Arc mold core and arc core-pulling mold

By adopting a two-layer cyclic waterway structure on the arc core, the problems of complex processing and poor cooling effect of arc core extraction molds in the prior art are solved, and uniform flow and rapid cooling of cooling water flow are achieved, and the product is improved accuracy and productivity.

CN222022143UActive Publication Date: 2024-11-19ANHUI LESSO CHIAO YUE NEW CONSTR MATERIAL CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420178602.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-11-19
Estimated Expiration
2034-01-24

AI Technical Summary

Technical Problem

During the processing and production process, existing arc core extraction molds have problems such as difficulty in clamping and drilling and poor cooling effect, resulting in poor product shape and dimensional accuracy and low pass rate.

Method used

The upper and lower two-layer cyclic waterway structure of the arc core is adopted, and the cooling waterway is separated into multiple evenly distributed waterways through arc parts, partition plates and closed covers, reducing the complexity of the production process and improving the cooling effect.

Benefits of technology

The uniform flow of cooling water flow is achieved, the cooling speed and effect is improved, the water processing is simplified, and the product yield and production efficiency are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222022143U_ABST
    Figure CN222022143U_ABST
Patent Text Reader

Abstract

The utility model provides an arc mold core and an arc core-pulling mold, and belongs to the technical field of injection molding production. Comprising an arc piece, a partition plate and a sealing cover, the arc piece is provided with an arc groove, the sealing cover is installed at the upper end of the arc groove, the arc core is of an upper-lower two-layer convolution communicating waterway structure, the water volume of built-in cooling water is large, the distances between the cooling water and all points and lines of the outer surface of the arc core are uniform, and the zigzag convolution flow speed of an inner circulation waterway is uniform. The inner circulation water path is uniform in flow speed, good in heat dissipation performance, high in cooling speed and good in cooling effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of injection molding production, in particular to an arc core and an arc core-pulling mold. Background Art

[0002] Most of the arc core-pulling cores of pipe fittings adopt an integral connecting rod structure, which is three-dimensionally curved, specifically sickle-shaped or horseshoe-shaped. The cooling water channel processing is relatively troublesome. The inlet and outlet holes are drilled through the end side of the outer tie rod to the inside of the core. After the angle is adjusted, two water channels are drilled on the side of the arc core to connect with the tie rod water channel. After the water channel is opened, the process drill port is sealed to form a circulating reflux. This type of core is difficult to clamp and drill, and the number of proofreadings is large. Drilling deviation, drilling errors, and scrapping often occur. At the same time, the internal water channel processing is a straight-through type. The distance from the water injection hole on the core to its arc surface point is inconsistent. The heat dissipation of the core is uneven during the cooling operation, and the shrinkage of the plastic parts is inconsistent. Various production defects such as warping, deformation, and cracking often occur. The product shape and size accuracy are poor, and the qualified rate is low. For plastic injection molds with half-side gates and inscribed arcs, the above shortcomings are particularly obvious, the distortion is more serious, the product sways when the part is pushed out, the product gate cross-section is inconsistent, and the height is uneven, affecting product quality.

[0003] Chinese patent CN201020696282.0 discloses an arc core pulling device, wherein a water transport pipe is built into the arc core and the outer diameter of the water transport pipe is smaller than the inner diameter of the arc core, so a ring-shaped pipe is formed inside the arc core and the water transport pipe, and the ring-shaped pipe is the water outlet pipe. Low-temperature water enters the water transport pipe through the water inlet and the water inlet interface in turn to cool the arc core and then is discharged from the water transport pipe, collides with the closed inner wall of the arc core and then flows back, seeps out through the water outlet pipe, the water outlet interface and the water outlet in turn. The cooling process is a single water transport pipe, which flows back after colliding with the inner wall, and the inflow and outflow of water affect each other, resulting in poor cooling effect, which is not conducive to heat dissipation and affects product quality.

[0004] Chinese patent CN201610787840.6 discloses an oil cooler upper cover mold, wherein the upper mold core and the lower mold core are both provided with local cooling devices at the upper and lower positions of the arc core pulling, and the local cooling device is composed of a water pump, a cooling box, a distributor and a plurality of cooling pipes, the water pump is provided with a water inlet pipe and a water outlet pipe, the water inlet pipe is connected to the cooling box, the water outlet pipe is connected to the distributor, the cooling pipe is adapted to the mold, the cooling pipes are respectively inserted into the corresponding positions of the upper mold core and the lower mold core, the two ends of the cooling pipe are respectively connected to the cooling box and the distributor, the cooling box and the distributor are respectively fixed to the left and right ends of the die-casting mold, the cooling pipes of the arc core pulling are distributed around it, and the distance from the arc core pulling is far, the cooling effect is affected, especially the cooling efficiency between the arc core pulling and the product is lower, affecting the product production efficiency and quality.

[0005] In summary, the arc core of the existing arc core-pulling mold has the problems of being difficult to process and produce, and having a poor cooling effect. Utility Model Content

[0006] The utility model is to overcome at least one of the above technical problems. The technical solution of the utility model is as follows: an arc core, comprising an arc part, a partition plate and a closing cover, wherein the arc part is provided with an arc groove, and the closing cover is installed at the upper end of the arc groove.

[0007] The partition plate is installed in the arc groove and divides the arc groove into an upper groove and a lower groove. A first through hole and a second through hole communicating with the outside are opened at one end of the arc member.

[0008] A first vertical plate connected to the partition plate is installed in the lower tank, the first vertical plate divides the lower tank into a first waterway and a second waterway, the first through hole is connected to the first waterway, and a gap is left between one end of the first vertical plate away from the first through hole and the arc member to form a first communication port.

[0009] A second vertical plate is installed at the lower end of the closing cover, and the lower end of the second vertical plate is connected to the partition plate. The second vertical plate divides the upper tank into a third waterway and a fourth waterway. The second through hole is connected to the fourth waterway. A gap is left between the end of the second vertical plate away from the second through hole and the arc member to form a second communication port.

[0010] The partition plate is provided with a third communication port, and the third communication port is located between the second water channel and the third water channel.

[0011] The first through hole and the second through hole are opened to connect the cooling water source. The various water channels inside the arc part are connected through the first connecting port, the second connecting port and the third connecting port. There is no need to drill the side of the arc core to connect the internal water channels, which reduces the production process. Moreover, the various water channels are evenly distributed and the distance from the outside of the arc core is consistent, ensuring uniform heat dissipation.

[0012] Preferably, the partition plate is made of stainless steel, is produced by wire cutting, and has a third connecting port for reflux.

[0013] Preferably, the partition plate is located in the middle of the arc-shaped groove, and the first through hole and the second through hole are symmetrical about the partition plate.

[0014] Preferably, the first vertical plate is located in the middle of the lower groove, and the second vertical plate is located in the middle of the upper groove.

[0015] Preferably, a first support ring is installed at the bottom of the arc-shaped groove, the first support ring is connected to the inner wall of the arc-shaped groove, and the top of the first support ring is connected to the partition plate.

[0016] Preferably, a second support ring is installed in the upper inner portion of the arc-shaped groove, the second support ring is connected to the inner wall of the arc-shaped groove, and the top of the second support ring is connected to the bottom of the closing cover.

[0017] Preferably, the upper end of the arc-shaped groove is provided with a first chamfer along the inner wall, and the upper end of the closing cover is provided with a second chamfer along the outer wall.

[0018] Preferably, the lower end of the closing cover is welded to the second vertical plate, and the closing cover is welded to the arc part, and the welding point is finely ground and polished to match the arc surface of the arc part.

[0019] Preferably, a sealing ring is installed between the closure cover and the arc groove. The sealing ring can be locked by screws, and finally the screw head hole is blocked with copper, and the copper blocking part is polished to match the profile of the arc groove and the closure cover. This detachable installation method greatly facilitates the replacement of waterway baffles and dirt cleaning in the later stage of production.

[0020] Preferably, it also includes a connecting rod, one end of which is connected to the arc part, and a first connecting rod water channel and a second connecting rod water channel are respectively penetrated through the connecting rod along the length direction, the first connecting rod water channel is connected to the first through hole, and the second connecting rod water channel is connected to the second through hole.

[0021] Preferably, a first lateral through hole and a second lateral through hole are formed at the other end of the connecting rod, the first lateral through hole is connected to the first connecting rod water channel, and the second lateral through hole is connected to the second connecting rod water channel.

[0022] A circular arc core-pulling mold comprises a panel, an A plate, a B plate, a support plate, a square iron and a bottom plate which are connected in sequence, a first core and a second core are movably installed between the A plate and the B plate, and the aforementioned circular arc core is also included, the circular arc part is located between the A plate and the B plate, a rotating rod is hinged on the support plate, a sliding block hinged to the end of the rotating rod is installed on the connecting rod, and the other end of the connecting rod is connected to a cooling water source through a joint.

[0023] Compared with the prior art, the beneficial effects of the technical solution of the utility model are: the utility model provides an arc core and an arc core-pulling mold,

[0024] (1) The arc core adopts an upper and lower two-layer swirling water channel structure. The built-in cooling water has a large volume of water, and the distance from each point line on the outer surface of the arc core is relatively uniform. The inner circulation water channel has a uniform flow rate, good heat dissipation, fast cooling speed, and good cooling effect.

[0025] (2) Arc parts, partition plates, and closed covers are used. The second vertical plate and the first vertical plate are produced and processed separately, which is convenient for opening holes to connect the water channels. The processing is convenient, and the water channels are connected accurately with high matching accuracy, which effectively improves the competitiveness of the product.

[0026] (3) The water channel structure inside the arc core has good cooling effect and is easy to process. It can be used in submerged gate, half-side gate, and large-gate arc-type plastic injection molds. It has a wide range of applications and high practicality.

[0027] (4) The arc core-pulling mold has an arc core structure, which is beneficial to reducing the cooling and shaping time during the production process. It quickly transfers the heat of the plastic part to the arc core, improves the cooling efficiency, and increases the yield rate of the plastic part. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is a schematic diagram of the three-dimensional structure of the arc core of the utility model;

[0029] Figure 2 This is a schematic diagram of the structure of the closure cover of the utility model;

[0030] Figure 3 This is a schematic diagram of the cross-sectional structure of the arc core of the utility model;

[0031] Figure 4 This is another cross-sectional structural schematic diagram of the arc core of the utility model;

[0032] Figure 5 This is a schematic diagram of the three-dimensional structure of the arc core of the utility model after removing the closing cover and the partition plate;

[0033] Figure 6 This is a schematic diagram of the structure of the arc core of the utility model after removing the closing cover and the partition plate;

[0034] Figure 7 This is a schematic diagram of the three-dimensional structure of the arc core of the utility model after removing the closing cover;

[0035] Figure 8 This is a schematic diagram of the top view of the arc core of the utility model after removing the closing cover;

[0036] Fig. 9 This is a schematic diagram of the flow path of cooling water in the arc core in the embodiment of the utility model;

[0037] Fig.10 This is a schematic diagram of the three-dimensional structure of the arc core with a connecting rod of the utility model;

[0038] Fig.11 This is another three-dimensional structural diagram of the arc core with connecting rod of the utility model;

[0039] Fig.12 This is a schematic diagram of the cross-sectional structure of the arc core with a connecting rod of the utility model;

[0040] Fig.13 This is another cross-sectional structural diagram of the arc core with connecting rod of the utility model;

[0041] Fig.14 This is a schematic diagram of the three-dimensional structure of the arc core-pulling mold of the utility model;

[0042] Fig.15 This is a schematic diagram of the internal structure of the arc core-pulling mold of the utility model;

[0043] Among them: 100, panel; 200, A plate; 300, B plate; 400, support plate; 500, square iron; 600, bottom plate; 700, first core; 800, second core;

[0044] 1. arc member; 2. partition plate; 3. closing cover; 4. first vertical plate; 5. first water channel; 6. second water channel; 7. first connecting port; 8. second vertical plate; 9. third water channel; 10. fourth water channel; 11. second connecting port; 12. first supporting ring; 13. second supporting ring; 14. connecting rod; 15. rotating rod; 16. slider; 17. joint;

[0045] 101, arc groove; 1011, upper groove; 1012, lower groove; 1013, first chamfer; 102, first through hole; 103, second through hole; 201, third communication port; 301, second chamfer;

[0046] 1401, first connecting rod water channel; 1402, second connecting rod water channel; 1403, first lateral through hole; 1404, second lateral through hole. DETAILED DESCRIPTION

[0047] The drawings are for illustrative purposes only and should not be construed as limiting this patent. To better illustrate this embodiment, some parts of the drawings may be omitted, enlarged, or reduced, and do not represent the size of the actual product. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted. Technologies, methods, and devices known to ordinary technicians in the relevant field may not be discussed in detail, but where appropriate, the technologies, methods, and devices should be considered part of the authorization specification. In the description of the present invention, it is necessary to understand that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, "first" and "second" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated; nor do they indicate the importance of components, and therefore cannot be understood as limiting the present invention.

[0048] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. The specific dimensions used in this embodiment are only for illustrating the technical solution and do not limit the scope of protection of the present invention.

[0049] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0050] Embodiment 1:

[0051] refer to Figure 1-8 As shown, an arc core comprises an arc part 1, a partition plate 2 and a closing cover 3. The arc part 1 is provided with an arc groove 101, and the closing cover 3 is installed at the upper end of the arc groove 101.

[0052] The partition plate 2 is installed in the arc groove 101 and divides the arc groove 101 into an upper groove 1011 and a lower groove 1012. A first through hole 102 and a second through hole 103 communicating with the outside are opened at one end of the arc member 1.

[0053] A first vertical plate 4 connected to the partition plate 2 is installed in the lower tank 1012. The first vertical plate 4 divides the lower tank 1012 into a first waterway 5 and a second waterway 6. The first through hole 102 is connected to the first waterway 5. A gap is left between the end of the first vertical plate 4 away from the first through hole 102 and the arc member 1 to form a first communication port 7.

[0054] A second vertical plate 8 is installed at the lower end of the closing cover 3, and the lower end of the second vertical plate 8 is connected to the partition plate 2. The second vertical plate 8 divides the upper groove 1011 into a third waterway 9 and a fourth waterway 10. The second through hole 103 is connected to the fourth waterway 10. A gap is left between the end of the second vertical plate 8 away from the second through hole 103 and the arc member 1 to form a second communication port 11.

[0055] The partition plate 2 defines a third communication port 201 , and the third communication port 201 is located between the second water channel 6 and the third water channel 9 .

[0056] The temperature control system of the injection mold is directly related to the surface quality, performance and injection cycle of the part. In the plastic part molding process, the sol filling time generally accounts for about 5% to 8%, the opening and closing of the mold and the ejection of the part generally account for about 12% to 18%, and the cooling and shaping time generally accounts for about 65% to 80%. Therefore, for molds with high production requirements, reducing the cooling time is the best way to shorten the production cycle. Before the plastic part is demolded, the main heat is transferred to the core, so the core needs to be cooled intensively.

[0057] When the arc core of the utility model is used to cool a plastic part, first, the internal arc groove 101 of the arc part 1 is divided into an upper groove 1011 and a lower groove 1012 by the partition plate 2, and then the upper and lower grooves are divided into a serially connected waterway structure by the first vertical plate 4 and the second vertical plate 8, so that the cooling water swirls inside the arc part 1 for internal circulation, and the cooling coverage of the cooling water on the outer surface of the arc core is large, and the heat dissipation is good;

[0058] Specifically, refer to Fig. 9As shown, one of the cooling water flow paths is illustrated as an example. The arc part 1 of the arc core and the closing cover 3 are inside the plastic part. The cooling water source flows into the first water channel 5 from the first through hole 102, then flows into the second water channel 6 from the first connecting port 7, then flows into the third water channel 9 located above the second water channel 6 from the third connecting port 201 of the partition plate 2, and then flows into the fourth water channel 10 from the second connecting port 11, and flows out of the arc part 1 from the second through hole 103; the cooling water flows in the first water channel 5 and the second water channel 6, and the cooling effect is good for the plastic parts on both sides and the bottom of the arc part 1 that are close to each other. The cooling water flows in the third water channel 9 and the fourth water channel 10, and the cooling effect is good for the arc part 1. The plastic parts on both sides, the top and the top of the closing cover 3 are close to each other, and the cooling effect is good. The cooling water flows in the upper groove 1011 and the lower groove 1012, absorbs heat, and flows out to take away the heat, thereby fully cooling the plastic parts and the arc core and improving the cooling effect. Of course, there is no specific restriction on the inlet and outlet of the water channel. The cooling water source can also enter the second through hole 103-the fourth water channel 10-the second connecting port 11-the third water channel 9-the third connecting port 201-the second water channel 6-the first connecting port 7-the first water channel 5-the first through hole 102 to cool the cooling water, so as to achieve rapid cooling of the plastic parts during the injection molding process and improve production efficiency.

[0059] In a further embodiment, reference is made to Figure 3-4 As shown, the partition plate 2 is located in the middle of the arc groove 101, the first through hole 102 and the second through hole 103 are symmetrical about the partition plate 2, and the partition plate 2 is located in the middle, evenly separating the arc groove 101 as an upper groove 1011 and a lower groove 1012, so that when the cooling water flows in the upper and lower sides, the distance from the bottom of the arc part 1 and the bottom of the closing cover 3 is equal, and the heat dissipation is more uniform.

[0060] In a further embodiment, reference is made to Figure 3-6 As shown, the first vertical plate 4 is located in the middle of the lower groove 1012, and the second vertical plate 8 is located in the middle of the upper groove 1011. The first vertical plate 4 evenly divides the lower groove 1012 into a first water channel 5 and a second water channel 6, and the second vertical plate 8 evenly divides the upper groove 1011 into a third water channel 9 and a fourth water channel 10, that is, the first vertical plate 4 and the second vertical plate 8 are both arc-shaped, similar to the arc shape of the arc-shaped groove 101, the first vertical plate 4 is at an equal distance from the inner wall of the lower groove 1012 on both sides, and the second vertical plate 8 is at an equal distance from the inner wall of the upper groove 1011 on both sides, so that the flow of the first water channel 5, the second water channel 6, the third water channel 9 and the fourth water channel 10 is uniform, and the overall heat dissipation effect is better.

[0061] In a further embodiment, reference is made to Figure 5-8As shown, a first support ring 12 is installed at the bottom of the arc groove 101, the first support ring 12 is connected to the inner wall of the arc groove 101, and the top of the first support ring 12 is connected to the partition plate 2. The first support ring 12 is arranged inside to support the entire partition plate 2, which makes the connection between the partition plate 2 and the arc groove 101 more stable, and the partition plate 2 can be movably connected to the first support ring 12, which is more convenient for production and processing.

[0062] In a further embodiment, reference is made to Figure 5-8 As shown, a second support ring 13 is installed in the upper part of the arc groove 101, the second support ring 13 is connected to the inner wall of the arc groove 101, and the top of the second support ring 13 is connected to the bottom of the closing cover 3. Similarly, the second support ring 13 is provided to support the bottom of the closing cover 3, so that the connection of the closing cover 3 is more stable and the positioning and installation of the closing cover 3 is facilitated during production.

[0063] In a further embodiment, reference is made to Figure 1-8 As shown, a first chamfer 1013 is provided along the inner wall at the upper end of the arc groove 101, and a second chamfer 301 is provided along the outer wall at the upper end of the closing cover 3. The arc groove 101 is connected to the closing cover 3, leaving a welding groove of appropriate depth to facilitate fine machining of the surface after full welding, without water leakage or desoldering.

[0064] In a further embodiment, reference is made to Figure 2 As shown, the lower end of the closing cover 3 is welded to the second vertical plate 8 , the second vertical plate 8 is integrally connected to the closing cover 3 , and then the closing cover 3 is welded to the arc member 1 , and the lower end of the second vertical plate 8 is connected to the partition plate 2 .

[0065] In a further embodiment, a sealing ring is installed between the closing cover 3 and the arc groove 101 to improve the sealing effect.

[0066] Embodiment 2:

[0067] refer to Figure 10-13 As shown, it also includes a connecting rod 14, one end of which is connected to the arc member 1.

[0068] A first connecting rod water channel 1401 and a second connecting rod water channel 1402 are respectively provided through the connecting rod 14 along the length direction. The first connecting rod water channel 1401 is connected to the first through hole 102 , and the second connecting rod water channel 1402 is connected to the second through hole 103 .

[0069] A connecting rod 14 is arranged to be connected with the arc part 1 to form a common sickle-shaped structure, that is, the entire arc core is driven to move by the connecting rod 14, and only two straight through holes need to be opened. The cooling water is transported to the arc groove 101 in the arc part 1 through the connecting rod 14, and then flows out through the connecting rod 14, which increases the convenience of connecting with the cooling water source; specifically, the cooling water is connected with the first through hole 102 through the first connecting rod water channel 1401 as an inlet water channel or an outlet water channel, and correspondingly, it is connected with the second through hole 103 through the second connecting rod water channel 1402 as an outlet water channel or an inlet water channel.

[0070] In a further embodiment, reference is made to Figure 10-13 As shown, the other end of the connecting rod 14 is provided with a first lateral through hole 1403 and a second lateral through hole 1404, the first lateral through hole 1403 is connected to the first connecting rod waterway 1401, and the second lateral through hole 1404 is connected to the second connecting rod waterway 1402. By providing the first lateral through hole 1403 and the second lateral through hole 1404, it is possible to select to connect from various sides of the end, which is more convenient to connect with the cooling water source.

[0071] Embodiment 3:

[0072] refer to Figure 14-15 As shown, an arc core-pulling mold includes a panel 100, an A plate 200, a B plate 300, a support plate 400, a square iron 500 and a bottom plate 600 connected in sequence, a first core 700 and a second core 800 are movably installed between the A plate 200 and the B plate 300, and also includes the arc core in Example 2, the arc part 1 is located between the A plate 200 and the B plate 300, a rotating rod 15 is hinged on the support plate 400, a slider 16 hinged to the end of the rotating rod 15 is installed on the connecting rod 14, and the other end of the connecting rod 14 is connected to a cooling water source through a joint 17.

[0073] In the specific implementation process, after the mold is closed, the injection molding machine injects liquid rubber into the mold to fill the gap on the mold. After a short period of pressure maintenance, the liquid rubber is formed on the mold, and the cooling water source is connected through the joint 17 on the connecting rod 14. The first connecting rod water channel 1401 and the second connecting rod water channel 1402 in the connecting rod 14 are connected to the first through hole 102 and the second through hole 103 of the arc part 1, so that the first water channel 5 and the second water channel 6, the third water channel 9 and the fourth water channel 10 in the arc part 1 have two-layer swirling flow, so that the cooling water continuously passes through the various parts of the mold, takes away the heat generated by the liquid rubber on the mold, and makes the mold quickly cool down, so that the liquid rubber can be quickly formed to form a qualified product.

[0074] After the mold is opened, the buckle portion of the product after molding is pulled out through the sliders of the first core 700 and the second core 800, and the rotating rod 15 is rotated relative to the carrier plate 400, thereby driving the slider 16, and then driving the connecting rod 14 to pull out the arc part 1, and then eject the product through the ejector plate. At this point, the production process of the plastic product is completed. The mold uses the water channel in the arc core to evenly cool the plastic product, reduce the cooling time, and improve production efficiency.

[0075] Obviously, the above embodiments of the utility model are only examples for clearly explaining the utility model, and are not intended to limit the implementation methods of the utility model. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made on the basis of the above description. It is not necessary and impossible to list all the implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the utility model should be included in the protection scope of the claims of the utility model.

Claims

1. A circular arc core, characterized in that: The invention comprises an arc member (1), a partition plate (2) and a closing cover (3), wherein the arc member (1) is provided with an arc groove (101), and the closing cover (3) is installed at the upper end of the arc groove (101). The partition plate (2) is installed in the arc-shaped groove (101) and divides the arc-shaped groove (101) into an upper groove (1011) and a lower groove (1012); one end of the arc member (1) is provided with a first through hole (102) and a second through hole (103) which are connected to the outside; A first vertical plate (4) connected to the partition plate (2) is installed in the lower tank (1012); the first vertical plate (4) divides the lower tank (1012) into a first water channel (5) and a second water channel (6); the first through hole (102) is connected to the first water channel (5); a gap is left between an end of the first vertical plate (4) away from the first through hole (102) and the arc member (1) to form a first communication port (7); A second vertical plate (8) is installed at the lower end of the closing cover (3); the lower end of the second vertical plate (8) is connected to the partition plate (2); the second vertical plate (8) divides the upper groove (1011) into a third water channel (9) and a fourth water channel (10); the second through hole (103) is connected to the fourth water channel (10); a gap is left between the end of the second vertical plate (8) away from the second through hole (103) and the arc member (1) to form a second communication port (11); The partition plate (2) is provided with a third communication port (201), and the third communication port (201) is located between the second water channel (6) and the third water channel (9).

2. The arc core according to claim 1, characterized in that: The partition plate (2) is located in the middle of the arc-shaped groove (101), and the first through hole (102) and the second through hole (103) are symmetrical with respect to the partition plate (2).

3. The arc core according to claim 1, characterized in that: The first vertical plate (4) is located in the middle of the lower groove (1012), and the second vertical plate (8) is located in the middle of the upper groove (1011).

4. The arc core according to claim 1, characterized in that: A first support ring (12) is installed at the bottom of the arc-shaped groove (101), the first support ring (12) is connected to the inner wall of the arc-shaped groove (101), and the top of the first support ring (12) is connected to the partition plate (2).

5. The arc core according to claim 1, characterized in that: A second support ring (13) is installed in the upper inner part of the arc-shaped groove (101), the second support ring (13) is connected to the inner wall of the arc-shaped groove (101), and the top of the second support ring (13) is connected to the bottom of the closing cover (3).

6. The arc core according to claim 1, characterized in that: The upper end of the arc-shaped groove (101) is provided with a first chamfer (1013) along the inner wall, and the upper end of the closing cover (3) is provided with a second chamfer (301) along the outer wall.

7. The arc core according to claim 1, characterized in that: A sealing ring is installed between the closing cover (3) and the arc-shaped groove (101).

8. The arc core according to any one of claims 1 to 7, characterized in that: It also includes a connecting rod (14), one end of which is connected to the arc member (1). A first connecting rod water channel (1401) and a second connecting rod water channel (1402) are respectively provided through the connecting rod (14) along the length direction; the first connecting rod water channel (1401) is connected to the first through hole (102), and the second connecting rod water channel (1402) is connected to the second through hole (103).

9. The arc core according to claim 8, characterized in that: The other end of the connecting rod (14) is provided with a first lateral through hole (1403) and a second lateral through hole (1404); the first lateral through hole (1403) is connected to the first connecting rod water channel (1401), and the second lateral through hole (1404) is connected to the second connecting rod water channel (1402).

10. A circular arc core-pulling mold, comprising a panel (100), an A plate (200), a B plate (300), a support plate (400), a square iron (500) and a bottom plate (600) connected in sequence, wherein a first core (700) and a second core (800) are movably installed between the A plate (200) and the B plate (300), characterized in that: It also includes the arc core as described in claim 8 or 9, the arc part (1) is located between the A plate (200) and the B plate (300), a rotating rod (15) is hinged on the support plate (400), a slider (16) hinged to the end of the rotating rod (15) is installed on the connecting rod (14), and the other end of the connecting rod (14) is connected to a cooling water source through a joint (17).