Concrete structural joint construction device
By introducing a position adjustment mechanism and a depth adjustment mechanism into the concrete structure joint construction device, the problems of difficulty in installing and poor adjustment of joints in the prior art are solved, and higher quality concrete structural joint construction is achieved, ensuring joints consistency of verticality and depth.
Patent Information
- Application Number
- CN202420219460.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-01-29
AI Technical Summary
It is difficult to determine the location of the existing concrete structural joint construction device during installation, and it is difficult to ensure the verticality and molding depth, which affects the construction quality and subsequent fill quality.
A concrete structure joint construction device including seam strips, top frames and mounting frames is designed. The position adjustment mechanism and depth adjustment mechanism are used to achieve verticality and depth adjustment of seam strips through screws and screwed parts to ensure seam formation. Accurate installation and adjustment of strips.
The position certainty and adjustment of the seam-forming strips are improved, installation difficulties are reduced, construction quality and seam-forming flatness are improved, and the verticality and depth consistency of the structural seam are ensured.
Smart Images

Figure CN222065819U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete structure joint construction, in particular to a concrete structure joint construction device. Background Art
[0002] In the process of concrete construction, in order to avoid temperature and deformation cracks in concrete, it is necessary to set structural joints at appropriate locations of the structural concrete to release internal stress and deformation. The bottom of the structural joints is filled with closed-cell foam boards and other materials. After the structural joints are formed, polysulfide sealants are used to backfill the inside. Figure 1 As shown, it generally includes a seam strip 1 and a fixing seat 2 arranged at both ends of the seam strip. During construction, the seam strip 1 is fixed by the fixing seats 2 at both ends, so that the seam strip 1 is fixed between the first pouring section 3 and the second pouring section 4. After the second pouring section 4 is poured, the seam strip 1 is pulled out to form a structural seam 5, or the seam strip 2 is fixed between two adjacent sections to be poured. After the two sections to be poured are poured, the seam strip 1 is pulled out to form a structural seam 5. The existing structural seam construction device has the following shortcomings:
[0003] 1) The position of the joint strip 1 is difficult to determine. During installation, it is difficult to ensure verticality and forming depth. After demolding, the two sides of the structural joint may have large unevenness or joint quality problems (concrete corners collapse, etc.), which affects the construction quality of the structural joint and even affects the subsequent filling quality;
[0004] 2) After the seam strip 1 is fixedly installed, it is difficult to adjust the verticality and the forming depth, and the adjustability is poor. Utility Model Content
[0005] The technical problem to be solved by the utility model is to overcome the deficiencies of the prior art and provide a concrete structure joint construction device which is easy to determine the position, reduces installation difficulties, has good adjustability and can improve construction quality.
[0006] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0007] A concrete structure joint construction device comprises a joint strip, a top frame and two mounting frames respectively fixed on the formworks of adjacent concrete pouring sections, at least two sets of position adjustment mechanisms arranged at intervals are respectively provided on both sides of the top frame, the joint strip is located between the two mounting frames and is arranged on the top frame through a depth adjustment mechanism, the depth adjustment mechanism is used to adjust the distance between the joint strip and the top frame to adjust the depth of the structural joint, and the top frame is arranged on the top of the two mounting frames through the position adjustment mechanisms to adjust the verticality of the joint strip relative to the concrete pouring section.
[0008] As a further improvement of the above technical solution:
[0009] The position adjustment mechanism includes a first adjustment member and a second adjustment member, the first adjustment member is movably inserted into the top frame, one end of the first adjustment member is threadedly connected to the top of the mounting frame, and the other end is provided with a first protruding screwing portion, the second adjustment member is inserted into the top frame and threadedly connected to the top frame, one end of the second adjustment member abuts against the top of the mounting frame, and the other end is provided with a second protruding screwing portion.
[0010] The first adjusting member and the second adjusting member are both screws.
[0011] The top frame is provided with a through hole which is larger than the first adjusting member, and the first adjusting member is inserted into the through hole.
[0012] The depth adjustment mechanism includes a third adjusting member, a fourth adjusting member and a fifth adjusting member which are arranged at intervals along the length direction of the seam strip. The third adjusting member and the fifth adjusting member are movably inserted into the top frame. One end of the third adjusting member and the fifth adjusting member are threadedly connected to the top of the seam strip, and the other end is provided with a third protruding screwing portion. The fourth adjusting member is inserted into the top frame and threadedly connected to the top frame. One end of the fourth adjusting member abuts against the top of the seam strip, and the other end is provided with a fourth screwing portion.
[0013] The third adjusting member, the fourth adjusting member and the fifth adjusting member are all screws.
[0014] A locking piece is connected between the two mounting frames, and a long hole for the locking piece to pass through is provided on the seam strip.
[0015] The locking piece is a locking bolt.
[0016] The two side surfaces of the seam forming strip are parallel, and at least one of the two sides of the bottom of the seam forming strip is provided with an inclined draft surface.
[0017] The top frame is in the shape of an elongated strip.
[0018] Compared with the prior art, the advantages of the utility model are:
[0019] The concrete structural joint construction device of the utility model takes the formation of a structural joint between a first pouring section and a second pouring section as an example, and the construction process is as follows: first, two mounting frames are respectively fixed on the formworks of the first pouring section and the second pouring section (two adjacent concrete pouring sections); then, the verticality of the seam strip relative to the concrete pouring section is adjusted by each position adjustment mechanism, so that the seam strip is perpendicular to the concrete pouring section; then, the distance between the seam strip and the top frame is adjusted by the depth adjustment mechanism to adjust the depth of the structural joint; then, concrete is poured into the second pouring section, and after the concrete in the second pouring section is solidified and formed, the concrete structural joint construction device is removed, and the seam strip is pulled out, that is, a structural joint is formed between the first pouring section and the second pouring section. After the seam strip of the concrete structural joint construction device is respectively fixed on the formworks of the first pouring section and the second pouring section by two mounting frames, the verticality and the forming depth can also be adjusted by the position adjustment mechanism and the depth adjustment mechanism, and the position of the seam strip is easy to determine, which reduces the difficulty of installation, and the adjustability is good, which can improve the construction quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a structural schematic diagram of an existing structural joint construction device.
[0021] Figure 2 It is a structural schematic diagram of a concrete structural joint construction device of the utility model.
[0022] Figure 3 The utility model is a structural schematic diagram of a depth adjustment mechanism of a concrete structural joint construction device.
[0023] Figure 4 It is another structural schematic diagram of the joint strip of the concrete structure joint construction device of the utility model.
[0024] The symbols in the figure represent:
[0025] 1. Slit strip; 11. Long hole; 12. Draft surface; 5. Structural seam; 6. Top frame; 61. Position adjustment mechanism; 611. First adjustment member; 612. Second adjustment member; 613. First screwing part; 614. Second screwing part; 62. Perforation; 7. Mold frame; 8. Mounting frame; 81. Locking member; 9. Depth adjustment mechanism; 91. Third adjustment member; 92. Fourth adjustment member; 93. Fifth adjustment member; 94. Third screwing part; 95. Fourth screwing part. DETAILED DESCRIPTION
[0026] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0027] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0028] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0029] In the present invention, unless otherwise clearly specified and limited, the terms "assemble", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] Figures 1 to 4 An embodiment of a concrete structure joint construction device of the utility model is shown. The concrete structure joint construction device of this embodiment includes a joint strip 1, a top frame 6 and two mounting frames 8 for respectively fixing on formworks 7 of adjacent concrete pouring sections. At least two groups of spaced position adjustment mechanisms 61 are respectively provided on both sides of the top frame 6. The joint strip 1 is located between the two mounting frames 8 and is set on the top frame 6 through a depth adjustment mechanism 9. The depth adjustment mechanism 9 is used to adjust the distance between the joint strip 1 and the top frame 6 to adjust the depth of the structural joint 5. The top frame 6 is arranged on the top of the two mounting frames 8 through the position adjustment mechanisms 61 to adjust the verticality of the joint strip 1 relative to the concrete pouring section.
[0031] The present concrete structure joint construction device takes the formation of a structure joint 5 between the first pouring section 3 and the second pouring section 4 as an example. The construction process is as follows: first, two mounting frames 8 are respectively fixed on the formwork 7 of the first pouring section 3 and the second pouring section 4 (two adjacent concrete pouring sections); then, the verticality of the joint strip 1 relative to the concrete pouring section is adjusted by each position adjustment mechanism 61, so that the joint strip 1 is perpendicular to the concrete pouring section; then, the distance between the joint strip 1 and the top frame 6 is adjusted by the depth adjustment mechanism 9 to adjust the depth of the structure joint 5; then, concrete is poured into the second pouring section 4. After the concrete in the post-casting section 4 is solidified and formed, the concrete structural joint construction device is removed and the joint strip 1 is pulled out, that is, a structural joint 5 is formed between the first cast section 3 and the post-casting section 4. After the joint strip 1 of the concrete structural joint construction device is fixed to the formwork 7 of the first cast section 3 and the post-casting section 4 respectively through two mounting frames 8, the verticality and the forming depth can be adjusted through the position adjustment mechanism 61 and the depth adjustment mechanism 9. The position of the joint strip 1 is easy to determine, which reduces the difficulty of installation, and the adjustability is good, which can improve the construction quality.
[0032] Further, in this embodiment, the position adjustment mechanism 61 includes a first adjustment member 611 and a second adjustment member 612. The first adjustment member 611 is movably arranged in the top frame 6. One end of the first adjustment member 611 is threadedly connected to the top of the mounting frame 8, and the other end is provided with a first convex screwing portion 613. The second adjustment member 612 is arranged in the top frame 6 and threadedly connected to the top frame 6. One end of the second adjustment member 612 abuts against the top of the mounting frame 8, and the other end is provided with a second convex screwing portion 614. The first adjustment member 611 and the second adjustment member 612 are fixedly connected to the top frame 6 and the mounting frame 8 in a one-pull-one manner. By screwing the first adjustment member 611 and the second adjustment member 612, the position of the top frame 6 relative to the mounting frame 8 can be adjusted to adjust the verticality of the seam strip 1 relative to the concrete pouring section. The structure is simple and the operation is convenient. Preferably, each position adjustment mechanism 61 on each side of the top frame 6 is arranged at intervals along the length direction of the seam strip 1. When the second adjusting member 612 and the mounting frame 8 are in a tightened state, the first screwing portion 613 is pressed against the top surface of the top frame 6, and the screwing operation is convenient.
[0033] Furthermore, in this embodiment, the first adjusting member 611 and the second adjusting member 612 are both screws.
[0034] Furthermore, in this embodiment, if Figure 2As shown, the top frame 6 is provided with a through hole 62 which is larger than the first adjusting member 611, and the first adjusting member 611 is inserted into the through hole 62. The through hole 62 is larger than the diameter of the first adjusting member 611, so that the first adjusting member 611 and the through hole 62 form a clearance fit, which can not only make the first adjusting member 611 movably sleeved with the top frame 6, but also make the first adjusting member 611 have a space for swinging adjustment relative to the through hole 62, so as to facilitate the flatness adjustment of the top frame 6 relative to the concrete pouring section, thereby facilitating the verticality adjustment of the seam strip 1.
[0035] Furthermore, in this embodiment, if Figure 2 and Figure 3 As shown, the depth adjustment mechanism 9 includes a third adjustment member 91, a fourth adjustment member 92 and a fifth adjustment member 93 arranged at intervals along the length direction of the seam strip 1. The third adjustment member 91 and the fifth adjustment member 93 are both movably arranged in the top frame 6. One end of the third adjustment member 91 and the fifth adjustment member 93 are both threadedly connected to the top of the seam strip 1, and the other end is provided with a third screwing portion 94 protruding outward. The fourth adjustment member 92 is arranged in the top frame 6 and threadedly connected to the top frame 6. One end of the fourth adjustment member 92 abuts against the top of the seam strip 1, and the other end is provided with a fourth screwing portion 95. When adjusting the depth, the third adjustment member 91 and the fifth adjustment member 93 are screwed to adjust the screwing depth with the seam strip 1, and then the fourth adjustment member 92 is screwed to make the fourth adjustment member 92 abut against the seam strip 1, that is, the distance of the seam strip 1 relative to the top frame 6 can be locked, thereby adjusting the forming depth of the seam strip 1 (the depth of the insertion into the space between the first casting section 3 and the second casting section 4). The structure is simple and the adjustment is convenient. The fourth adjustment member 92 can be adjusted by one or more positions.
[0036] Furthermore, in this embodiment, the third adjusting member 91 , the fourth adjusting member 92 and the fifth adjusting member 93 are all screws.
[0037] Furthermore, in this embodiment, a locking member 81 is connected between the two mounting frames 8, and a long hole 11 is provided on the seam strip 1 for the locking member 81 to pass through. The two mounting frames 8 are connected by the locking member 81 to improve the strength and stability of the overall structure. The seam strip 1 is provided with a long hole 11 for the locking member 81 to pass through, and the locking member 81 can slide relative to the long hole 11 to prevent obstruction of the adjustment of the forming depth of the seam strip 1. Preferably, the long hole 11 is a waist-shaped hole, and its extension direction is parallel to the length direction of the third adjusting member 91.
[0038] Furthermore, in this embodiment, if Figure 2 As shown, the locking member 81 is a locking bolt. The structure is simple and easy to disassemble and assemble.
[0039] Furthermore, in this embodiment, the two side surfaces of the seam strip 1 are parallel, and at least one of the two sides of the bottom of the seam strip 1 is provided with an inclined draft surface 12. Figure 2As shown, an inclined draft surface 12 is provided on the side of the bottom of the seam strip 1 facing the post-casting section 4, so as to facilitate the pulling out of the seam strip 1 after the concrete is poured and formed in the post-casting section 4. Of course, in other embodiments, inclined draft surfaces 12 are provided on both sides of the bottom of the seam strip 1, which is suitable for the construction of forming the structural seam 5 between two adjacent sections to be poured, so as to facilitate the separation of the two sides of the bottom of the seam strip 1 from the poured concrete when the seam strip 1 is pulled out.
[0040] Furthermore, in this embodiment, the top frame 6 is in the shape of an elongated strip, such as a rectangle whose length is much greater than its width.
[0041] Although the present invention has been disclosed as a preferred embodiment as above, it is not intended to limit the present invention. Any technician familiar with the art can use the above disclosed technical content to make many possible changes and modifications to the technical solution of the present invention without departing from the scope of the technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention should fall within the scope of protection of the technical solution of the present invention.
Claims
1. A concrete structure joint construction device, characterized in that: The invention comprises a seam strip (1), a top frame (6), and two mounting frames (8) respectively fixed on formwork frames (7) of adjacent concrete pouring sections, at least two groups of position adjustment mechanisms (61) arranged at intervals are respectively provided on both sides of the top frame (6), the seam strip (1) is located between the two mounting frames (8), and is arranged on the top frame (6) through a depth adjustment mechanism (9), the depth adjustment mechanism (9) is used to adjust the distance between the seam strip (1) and the top frame (6) so as to adjust the depth of the structural seam (5), and the top frame (6) is arranged on the top of the two mounting frames (8) through the position adjustment mechanisms (61) so as to adjust the verticality of the seam strip (1) relative to the concrete pouring section.
2. The concrete structure joint construction device according to claim 1 is characterized in that: The position adjustment mechanism (61) comprises a first adjustment member (611) and a second adjustment member (612); the first adjustment member (611) is movably inserted into the top frame (6); one end of the first adjustment member (611) is threadedly connected to the top of the mounting frame (8); and the other end is provided with a first protruding screwing portion (613); the second adjustment member (612) is inserted into the top frame (6) and threadedly connected to the top frame (6); one end of the second adjustment member (612) is in contact with the top of the mounting frame (8); and the other end is provided with a second protruding screwing portion (614).
3. The concrete structure joint construction device according to claim 2 is characterized in that: The first adjusting member (611) and the second adjusting member (612) are both screws.
4. The concrete structure joint construction device according to claim 2 is characterized in that: The top frame (6) is provided with a through hole (62) that is larger than the first adjusting member (611), and the first adjusting member (611) is inserted into the through hole (62).
5. The concrete structure joint construction device according to claim 1 is characterized in that: The depth adjustment mechanism (9) comprises a third adjustment member (91), a fourth adjustment member (92) and a fifth adjustment member (93) which are arranged at intervals along the length direction of the seam strip (1); the third adjustment member (91) and the fifth adjustment member (93) are both movably inserted into the top frame (6); one end of the third adjustment member (91) and the fifth adjustment member (93) are both threadedly connected to the top of the seam strip (1); and the other end is provided with a third protruding screwing portion (94); the fourth adjustment member (92) is inserted into the top frame (6) and threadedly connected to the top frame (6); one end of the fourth adjustment member (92) abuts against the top of the seam strip (1); and the other end is provided with a fourth screwing portion (95).
6. The concrete structure joint construction device according to claim 5, characterized in that: The third adjusting member (91), the fourth adjusting member (92) and the fifth adjusting member (93) are all screws.
7. The concrete structure joint construction device according to any one of claims 1 to 6, characterized in that: A locking piece (81) is connected between the two mounting frames (8), and a long hole (11) for the locking piece (81) to pass through is provided on the seam strip (1).
8. The concrete structure joint construction device according to claim 7 is characterized in that: The locking member (81) is a locking bolt.
9. The concrete structure joint construction device according to any one of claims 1 to 6, characterized in that: The two side surfaces of the seam forming strip (1) are parallel, and at least one of the two sides of the bottom of the seam forming strip (1) is provided with an inclined draft surface (12).
10. The concrete structure joint construction device according to any one of claims 1 to 6, characterized in that: The top frame (6) is in the shape of an elongated strip.