Ultra-deep foundation pit unearthed ramp trestle structure
By designing support pile and crown beam structures in ultra-deep foundation pits, combining the beam body section and the extension ramp, the problem of the unearthed ramp occupying the bottom space of the foundation pit is solved, and the effect of earth-moving transport vehicles entering the bottom of the pit is achieved. Improve construction efficiency and cost-effectiveness.
Patent Information
- Application Number
- CN202420709243.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-08
AI Technical Summary
In the prior art, the unearthed slope trestle bridge of the ultra-deep foundation pit occupies too much construction site at the bottom of the foundation pit, resulting in earthwork transport vehicles being unable to go directly to the bottom of the pit to load, affecting the construction efficiency of the foundation pit.
A ramp trench structure of an ultra-deep foundation pit was designed. By setting up support piles and crown beams on the side walls of the foundation pit, combining the first beam body section, the second beam body section and the transition beam body section, the vehicle entry and exit foundation is formed. The passage at the bottom of the pit and an external ramp is set up to match the slope, shorten the length of the main body of the trestle, and ensure that the vehicle directly enters the bottom of the pit.
The length of the main body of the trest bridge is effectively shortened, construction space is saved, and earth-moving transport vehicles can directly enter the pit bottom, which improves construction efficiency and reduces costs.
Smart Images

Figure CN222043876U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a ramp trestle structure for an ultra-deep foundation pit excavation. Background Art
[0002] With the rapid development of my country's social economy and urban construction, and the emergence of a large number of high-rise and super-high-rise buildings in recent years, the construction of ultra-deep foundation pits has become increasingly frequent. For the excavation of ultra-deep foundation pits, the excavation ramp is particularly important.
[0003] Generally, the excavation ramp needs to maintain a slope of 1:6 to 1:8 to facilitate heavy vehicles to climb the slope. However, for the excavation ramp of an ultra-deep foundation pit, in order to make the excavation ramp have a suitable slope, the horizontal length of the excavation ramp needs to be extended accordingly. This will cause the excavation ramp to occupy too much construction space at the bottom of the foundation pit, resulting in the problem that earth-moving transport vehicles cannot directly reach the bottom of the pit for loading, affecting the efficiency of the foundation pit construction.
[0004] Therefore, for the excavated ramp trestle structure used in ultra-deep foundation pits, how to reduce the construction site occupied by the excavated ramp trestle at the bottom of the foundation pit and ensure that earth-moving transport vehicles can go directly to the bottom of the pit for loading, thereby improving the construction efficiency of the foundation pit, is a technical problem that needs to be urgently solved in the existing technology. Utility Model Content
[0005] The purpose of the utility model is to provide an ultra-deep foundation pit excavation ramp trestle structure to address the problem in the prior art of how to reduce the construction site occupied by the excavation ramp trestle at the bottom of the foundation pit, ensure that earth-moving transport vehicles can directly reach the bottom of the pit for loading, and thus improve the construction efficiency of the foundation pit.
[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0007] A super-deep foundation pit excavation ramp trestle structure comprises a foundation pit and a trestle main body, wherein a plurality of support piles are arranged at the side wall edge of the foundation pit, the support piles are used to improve the stability of the soil around the foundation pit, a crown beam is arranged on the top of the support pile, the crown beam is used to connect the plurality of support piles as a whole, the trestle main body is connected to the crown beam, the trestle main body extends from the top of the foundation pit to the bottom of the pit, the trestle main body is used to form a passage for vehicles to enter and exit the bottom of the foundation pit, the crown beam comprises a first beam section, a second beam section and a transition beam section, the elevation of the first beam section is greater than the elevation of the second beam section, and the elevation of the second beam section is less than or equal to the maximum elevation of the trestle main body corresponding to the slope set for vehicles to enter and exit the bottom of the foundation pit, the transition beam section is arranged between the first beam section and the second beam section, the trestle main body is connected to the second beam section, and an extension ramp is also arranged on the top of the foundation pit corresponding to the second beam section, and the slope of the extension ramp matches the slope set by the trestle main body.
[0008] Preferably, the angle formed by the transition beam section, the first beam section and the second beam section is an obtuse angle.
[0009] Preferably, the side walls on both sides of the extension ramp are provided with a slope, and the slope of the side walls on both sides of the extension ramp is consistent with the inclination of the transition beam section.
[0010] Preferably, the first beam segment, the second beam segment and the transition beam segment are an integral structure.
[0011] Preferably, a drainage ditch is provided at the junction of the outer ramp and the second beam section, and the drainage ditch is used to prevent the accumulated water from flowing into the foundation pit.
[0012] Preferably, the pier body includes a plurality of column piles and a pier bridge deck, and the second beam section is divided into a first casting area and a second casting area along its horizontal axis, the first casting area is integrally formed with the first beam section and the transition beam section, the structural thickness of the second casting area matches the structural thickness of the pier bridge deck, and the second casting area is integrally formed with the pier bridge deck.
[0013] Preferably, the pile bottom of the column pile is configured as an enlarged head structure, and the diameter of the enlarged head structure is larger than the diameter of the remaining part of the pile body of the column pile.
[0014] Preferably, the surface of the trestle bridge deck is provided with anti-skid grooves, and the anti-skid grooves are used to increase the friction force on the surface of the trestle bridge deck.
[0015] Preferably, anti-steps are provided on both sides of the trestle bridge deck, and protective railings are provided on the anti-steps.
[0016] Preferably, an approach bridge section is further provided at one end of the trestle bridge deck corresponding to the bottom of the foundation pit, and the approach bridge section is provided with a plurality of crossings, and vehicles can go to different directions of the bottom of the foundation pit through different crossings.
[0017] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:
[0018] 1. The ultra-deep foundation pit excavation ramp trestle structure described in the utility model can effectively shorten the length of the trestle body in the foundation pit while meeting the slope required for heavy vehicles to climb by lowering the elevation of the second beam body section and coordinating with the arrangement of the extension ramp, thereby avoiding the trestle body from occupying too much construction space in the foundation pit, and then earthwork transport vehicles can directly drive into the pit bottom of the foundation pit for loading through the new ramp trestle structure, thereby improving construction efficiency and saving the cost of excavating and transporting earthwork at the pit bottom;
[0019] 2. The utility model describes a super-deep foundation pit excavation ramp trestle structure, wherein the trestle body includes a plurality of column piles and a trestle bridge deck, and the second beam section is divided into a first casting area and a second casting area along its horizontal axis, the first casting area is integrally formed with the first beam section and the transition beam section, the structural thickness of the second casting area matches the structural thickness of the trestle bridge deck, and the second casting area is integrally formed with the trestle bridge deck. In this embodiment, the second casting area is integrally cast with the trestle bridge deck, which can improve the structural integrity of the trestle bridge deck and the second beam section, so that the pressure exerted on the trestle body by earthmoving vehicles can be better transmitted to the support piles through the second beam section, thereby improving the bearing capacity of the trestle body;
[0020] 3. The utility model discloses a super-deep foundation pit excavation ramp trestle structure, wherein the end of the trestle bridge deck corresponding to the foundation pit bottom is also provided with a connecting bridge section, and the connecting bridge section is provided with multiple crossings, and vehicles can go to different directions of the foundation pit bottom through different crossings. This structural setting can improve the traffic efficiency of earthmoving vehicles on the trestle body. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a structural schematic diagram of a ramp trestle structure excavated from an ultra-deep foundation pit;
[0022] Figure 2 It is a schematic diagram of the cross-sectional structure of a crown beam in a ramp trestle structure excavated from an ultra-deep foundation pit;
[0023] Figure 3 It is a schematic diagram of the cross-sectional structure of the main body of a trestle bridge in a ramp trestle bridge structure excavated from an ultra-deep foundation pit;
[0024] Figure 4 This is a top-down structural diagram of the main body of the pier.
[0025] Markings in the figure: 1-foundation pit, 2-main body of trestle, 3-support piles, 4-crown beam, 5-first beam section, 6-second beam section, 7-transition beam section, 8-extension ramp, 9-intercepting ditch, 10-column piles, 11-trestle deck, 12-first pouring area, 13-second pouring area, 14-enlarged head structure, 15-counter-slope, 16-guardrail, 17-approach bridge section. DETAILED DESCRIPTION
[0026] The utility model is described in detail below in conjunction with the accompanying drawings.
[0027] To make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be described clearly and completely in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them.
[0028] Therefore, the following detailed description of the embodiments of the present invention is not intended to limit the scope of the invention claimed for protection, but merely represents some embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features and technical solutions in the embodiments may be combined with each other.
[0030] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0031] In the description of the present invention, it should be noted that the orientation or positional relationship indicated by the terms "upper", "lower", etc. is based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship in which the invention product is usually placed when in use, or the orientation or positional relationship commonly understood by those skilled in the art. Such terms are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0032] Example 1
[0033] like Figure 1 and Figure 2As shown, the utility model of an ultra-deep foundation pit excavation ramp trestle structure comprises a foundation pit 1 and a trestle body 2, a plurality of supporting piles 3 are arranged at the side wall edge of the foundation pit 1, the supporting piles 3 are used to improve the stability of the soil around the foundation pit 1, a crown beam 4 is arranged on the top of the supporting piles 3, the crown beam 4 is used to connect the plurality of supporting piles 3 as a whole, the trestle body 2 is connected to the crown beam 4, the trestle body 2 extends from the top of the foundation pit 1 to the bottom of the pit, the trestle body 2 is used to form a passage for vehicles to enter and exit the bottom of the foundation pit 1, and the crown beam 4 includes a first beam section 5. , a second beam section 6 and a transition beam section 7, the elevation of the first beam section 5 is greater than the elevation of the second beam section 6, and the elevation of the second beam section 6 is less than or equal to the maximum elevation of the trestle body 2 corresponding to the slope set at the bottom of the foundation pit 1 for vehicles to enter and exit, the transition beam section 7 is arranged between the first beam section 5 and the second beam section 6, the trestle body 2 is connected to the second beam section 6, and the top of the foundation pit 1 corresponding to the second beam section 6 is also provided with an extension ramp 8, and the slope of the extension ramp 8 matches the slope set by the trestle body 2.
[0034] By adopting the ultra-deep foundation pit excavation ramp trestle structure described in the present invention, by lowering the elevation of the second beam section 6 and coordinating the arrangement of the extended ramp 8, the trestle body 2 can effectively shorten the length of the trestle body 2 in the foundation pit 1 while meeting the slope required for heavy vehicles to climb, thereby avoiding the trestle body 2 from occupying too much construction space in the foundation pit 1. As a result, earth-moving transport vehicles can directly drive into the bottom of the foundation pit 1 for loading through the ramp trestle structure of the present invention, thereby improving construction efficiency and saving the cost of excavating and transporting earth and stone at the bottom of the pit.
[0035] Specifically, the support piles 3 in this embodiment are reinforced concrete rotary bored piles, and the setting elevation of the second beam section 6 needs to be calculated according to the actual situation on site. It is necessary to ensure that the width of the pier body 2 is not less than 6m, the slope of the pier body 2 is between 1:6 and 1:8, and the length of the second beam section 6 is not less than the width of the pier body 2.
[0036] As a preferred embodiment, based on the above method, further, the angle formed by the transition beam segment 7, the first beam segment 5 and the second beam segment 6 is an obtuse angle. With this structural setting, the stress at the intersection of the transition beam segment 7, the first beam segment 5 and the second beam segment 6 can be reduced, ensuring the stability of the crown beam 4 structure; on the other hand, with this structural setting, the transition beam segments 7 on both sides form a bell-mouth structure, increasing the spacing area on the upper part of the transition beam segment 7, thereby reducing the risk of scratching the transition beam segment 7 when a vehicle passes by.
[0037] As a preferred implementation scheme, based on the above method, further, the side walls on both sides of the extension ramp 8 are provided with a slope, and the slope of the side walls on both sides of the extension ramp 8 is consistent with the inclination of the transition beam section 7.
[0038] In this embodiment, the slope of the side walls of the epitaxial ramp 8 is set to 1:1. This structural setting can widen the spacing between the side walls of the epitaxial ramp 8 and reduce the risk of vehicles scraping against the side walls when passing through the epitaxial ramp 8. On the other hand, this structural setting can also effectively reduce the risk of collapse of the side walls of the epitaxial ramp 8, thereby improving the practicality of the present invention in actual use.
[0039] As a preferred embodiment, based on the above method, further, the first beam segment 5, the second beam segment 6 and the transition beam segment 7 are an integrated structure. With this structural setting, the structural strength of the crown beam 4 corresponding to the trestle body 2 can be further improved.
[0040] As a preferred implementation scheme, based on the above-mentioned method, further, a drainage ditch 9 is provided at the intersection of the outer ramp 8 and the second beam section 6, and the drainage ditch 9 is used to prevent the accumulated water from flowing into the foundation pit 1.
[0041] Specifically, in this embodiment, a drainage device is arranged in the intercepting ditch 9. The intercepting ditch 9 is arranged at the intersection of the outer ramp 8 and the second beam section 6, which can prevent the accumulated water outside the foundation pit 1 from flowing into the foundation pit 1, causing the risk of soil instability in the foundation pit 1, thereby improving the safety of construction.
[0042] Example 2
[0043] like Figure 3 and Figure 4 As shown, the utility model describes an ultra-deep foundation pit excavation ramp trestle structure, based on the above method, further, the trestle body 2 includes a plurality of column piles 10 and a trestle bridge deck 11, the second beam section 6 is divided into a first casting area 12 and a second casting area 13 along its horizontal axis, the first casting area 12 is integrally formed with the first beam section 5 and the transition beam section 7, the structural thickness of the second casting area 13 matches the structural thickness of the trestle bridge deck 11, and the second casting area 13 is integrally formed with the trestle bridge deck 11.
[0044] Specifically, the column piles 10 described in this embodiment are concrete cast-in-place piles with steel cages and steel columns inside; due to the large bearing capacity requirements, the density of the pile ends of the column piles 10 is required to be high, so all the pile ends of the column piles 10 are treated with post-grouting technology after forming, and the grouting amount and slurry water-cement ratio are implemented according to the design requirements; the trestle deck 11 should be cast and formed in one time to avoid cold joints; if it is necessary to cast in batches, the construction joint is left within 1 / 3 of the support span. In this embodiment, the second casting area 13 is cast and formed integrally with the trestle deck 11, which can improve the structural integrity of the trestle deck 11 and the second beam section 6, so that the pressure applied by earth-moving vehicles on the trestle body 2 can be better transmitted to the support piles 3 through the second beam section 6, thereby improving the bearing capacity of the trestle body 2.
[0045] As a preferred embodiment, based on the above method, further, the bottom of the column pile 10 is set as an enlarged head structure 14, and the diameter of the enlarged head structure 14 is larger than the diameter of the rest of the pile body of the column pile 10. With this structural setting, the bearing capacity of the pier body 2 is further improved.
[0046] As a preferred implementation scheme, based on the above-mentioned method, further, the surface of the trestle bridge board 11 is provided with anti-skid grooves, and the anti-skid grooves are used to increase the friction force on the surface of the trestle bridge board 11.
[0047] In this embodiment, the anti-skid groove is provided on the surface of the trestle bridge deck 11 to increase the friction force on the surface of the trestle bridge deck 11, so that the risk of slipping of earth-moving vehicles when passing through the trestle bridge deck 11 is greatly reduced, the passing performance of earth-moving vehicles is improved, and the construction efficiency of the new earth-rock excavation and transportation is further improved.
[0048] As a preferred implementation scheme, based on the above-mentioned method, further, anti-steps 15 are provided on both sides of the trestle bridge deck 11, and protective railings 16 are provided on the anti-steps 15.
[0049] Specifically, the counter-step 15 in this embodiment is an independent structure, the counter-step 15 is made of concrete, and the height of the counter-step 15 is 30 cm; in this embodiment, the provision of the counter-step 15 can prevent debris on the trestle bridge deck 11 from falling and injuring workers in the pit, thereby improving the safety of construction operations; further, the height of the guardrail 16 is 1.2 m, and the provision of the guardrail 16 can prevent workers from accidentally falling when walking on the trestle bridge deck 11, thereby further improving the safety of construction operations.
[0050] As a preferred embodiment, based on the above method, further, the end of the trestle bridge deck 11 corresponding to the bottom of the foundation pit 1 is further provided with a connecting bridge section 17, and the connecting bridge section 17 is provided with multiple crossings, and vehicles can go to different directions of the bottom of the foundation pit 1 through different crossings. With this structural setting, the passage efficiency of earth-moving vehicles on the trestle main body 2 can be improved.
[0051] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A ramp trestle structure unearthed from an ultra-deep foundation pit, characterized in that: It includes a foundation pit and a trestle bridge body, wherein a plurality of supporting piles are arranged on the side wall edge of the foundation pit, the supporting piles are used to improve the stability of the soil around the foundation pit, a crown beam is arranged on the top of the supporting piles, the crown beam is used to connect the plurality of supporting piles into a whole, the trestle bridge body is connected to the crown beam, the trestle bridge body extends from the top of the foundation pit to the bottom of the pit, the trestle bridge body is used to form a passage for vehicles to enter and exit the bottom of the foundation pit, the crown beam includes a first beam body section, a second beam body section and a transition beam body section, the elevation of the first beam body section is greater than the elevation of the second beam body section, and the elevation of the second beam body section is less than or equal to the maximum elevation of the trestle bridge body corresponding to the slope set for vehicles to enter and exit the bottom of the foundation pit, the transition beam body section is arranged between the first beam body section and the second beam body section, the trestle bridge body is connected to the second beam body section, and an extension ramp is also arranged on the top of the foundation pit corresponding to the second beam body section, and the slope of the extension ramp matches the slope set by the trestle bridge body.
2. The ultra-deep foundation pit excavation ramp trestle structure according to claim 1 is characterized in that: The angle formed by the transition beam section, the first beam section and the second beam section is an obtuse angle.
3. The ultra-deep foundation pit excavation ramp trestle structure according to claim 2 is characterized in that: The side walls on both sides of the extension ramp are provided with a slope, and the slope of the side walls on both sides of the extension ramp is consistent with the inclination of the transition beam body section.
4. The ultra-deep foundation pit excavation ramp trestle structure according to claim 3 is characterized in that: The first beam section, the second beam section and the transition beam section are an integrated structure.
5. The ultra-deep foundation pit excavation ramp trestle structure according to claim 4 is characterized in that: A drainage ditch is provided at the junction of the extended ramp and the second beam section, and the drainage ditch is used to prevent accumulated water from flowing into the foundation pit.
6. The ultra-deep foundation pit excavation ramp trestle structure according to claim 5 is characterized in that: The pier body includes a plurality of column piles and a pier bridge deck. The second beam section is divided into a first casting area and a second casting area along its horizontal axis. The first casting area is integrally formed with the first beam section and the transition beam section. The structural thickness of the second casting area matches the structural thickness of the pier bridge deck. The second casting area is integrally formed with the pier bridge deck.
7. The ultra-deep foundation pit excavation ramp trestle structure according to claim 6 is characterized in that: The bottom of the column pile is arranged as an enlarged head structure, and the diameter of the enlarged head structure is larger than the diameter of the remaining part of the column pile.
8. The ultra-deep foundation pit excavation ramp trestle structure according to claim 7 is characterized in that: The surface of the trestle bridge deck is provided with anti-skid grooves, and the anti-skid grooves are used to increase the friction force on the surface of the trestle bridge deck.
9. The ultra-deep foundation pit excavation ramp trestle structure according to claim 8, characterized in that: Anti-steps are also arranged on both sides of the trestle bridge deck, and protective railings are also arranged on the anti-steps.
10. The ultra-deep foundation pit excavation ramp trestle structure according to claim 9, characterized in that: An approach bridge section is also provided at one end of the trestle bridge deck corresponding to the bottom of the foundation pit. The approach bridge section is provided with a plurality of crossings, and vehicles can go to different directions of the bottom of the foundation pit through different crossings.