the second clamping block 321 are separated from the first clamping groove 31 and the second clamping groove 421 respectively, so that the disassembly and maintenance of the assembled sidewalk are relatively convenient and quick, and the construction and maintenance efficiency of the assembled sidewalk is effectively improved.

[0036] The preferred specific embodiments of the utility model are described in detail above. It should be understood that ordinary technicians in this field can make many modifications and changes based on the concept of the utility model without creative work. Therefore, all technical solutions that can be obtained by technicians in this technical field based on the concept of the utility model through logical analysis, reasoning or limited experiments on the basis of the existing technology should be within the scope of protection determined by the claims.

Claims

1. A newly added assembled sidewalk on a bridge, fixed on the bridge body and the curb, characterized in that: It includes a connecting frame, a bracket, multiple groups of steel longitudinal beams and multiple groups of sidewalk slabs. The connecting frame is fixedly connected to the bridge body, the bracket is mortise-jointed with the connecting frame, the multiple groups of steel longitudinal beams are arranged at intervals and fixedly connected to the bracket, each group of steel longitudinal beams is perpendicular to the bracket, one end of each group of sidewalk slabs is fixedly connected to one group of steel longitudinal beams, and the other end is fixedly connected to the curb or adjacent steel longitudinal beams, the upper surfaces of the bracket, the connecting frame and the bridge body are located in the same plane, and all abut against the lower surface of the curb.

2. The newly added assembled sidewalk for bridge according to claim 1 is characterized in that: The connecting frame is provided with a plurality of first card slots at intervals, and the opening of each first card slot is located on the upper surface of the connecting frame. The bracket is provided with a plurality of first card blocks at intervals, and the positions and quantities of the first card slots and the first card blocks correspond to each other, and the first card blocks are embedded in the corresponding first card slots.

3. The newly added assembled sidewalk for bridge according to claim 1 is characterized in that: An anti-collision guardrail is arranged on the curb.

4. The newly added assembled sidewalk for bridge according to claim 1 is characterized in that: The bottom of the connecting frame includes an extension plate, which extends in a direction away from the upper surface of the bridge body and abuts against the side wall of the bridge body; the bottom of the bracket includes an extension frame, which extends in a direction away from the upper surface of the bridge body and is mortise-jointed with the extension plate.

5. The newly added assembled sidewalk for bridge according to claim 4 is characterized in that: The extension plate is provided with a plurality of second card blocks at intervals, and the extension frame is provided with a plurality of second card slots at intervals, the opening of each second card slot is located on the lower surface of the extension frame, the position and quantity of the second card blocks correspond to those of the second card slots, and the second card blocks are embedded in the corresponding second card slots.

6. The newly added assembled sidewalk for bridge according to claim 1 is characterized in that: Adjacent steel longitudinal beams are fixedly connected via cross beams.

7. The newly added assembled sidewalk for bridge according to claim 1 is characterized in that: A mortar cushion layer is filled between each group of the sidewalk slabs and the bracket.

8. The newly added assembled sidewalk for bridge according to claim 1 is characterized in that: A pedestrian guardrail is provided at the end of the sidewalk slab farthest from the curbstone.

9. The newly added assembled sidewalk for bridge according to claim 1 is characterized in that: The connecting frame is welded to the bridge body.

10. The newly added assembled sidewalk for bridge according to claim 1, characterized in that: The connecting frame is fixedly connected to the bridge body by bolts.

Citation Information

Cited By

  • Foot bridge structure and construction method thereof

    CN119711311A