Gypsum recovery system of desulfurization tower
By accelerating solid-liquid separation by using a multi-stage precipitation tank and oscillator in the desulfurization tower gypsum recovery system, and combining with an automatic drug delivery device, the problems of slow precipitation speed and high labor cost in the existing technology are solved, and efficient gypsum recycling and Production costs are reduced.
Patent Information
- Application Number
- CN202420927836.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2034-04-29
AI Technical Summary
The existing desulfurization tower gypsum recycling device lacks drug delivery devices, which leads to slow precipitation speed and is not easy to stack, increasing labor costs and production costs.
A desulfurization tower gypsum recovery system including a multi-stage precipitation tank and a shock device was designed. Combined with the drug delivery device and a drug sensor, it realizes automatic quantitative drug delivery and oscillating solid-liquid separation, improving precipitation efficiency.
Through multi-stage precipitation tanks and oscillators, the automatic drug delivery device reduces the demand for manual drug delivery, improves the precipitation speed, saves production time and energy consumption, and reduces production costs.
Smart Images

Figure CN222286476U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of desulfurization tower recovery equipment, in particular to a desulfurization tower gypsum recovery system. Background Art
[0002] In the production process of ceramics, the flue gas of ceramic kilns contains a large amount of sulfur oxides. Before it is discharged, it must be desulfurized in a desulfurization tower to meet the emission standards. The flue gas of ceramic kilns is generally desulfurized by the limestone method. After desulfurization, a large amount of gypsum water waste liquid will be produced. When the gypsum water flows into the environmental protection pool and the raw material warehouse, it will pollute the environmental protection water and raw materials and cause the bricks to bubble. The traditional method uses natural precipitation to precipitate into gypsum slurry, and then pour the gypsum slurry into the stacking pool. However, the gypsum slurry precipitated by the natural precipitation method still contains a high amount of water, which is difficult to handle and difficult to stack high, resulting in gypsum slurry all over the ground.
[0003] The desulfurization tower gypsum recovery device in the prior art usually uses an oscillator to separate solid and liquid. Its working principle is as follows: Figure 1 As shown, it includes multiple sedimentation tanks, and an oscillator is set on the side wall of the sedimentation tank. The gypsum wastewater and gypsum in the sedimentation tank are separated by the oscillation. The gypsum is naturally precipitated to the bottom of the pool to form gypsum cakes under the action of the oscillation. The gypsum wastewater is discharged after being filtered through the multi-stage sedimentation tank; however, Figure 1 The desulfurization tower gypsum recovery system also has the following problems:
[0004] (1) Due to the lack of a dosing device, the gypsum in the sedimentation tank can only naturally settle to the bottom of the pool under the action of the oscillator. This method not only has a slow sedimentation speed, but also easily causes the gypsum to disperse during the oscillation process, thereby aggravating the turbidity of the gypsum wastewater.
[0005] (2) Manual dosing is not only inefficient but also increases labor costs. Utility Model Content
[0006] In order to solve the technical defects raised in the above-mentioned background technology, the purpose of the utility model is to provide a desulfurization tower gypsum recovery system, aiming to solve the problems of poor filtration effect and slow sedimentation speed in the existing desulfurization tower gypsum recovery device.
[0007] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0008] A desulfurization tower gypsum recovery system comprises a base bracket, a sedimentation box installed on the base bracket, and an oscillating device connected to the sedimentation box, the sedimentation box is detachably connected to a dosing device, the dosing device comprises a medicine storage box and a spray head, one side of the medicine storage box is integrally formed with a hook, and the medicine storage box is hung on the side wall of the sedimentation box by the hook, the top of the medicine storage box is provided with a dosing port, the spray head is connected to the medicine storage box, and a plurality of spray holes are provided on the spray head.
[0009] Preferably, shock absorbing devices are provided at the four corners of the top of the base bracket, one end of the shock absorbing device is fixedly connected to the base bracket, and the other end is connected to the mounting guard plate.
[0010] Preferably, the medicine storage box is also equipped with a medicine sensor for real-time detection of the remaining medicine amount, and the medicine sensor is connected to an external electronic device by signal.
[0011] Preferably, the oscillating device includes an oscillator, which is used to vibrate the sedimentation box to perform solid-liquid separation, and the oscillator is fixed to the bottom end of the mounting guard plate by welding.
[0012] Preferably, a mounting guard plate is provided between the base support and the sedimentation box, and baffles are provided on the four edges of the mounting guard plate so that a mounting groove adapted to the sedimentation box is formed in the middle thereof, and the sedimentation box is placed in the mounting groove.
[0013] Preferably, a shock absorbing device is provided at the connection between the mounting guard plate and the base bracket, and two ends of the shock absorbing device are respectively fixedly connected to the base bracket and the mounting guard plate.
[0014] Preferably, the shock absorbing device includes a shock absorbing spring, a damping member and a buffer block, the buffer block is respectively arranged on the base bracket and the mounting guard plate, and the buffer block is a hollow structure, the damping member is connected to the buffer block, and the two ends of the damping member are respectively abutted against the base bracket and the mounting guard plate, and the shock absorbing spring is sleeved on the outside of the damping member.
[0015] Preferably, the sedimentation tank includes a primary sedimentation tank, a secondary sedimentation tank and an N-stage sedimentation tank, N is a positive integer greater than or equal to 2, and the top ends of the multiple sedimentation tanks are respectively connected to the output ends of the desulfurization tower; and the multiple sedimentation tanks are arranged in sequence from high to low to form a stepped shape, and the ends of the sedimentation tanks are connected to a waste liquid recovery tank.
[0016] Preferably, two adjacent sedimentation tanks are connected via an overflow pipe, one end of the overflow pipe is connected to the top outlet of the sedimentation tank of the previous stage, and the other end is connected to the upper part of the sedimentation tank of the next stage.
[0017] Preferably, the bottom of the sedimentation box is provided with strip-shaped through holes for easy transportation by forklift, and there are at least two strip-shaped through holes, and the cross-section of the strip-shaped through holes is a rectangular structure.
[0018] In summary, the beneficial effects of the utility model are:
[0019] The desulfurization tower gypsum recovery system of the utility model filters and recovers gypsum by setting up a multi-stage sedimentation box, and sets an oscillator at the bottom of the multi-stage sedimentation box to accelerate solid-liquid separation, thereby improving sedimentation efficiency; at the same time, a dosing device is set on the sedimentation box to realize automatic drug delivery, and a drug sensor is used to detect the drug inventory in real time and automatically deliver the drug in a quantitative manner, so that it reacts with the gypsum wastewater to accelerate gypsum precipitation. Since the sedimentation time is reduced, production time and energy consumption can also be saved, thereby reducing production costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a structural schematic diagram of a desulfurization tower gypsum recovery device in the prior art;
[0021] Figure 2 This is a structural schematic diagram of the desulfurization tower gypsum recovery system of the utility model;
[0022] Figure 3 yes Figure 2 An enlarged structural diagram of the drug delivery device;
[0023] Figure 4 This is a half-section view of the sulfur tower gypsum recovery system of the utility model;
[0024] Figure 5 yes Figure 4 Enlarged structural diagram of the middle shock absorber.
[0025] Description of reference numerals in the figures:
[0026] 1. Base bracket; 2. Sedimentation box; 21. Primary sedimentation box; 22. Secondary sedimentation box; 23. Tertiary sedimentation box; 24. Waste liquid recovery box; 3. Dosing device; 31. Drug storage box; 32. Spray head; 321. Spray hole; 33. Hook; 34. Drug sensor; 35. Dosing port; 36. Cover plate; 361. Hollow hole; 4. Shock absorbing device; 41. Shock absorbing spring; 42. Damping element; 43. Buffer block; 5. Mounting guard plate; 51. Mounting groove; 52. Baffle; 6. Oscillator; 7. Overflow pipe; 8. Strip through hole. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the utility model.
[0028] Those skilled in the art should understand that, in the disclosure of the present invention, the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the above terms should not be understood as limiting the present invention.
[0029] In the description of the utility model, if there is a word description such as "several", it means one or more, and the meaning of "more" is two or more. Greater than, less than, and more than are understood to exclude the number itself, and above, below, and within are understood to include the number itself. If there is a description of the first, second, and third, it is only used to distinguish the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0030] The following is combined with Figure 1-5 , an embodiment of a desulfurization tower gypsum recovery system of the utility model is further described in detail.
[0031] A desulfurization tower gypsum recovery system, such as Figure 2 , 3 As shown, it includes a base bracket 1, a sedimentation box 2 installed on the base bracket 1, a dosing device 3 is suspended on the sedimentation box 2, the dosing device 3 includes a medicine storage box 31 and a spray head 32, a hook 33 is integrally formed on one side of the medicine storage box 31, and the medicine storage box 31 is suspended on the side wall of the sedimentation box 2 through the hook 33, a medicine adding port 35 is opened on the top of the medicine storage box 31, the spray head 32 is connected to the medicine storage box 31, and a plurality of spray holes 321 are opened on the spray head 32; a medicine sensor 35 for real-time detection of the remaining medicine is also installed on the medicine storage box 31, and the medicine sensor 34 is connected to the external electronic equipment signal.
[0032] Specifically, medicine is placed in the medicine storage box 31, and the medicine can react with gypsum in gypsum wastewater to form a precipitate. There are many types of medicines to choose from, such as sodium carbonate powder. The principle is to use a chemical reaction. Sodium carbonate reacts with gypsum wastewater to form a white precipitate, and at the same time clarifies the gypsum wastewater. As long as it can react with gypsum to form a precipitate, the medicine is not limited; a dosing port 35 is provided at one end of the medicine storage box 31, and the medicine can be supplemented along the dosing port 35. At the same time, a cover plate 36 is provided at the top of the medicine storage box 31, and a plurality of hollow holes 361 are evenly provided on the top of the cover plate 36. When the gypsum wastewater is fully stored, it can flow into the medicine storage box 31 through the hollow hole 361 for reaction; in addition, the spray head 32 is installed on the medicine storage box 31, and a plurality of spray holes 321 are opened on the spray head 32. The spray head 32 can spray the sodium carbonate powder in the medicine storage box 31 into the gypsum wastewater. In order to remind the operator of the remaining medicine in the medicine storage box 31, the medicine sensor 34 arranged on the spray head 32 can detect the remaining medicine in real time and provide feedback. The medicine sensor 34 can synchronize the data with the electronic device, so that the operator can remotely monitor or control the discharge of the medicine.
[0033] In this embodiment, the oscillating device includes an oscillator, which is used to vibrate the sedimentation box for solid-liquid separation, and the oscillator is fixed to the bottom end of the mounting guard plate by welding.
[0034] Specifically, the oscillator 6 uses a vibration motor to vibrate, and a vibration transmission rod is transmission-connected to the output shaft of the vibration motor, and the other end of the vibration transmission rod is connected to the sedimentation box 2, thereby transmitting the vibration force to the sediment in the sedimentation box 2; wherein, the working principle of the oscillator 6 is: when the solid particles in the sedimentation box 2 are suspended in the liquid, the vibration force generated by the oscillator 6 is transmitted to the sediment through the vibration transmission rod, causing it to vibrate slightly, thereby promoting collision and sedimentation between the solid particles. This vibration effect can effectively improve the sedimentation efficiency and shorten the sedimentation time.
[0035] It is worth noting that the installation position of the oscillator 6 in the present invention is subject to corresponding requirements. If it is installed at the bottom, the vibration force can be uniform, so that the vibration force in all directions inside the sedimentation box 2 is uniform. If it is installed on the side wall of the sedimentation box 2, the vibration force on one side of the sedimentation box 2 close to the oscillator 6 is much greater than that on the other side, which leads to slow sedimentation efficiency and poor sedimentation effect.
[0036] In this embodiment, an installation guard plate 5 is arranged between the base bracket 1 and the sedimentation box 2, and baffles 52 for limiting the position of the sedimentation box 2 are arranged on the four edges of the installation guard plate 5, so that an installation groove 51 adapted to the sedimentation box 2 is formed in the middle, and the sedimentation box 2 is placed in the installation groove 51; a shock absorbing device 4 is arranged at the connection between the installation guard plate and the base bracket 1, and the two ends of the shock absorbing device 4 are respectively fixedly connected to the base bracket 1 and the installation guard plate 5.
[0037] Specifically, the base bracket 1 is used to support the installation of the sedimentation box 2 to prevent the sedimentation box 2 from shaking and shifting during vibration, which may cause the risk of falling. An installation guard plate 5 is set on the bottom bracket 1, and the sedimentation box 2 is placed on the installation guard plate 5. The sedimentation box 2 and the installation guard plate 5 are installed in a detachable manner. The purpose is to facilitate the cleaning of solid matter accumulated in the sedimentation box 2 after sedimentation is completed, and the baffles 52 set around the installation guard plate 5 can effectively limit the position of the sedimentation box 2.
[0038] In this embodiment, if Figure 4 , 5 As shown, shock absorbing devices 4 are arranged at the four corners of the top of the base bracket 1, one end of the shock absorbing device 4 is fixedly connected to the base bracket 1, and the other end is connected to the mounting guard plate 5; the shock absorbing device 4 includes a shock absorbing spring 41, a damping member 42 and a buffer block 43, the buffer block 43 is respectively arranged on the base bracket 1 and the mounting guard plate 5, and the buffer block 43 is a hollow structure, the damping member 42 is connected to the buffer block 43, and the two ends of the damping member 42 are respectively abutted on the base bracket 1 and the mounting guard plate 5, and the shock absorbing spring 41 is sleeved on the outside of the damping member 42.
[0039] Specifically, in order to avoid the risk of the entire sedimentation box 2 shaking and swinging simultaneously under the action of the oscillator 6 during the oscillation of the oscillator 6, which may cause displacement and fall, the utility model arranges a shock absorbing device 4 on the base bracket 1, utilizes elastic force to absorb the force generated in the vibration process, and utilizes the damping member 42 to generate a reverse force opposite to the vibration force, thereby canceling the vibration force, so that the sedimentation box 2 always remains stable. In order to further improve the buffering effect, the buffer blocks 43 arranged at both ends of the shock absorbing spring 41 can buffer and absorb the vibration force to avoid displacement of the sedimentation box 2, thereby effectively improving the sedimentation efficiency of the sedimentation box 2.
[0040] In this embodiment, the sedimentation tank 2 includes a primary sedimentation tank 21, a secondary sedimentation tank 22 and an N-stage sedimentation tank, N is a positive integer greater than or equal to 2, and the tops of the multiple sedimentation tanks 2 are respectively connected to the output end of the desulfurization tower; and the multiple sedimentation tanks 2 are arranged in sequence from high to low to form a ladder shape, and the end of the sedimentation tank 2 is connected to the waste liquid recovery tank 24; two adjacent sedimentation tanks 2 are connected through an overflow pipe 7, one end of the overflow pipe 7 is connected to the top outlet of the upper-stage sedimentation tank 2, and the other end is connected to the upper part of the lower-stage sedimentation tank 2; the bottom of the sedimentation tank 2 is provided with a strip through hole 8 that is convenient for forklift transportation, and there are at least two strip through holes 8, and the cross-section of the strip through holes 8 is a rectangular structure
[0041] Specifically, in industrial production, the sedimentation tank 2 is widely used in the solid-liquid separation process to separate the solid particles suspended in the liquid through natural sedimentation. However, due to the difference in density and size of solid particles, the sedimentation efficiency is low and the time is long. Therefore, multiple sedimentation boxes 2 are set for filtering and sedimentation to improve the sedimentation efficiency. The sedimentation boxes 2 in the utility model can be set in corresponding quantity according to actual needs. Taking three sedimentation boxes 2 as an example, from left to right, they are respectively a first-level sedimentation box 21, a second-level sedimentation box 22, and a third-level sedimentation box 23. At this time, N is equal to 3, and each level of sedimentation boxes 2 are connected through an overflow pipe 7. A switch valve is provided in the overflow pipe 7. The switch valve is used to control the flow between two adjacent sedimentation boxes 2. Since the height of each sedimentation box 2 is different, the concentration of the precipitated gypsum wastewater is also different. After step-by-step sedimentation and filtration, the last sedimentation box 2 is connected to the waste liquid recovery box 24, and the wastewater flows into the waste liquid recovery box 24. The precipitated gypsum is located at the bottom of the sedimentation box 2 to form a solid. A forklift can be used to insert the bar through hole 8 provided at the bottom of the sedimentation box 2 to replace the sedimentation box 2 and recover the sediment.
[0042] The working principle of this utility model:
[0043] When filtering and separating the lime slurry produced by the desulfurization tower, the desulfurization tower is used to add lime to treat the sulfur oxides in the flue gas of the ceramic kiln. The treated gypsum water is filtered by the graded filter on the desulfurization tower and then flows to the corresponding sedimentation tanks 2. Different levels of sedimentation tanks 2 process gypsum water with different initial concentrations. In order to increase the processing capacity of the gypsum water in the desulfurization tower, the sedimentation tank 2 is vibrated by an oscillator 6 arranged at the bottom of the sedimentation tank 2. The sedimentation efficiency of the gypsum is accelerated under the action of the vibration. At the same time, the drug is sprayed by the dosing device 3 to combine with the solids in the gypsum wastewater and precipitate to the bottom of the box. After a period of vibration, the gypsum slurry in the sedimentation tank 2 of this level flows to the sedimentation tank 21 of the next level, and in the next The gypsum slurry is vibrated and precipitated in the N-stage sedimentation box 21, and so on. After multiple stages of vibration sedimentation, the high-concentration gypsum slurry precipitated in the N-stage sedimentation box 2 is finally divided into fixed gypsum and wastewater, and the wastewater flows into the waste liquid recovery box 24. The desulfurization tower gypsum recovery system of the utility model filters and recovers gypsum by setting a multi-stage sedimentation box 2, and sets an oscillator 6 at the bottom of the multi-stage sedimentation box 2 to accelerate solid-liquid separation, thereby improving the sedimentation efficiency; at the same time, a dosing device 3 is set on the sedimentation box 2 to realize automatic drug delivery, and a drug sensor 34 is used to detect the drug inventory in real time and automatically deliver it in a quantitative manner, so that it reacts with the gypsum wastewater to accelerate gypsum precipitation. Since the precipitation time is reduced, production time and energy consumption can also be saved, thereby reducing production costs.
[0044] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A desulfurization tower gypsum recovery system, comprising a base support, a sedimentation box mounted on the base support, and an oscillating device connected to the sedimentation box, characterized in that: The sedimentation box is detachably connected to a dosing device, which includes a medicine storage box and a spray head. A hook is integrally formed on one side of the medicine storage box, and the medicine storage box is hung on the side wall of the sedimentation box through the hook. A dosing port is provided at the top of the medicine storage box. The spray head is connected to the medicine storage box, and a plurality of spray holes are provided on the spray head.
2. The desulfurization tower gypsum recovery system according to claim 1, characterized in that: The medicine storage box is also provided with a medicine sensor for real-time detection of the remaining amount of medicine, and the medicine sensor is connected to an external electronic device by signal.
3. The desulfurization tower gypsum recovery system according to claim 1, characterized in that: The oscillating device comprises an oscillator, which is used to vibrate the sedimentation box for solid-liquid separation, and the oscillator is fixed to the bottom end of the mounting guard plate by welding.
4. The desulfurization tower gypsum recovery system according to claim 1, characterized in that: A mounting guard plate is arranged between the base support and the sedimentation box, and baffles are arranged on the four edges of the mounting guard plate so that a mounting groove adapted to the sedimentation box is formed in the middle thereof, and the sedimentation box is placed in the mounting groove.
5. The desulfurization tower gypsum recovery system according to claim 4, characterized in that: A shock absorbing device is arranged at the connection between the mounting guard plate and the base bracket, and two ends of the shock absorbing device are respectively fixedly connected to the base bracket and the mounting guard plate.
6. The desulfurization tower gypsum recovery system according to claim 5, characterized in that: The shock absorbing device includes a shock absorbing spring, a damping member and a buffer block. The buffer block is respectively arranged on the base bracket and the mounting guard plate, and the buffer block is a hollow structure. The damping member is connected to the buffer block, and the two ends of the damping member are respectively abutted on the base bracket and the mounting guard plate. The shock absorbing spring is sleeved on the outside of the damping member.
7. The desulfurization tower gypsum recovery system according to claim 1, characterized in that: The sedimentation tanks include a primary sedimentation tank, a secondary sedimentation tank and an N-stage sedimentation tank, where N is a positive integer greater than or equal to 2, and the top ends of the multiple sedimentation tanks are respectively connected to the output ends of the desulfurization tower; and the multiple sedimentation tanks are arranged in sequence from high to low to form a stepped shape, and the ends of the sedimentation tanks are connected to a waste liquid recovery tank.
8. The desulfurization tower gypsum recovery system according to claim 1, characterized in that: Two adjacent sedimentation tanks are connected via an overflow pipe, one end of the overflow pipe is connected to the top outlet of the sedimentation tank of the previous stage, and the other end is connected to the upper part of the sedimentation tank of the next stage.
9. The desulfurization tower gypsum recovery system according to claim 1, characterized in that: The bottom of the sedimentation box is provided with strip-shaped through holes for easy transportation by forklift, and there are at least two strip-shaped through holes, and the cross section of the strip-shaped through holes is a rectangular structure.