Prefabricated forming device for pier column

By introducing pier frame supports and conveyor rollers into the pier prefabrication device, and setting up an intermediate transfer channel, the problem of low transfer efficiency of the pier prefabrication device is solved, and a more efficient pier prefabrication process is achieved.

CN221912543UActive Publication Date: 2024-10-29THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323395241.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2024-10-29
Estimated Expiration
2033-12-13

AI Technical Summary

Technical Problem

The existing pier prefabricated molding device has low efficiency during the transfer process. Because of the lack of an intermediate transfer channel, the outer side of the pier frame support is transferred, which affects the efficiency of the prefabricated molding.

Method used

The pier skeleton support and the conveyor roller machine are designed. The pier skeleton support is used to realize prefabrication. An intermediate transfer channel is set up between the workstations through the conveyor roller machine to connect the pier skeleton support and the conveyor roller machine. Roller transfer.

Benefits of technology

It improves the efficiency of prefabricated piers, optimizes the transfer operations of pier skeletons, formwork and prefabricated piers, and ensures an efficient production process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221912543U_ABST
    Figure CN221912543U_ABST
Patent Text Reader

Abstract

A prefabrication forming device for a pier column comprises pier column framework supports (1) installed on a prefabrication forming foundation surface of the pier column in rows and columns and conveying roller machines (2) arranged between every two adjacent pier column framework supports (1) distributed in rows, prefabrication forming manufacturing of the pier column is achieved through the pier column framework supports (1), and the pier column framework supports (1) and the conveying roller machines (2) are connected through the conveying roller machines (2). According to the roller body transfer device, roller body transfer for rotating a prefabricated forming pier column is achieved, a middle transfer channel is arranged between stations for preparing the prefabricated forming pier column, and the technical problem that a pier column framework support is directly installed on a manufacturing site, so that the prefabricated forming pier column is transferred from the outer side of the pier column framework support is solved; therefore, the prefabrication forming efficiency of the pier column is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a prefabricated forming device, in particular to a prefabricated forming device for piers. Background Art

[0002] A pier is a lower load-bearing object used to support an upper structure in civil engineering. The cross-section of a pier is mostly circular, but there are also elliptical, square, curved, parabolic and other special piers. It is an important component in highway bridges, railway bridges, sidewalk bridges, flyovers, ramp bridges, overpasses and other projects. In order to optimize the construction environment, the piers are prefabricated in factories. Therefore, the prefabricated forming device for piers is an important construction device. In the existing prefabricated forming devices for piers, the pier frame supports are directly installed on the production site. When the prefabricated piers are completed, they are transported from the outside of the pier frame supports. Since there is no set transfer channel between the pier frame supports, the efficiency of the prefabrication of the piers is affected.

[0003] The utility model has the technical feature of arranging an intermediate transfer channel between the workstations for preparing the prefabricated pier columns, and has effectively explored and studied the technical problem that the pier column skeleton support is directly installed on the production site so that the prefabricated pier columns can be transferred from the outside of the pier column skeleton support.

[0004] The statements here only provide background technology related to the utility model and do not necessarily constitute prior art. The technical solution of the application of the present invention is made based on the technical briefing document provided by the applicant on September 9, 2023, which solves actual technical problems in the work process, and the existing technical problems, technical features and technical effects in the similar patent literature and background technology obtained through retrieval. Summary of the invention

[0005] The object of the utility model is a prefabricated forming device for piers.

[0006] In order to overcome the above technical disadvantages, the purpose of the utility model is to provide a prefabrication molding device for piers, thereby improving the efficiency of prefabrication molding of piers.

[0007] To achieve the above purpose, the technical solution adopted by the utility model is: it includes pier frame supports installed in rows and columns on the prefabricated foundation surface of the pier, and a conveying roller machine arranged between two adjacent pier frame supports distributed in rows.

[0008] Due to the design of the pier column skeleton support and the conveying roller machine, the pier columns can be prefabricated and formed by the pier column skeleton support, and the conveying roller machine can be used to transport the prefabricated formed pier columns by rotating rollers, thereby realizing the setting of intermediate transfer channels between the workstations for preparing the prefabricated formed pier columns, solving the technical problem of directly installing the pier column skeleton support on the production site so that the prefabricated formed pier columns are transported from the outside of the pier column skeleton support, thereby improving the efficiency of prefabricating the pier columns.

[0009] The utility model is designed to connect the pier column skeleton support and the conveying roller machine to each other in a manner of arranging an intermediate transfer channel between workstations for preparing the prefabricated pier columns.

[0010] The utility model is designed to connect the conveying roller machine with the pier column skeleton support in a roller body transfer mode for rotating the prefabricated pier column.

[0011] The technical effect of the above technical solution is: highlighting the technical feature of setting up an intermediate transfer channel between the workstations for preparing prefabricated piers, and introducing its application in the technical field of prefabricated forming devices for piers.

[0012] The utility model is designed to further include a first accessory device, and the first accessory device is arranged on the conveying roller machine, and the first accessory device is arranged as an anti-collision rod.

[0013] The utility model is designed to further include a second accessory device, and the second accessory device is arranged between the pier column skeleton support and the conveying roller machine, and the second accessory device is arranged to include a side bracket, a guide rail beam and a lifting hoist.

[0014] The utility model is designed to further include a third accessory device, and the third accessory device is arranged on the second accessory device, and the third accessory device is arranged as a water delivery pipe.

[0015] The utility model is designed to further include a fourth accessory device, and the fourth accessory device is arranged on the second accessory device, and the fourth accessory device is arranged as a mortar conveying pipe.

[0016] The technical effects of the above four technical solutions are: realizing the installation of other components and expanding the technical effects of the utility model.

[0017] The utility model is designed that a pier column skeleton support is arranged on the side of the conveying roller machine, an anti-collision rod and a side bracket are respectively arranged on the conveying roller machine, and a guide rail beam, a water pipe and a mortar pipe are respectively arranged on the side bracket, and a lifting hoist is arranged on the guide rail beam.

[0018] The technical effect of the above technical scheme is that the basic technical scheme of the utility model is formed by the pier frame support, conveying roller machine, anti-collision rod, side bracket, guide rail beam, lifting hoist, water pipe and mortar pipe, which solves the technical problem of the utility model.

[0019] The utility model is designed that the pier column skeleton support is arranged to include a first vertical beam portion, a second vertical beam portion, a third vertical beam portion, a first cross beam portion, a second cross beam portion and a third cross beam portion, and one end of the first cross beam portion is arranged to be connected to one of the inner side portions of the inner end end surface of the first vertical beam portion, another end of the first cross beam portion is arranged to be connected to one of the inner side portions of the inner end end surface of the third vertical beam portion, and the middle cross section end of the first cross beam portion is arranged to be connected to the inner side portion of one end of the second vertical beam portion, one end of the third cross beam portion is arranged to be connected to one of the inner side portions of the inner end end surface of the first vertical beam portion, and another end of the third cross beam portion is arranged to be connected to one of the inner side portions of the inner end end surface of the third vertical beam portion, and the third cross beam portion The end of the middle section is arranged to be connected to the inner side of the other end of the second vertical beam portion and one of the ends of the second cross beam portion is arranged to be connected to the middle part of the inner end face of the first vertical beam portion, the other end of the second cross beam portion is arranged to be connected to the middle part of the inner end face of the third vertical beam portion and the end of the middle section of the second cross beam portion is arranged to be connected to the middle part of the second vertical beam portion, the first vertical beam portion, the second vertical beam portion, the third vertical beam portion, the first cross beam portion, the second cross beam portion and the third cross beam portion are respectively arranged to be distributed corresponding to the conveying roller, the side bracket, the guide rail beam, the lifting hoist, the water pipe and the mortar pipe and the first vertical beam portion, the second vertical beam portion, the third vertical beam portion, the first cross beam portion, the second cross beam portion and the third cross beam portion are respectively arranged to be I-shaped beams.

[0020] The technical effect of the above technical solution is: achieving positioning support for the pier column skeleton and ensuring the installation consistency of the pier column skeleton.

[0021] The utility model is designed that a conveyor roller machine is arranged to include a first column part, a second column part, an upper support frame part, a lower support frame part and a roller body part, and a receiving hole body is respectively arranged at a lower side part of an inner end face of the first column part and a lower side part of an inner end face of the second column part, a rotating hole body is respectively arranged at a middle upper part of the first column part and a middle upper part of the second column part, and the rotating hole body is arranged to be connected with an end head of the roller body part, a middle part of an inner end face of the first column part and a middle part of an inner end face of the second column part are respectively arranged to be connected with a transverse end head of the upper support frame part, and a lower side part of an inner end face of the first column part and an inner end end of the second column part are respectively arranged. The lower side parts of the surface are respectively arranged to be connected to the transverse end parts of the lower support frame part, the accommodating hole body is arranged to be connected to the anti-collision rod and the outer end face part of the first column part and the outer end face part of the second column part are respectively arranged to be connected to the side bracket through a connecting rod, the roller body part is arranged to be distributed corresponding to the guide rail beam and the first column part and the second column part are respectively arranged to be distributed corresponding to the pier column skeleton support, the first column part and the second column part are respectively arranged to be I-shaped beam-shaped bodies, the upper support frame part and the lower support frame part are respectively arranged to be mesh frame-shaped bodies and the roller body part is arranged to be a middle-shaped rotating roller, the rotating hole body is arranged to be a circular hole-shaped body and the accommodating hole body is arranged to be a blind hole.

[0022] The technical effect of the above technical solution is that: the conveying roller conveyor is set up to ensure the transportation support strength for the preparation of prefabricated piers.

[0023] The utility model is designed that the anti-collision rod is arranged as a T-shaped rubber rod, the contraction part of the anti-collision rod is arranged to be embeddedly connected with the conveying roller machine, and the expansion part of the anti-collision rod is arranged to be distributed correspondingly to the conveying roller machine.

[0024] The technical effect of the above technical solution is: to achieve elastic surface support and guidance for the prefabricated pier column, thereby preventing impact force from being generated on the prefabricated pier column.

[0025] The present utility model is designed such that the side bracket is configured to include a frame portion, a plate portion, a rod portion, and a rope hook portion. One end of the rod portion is configured to be connected to the upper side portion of the outer end surface of the vertical portion of the frame portion, and the other end of the rod portion is configured to be connected to the middle portion of the inner end surface of the plate portion. The rope end of the rope hook portion is configured to be connected to the outer end surface portion of the vertical portion of the frame portion. The hook body of the rope hook portion is configured to be connected to the rod portion in a hanging manner. The middle portion of the lower end surface of the horizontal portion of the frame portion is configured to be connected to the guide rail beam. The vertical portion of the frame portion is configured to be connected to the conveying roller machine through a connecting rod, and the end of the vertical portion of the frame portion is configured to be connected to the ground surface. The upper end surface portion of the rod portion and the upper portion of the inner end surface of the plate portion are respectively configured to be connected to the mortar conveying pipe, and the rope body of the rope hook portion is configured to be connected to the water conveying pipe in a surrounding manner. The lower portion of the inner end surface of the plate portion is configured to be connected to the water conveying pipe. The frame portion is configured as a U-shaped rod body, the plate portion is configured as a strip-shaped sheet body, the rod portion is configured as a rod body, and the rope hook portion is configured as a connecting component having a textile rope body and a U-shaped rod body.

[0026] The present utility model is designed such that the guide rail beam is configured as an I-shaped beam body, and the upper end surface portion of the guide rail beam is configured to be connected to the side bracket. The guide rail beam is configured to be connected to the hoist in a supporting manner and is configured to be distributed across the conveying roller machine.

[0027] The present utility model is designed such that the hoist is configured as an electric wire rope hoist, and the driving device of the hoist is configured to be connected to the guide rail beam.

[0028] The technical effects of the above three technical solutions are as follows: A gantry crane is arranged between the pier column skeleton support and the conveying roller machine, enabling the hoisting of the pier column skeleton, pier column formwork, and prefabricated and formed pier columns, and improving the production efficiency of prefabricated and formed pier columns.

[0029] The present utility model is designed such that the water conveying pipe is configured as a tubular body and is configured to be connected to the side bracket. The input port portion of the water conveying pipe is configured to be connected to a high-pressure water source through a stop valve.

[0030] The technical effects of the above three technical solutions are as follows: The conveying of curing water is realized, ensuring on-site curing of pier columns at the production station of the pier column skeleton support.

[0031] The present utility model is designed such that the mortar conveying pipe is configured as a tubular body and is configured to be connected to the side bracket. The input port portion of the mortar conveying pipe is configured to be connected to the output pipe of the cement mortar conveying pump through a stop valve.

[0032] The technical effects of the above three technical solutions are as follows: The conveying of pouring mortar is realized, ensuring on-site pouring of pier columns at the production station of the pier column skeleton support.

[0033] The utility model is designed that the pier frame support and the conveying roller machine are arranged to be distributed in a side installation manner, and the pier frame support and the conveying roller machine and the anti-collision bar are arranged to be distributed in an upper end buffer support manner, the pier frame support and the conveying roller machine and the guide rail beam and the lifting hoist are arranged to be distributed in a side lifting manner, and the pier frame support and the conveying roller machine and the water pipe and the mortar pipe are arranged to be distributed in a pipeline transportation manner.

[0034] The utility model is designed that two pier column skeleton supports, two side brackets, a guide rail beam and two lifting hoists are arranged to form a group of prefabricated components, multiple groups of prefabricated components are arranged to be distributed at intervals along the center line of the conveying roller machine, two water pipes and two mortar pipes are respectively arranged on the side brackets, a first column part, a second column part and a roller body part are arranged to form a group of roller parts, multiple groups of roller parts are arranged between the upper support frame part and the lower support frame part, and the frame parts are respectively arranged to be connected with the first column part and the second column part.

[0035] In the present technical scheme, the pier frame support and the conveying roller are basic components and are also the necessary technical features of the present utility model; the anti-collision rod, the side bracket, the guide rail beam, the lifting hoist, the water pipe and the mortar pipe are functional components and are the features for realizing other technical effects of the present utility model; the designs of the technical features of the first vertical beam portion, the second vertical beam portion, the third vertical beam portion, the first cross beam portion, the second cross beam portion, the third cross beam portion, the first column portion, the second column portion, the upper support frame portion, the lower support frame portion, the roller body portion, the rotating hole body, the accommodating hole body, the frame portion, the plate portion, the rod portion and the rope hook portion are technical features that comply with the Patent Law and its implementing rules.

[0036] In the present technical scheme, the pier frame support and conveying roller machine for the intermediate transfer channel are arranged between the work stations for preparing the prefabricated piers as an important technical feature. In the technical field of prefabricated forming devices for piers, it has novelty, creativity and practicality. The terms in the present technical scheme can be explained and understood using the patent literature in this technical field. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0038] Figure 1 It is a schematic diagram of the utility model.

[0039] Figure 2 It is a structural schematic diagram of the pier column skeleton support 1.

[0040] Pier frame support-1, conveying roller machine-2, anti-collision rod-3, side bracket-4, guide rail beam-5, lifting hoist-6, water pipe-7, mortar pipe-8, first vertical beam part-11, second vertical beam part-12, third vertical beam part-13, first cross beam part-14, second cross beam part-15, third cross beam part-16, first column part-21, second column part-22, upper support frame part-23, lower support frame part-24, roller body part-25, rotating hole body-26, accommodating hole body-27, frame part-41, plate part-42, rod part-43, rope hook part-44. Implementation

[0041] According to the Examination Guidelines, terms such as “having”, “including” and “comprising” used in the present invention should be understood as not precluding the existence or addition of one or more other elements or combinations thereof.

[0042] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0043] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0044] In addition, the technical features involved in the different embodiments of the utility model described below can be combined with each other as long as they do not conflict with each other. In addition, unless otherwise specified, the equipment and materials used in the following embodiments are commercially available. If the processing conditions are not clearly stated, please refer to the purchased product manual or proceed according to conventional methods in the field.

[0045] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0046] Figure 1 This is the first embodiment of the utility model. This embodiment is specifically described in conjunction with the accompanying drawings. It includes a pier frame support 1, a conveying roller machine 2, an anti-collision bar 3, a side bracket 4, a guide beam 5, a lifting hoist 6, a water pipe 7 and a mortar pipe 8, and the pier frame support 1 is arranged on the side of the conveying roller machine 2, the anti-collision bar 3 and the side bracket 4 are respectively arranged on the conveying roller machine 2, and the guide beam 5, the water pipe 7 and the mortar pipe 8 are respectively arranged on the side bracket 4, and the lifting hoist 6 is arranged on the guide beam 5.

[0047] In the present embodiment, the pier frame support 1 is configured to include a first vertical beam portion 11, a second vertical beam portion 12, a third vertical beam portion 13, a first cross beam portion 14, a second cross beam portion 15 and a third cross beam portion 16, and one end of the first cross beam portion 14 is configured to be connected to one of the inner side portions of the inner end face of the first vertical beam portion 11, another end of the first cross beam portion 14 is configured to be connected to one of the inner side portions of the inner end face of the third vertical beam portion 13, and the middle cross section end of the first cross beam portion 14 is configured to be connected to the inner side portion of one end of the second vertical beam portion 12, one end of the third cross beam portion 16 is configured to be connected to one of the inner side portions of the inner end face of the first vertical beam portion 11, and another end of the third cross beam portion 16 is configured to be connected to one of the inner side portions of the inner end face of the third vertical beam portion 13, and the middle cross section end of the third cross beam portion 16 It is arranged to be connected to the inner side part of the other end of the second vertical beam part 12 and one of the ends of the second cross beam part 15 is arranged to be connected to the middle part of the inner end face of the first vertical beam part 11, the other end of the second cross beam part 15 is arranged to be connected to the middle part of the inner end face of the third vertical beam part 13 and the middle cross section end of the second cross beam part 15 is arranged to be connected to the middle part of the second vertical beam part 12, the first vertical beam part 11, the second vertical beam part 12, the third vertical beam part 13, the first cross beam part 14, the second cross beam part 15 and the third cross beam part 16 are respectively arranged to be distributed corresponding to the conveying roller machine 2, the side bracket 4, the guide rail beam 5, the lifting hoist 6, the water pipe 7 and the mortar pipe 8 and the first vertical beam part 11, the second vertical beam part 12, the third vertical beam part 13, the first cross beam part 14, the second cross beam part 15 and the third cross beam part 16 are respectively arranged to be I-shaped beam bodies.

[0048] Through the pier frame support 1, support connection points for the conveying roller 2, the side bracket 4, the guide beam 5, the lifting hoist 6, the water pipe 7 and the mortar pipe 8 are formed. The first vertical beam part 11, the second vertical beam part 12, the third vertical beam part 13, the first cross beam part 14, the second cross beam part 15 and the third cross beam part 16 realize the connection with the conveying roller 2, the connection with the side bracket 4, the connection with the guide beam 5, the connection with the lifting hoist 6, the connection with the water pipe 7, and the connection with the mortar pipe 8. The technical purpose is to serve as a supporting carrier for the pier frame and the formwork.

[0049] In this embodiment, the conveyor roller machine 2 is configured to include a first column portion 21, a second column portion 22, an upper support frame portion 23, a lower support frame portion 24 and a roller body portion 25, and a receiving hole body 27 is respectively provided at the lower side portion of the inner end surface of the first column portion 21 and the lower side portion of the inner end surface of the second column portion 22, a rotating hole body 26 is respectively provided at the middle upper portion of the first column portion 21 and the middle upper portion of the second column portion 22, and the rotating hole body 26 is configured to be connected to the end head of the roller body portion 25, the middle portion of the inner end surface of the first column portion 21 and the middle portion of the inner end surface of the second column portion 22 are respectively configured to be connected to the transverse end head of the upper support frame portion 23, and the lower side portion of the inner end surface of the first column portion 21 and ... The lower side of the end face is respectively configured to be connected to the transverse end of the lower support frame portion 24, the accommodating hole body 27 is configured to be connected to the anti-collision rod 3 and the outer end face portion of the first column portion 21 and the outer end face portion of the second column portion 22 are respectively configured to be connected to the side bracket 4 through a connecting rod, the roller body portion 25 is configured to be distributed corresponding to the guide rail beam 5 and the first column portion 21 and the second column portion 22 are respectively configured to be distributed corresponding to the pier column skeleton support 1, the first column portion 21 and the second column portion 22 are respectively configured to be I-shaped beam-shaped bodies, the upper support frame portion 23 and the lower support frame portion 24 are respectively configured to be mesh frame-shaped bodies and the roller body portion 25 is configured to be a center-shaped rotating roller, the rotating hole body 26 is configured to be a circular hole-shaped body and the accommodating hole body 27 is configured to be a blind hole.

[0050] Through the conveying roller machine 2, supporting connection points for the pier frame support 1, the anti-collision bar 3, the side bracket 4 and the guide rail beam 5 are formed. The first column part 21 and the second column part 22 realize the connection with the pier frame support 1, realize the connection with the side bracket 4, the accommodating hole body 27 realizes the connection with the anti-collision bar 3, the roller body part 25 realizes the connection with the guide rail beam 5, the upper support frame part 23 and the lower support frame part 24 realize the connection processing between the first column part 21 and the second column part 22, and the rotating hole body 26 realizes the rotation support processing of the roller body part 25. The technical purpose is to be used as a component for transporting prefabricated piers.

[0051] In this embodiment, the anti-collision rod 3 is set as a T-shaped rubber rod, and the contraction part of the anti-collision rod 3 is set to be embedded and connected with the conveying roller machine 2, and the extension part of the anti-collision rod 3 is set to be distributed corresponding to the conveying roller machine 2.

[0052] Through the anti-collision rod 3, a support connection point for the conveying roller machine 2 is formed. Through the anti-collision rod 3, the connection with the conveying roller machine 2 is realized. Its technical purpose is: to be used as a component for the safety protection of prefabricated and formed pier columns.

[0053] In this embodiment, the side support 4 is set to include a frame part 41, a plate part 42, a rod part 43 and a rope hook part 44. One end of the rod part 43 is set to be connected to the upper side part of the outer end surface of the vertical part of the frame part 41, and the other end of the rod part 43 is set to be connected to the middle part of the inner end surface of the plate part 42. The rope end of the rope hook part 44 is set to be connected to the outer end surface part of the vertical part of the frame part 41. The hook body of the rope hook part 44 is set to be connected to the rod part 43 in a hanging manner. The middle part of the lower end surface of the horizontal part of the frame part 41 is set to be connected to the guide rail beam 5. The vertical part of the frame part 41 is set to be connected to the conveying roller machine 2 through a connecting rod, and the end of the vertical part of the frame part 41 is set to be connected to the ground surface. The upper end surface part of the rod part 43 and the upper part of the inner end surface of the plate part 42 are respectively set to be connected to the mortar conveying pipe 8, and the rope body of the rope hook part 44 is set to be wound around the water conveying pipe 7. The lower part of the inner end surface of the plate part 42 is set to be connected to the water conveying pipe 7. The frame part 41 is set as a C-shaped rod body, the plate part 42 is set as a strip-shaped sheet body, the rod part 43 is set as a rod body, and the rope hook part 44 is set as a connecting component with a textile rope body and a C-shaped rod body.

[0054] Through the side support 4, support connection points for the conveying roller machine 2, the guide rail beam 5, the water conveying pipe 7 and the mortar conveying pipe 8 are formed. Through the frame part 41, the connection with the conveying roller machine 2 is realized, and the connection with the guide rail beam 5 is realized. Through the plate part 42 and the rope hook part 44, the connection with the water conveying pipe 7 is realized. Through the plate part 42 and the rod part 43, the connection with the mortar conveying pipe 8 is realized. Its technical purpose is: to be used as a support carrier for the guide rail beam 5, the water conveying pipe 7 and the mortar conveying pipe 8.

[0055] In this embodiment, the guide rail beam 5 is set as an I-shaped beam body, and the upper end surface part of the guide rail beam 5 is set to be connected to the side support 4. The guide rail beam 5 is set to be supported and connected with the hoist 6, and the guide rail beam 5 is set to be distributed across the conveying roller machine 2.

[0056] Through the guide rail beam 5, support connection points for the conveying roller machine 2, the side support 4 and the hoist 6 are formed. Through the guide rail beam 5, the connection with the conveying roller machine 2 is realized, the connection with the side support 4 is realized, and the connection with the hoist 6 is realized. Its technical purpose is: to be used as a support carrier for the hoist 6.

[0057] In the present embodiment, the hoist 6 is configured as a wire rope electric hoist and a driving device of the hoist 6 is configured to be connected to the guide rail beam 5 .

[0058] A supporting connection point for the guide rail beam 5 is formed by the hoisting hoist 6, and the connection with the guide rail beam 5 is realized by the hoisting hoist 6. Its technical purpose is to be used as a component for lifting the prefabricated pier column.

[0059] In this embodiment, the water pipe 7 is configured as a tubular body and is configured to be connected to the side bracket 4 , and the input port portion of the water pipe 7 is configured to be connected to a high-pressure water source through a stop valve.

[0060] A supporting connection point of the side bracket 4 is formed by the water pipe 7, and the connection with the side bracket 4 is realized by the water pipe 7. Its technical purpose is to be used as a component for spraying curing water on the prefabricated piers.

[0061] In this embodiment, the mortar delivery pipe 8 is configured as a tubular body and is configured to be connected to the side bracket 4, and the input port portion of the mortar delivery pipe 8 is configured to be connected to the output pipe of the cement mortar delivery pump through a stop valve.

[0062] A supporting connection point of the side bracket 4 is formed by the mortar delivery pipe 8, and the connection with the side bracket 4 is realized by the mortar delivery pipe 8. Its technical purpose is to be used as a component for conveying mortar for pouring prefabricated piers.

[0063] In this embodiment, the pier frame support 1 and the conveying roller 2 are arranged to be distributed in a side installation manner, and the pier frame support 1 and the conveying roller 2 and the anti-collision bar 3 are arranged to be distributed in an upper end buffer support manner, the pier frame support 1 and the conveying roller 2 and the guide beam 5 and the lifting hoist 6 are arranged to be distributed in a side lifting manner, and the pier frame support 1 and the conveying roller 2 and the water pipe 7 and the mortar pipe 8 are arranged to be distributed in a pipeline transportation manner, two pier frame supports 1, two side supports 4, a guide beam 5 and two lifting hoists 6 are arranged to form a group of prefabricated components, and multiple groups of prefabricated components are arranged to be arranged and distributed along the center line of the conveying roller 2, two water pipes 7 and two mortar pipes 8 are respectively arranged on the side supports 4, a first column portion 21, a second column portion 22 and a roller body portion 25 are arranged to form a group of roller components, multiple groups of roller components are arranged between the upper support frame portion 23 and the lower support frame portion 24, and the frame portion 41 is respectively arranged to be connected to the first column portion 21 and the second column portion 22.

[0064] The method of using this embodiment is as follows: marking the conveyor roller machine 2 for installation on the prefabricated foundation surface of the pier, placing the lower end surface of the first vertical beam portion 11 and the lower end surface of the second vertical beam portion 12 on the marked position, thereby installing the conveyor roller machine 2 on the prefabricated foundation surface of the pier, placing the vertical end of the frame portion 41 on the prefabricated foundation surface of the pier, connecting one of the vertical portions of the frame portion 41 to one of the first column portions 21 or one of the second column portions 22 through a connecting rod, connecting another vertical portion of the frame portion 41 to another of the first column portions 21 or another of the second column portions 22 through a connecting rod, connecting one section of the upper end surface of the guide rail beam 5 to the middle portion of the lower end surface of the horizontal portion of the frame portion 41 located on the first column portion 21, and connecting another section of the upper end surface of the guide rail beam 5 to the lower end surface of the horizontal portion of the frame portion 41 located on the second column portion 22. The middle part is connected, so that the guide beam 5 is installed on the side bracket 4, the driving device of one of the lifting hoists 6 is installed on one end of the guide beam 5, and the driving device of the other lifting hoist 6 is installed on the other end of the guide beam 5. One of the pier frame supports 1 is placed on the outside of the first column part 21, so that one of the pier frame supports 1 corresponds to one end of the guide beam 5, and the other pier frame support 1 is placed on the outside of the second column part 22, so that the other pier frame support 1 corresponds to the other end of the guide beam 5. The mortar delivery pipe 8 is placed between the upper end surface of the rod part 43 and the upper part of the inner end surface of the plate part 42, and the water delivery pipe 7 is placed between the rope body of the rope hook part 44 and the lower part of the inner end surface of the plate part 42, the rope body of the rope hook part 44 is wrapped around the water delivery pipe 7, and the hook body of the rope hook part 44 is hooked on the rod part 43.

[0065] When the pier is prefabricated, the template of the pier is lifted by the hoisting hoist 6, and the template of the pier is mounted on the pier frame support 1, and then the lifting hook of the hoisting hoist 6 is separated from the template of the pier, and the pier frame is lifted by the hoisting hoist 6, and then the ends of the vertical rods of the pier frame are placed on the connection parts of the first vertical beam part 11, the second vertical beam part 12 and the third vertical beam part 13 and the first cross beam part 14, the second cross beam part 15 and the third cross beam part 16 respectively. Take out the output port of the mortar delivery pipe 8 from between the upper end surface of the rod 43 and the upper part of the inner end surface of the plate 42, open the stop valve between the input port of the mortar delivery pipe 8 and the output pipe of the cement mortar delivery pump, and deliver the mortar to the template of the pier column. When the thickness of the mortar in the template of the pier column reaches 500 mm, close the stop valve between the input port of the mortar delivery pipe 8 and the output pipe of the cement mortar delivery pump, and then lift the hoist 6. The hook is separated from the frame of the pier column, and the output port of the mortar delivery pipe 8 is connected to the lifting hook of the lifting hoist 6. The output port of the mortar delivery pipe 8 is placed in the template of the pier column through the lifting hoist 6. Then the stop valve between the input port of the mortar delivery pipe 8 and the output pipe of the cement mortar delivery pump is opened. The input port of the mortar delivery pipe 8 is kept 300mm away from the pouring mortar through the lifting hoist 6. The mortar is poured on the template of the pier column. When the mortar is poured on the template of the pier column, After that, the stop valve between the input port of the mortar delivery pipe 8 and the output pipe of the cement mortar delivery pump is closed, the output port of the mortar delivery pipe 8 is separated from the lifting hook of the lifting hoist 6, and the output port of the mortar delivery pipe 8 is placed between the upper end surface of the rod 43 and the upper part of the inner end surface of the plate 42. After the pouring mortar solidifies, the formwork of the pier column is removed, the hook body of the rope hook 44 is separated from the rod 43, and the output port of the water delivery pipe 7 is taken out from the lower part of the inner end surface of the plate 42. The cast pier column is sprayed with water for curing through the stop valve located between the input port of the water pipe 7 and the high-pressure water source. When the curing of the cast pier column is completed, the prefabricated pier column is obtained, and the lifting hook of the lifting hoist 6 is connected to the lifting frame located at the prefabricated pier column. The prefabricated pier column is lifted by the lifting hoist 6, and the prefabricated pier column is placed on the roller body 25. A push-pull force is applied to the prefabricated pier column, and the roller body 25 is rotated in the rotating hole 26 to transport the prefabricated pier column outward.

[0066] When verifying the utility model, the inventor abandoned the existing technical feature of directly installing the pier frame support on the production site so that the prefabricated piers were transferred from the outside of the pier frame support, and first proposed the technical feature of setting an intermediate transfer channel between the work stations for preparing the prefabricated piers, and obtained the first unexpected technical effect: the pier production station and the pier transfer channel are configured on both sides, and the number of pier production stations is increased, and the second unexpected technical effect is obtained: the transfer operation of the pier frame, pier formwork and prefabricated piers is optimized, and the operation efficiency is improved, and the third unexpected technical effect is obtained: the high-pressure water source and the cement mortar delivery pump are set at a long distance to ensure the need for prefabricated pier production space.

[0067] In the second embodiment of the present invention, the pier frame support 1 and the conveying roller machine 2 are connected to each other in a manner of arranging an intermediate transfer channel between the workstations for preparing the prefabricated piers.

[0068] In this embodiment, the conveying roller machine 2 is connected to the pier frame support 1 in a manner of rotating rollers for transporting the prefabricated piers.

[0069] In this embodiment, a first accessory device is further included and is arranged on the conveying roller machine 2 , and the first accessory device is arranged as an anti-collision rod 3 .

[0070] In this embodiment, a second accessory device is also included and is arranged between the pier frame support 1 and the conveyor roller machine 2 . The second accessory device is arranged to include a side bracket 4 , a guide rail beam 5 and a lifting hoist 6 .

[0071] In this embodiment, a third accessory device is further included and is arranged on the second accessory device. The third accessory device is arranged as a water pipe 7 .

[0072] In this embodiment, a fourth accessory device is further included and is arranged on the second accessory device. The fourth accessory device is arranged as a mortar delivery pipe 8 .

[0073] The second embodiment of the present utility model is based on the first embodiment.

[0074] The utility model has the following characteristics:

[0075] 1. Due to the design of the pier column skeleton support 1 and the conveying roller machine 2, the pier column is prefabricated and formed through the pier column skeleton support 1, and the conveying roller machine 2 is used to transfer the prefabricated pier column by rotating the roller body, and an intermediate transfer channel is set between the workstations for preparing the prefabricated pier column, which solves the technical problem that the pier column skeleton support is directly installed on the production site and the prefabricated pier column is transferred from the outside of the pier column skeleton support, thereby improving the efficiency of the prefabrication of the pier column.

[0076] 2. Due to the design of the anti-collision rod 3, a buffer component is arranged between the prefabricated forming pier and the conveying roller machine 2.

[0077] 3. Due to the design of the side bracket 4, the guide rail beam 5 and the hoisting hoist 6, it is possible to set a hoisting machinery on the pier column skeleton support 1.

[0078] 4. Due to the design of the water pipe 7, it is possible to set a water spray component on the pier column skeleton support 1.

[0079] 5. Due to the design of the mortar delivery pipe 8, it is possible to set the mortar pouring components on the pier column skeleton support 1.

[0080] 6. Since the design limits the numerical range of the structural shape, the numerical range is the technical feature in the technical solution of the utility model, and is not a technical feature calculated by formula or obtained through a limited number of tests. Tests have shown that the technical features of this numerical range have achieved good technical effects.

[0081] 7. Due to the design of the technical features of the utility model and the effects of the individual and combined technical features, experiments have shown that the performance indicators of the utility model are at least 1.7 times the existing performance indicators, and the evaluation shows that the utility model has a good market value.

[0082] There are other technical features that are connected with the pier frame support 1 and the conveying roller machine 2 for setting an intermediate transfer channel between the work stations for preparing prefabricated piers, which are all embodiments of the present utility model, and the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to meet the requirements of the Patent Law, Patent Implementation Rules and Examination Guidelines, all possible combinations of the technical features in the above-mentioned embodiments will no longer be described.

[0083] Therefore, in the technical field of prefabricated forming devices for piers, all technical contents including pier frame supports 1 installed in rows and columns on the prefabricated forming foundation surface of the piers and conveyor roller machines 2 arranged between two adjacent row-distributed pier frame supports 1 are within the protection scope of the present utility model.

Claims

1. A prefabricated forming device for piers, characterized in that: The invention comprises pier frame supports (1) which are installed in rows and columns on the prefabricated foundation surface of the piers, and a conveying roller machine (2) which is arranged between two adjacent pier frame supports (1) which are distributed in rows.

2. The prefabricated forming device for piers according to claim 1 is characterized in that: The pier frame support (1) and the conveying roller machine (2) are connected to each other in a manner that an intermediate transfer channel is provided between the workstations for preparing the prefabricated piers.

3. The prefabricated forming device for piers according to claim 2, characterized in that: The conveying roller machine (2) is connected to the pier frame support (1) in a manner of rotating rollers to transport the prefabricated pier.

4. The prefabricated forming device for piers according to claim 1, characterized in that: It also includes a first accessory device and the first accessory device is arranged on the conveying roller machine (2), and the first accessory device is arranged as an anti-collision rod (3). Or, it further comprises a second accessory device and the second accessory device is arranged between the pier frame support (1) and the conveying roller machine (2), and the second accessory device is arranged to include a side bracket (4), a guide rail beam (5) and a lifting hoist (6), Or, it further comprises a third accessory device and the third accessory device is arranged on the second accessory device, and the third accessory device is arranged as a water pipe (7), Or, it further comprises a fourth accessory device and the fourth accessory device is arranged on the second accessory device, and the fourth accessory device is arranged as a mortar conveying pipe (8).

5. The prefabricated forming device for piers according to claim 4 is characterized in that: A pier frame support (1) is arranged on the side of the conveyor roller (2), an anti-collision rod (3) and a side bracket (4) are arranged on the conveyor roller (2), a guide rail beam (5), a water pipe (7) and a mortar pipe (8) are arranged on the side bracket (4), and a lifting hoist (6) is arranged on the guide rail beam (5).

6. The prefabricated forming device for piers according to claim 5, characterized in that: The pier column skeleton support (1) is configured to include a first vertical beam portion (11), a second vertical beam portion (12), a third vertical beam portion (13), a first cross beam portion (14), a second cross beam portion (15) and a third cross beam portion (16), wherein one end of the first cross beam portion (14) is configured to be connected to one of the inner side portions of the inner end surface of the first vertical beam portion (11), and the other end of the first cross beam portion (14) is configured to be connected to one of the inner side portions of the inner end surface of the third vertical beam portion (13). The middle cross-section end of the first cross-beam portion (14) is arranged to be connected to the inner side of one end of the second vertical beam portion (12), one end of the third cross-beam portion (16) is arranged to be connected to the other inner side of the inner end face of the first vertical beam portion (11), and the other end of the third cross-beam portion (16) is arranged to be connected to the other inner side of the inner end face of the third vertical beam portion (13), and the middle cross-section end of the third cross-beam portion (16) is arranged to be connected to the second vertical beam portion ( The inner side of the other end of the second cross beam (12) is connected and one end of the second cross beam (15) is arranged to be connected to the middle part of the inner end face of the first vertical beam (11), the other end of the second cross beam (15) is arranged to be connected to the middle part of the inner end face of the third vertical beam (13) and the middle cross section end of the second cross beam (15) is arranged to be connected to the middle part of the second vertical beam (12), the first vertical beam (11), the second vertical beam (12) and the third vertical beam ( The first cross beam (13), the first cross beam (14), the second cross beam (15) and the third cross beam (16) are respectively arranged to correspond to the conveying roller (2), the side bracket (4), the guide rail beam (5), the lifting hoist (6), the water pipe (7) and the mortar pipe (8); and the first vertical beam (11), the second vertical beam (12), the third vertical beam (13), the first cross beam (14), the second cross beam (15) and the third cross beam (16) are respectively arranged to be I-shaped beams.

7. The prefabricated forming device for piers according to claim 5, characterized in that: The conveyor roller machine (2) is configured to include a first column part (21), a second column part (22), an upper support frame part (23), a lower support frame part (24) and a roller body part (25), and a receiving hole body (27) is respectively arranged at the lower side of the inner end surface of the first column part (21) and the lower side of the inner end surface of the second column part (22), a rotating hole body (26) is respectively arranged at the middle upper part of the first column part (21) and the middle upper part of the second column part (22), and the rotating hole body (26) is configured to be connected to the end head of the roller body part (25), the middle part of the inner end surface of the first column part (21) and the middle part of the inner end surface of the second column part (22) are respectively configured to be connected to the transverse end head of the upper support frame part (23), and the lower side of the inner end surface of the first column part (21) and the inner end surface of the second column part (22) are respectively connected to the transverse end head of the upper support frame part (23). The lower side parts are respectively arranged to be connected to the transverse end of the lower support frame part (24), the receiving hole body (27) is arranged to be connected to the anti-collision rod (3), and the outer end face part of the first column part (21) and the outer end face part of the second column part (22) are respectively arranged to be connected to the side bracket (4) through a connecting rod, the roller body part (25) is arranged to be distributed corresponding to the guide rail beam (5), and the first column part (21) and the second column part (22) are respectively arranged to be distributed corresponding to the pier column skeleton support (1), the first column part (21) and the second column part (22) are respectively arranged to be I-shaped beam bodies, the upper support frame part (23) and the lower support frame part (24) are respectively arranged to be mesh frame bodies, and the roller body part (25) is arranged to be a Chinese-shaped rotating roller, the rotating hole body (26) is arranged to be a circular hole body, and the receiving hole body (27) is arranged to be a blind hole.

8. The prefabricated forming device for piers according to claim 5, characterized in that: The anti-collision bar (3) is arranged as a T-shaped rubber bar, and the contraction portion of the anti-collision bar (3) is arranged to be embeddedly connected with the conveying roller (2), and the expansion portion of the anti-collision bar (3) is arranged to be distributed correspondingly to the conveying roller (2).

9. The prefabricated forming device for piers according to claim 5, characterized in that: The side support (4) is arranged to include a frame part (41), a plate part (42), a rod part (43) and a rope hook part (44). One end of the rod part (43) is arranged to be connected to the upper side part of the outer end face of the vertical part of the frame part (41), and the other end of the rod part (43) is arranged to be connected to the middle part of the inner end face of the plate part (42). The rope end of the rope hook part (44) is arranged to be connected to the outer end face part of the vertical part of the frame part (41). The hook body of the rope hook part (44) is arranged to be connected to the rod part (43) in a hanging connection manner. The middle part of the lower end face of the horizontal part of the frame part (41) is arranged to be connected to the guide rail beam (5). The vertical part of the frame part (41) is arranged to be connected to the conveying roller machine (2) through a connecting rod, and the end of the vertical part of the frame part (41) is arranged to be connected to the ground surface. The upper end face part of the rod part (43) and the upper part of the inner end face of the plate part (42) are respectively arranged to be connected to the mortar conveying pipe (8), and the rope body of the rope hook part (44) is arranged to be connected to the water conveying pipe (7) in a surrounding manner. The lower part of the inner end face of the plate part (42) is arranged to be connected to the water conveying pipe (7). The frame part (41) is arranged as a C-shaped rod-like body, the plate part (42) is arranged as a strip-shaped sheet body, the rod part (43) is arranged as a rod-like body, and the rope hook part (44) is arranged as a connecting component with a textile rope body and a C-shaped rod body. Or, the guide rail beam (5) is arranged as an I-shaped beam-like body, and the upper end face part of the guide rail beam (5) is arranged to be connected to the side support (4). The guide rail beam (5) is arranged to be connected to the hoist (6) in a supporting manner and is arranged to be distributed across the conveying roller machine (2). Or, the hoist (6) is arranged as an electric wire rope hoist, and the driving device of the hoist (6) is arranged to be connected to the guide rail beam (5). Or, the water conveying pipe (7) is arranged as a tubular body and is arranged to be connected to the side support (4). The input port part of the water conveying pipe (7) is arranged to be connected to a high-pressure water source through a stop valve. Or, the mortar conveying pipe (8) is arranged as a tubular body and is arranged to be connected to the side support (4). The input port part of the mortar conveying pipe (8) is arranged to be connected to the output pipe of a cement mortar conveying pump through a stop valve.

10. The prefabricated forming device for piers according to any one of claims 1 to 9, characterized in that: The pier column skeleton support (1) and the conveying roller machine (2) are arranged to be distributed in a side-mounted manner, and the pier column skeleton support (1) and the conveying roller machine (2) and the anti-collision rod (3) are arranged to be distributed in an upper-end buffer support manner. The pier column skeleton support (1) and the conveying roller machine (2) and the guide rail beam (5) and the hoist (6) are arranged to be distributed in a side-lifting manner, and the pier column skeleton support (1) and the conveying roller machine (2) and the water conveying pipe (7) and the mortar conveying pipe (8) are arranged to be distributed in a pipeline conveying manner. Alternatively, two pier frame supports (1), two side brackets (4), a guide rail beam (5) and two lifting hoists (6) are arranged to form a group of prefabricated components, and multiple groups of prefabricated components are arranged to be spaced and distributed along the center line of the conveying roller machine (2), two water pipes (7) and two mortar pipes (8) are respectively arranged on the side brackets (4), a first column part (21), a second column part (22) and a roller body part (25) are arranged to form a group of roller parts, and multiple groups of roller parts are arranged between the upper support frame part (23) and the lower support frame part (24), and the frame part (41) is respectively arranged to be connected to the first column part (21) and the second column part (22).