Reservoir level and radial gate linkage system

Through the reservoir water level and arc door linkage system, the automatic linkage of arc doors is achieved using the water level gauge and computer monitoring system, solving the problems of manual judgment of lag and arc door water and grass attachment, ensuring the safe operation and smooth drainage of the dam.

CN222183253UActive Publication Date: 2024-12-17CHONGQING DATANG INT WULONG HYDROPOWER DEV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420313752.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-20
Publication Date
2024-12-17
Estimated Expiration
2034-02-20

AI Technical Summary

Technical Problem

In the prior art, when the water level rises in front of the river dam or the water level rises to the alarm threshold, it is manually judged that the arc door has a time lag, and the arc door has long-term water contact, which causes aquatic plants and moss to adhere, which is easy to damage and is not conducive to the passing of the water flow.

Method used

Design a reservoir water level and arc door linkage system, including water level gauge, computer monitoring system, arc door communication machine and arc door control system. By measuring water level, the arc door opening is controlled in real time to ensure that the flood discharge arc door is automatically opened in an emergency situation, and Clean the water plants and moss on the outer wall of the arc door through the threaded rod and the brushing unit.

Benefits of technology

The automatic linkage of arc doors is realized, which reduces the time lag of manual judgment, ensures the safe operation of the dam, and effectively cleans the outer wall of arc doors to avoid the adhesion of aquatic plants and affects drainage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222183253U_ABST
    Figure CN222183253U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of reservoir arc gates, and discloses a reservoir water level and arc gate linkage system which comprises a water level gauge, a plurality of reservoir arc gates, a computer monitoring system, an arc gate communication machine and an arc gate control system which are installed in an upstream reservoir, and the water level gauge is used for measuring the water level of the upstream reservoir; linkage of the water level in front of the dam and the radial gate is achieved, automatic starting and stopping are carried out according to the formulated radial gate opening target and scheme, the achieved functions are complete, automatic starting and stopping of the radial gate can be achieved at the necessary moment, and the phenomenon that reservoir water overflows the dam due to the fact that attenders do not pay attention in place can be effectively eradicated; the computer monitoring system and the radial gate control system are organically combined through control over the water level, radial gate linkage under the emergency condition is achieved, cost is saved, related control parts do not need to be independently arranged, the construction cost can be effectively saved, the outer wall of the reservoir radial gate is cleaned, and the phenomenon that water drainage is affected due to attachment of aquatic plants is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of reservoir arc gates, in particular to a reservoir water level and arc gate linkage system. Background Art

[0002] During the flood season every year, there are occasional flooding incidents at power stations. By building complete technical measures, the power station's early warning and handling capabilities in emergency duty, flood control dispatch, emergency rescue, etc. can be improved, accurate early warning can be made, and the arc gate can be automatically opened under unconventional circumstances, resolutely preventing the occurrence of flooding of plant buildings and reservoir water overflowing the dam, and ensuring safe flood discharge. An independent reservoir water level and arc gate linkage system is established at the power station. When the water level in front of the dam or the rising trend of the water level in front of the dam reaches the alarm threshold, the water level in front of the dam and the flood discharge arc gate are linked, which plays an emergency automatic opening and closing function, ensuring that when the water level in front of the dam is too high, rises too fast, or in an emergency, the flood discharge arc gate can be automatically opened safely, promptly, and effectively to ensure the safe operation of the dam.

[0003] Prior art, such as the patent with publication number CN219872551U, discloses an intelligent safety warning system for dam flood discharge facilities, including a high-altitude observation laser pan-tilt installed on the dam top gantry of the flood discharge dam section, a laser ball machine installed on the top of the elevator shaft downstream of the flood discharge dam section, a first infrared cylinder machine installed on the top of the flood discharge gate machine room, a second infrared cylinder machine installed above the arc gate support hinge of the flood discharge gate, and a third infrared cylinder machine installed on the top of the discharge chute. The high-altitude observation laser pan-tilt, laser ball machine, first infrared cylinder machine, second infrared cylinder machine and third infrared cylinder machine are connected to the terminal server through a data acquisition module. The utility model is used to solve the problem that manual inspection is subjective and periodic, and it is impossible to grasp the entire situation of the upstream water area of ​​the flood discharge, the flood discharge facility machine room, the flood discharge gate, the flood discharge channel and the flood discharge tailwater area in real time.

[0004] The existing technology still has shortcomings:

[0005] The above-mentioned prior art is used to solve the problem that manual inspection is subjective and periodic. However, when the water level in front of the river dam rises or the rising trend of the water level in front of the dam reaches the alarm threshold, there is a certain time lag in manually judging whether to start the arc gate, which may cause the arc gate top to overflow. There is a lack of real-time grasp of the entire situation of the upstream water area, the flood discharge facility machine room, the flood discharge gate, the flood discharge channel and the flood discharge tailwater area. At the same time, the arc surface of the arc gate is in contact with water for a long time, and the water plants and moss in the water are easily attached to the arc surface of the arc gate. When the water plants gather more, it is easy to cause damage to the arc gate when opening it, and it is not conducive to the passage of water. For this reason, a reservoir water level and arc gate linkage system is proposed. Utility Model Content

[0006] In view of the deficiencies in the prior art, the utility model provides a reservoir water level and arc gate linkage system, which can realize the linkage between the reservoir water level and the arc gate, and formulate arc gate opening targets and plans according to the water level rise situation, to ensure that the flood discharge arc gate can be automatically opened safely, timely and effectively in an emergency situation when the water level in front of the dam is too high or rises too fast, to ensure the safe operation of the dam, and to clean the aquatic plants on the outer wall of the arc gate.

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a reservoir water level and arc gate linkage system, comprising a water level meter installed in an upstream reservoir, a plurality of reservoir arc gates, a computer monitoring system, an arc gate communicator and an arc gate control system, the water level meter is used to measure the water level of the upstream reservoir, the water level meter is electrically connected to the computer monitoring system, the computer monitoring system is electrically connected to the arc gate communicator, the arc gate communicator is electrically connected to the arc gate control system, the arc gate control system controls the opening and closing of the reservoir arc gate, two baffles are fixedly connected to the arc surface outer wall of the reservoir arc gate, a threaded rod is rotatably connected between the two baffles, a second motor is installed on the outer wall of one of the baffles, the second motor is transmission-connected to the threaded rod through a transmission belt, the outer wall of the threaded rod is threadedly connected to a cleaning bar slidably connected to the outer wall of the reservoir arc gate, and a cleaning unit is installed on the side wall of the cleaning bar.

[0008] Preferably, the number of the water level gauges is three, and the three water level gauges are evenly distributed in the upstream reservoir.

[0009] Preferably, there are three threaded rods, which are respectively located at the two ends and the middle of the two baffle bars. The three threaded rods are all threadedly connected to the cleaning bar. The adjacent two threaded rods are connected by a transmission belt. The outer wall of the reservoir arc gate is provided with a make way groove for making way for the transmission belt connected between the multiple threaded rods.

[0010] Preferably, there are two cleaning strips, and the cleaning unit is located between the two cleaning strips.

[0011] Preferably, the cleaning unit includes a connecting plate installed between two cleaning strips, a plurality of brush heads are fixedly connected to the bottom surface of the connecting plate, a slide groove is provided on the adjacent sides of the two cleaning strips, a plurality of sliders are fixedly connected to the bottom surface of the connecting plate, and the sliders are slidably connected to the inner wall of the slide groove.

[0012] Preferably, the cleaning unit also includes a connecting frame, which is installed at the ends of the two cleaning strips, and a first motor and a support plate are installed on the connecting frame. One side of the support plate and the output end of the first motor are rotatably connected to an adjusting disk, an adjusting rod is rotatably connected between the two adjusting disks, and two connecting blocks are fixedly connected to the outer wall of the connecting plate, and the other end of the adjusting rod is rotatably connected between the two connecting blocks.

[0013] Preferably, the plurality of brush heads are distributed perpendicularly to the cleaning strip.

[0014] Compared with the prior art, the utility model has the following beneficial effects:

[0015] 1. The utility model realizes the linkage between the water level in front of the dam and the arc gate, and automatically starts and stops according to the established arc gate opening target and plan. The functions realized are relatively complete, and the arc gate can be automatically started and stopped when necessary, which can effectively prevent the reservoir water from flooding the dam due to the lack of attention of the on-duty personnel. Through the control of the water level, the computer monitoring system and the arc gate control system are organically combined to realize the arc gate linkage in emergency situations, saving costs. There is no need to set up related control parts separately, which can effectively save construction costs, and clean the outer wall of the reservoir arc gate to avoid the phenomenon of water grass attachment affecting drainage.

[0016] 2. The utility model provides three threaded rods, and the cleaning strip moves through the threaded connection of the three threaded rods. The three threaded rods can support multiple locations of the cleaning strip, maintain the strength of the cleaning strip, and improve the stability of cleaning.

[0017] 3. The utility model installs a connecting plate between two cleaning strips, and when the cleaning strip moves, the connecting plate can be driven to move. The brush head on the bottom of the connecting plate can clean the outer wall of the reservoir arc gate, so that the firmly attached moss can be cleaned from the reservoir arc gate to reduce the attachment of weeds in the water and ensure the drainage of the reservoir.

[0018] 4. The utility model installs a first motor at the ends of the two cleaning strips. The first motor cooperates with the adjusting disk and the adjusting rod to drive the connecting plate to slide back and forth between the two cleaning strips, thereby improving the cleaning of the outer wall of the reservoir arc gate by the brush head and improving the cleaning degree.

[0019] Other features and advantages of the utility model will be described in the following description, and partly become apparent from the description, or understood by implementing the utility model. The purpose and other advantages of the utility model can be realized and obtained by the structures indicated in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0021] Figure 2 It is a front structural schematic diagram of the reservoir arc gate of the utility model;

[0022] Figure 3 It is a schematic diagram of the upper structure of the reservoir arc gate of the utility model;

[0023] Figure 4 This is a schematic diagram of the driving structure of the cleaning unit of the utility model;

[0024] Figure 5This is a schematic diagram of the structure of the connection between the connecting plate and the cleaning strip of the utility model;

[0025] Figure 6 This is a control system diagram of the reservoir arc gate of the utility model.

[0026] In the figure: 1. water level gauge; 2. cleaning bar; 3. computer monitoring system; 4. arc gate communication machine; 5. arc gate monitoring system; 6. reservoir arc gate; 7. give way groove; 8. baffle bar; 9. cleaning brush unit; 91. connecting plate; 92. brush head; 93. connecting frame; 94. first motor; 95. support plate; 96. adjusting disk; 97. adjusting rod; 98. connecting block; 10. threaded rod; 11. second motor; 12. slide groove; 13. slider. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this technical field without creative work are within the scope of protection of the utility model.

[0028] See also Figure 1-6 The reservoir water level and arc gate linkage system of this embodiment includes a water level meter 1 installed in an upstream reservoir, a plurality of reservoir arc gates 6, a computer monitoring system 3, an arc gate communication machine 4 and an arc gate control system 5. The water level meter 1 is used to measure the water level of the upstream reservoir. The water level meter 1 is electrically connected to the computer monitoring system 3, the computer monitoring system 3 is electrically connected to the arc gate communication machine 4, the arc gate communication machine 4 is electrically connected to the arc gate control system 5, and the arc gate control system 5 controls the opening and closing of the reservoir arc gate 6. Two baffle bars 8 are fixedly connected to the arc surface outer wall of the reservoir arc gate 6, and a threaded rod 10 is rotatably connected between the two baffle bars 8. A second motor 11 is installed on the outer wall of one of the baffle bars 8, and the second motor 11 is transmission-connected to the threaded rod 10 through a transmission belt. The outer wall of the threaded rod 10 is threadedly connected to a cleaning bar 2 that is slidably connected to the outer wall of the reservoir arc gate 6, and a cleaning unit 9 is installed on the side wall of the cleaning bar 2.

[0029] like Figure 1 , 2As shown in , 3, and 6, the reservoir water level and arc gate linkage system structure in the utility model is similar to the existing reservoir water level and arc gate linkage system structure, such as the intelligent safety early warning system of a dam flood discharge facility disclosed in the patent with publication number CN219872551U. The main improvement of the utility model is that it can realize the linkage between the reservoir water level and the arc gate, and formulate arc gate opening targets and plans according to the water level rise, so as to ensure that the flood discharge arc gate can be automatically opened safely, timely and effectively in an emergency situation when the water level in front of the dam is too high or rises too fast, so as to ensure the safe operation of the dam and clean the water plants on the outer wall of the arc gate; the plurality of reservoir arc gates 6 in the utility model include a first arc gate, a second arc gate, a third arc gate, and a fourth arc gate. The second arc gate, the third arc gate, the fourth arc gate, the fifth arc gate, the sixth arc gate, the seventh arc gate, the eighth arc gate, the ninth arc gate and the tenth arc gate; according to the set water level start-up program, the water level of the upstream reservoir is measured by the water level meter 1, and the water level meter 1 transmits the water level signal to the computer monitoring system 3 in real time by using a cable. The computer monitoring system 3 calculates the number and opening degree of the reservoir arc gates 6 that need to be opened at the current water level. After the calculation is completed, the computer monitoring system 3 transmits the corresponding instructions to the arc gate communication machine 4 first, and after being transferred by the arc gate communication machine 4, it is transmitted to the arc gate control system 5 for command, and then the corresponding reservoir arc gate 6 is opened to the corresponding opening to prevent the arc gate from being flooded over the top;

[0030] The specific control method is as follows: when the upstream water level is lower than the set height, the conditions of the reservoir water level linkage system are not met, the system does not participate in the work, and the reservoir arc gate is started and stopped based on manual judgment.

[0031] When the upstream water level is higher than the set height, the monitoring system activates the reservoir water level linkage arc gate process and sounds the flood control alarm.

[0032] If the upstream water level exceeds the set height and the reservoir water level drops below the set height 20 minutes later, the monitoring system reservoir water level linkage arc gate process will exit.

[0033] When the upstream water level exceeds the set height, and 20 minutes later, the reservoir water level rises above the set height, the monitoring system will sound the flood alarm again, and command the arc gate control system 5 to immediately open the fifth arc gate to 1 meter, and then open the sixth arc gate to 1 meter after an interval of 60 seconds; after the fifth arc gate is opened to 1 meter, open the seventh arc gate to 1 meter; after the sixth arc gate is opened to 1 meter, open the eighth arc gate to 1 meter.

[0034] If the upstream water level exceeds the set height, the flood alarm is sounded for more than 20 minutes from the set height, and the fifth to eighth arc gates have been opened to 1 meter, the arc gate control system 5 will issue a command to immediately open the ninth arc gate to 1 meter, and delay 60 seconds to open the tenth arc gate to 1 meter; after the ninth arc gate is opened to 1 meter, the first arc gate is opened to 1 meter; after the tenth arc gate is opened to 1 meter, the second arc gate is opened to 1 meter; after the first arc gate is opened to 1 meter, the third arc gate is opened to 1 meter; after the second arc gate is opened to 1 meter, the fourth arc gate is opened to 1 meter.

[0035] If the upstream water level rises too fast and directly rises to exceed the set height, the arc gate control system 5 orders to immediately open the fifth arc gate to an opening of 1 meter, and then open the sixth arc gate to an opening of 1 meter after an interval of 60 seconds; after the fifth arc gate is opened to an opening of 1 meter, open the seventh arc gate to an opening of 1 meter; after the sixth arc gate is opened to an opening of 1 meter, open the eighth arc gate to an opening of 1 meter; after the seventh arc gate is opened to an opening of 1 meter, open the ninth arc gate to an opening of 1 meter; after the eighth arc gate is opened to an opening of 1 meter, open the tenth arc gate to an opening of 1 meter; after the ninth arc gate is opened to an opening of 1 meter, open the first arc gate to an opening of 1 meter; after the tenth arc gate is opened to an opening of 1 meter, open the second arc gate to an opening of 1 meter; after the first arc gate is opened to an opening of 1 meter, open the third arc gate to an opening of 1 meter; after the second arc gate is opened to an opening of 1 meter, open the fourth arc gate to an opening of 1 meter.

[0036] When the reservoir arc gate 6 is opened according to the above settings, when the upstream water level drops below the set height, the arc gate linkage program exits, and the existing opening of the existing reservoir arc gate 6 is adjusted according to actual requirements;

[0037] By calculating the water level of the reservoir, a linkage relationship is established with the reservoir arc gate 6 to realize automatic opening of the arc gate to protect the safety of the dam;

[0038] When there are a lot of aquatic plants and mosses attached to the outer wall of the reservoir arc gate 6, the second motor 11 can be started to work. The second motor 11 drives the threaded rod 10 to rotate through a transmission belt. The transmission belt can be a chain, which cooperates with a sprocket to drive the threaded rod 10 to rotate. The threaded rod 10 is supported by the baffle 8 on the outer wall of the reservoir arc gate 6. The threaded rod 10 drives the cleaning strip 2 to move back and forth on the outer wall of the reservoir arc gate 6. The cleaning strip 2 can clean the outer wall of the reservoir arc gate 6 and clean out the aquatic plants and the like attached to the outer wall of the reservoir arc gate 6, so as to avoid damage to the reservoir arc gate 6 caused by the aquatic plants sticking to the outer wall when the reservoir arc gate 6 is opened, and at the same time avoid affecting the drainage.

[0039] like Figure 6As shown, there are three water level gauges 1, and the three water level gauges 1 are evenly distributed in the upstream reservoir; after receiving the signals of the three water level gauges 1, the computer monitoring system 3 performs three-mean logic processing, that is, each time the calculation is performed, three data with an interval of five seconds are taken for average calculation to prevent the fluctuation of a single water level gauge 1 from causing abnormal upstream water level measurement; the reservoir water level is calculated using the "three-mean" logic, and each time the calculation is performed, three data with an interval of five seconds are taken for average calculation to prevent water level fluctuations from affecting the calculation results; after the monitoring calculates the upstream water level, according to the actual regulation of the reservoir, different water levels are set to realize the control logic of automatic startup of the reservoir arc gate 6.

[0040] like Figure 2 , 3 As shown, there are three threaded rods 10, which are respectively located at the two ends and the middle of the two baffle bars 8. The three threaded rods 10 are all threadedly connected to the cleaning bar 2, and two adjacent threaded rods 10 are connected by a transmission belt. The outer wall of the reservoir arc gate 6 is provided with a makeshift groove 7 for making way for the transmission belt connected between the multiple threaded rods 10; when the second motor 11 drives one of the threaded rods 10 to rotate, the threaded rod 10 drives the other threaded rods 10 to rotate synchronously through the transmission belt, and the makeshift groove 7 makes way for the transmission belt, so that the multiple threaded rods 10 rotate synchronously and drive the cleaning bar 2 to move, so that the cleaning bar 2 can stably clean the water plants and the like on the outer wall of the reservoir arc gate 6, thereby improving the strength and stability of the cleaning bar 2.

[0041] like Figure 1-5 As shown, there are two cleaning strips 2, and the cleaning unit 9 is located between the two cleaning strips 2; the two cleaning strips 2 move synchronously on the outer wall of the reservoir arc gate 6, which can achieve more thorough cleaning of the aquatic plants on the outer wall of the reservoir tiger gate 6 and improve practicality.

[0042] like Figure 2-5 As shown, the cleaning unit 9 includes a connecting plate 91 installed between two cleaning strips 2, a plurality of brush heads 92 are fixedly connected to the bottom surface of the connecting plate 91, a slide groove 12 is provided on the adjacent side of the two cleaning strips 2, a plurality of sliders 13 are fixedly connected to the bottom surface of the connecting plate 91, and the sliders 13 are slidably connected to the inner wall of the slide groove 12; when the threaded rod 10 drives the two cleaning strips 2 to move, the cleaning strip 2 drives the connecting plate 91 to move through the restriction of the slide groove 12 on the slider 13, and the plurality of brush heads 92 on the bottom surface of the connecting plate 91 clean the outer wall of the reservoir arc gate 6 during the movement of the connecting plate 91, so that the moss and the like on the outer wall of the reservoir arc gate 6 can be brushed out by the brush heads 92, thereby improving the cleaning degree of the outer wall of the reservoir arc gate 6, ensuring the opening and closing of the reservoir arc gate 6, and improving the smoothness of the reservoir water discharge.

[0043] like Figure 4 , 5As shown, the cleaning unit 9 also includes a connecting frame 93, which is installed at the ends of the two cleaning strips 2, and a first motor 94 and a support plate 95 are installed on the connecting frame 93. One side of the support plate 95 and the output end of the first motor 94 are both rotatably connected with an adjusting disk 96, and an adjusting rod 97 is rotatably connected between the two adjusting disks 96. The outer wall of the connecting plate 91 is fixedly connected with two connecting blocks 98, and the other end of the adjusting rod 97 is rotatably connected between the two connecting blocks 98; when the threaded rod 10 drives the two cleaning strips 2 to move, the first motor 94 is started to work, and the first motor 94 is supported by the connecting frame 93, and the first motor 94 drives the adjusting disk 96 to rotate The two adjusting disks 96 are supported by the first motor 94 and the support plate 95 respectively. The two adjusting disks 96 drive the adjusting rod 97 to move. The adjusting rod 97 and the connecting block 98 rotate and move, thereby driving the connecting plate 91 to move. The connecting plate 91 drives the slider 13 to slide in the slide groove 12. The connecting plate 91 drives multiple brush heads 92 to move back and forth. In conjunction with the movement of the cleaning strip 2, the brush head 92 performs active cleaning of the outer wall of the reservoir arc gate 6. The use of the active brush head 92 can improve the cleaning of the outer wall of the reservoir arc gate 6, and avoid water plants, moss, etc. adhering to the outer wall of the reservoir arc gate 6, which affects the opening and closing of the reservoir arc gate 6 and the smoothness of the reservoir water discharge.

[0044] like Figure 5 As shown, multiple brush heads 92 are vertically distributed with the cleaning strip 2; when the brush heads 92 vertically distributed with the cleaning strip 2 move up and down on the connecting plate 91, the outer wall of the reservoir arc gate 6 can be better cleaned to improve practicality.

[0045] Implementation steps in this embodiment: according to the set water level start program, the water level of the upstream reservoir is measured by the water level meter 1, and the water level meter 1 uses a cable to transmit the water level signal to the computer monitoring system 3 in real time. The computer monitoring system 3 calculates the number and opening degree of the reservoir arc gates 6 that need to be opened at the current water level. After the calculation is completed, the computer monitoring system 3 first transmits the corresponding instructions to the arc gate communication machine 4, and after being transferred by the arc gate communication machine 4, it is transmitted to the arc gate control system 5 for command, and then the corresponding reservoir arc gate 6 is opened to the corresponding opening to prevent the arc gate from being flooded over the top; when there are more aquatic plants and mosses attached to the outer wall of the reservoir arc gate 6, the second motor 11 can be started to work, and the second motor 11 drives the threaded rod 10 to rotate through the transmission belt. The transmission belt can be a chain, which cooperates with the sprocket to drive the threaded rod 10 Rotate, the threaded rod 10 is supported by the baffle bar 8 on the outer wall of the reservoir arc gate 6, and the threaded rod 10 drives the two cleaning strips 2 to reciprocate on the outer wall of the reservoir arc gate 6. At the same time, the first motor 94 is started to work, and the first motor 94 drives the adjusting disk 96 to rotate. The two adjusting disks 96 are supported by the first motor 94 and the support plate 95 respectively, and the two adjusting disks 96 drive the adjusting rod 97 to move. The adjusting rod 97 and the connecting block 98 rotate and move, thereby driving the connecting plate 91 to move, and the connecting plate 91 drives the slider 13 to slide in the slide groove 12. The connecting plate 91 drives multiple brush heads 92 to reciprocate, and cooperates with the movement of the cleaning strip 2, so that the brush head 92 can flexibly clean the outer wall of the reservoir arc gate 6, and the cleaning strip 2 can clean the outer wall of the reservoir arc gate 6, and clean out the water plants attached to the outer wall of the reservoir arc gate 6.

[0046] Obviously, the above embodiments of the present invention are merely examples for clearly explaining the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention shall be included in the protection scope of the claims of the present invention.

Claims

1. A reservoir water level and arc gate linkage system, characterized in that: The invention comprises a water level meter (1) installed in an upstream reservoir, a plurality of reservoir arc gates (6), a computer monitoring system (3), an arc gate communication machine (4) and an arc gate control system (5), wherein the water level meter (1) is used to measure the water level of the upstream reservoir, the water level meter (1) is electrically connected to the computer monitoring system (3), the computer monitoring system (3) is electrically connected to the arc gate communication machine (4), the arc gate communication machine (4) is electrically connected to the arc gate control system (5), and the arc gate control system (5) controls the opening and closing of the reservoir arc gate (6), two baffle bars (8) are fixedly connected to the arc surface outer wall of the reservoir arc gate (6), a threaded rod (10) is rotatably connected between the two baffle bars (8), a second motor (11) is installed on the outer wall of one of the baffle bars (8), the second motor (11) is transmission-connected to the threaded rod (10) through a transmission belt, a cleaning bar (2) is threadedly connected to the outer wall of the reservoir arc gate (6) and a cleaning unit (9) is installed on the side wall of the cleaning bar (2).

2. A reservoir water level and arc gate linkage system according to claim 1, characterized in that: The number of water level gauges (1) is three, and the three water level gauges (1) are evenly distributed in the upstream reservoir.

3. A reservoir water level and arc gate linkage system according to claim 1, characterized in that: The number of the threaded rods (10) is three, and the three threaded rods (10) are respectively located at the two ends and the middle of the two blocking bars (8). The three threaded rods (10) are all threadedly connected to the cleaning bar (2). Two adjacent threaded rods (10) are connected by a transmission belt. The outer wall of the reservoir arc gate (6) is provided with a clearance groove (7) for giving way to the transmission belt for transmission connection between the plurality of threaded rods (10).

4. A reservoir water level and arc gate linkage system according to claim 3, characterized in that: There are two cleaning strips (2), and the cleaning unit (9) is located between the two cleaning strips (2).

5. A reservoir water level and arc gate linkage system according to claim 4, characterized in that: The cleaning unit (9) comprises a connecting plate (91) installed between two cleaning strips (2); a plurality of brush heads (92) are fixedly connected to the bottom surface of the connecting plate (91); a slide groove (12) is provided on one side adjacent to the two cleaning strips (2); a plurality of sliding blocks (13) are fixedly connected to the bottom surface of the connecting plate (91); and the sliding blocks (13) are slidably connected to the inner wall of the slide groove (12).

6. A reservoir water level and arc gate linkage system according to claim 5, characterized in that: The cleaning unit (9) further comprises a connecting frame (93), the connecting frame (93) being mounted on the ends of the two cleaning strips (2), a first motor (94) and a support plate (95) being mounted on the connecting frame (93), an adjusting disk (96) being rotatably connected to one side of the support plate (95) and the output end of the first motor (94), an adjusting rod (97) being rotatably connected between the two adjusting disks (96), two connecting blocks (98) being fixedly connected to the outer wall of the connecting plate (91), and the other end of the adjusting rod (97) being rotatably connected between the two connecting blocks (98).

7. A reservoir water level and arc gate linkage system according to claim 6, characterized in that: The plurality of brush heads (92) are distributed perpendicularly to the cleaning strip (2).

Citation Information

Cited By

  • MCU control system based on variable capacitor

    CN120652852A