Platform reinforcing device and ore storage tank

By designing a platform reinforcement device, the upper pillar, lower pillar and support connecting structure are used, combined with vibration isolation gap and conversion beam, the problem of easy damage to the vibrating screen platform beam is solved, and the structural reinforcement and stable operation of the equipment are achieved.

CN222573687UActive Publication Date: 2025-03-07MCC CAPITAL ENGINEERING & RESEARCH INC LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420688080.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2025-03-07
Estimated Expiration
2034-04-03

AI Technical Summary

Technical Problem

Vibrating screen platform beams are prone to structural damage due to vibration, resulting in insecurity and equipment failure.

Method used

A platform reinforcement device is designed, including a basic structure, upper pillar, lower pillar and support connecting structure. It is connected by pulling bolts and support members. A vibration isolation gap is provided below the upper platform beam, and the conversion beam is used to connect the upper platform beam and the upper pillar.

Benefits of technology

The vibration of the upper platform beam is effectively reduced, resonance is avoided, structural stability is enhanced, vibration is prevented to be transmitted to the lower platform, and the stable operation of the equipment is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222573687U_ABST
    Figure CN222573687U_ABST
Patent Text Reader

Abstract

The utility model discloses a platform reinforcing device and an ore storage tank. The platform reinforcing device comprises a foundation structure and a reinforcing structure, the bottom end of the lower supporting column is connected with the foundation structure; the top end of the upper supporting column is connected with the upper platform beam; the bottom end of the upper supporting column is connected with the top end of the lower supporting column through the supporting connecting structure, the lower platform below the upper platform beam is located between the upper supporting column and the lower supporting column, and vibration isolation gaps are formed between the lower platform and the upper supporting column and between the lower platform and the lower supporting column. Resonance caused by the fact that the natural vibration frequency of the upper platform beam of the vibrating screen platform is close to the vibration frequency of a vibrating screen can be avoided, vibration of the upper platform beam of the vibrating screen platform is reduced, the vibration can be transmitted to a base structure, structural damage of the upper platform beam caused by vibration is avoided, reinforcing of the upper platform beam is achieved, and the service life of the vibrating screen platform is prolonged. And the vibration can be prevented from being transmitted to the weighing platform, so that the stable operation of the weighing device on the weighing platform can be ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of smelting engineering facilities, in particular to a platform reinforcement device and an ore storage tank. Background Art

[0002] The ore storage tank is an indispensable structure in the ironmaking project. The raw materials of the blast furnace (such as ore powder, pellets, coke, etc.) need to be stored in the ore storage tank, and then put into the blast furnace in batches through the belt. In order to avoid problems caused by the powdered or broken raw materials being put into the blast furnace, Figure 1 As shown, a vibrating screen 50 needs to be installed at the discharge port of the tank body 40 of the ore storage tank 100. The vibrating screen 50 needs to vibrate horizontally or vertically to remove the powdered or broken raw materials from the qualified raw materials. The vibrating screen 50 is installed on the vibrating screen platform 20. If the vibration frequency of the vibrating screen 50 is close to the natural frequency of the vibrating screen platform beam (also defined as the upper platform beam 201), resonance will occur, causing the vibration of the vibrating screen platform beam. Excessive vibration will make the operator feel uncomfortable or unsafe, and even cause structural damage to the vibrating screen platform beam. Utility Model Content

[0003] The utility model aims to provide a platform reinforcement device and an ore storage tank to solve the technical problem that the existing platform beam of the vibrating screen is easily damaged by vibration.

[0004] The above-mentioned purpose of the utility model can be achieved by adopting the following technical solutions:

[0005] The utility model provides a platform reinforcement device, comprising: a basic structure; at least one lower support, whose bottom end is connected to the basic structure; at least one upper support, whose top end is connected to at least one upper platform beam; at least one supporting connection structure, the bottom end of the upper support and the top end of the lower support are connected through the supporting connection structure, the lower platform below the upper platform beam is located between the upper support and the lower support, and there are vibration isolation gaps between the lower platform and the upper support and the lower support.

[0006] In an embodiment of the utility model, the supporting connection structure includes a plurality of tension bolts and a plurality of support members, the bottom end of the upper support is provided with an upper bottom end plate, the top end of the lower support is provided with a lower top end plate, the upper bottom end plate is connected by a plurality of the tension bolts, and the plurality of support members are fixed between the upper bottom end plate and the lower top end plate, and the vibration isolation gap is formed between the lower platform and the upper bottom end plate and the lower top end plate.

[0007] In the implementation manner of the utility model, the vibration isolation gap is 40mm-60mm.

[0008] In an embodiment of the utility model, a lower bottom end plate is provided at the bottom end of the lower pillar, and the lower bottom end plate is connected to the base structure through a plurality of anchor bolt structures. The anchor bolt structure includes an anchor bolt and a clamping nut. The bottom end of the anchor bolt is anchored in the base structure, and the top end of the anchor bolt passes through the lower bottom end plate and is connected to the clamping nut.

[0009] In an embodiment of the utility model, the top end of the anchor bolt passes through the lower bottom end plate with a reserved length, and the lower support column can move upward relative to the anchor bolt by the reserved length to form a secondary pouring space between the lower support column and the foundation structure, and the secondary pouring space is used to pour concrete to form a secondary pouring layer.

[0010] In the implementation manner of the utility model, the reserved length is 40mm-60mm.

[0011] In the implementation manner of the present utility model, the foundation structure is a reinforced concrete foundation structure.

[0012] In an implementation manner of the utility model, the reinforcement device further comprises a conversion beam, and the top end of the upper support column is connected to the upper platform beam via the conversion beam.

[0013] In an embodiment of the utility model, at least one connecting plate is provided on the top surface of the conversion beam, and the connecting plate has a bottom plate and two side plates arranged opposite to each other and connected to the bottom plate, the bottom plate is fixed to the top surface of the conversion beam, and at least one upper platform beam is inserted between the two side plates of at least one connecting plate and fixedly connected to the inner side surfaces of the two side plates.

[0014] In the implementation manner of the utility model, an upper platform plate is fixed on the upper platform beam, and the outer side surfaces of the two side plates of the connecting plate are also connected to the upper platform plate through a plurality of connecting bolts.

[0015] In an implementation manner of the utility model, the number of the upper pillars, the number of the lower pillars and the supporting connection structure are correspondingly set to be multiple, and the multiple upper pillars are connected to the multiple lower pillars through the multiple supporting connection structures.

[0016] The utility model also provides a ore storage tank, comprising the above-mentioned platform reinforcement device, the ore storage tank also includes a main support structure, a tank body, a vibrating screen and a weighing device, the tank body is installed on the main support structure, the main support structure is provided with a vibrating screen platform and a weighing platform, the vibrating screen platform is located below the tank body, the vibrating screen is installed on the vibrating screen platform, the weighing platform is located below the vibrating screen platform beam, the weighing device is installed on the weighing platform beam, the upper platform beam of the vibrating screen platform is reinforced by the platform reinforcement device, and there is a vibration isolation gap between the weighing platform and the upper support and lower support of the platform reinforcement device.

[0017] The characteristics and advantages of this utility model are:

[0018] The platform reinforcement device of the utility model can, on the one hand, reduce the span of the upper platform beam under the support of multiple upper pillars, change the natural frequency of the upper platform beam, avoid resonance between the upper platform beam and the equipment installed on the upper platform, thereby reducing the vibration of the upper platform beam; on the other hand, it can transmit the vibration of the upper platform beam to the foundation structure through the upper pillars, the supporting connecting structure and the lower pillars, and because there are vibration isolation gaps between the lower platform and the upper pillars and the lower pillars, it can avoid the vibration being transmitted to the lower platform and affecting the stability of the lower platform, thereby ensuring that the equipment installed on the lower platform can operate stably.

[0019] The ore storage trough of the utility model can prevent the resonance caused by the natural frequency of the upper platform beam of the vibrating screen platform being close to the vibration frequency of the vibrating screen, thereby reducing the vibration of the upper platform beam of the vibrating screen platform, and can transmit the vibration of the upper platform beam of the vibrating screen platform to the basic structure, thereby preventing the structural damage of the upper platform beam of the vibrating screen platform due to vibration, realizing the reinforcement of the upper platform beam of the vibrating screen platform, and can also prevent the vibration from being transmitted to the weighing platform, thereby ensuring that the weighing device on the weighing platform can operate stably. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0021] Figure 1 It is a structural schematic diagram of a ore storage tank in the prior art.

[0022] Figure 2 It is a structural schematic diagram of the platform reinforcement device in the utility model.

[0023] Figure 3 for Figure 2 Enlarged view of point Ⅰ in the middle.

[0024] Figure 4 for Figure 3 Side view at AA.

[0025] Figure 5 for Figure 3 Top view of the center BB.

[0026] Figure 6 for Figure 2 Enlarged view of point II in the middle.

[0027] Figure 7 for Figure 6 Side view at mid-CC.

[0028] Figure 8 for Figure 7 Top view at DD in the middle.

[0029] Fig. 9 for Figure 7 Top view at EE in the middle.

[0030] Fig.10 for Figure 2 Enlarged view of point III in the middle.

[0031] Fig.11 for Fig.10 Top view at FF.

[0032] Fig.12 It is a structural schematic diagram of the secondary perfusion layer in the utility model.

[0033] In the figure:

[0034] 100, ore storage tank; 10, main support structure; 20, vibrating screen platform; 201, upper platform beam; 202, upper platform plate; 30, weighing platform; 301, lower platform beam; 302, lower platform plate; 40, tank body; 50, vibrating screen; 60, weighing device;

[0035] 1. Upper support; 11. Upper top plate; 12. Upper bottom plate; 13. Upper stiffening plate; 14. Upper bolt hole;

[0036] 2. Lower support; 21. Lower top plate; 22. Lower bottom plate; 23. Lower stiffening plate; 24. Lower bolt hole;

[0037] 3. Support connection structure; 31. Support member; 32. Tension bolt; 33. Vibration isolation gap;

[0038] 4. Transfer beam; 41. Web plate; 42. Upper wing plate; 43. Lower wing plate; 44. Beam stiffening plate; 45. Connecting plate; 451. Bottom plate; 452. Side plate; 46. Connecting bolts; 47. Fixing plate;

[0039] 5. Foundation structure; 51. Steel bars; 52. Plum-shaped bars; 53. Anchor bolts; 54. Compression nuts; 55. Pads;

[0040] 6. Secondary irrigation layer. DETAILED DESCRIPTION

[0041] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0042] Implementation Method 1

[0043] like Figure 2 As shown, the utility model provides a platform reinforcement device, including: a basic structure 5; at least one lower pillar 2, whose bottom end is connected to the basic structure 5; at least one upper pillar 1, whose top end is connected to at least one upper platform beam 201; at least one supporting connection structure 3, the bottom end of the upper pillar 1 and the top end of the lower pillar 2 are connected through the supporting connection structure 3, the lower platform below the upper platform beam 201 is located between the upper pillar 1 and the lower pillar 2, and there is a vibration isolation gap 33 between the lower platform and the upper pillar 1 and the lower pillar 2.

[0044] Among them, an upper platform beam 201 is provided with an upper platform plate 202, thereby forming an upper platform; the lower platform includes a lower platform beam 301 and a lower platform plate 302 provided on the lower platform beam 301. In the embodiment of the utility model, the upper platform beam 201 and the lower platform beam 301 are both concrete beams. Optionally, the upper platform beam 201 and the lower platform beam 301 can also be steel beams. Figure 1 As shown, the upper platform beam 201 and the lower platform beam 301 can be erected on a main support structure 10 such as a support frame and a support wall.

[0045] The platform reinforcement device of the utility model, on the one hand, can reduce the span of the upper platform beam 201 under the support of multiple upper pillars 1, change the natural frequency of the upper platform beam 201, avoid resonance between the upper platform beam 201 and the equipment installed on the upper platform, thereby reducing the vibration of the upper platform beam 201; on the other hand, it can transmit the vibration of the upper platform beam 201 to the foundation structure 5 via the upper pillar 1, the supporting connection structure 3 and the lower pillar 2, and because there is a vibration isolation gap 33 between the lower platform and the upper pillar 1 and the lower pillar 2, it can avoid the vibration from being transmitted to the lower platform and affecting the stability of the lower platform beam 301, thereby ensuring that the equipment installed on the lower platform can operate stably.

[0046] Combination Figure 1 and Figure 2 As shown, the platform reinforcement device of the utility model is particularly suitable for reinforcing the vibrating screen platform 20 of the ore storage tank, so as to avoid the resonance caused by the natural frequency of the supporting beam (i.e., the upper platform beam 201) of the vibrating screen platform 20 being close to the vibration frequency of the vibrating screen 50, thereby reducing the vibration of the upper platform beam 201 of the vibrating screen platform 20, and can transmit the vibration of the upper platform beam 201 of the vibrating screen platform 20 to the basic structure 5, thereby avoiding the structural damage of the upper platform beam 201 of the vibrating screen platform 20 due to vibration, realizing the reinforcement of the upper platform beam 201 of the vibrating screen platform 20, and can also avoid the vibration from being transmitted to the weighing platform 30, thereby ensuring that the weighing device 60 on the weighing platform 30 can operate stably.

[0047] Of course, the platform reinforcement device of the utility model can also be used to reinforce the platforms of other equipment as needed, which can also produce the above-mentioned beneficial effects.

[0048] Specific, combined Figure 2 As shown, the upper support 1 and the lower support 2 can be selected in different sizes, shapes and / or materials according to the reinforcement requirements. In this embodiment, the upper support 1 and the lower support 2 are both circular steel pipe columns with high support strength and easy installation. Optionally, the upper support 1 and the lower support 2 can also be square steel pipe columns. Optionally, the upper support 1 and the lower support 2 can also be a main support structure 10 made of channel steel, H-shaped steel or other steel. And the number of upper support 1, support connection structure 3 and lower support 2 can be set to one or more according to the number of upper platform beams 201 and reinforcement requirements. For example, in some embodiments of the utility model, the number of upper platform beams 201 is multiple, and multiple upper platform beams 201 are arranged in parallel. The number of upper support 1, support connection structure 3 and lower support 2 is correspondingly arranged, and is arranged at intervals along the arrangement direction of multiple upper platform beams 201. The lower platform beam 301 is arranged perpendicular to the upper platform beam 201 in space. When the number of support connection structures 3 is set to multiple, multiple support connection structures 3 are arranged at intervals along the axial direction of the lower platform beam 301.

[0049] Of course, if the stability of the upper platform is to be further improved, the upper platform beam 201 may be provided with a plurality of beams 201 extending in the axial direction thereof (i.e., in the longitudinal direction thereof). Figure 2 A plurality of upper pillars 1, supporting connection structures 3 and lower pillars 2 are arranged at intervals (in a direction perpendicular to the page).

[0050] like Figure 2 As shown, when the installation space below the upper platform beam 201 is limited and the upper pillar 1 cannot be installed directly below the upper platform beam 201, the upper pillar 1 can be connected to the upper platform beam 201 through the conversion beam 4, so that the upper pillar 1 is arranged below the upper platform beam 201. Wherein, when there are multiple upper platform beams 201, multiple upper platform beams 201 are arranged in parallel, the conversion beam 4 is extended along the arrangement direction of the multiple upper platform beams 201 and is located below the multiple upper platform beams 201, and the number of upper pillars 1 is preferably set to multiple, and of course it can also be set to one. In order to improve the stability of the structure, the platform reinforcement device is symmetrically arranged relative to the distribution center of the multiple upper platform beams 201. When the number of the upper platform beam 201 is one, multiple upper pillars 1 are connected to the conversion beam 4. In order to improve the stability of the structure, the platform reinforcement device is symmetrically arranged relative to the central axis of the upper platform beam 201, that is, the center of the conversion beam 4 and the distribution center of the multiple upper pillars 1 are both located directly below the central axis of the upper platform beam 201.

[0051] Combination Figure 3 , Figure 4 as well as Figure 5 As shown, in order to ensure the stability of the connection between the conversion beam 4 and the upper platform beam 201, a connection plate 45 is provided on the top surface of the conversion beam 4. The connection plate 45 has a bottom plate 451 and two side plates 452 arranged opposite to and connected to the bottom plate 451. The bottom plate 451 is fixed to the top surface of the conversion beam 4, and the upper platform beam 201 is inserted between the two side plates 452 of the connection plate 45 and fixedly connected to the inner side surfaces of the two side plates 452. The number of the connection plates 45 can be set to one or more according to the number of the upper platform beams 201. For example, in the embodiment of the present utility model, the number of the connection plates 45 is multiple, and multiple upper platform beams 201 are correspondingly inserted between the two side plates 452 of multiple connection plates 45.

[0052] Specifically, the connecting plate 45 is generally a U-shaped steel plate structure. Mud is poured between the connecting plate 45 and the upper platform beam 201, so that the bottom surface of the upper platform beam 201 and the top surface of the bottom plate 451 are closely fitted, and the two side surfaces of the upper platform beam 201 and the inner side surfaces of the two side plates 452 are closely fitted. The bottom surface of the bottom plate 451 is welded and fixed to the top surface of the conversion beam 4. The conversion beam 4 is generally an H-shaped steel beam structure, including an upper wing plate 42, a lower wing plate 43 and a web 41. The web 41 is connected between the upper wing plate 42 and the lower wing plate 43. The upper wing plate 42 is welded to the bottom plate 451 of the connecting plate 45, and the lower wing plate 43 is welded to the upper top plate 11 set at the top of the upper support 1. In addition, in order to improve the structural strength of the conversion beam 4, a plurality of beam stiffening plates 44 are also provided on both sides of the web 41 to connect with the upper wing plate 42 and the lower wing plate 43.

[0053] Combination Figure 3 As shown, in order to further improve the stability of the connection between the transfer beam 4 and the upper platform, the outer side surfaces of the two side plates 452 of each connecting plate 45 are also connected to the upper platform plate 202 through a plurality of connecting bolts 46. Specifically, the plurality of connecting bolts 46 are distributed on both sides of the upper platform beam 201. Figure 4 As shown, a fixing plate 47 is disposed on the upper platform plate 202, and the bottom ends of a plurality of connecting bolts 46 pass through the fixing plate 47 in sequence to weld the upper platform plate 202 to the outer side surface of the corresponding side plate 452 below. The fixing plate 47 is a steel plate.

[0054] Of course, if the installation space below the upper platform beam 201 is not restricted by other equipment and the upper support 1 can be installed directly below the upper platform beam 201, the conversion beam 4 can be omitted and the lower support 2 can be directly connected to the upper platform beam 201 through the above-mentioned connecting plate 45 and connecting bolts 46.

[0055] like Figure 6 As shown, in the embodiment of the utility model, the support connection structure 3 includes a plurality of tension bolts 32 and a plurality of support members 31, the bottom end of the upper support 1 is provided with an upper bottom end plate 12, the top end of the lower support 2 is provided with a lower top end plate 21, the upper bottom end plate 12 is connected by a plurality of tension bolts 32, and a plurality of support members 31 are fixed between the upper bottom end plate 12 and the lower top end plate 21, and vibration isolation gaps 33 are formed between the lower platform and the upper bottom end plate 12 and the lower top end plate 21. The upper support 1 and the lower support 2 are connected by a plurality of tension bolts 32, and the plurality of support members 31 are used to support and limit between the upper support 1 and the lower support 2, ensuring that a vibration isolation gap 33 is formed between the lower platform and the upper bottom end plate 12 of the upper support 1 and the lower top end plate 21 of the lower support 2, so that the vibration of the upper support 1 is transmitted to the lower support 2 through the plurality of support members 31, and is not directly transmitted to the lower platform beam 301.

[0056] Specific, combined Figure 7 , Figure 8 as well as Fig. 9 As shown, a vibration isolation gap 33 is formed between the lower platform plate 302 and the upper bottom end plate 12, and a vibration isolation gap 33 is also formed between the bottom surface of the lower platform beam 301 and the lower top plate 21. The vibration isolation gap 33 is 40mm-60mm, preferably 50mm. The support member 31 is preferably made of angle steel, which has good supporting strength. The top of the support member 31 is welded and fixed to the bottom surface of the upper bottom end plate 12, and the bottom end of the support member 31 is welded and fixed to the top surface of the lower top plate 21. The upper bottom end plate 12 and the lower top plate 21 are both generally square steel plate structures, and four support members 31 are distributed at the four corners of the upper bottom end plate 12 and the lower top plate 21. The four corners of the upper bottom end plate 12 and the lower top plate 21 are provided with a plurality of upper bolt holes 14 and a plurality of lower bolt holes 24 for passing a plurality of tension bolts 32. In order to improve the stability of the support, multiple support members 31 and multiple tension bolts 32 are distributed on both sides of the lower platform beam 301. The support members 31 and tension bolts 32 on one side directly connect the upper bottom end plate 12 and the lower top end plate 21 from the side of the lower platform beam 301 and the lower platform plate 302, and the support members 31 and tension bolts 32 on the other side need to pass through the hole opened on the lower platform plate 302 to connect the upper bottom end plate 12 and the lower top end plate 21. In addition, in order to improve the stability of the upper bottom end plate 12 and the lower top end plate 21, multiple upper stiffening plates 13 are arranged at intervals along the circumference on the side of the upper support 1 and connected to the upper bottom end plate 12, and multiple lower stiffening plates 23 are arranged at intervals along the circumference on the side of the lower support 2 and connected to the lower top end plate 21.

[0057] like Fig.10 As shown, in the embodiment of the utility model, a lower bottom end plate 22 is provided at the bottom end of the lower pillar 2, and the lower bottom end plate 22 is connected to the base structure 5 through a plurality of anchor bolt structures. The anchor bolt structure includes an anchor bolt 53 and a clamping nut 54. The bottom end of the anchor bolt 53 is anchored in the base structure 5, and the top end of the anchor bolt 53 passes through the lower bottom end plate 22 and is connected to the clamping nut 54, thereby ensuring the stability of the connection between the lower pillar 2 and the base structure 5.

[0058] Specifically, the foundation structure 5 is preferably a reinforced concrete foundation structure, that is, the foundation structure 5 is cast by concrete, and a plurality of foundation steel bars 51 are embedded along its length and width. In addition, in order to improve the stability of the foundation structure 5, a plurality of plum blossom ribs 52 are also provided in the foundation structure 5, and the plurality of plum blossom ribs 52 are embedded in the floor, so that the foundation structure 5 and the floor are connected as a whole. A pad 55 is sandwiched between the clamping nut 54 and the lower bottom end plate 22. Fig.11 As shown, a plurality of anchor bolts 53 are arranged at intervals along the circumference of the lower support 2 .

[0059] Combination Fig.10 and Fig.12As shown, in order to prevent the foundation structure 5 from settling later and failing to provide effective support for the lower pillar 2, in the embodiment of the utility model, the top of the anchor bolt 53 passes through the lower bottom end plate 22 with a reserved length, and the lower pillar 2 can move upward relative to the anchor bolt 53 by the reserved length to form a secondary pouring space between the lower pillar 2 and the foundation structure 5, and the secondary pouring space is used to pour concrete to form a secondary pouring layer 6. When the foundation structure 5 settles later, the clamping nut 54 can be removed or screwed upward by the reserved length, and then the lower pillar 2 is lifted up by the reserved length, so that the gap space formed between the lower bottom end plate 22 of the lower pillar 2 and the foundation structure 5 is used to form a secondary pouring space, and then concrete is poured into the secondary pouring space to solidify to form a secondary pouring layer 6. Specifically, the reserved length is 40mm-60mm, preferably 50mm.

[0060] Implementation Method 2

[0061] Combination Figure 1 and Figure 2 As shown, the utility model also provides a ore storage tank, including a platform reinforcement device. The platform reinforcement device in this embodiment has the same specific structure, working principle and beneficial effects as the platform reinforcement device in the first embodiment, which will not be repeated here.

[0062] like Figure 1 As shown, the more specific structure of the ore storage tank is the same as the prior art, and also includes a main support structure 10, a tank body 40, a vibrating screen 50 and a weighing device 60. The tank body 40 is installed on the main support structure 10, and the main support structure 10 is provided with a vibrating screen platform 20 and a weighing platform 30. The vibrating screen platform 20 is located below the tank body 40, the vibrating screen 50 is installed on the vibrating screen platform 20, the weighing platform 30 is located below the beam of the vibrating screen platform 20, and the weighing device 60 is installed on the beam of the weighing platform 30.

[0063] like Figure 2 As shown, the ore storage tank of the utility model is different from the ore storage tank 100 of the prior art: the upper platform beam 201 of the vibrating screen platform 20 is reinforced by a platform reinforcement device, and a vibration isolation gap 33 is provided between the weighing platform 30 and the upper support 1 and the lower support 2 of the platform reinforcement device.

[0064] The above are only several embodiments of the present invention. Those skilled in the art can make various changes or modifications to the embodiments of the present invention based on the contents disclosed in the application documents without departing from the spirit and scope of the present invention.

Claims

1. A platform reinforcement device, characterized in that: include: Infrastructure; at least one lower support, the bottom end of which is connected to the base structure; at least one upper support, the top end of which is connected to at least one upper platform beam; At least one supporting connection structure, the bottom end of the upper support and the top end of the lower support are connected through the supporting connection structure, the lower platform below the upper platform beam is located between the upper support and the lower support, and there is a vibration isolation gap between the lower platform and the upper support and the lower support.

2. The platform reinforcement device according to claim 1, characterized in that: The supporting connection structure includes a plurality of tension bolts and a plurality of support members, the bottom end of the upper support is provided with an upper bottom end plate, the top end of the lower support is provided with a lower top end plate, the upper bottom end plate is connected by a plurality of the tension bolts, and the plurality of support members are fixed between the upper bottom end plate and the lower top end plate, and the vibration isolation gap is formed between the lower platform and the upper bottom end plate and the lower top end plate.

3. The platform reinforcement device according to claim 1, characterized in that: The vibration isolation gap is 40mm-60mm.

4. The platform reinforcement device according to claim 1, characterized in that: The bottom end of the lower support is provided with a lower bottom end plate, and the lower bottom end plate is connected to the base structure through a plurality of anchor bolt structures. The anchor bolt structure includes an anchor bolt and a clamping nut. The bottom end of the anchor bolt is anchored in the base structure, and the top end of the anchor bolt passes through the lower bottom end plate and is connected to the clamping nut.

5. The platform reinforcement device according to claim 4, characterized in that: The top end of the anchor bolt passes through the lower end plate with a reserved length, and the lower support column can move upward relative to the anchor bolt by the reserved length to form a secondary pouring space between the lower support column and the foundation structure, and the secondary pouring space is used to pour concrete to form a secondary pouring layer.

6. The platform reinforcement device according to claim 5, characterized in that: The reserved length is 40mm-60mm.

7. The platform reinforcement device according to claim 1, characterized in that: The foundation structure is a reinforced concrete foundation structure.

8. The platform reinforcement device according to claim 1, characterized in that: The reinforcement device also includes a conversion beam, and the top end of the upper support is connected to the upper platform beam through the conversion beam.

9. The platform reinforcement device according to claim 8, characterized in that: At least one connecting plate is provided on the top surface of the conversion beam, and the connecting plate has a bottom plate and two side plates arranged opposite to each other and connected to the bottom plate, the bottom plate is fixed to the top surface of the conversion beam, and at least one upper platform beam is inserted between the two side plates of at least one connecting plate and fixedly connected to the inner side surfaces of the two side plates.

10. The platform reinforcement device according to claim 9, characterized in that: An upper platform plate is fixed on the upper platform beam, and the outer side surfaces of the two side plates of the connecting plate are also connected to the upper platform plate through a plurality of connecting bolts.

11. The platform reinforcement device according to claim 1, characterized in that: The number of the upper pillars, the number of the lower pillars and the supporting connection structure are correspondingly set to be multiple, and the multiple upper pillars are connected to the multiple lower pillars through the multiple supporting connection structures.

12. A ore storage tank, characterized in that: The platform reinforcement device comprises the platform reinforcement device described in any one of claims 1 to 11, wherein the ore storage tank further comprises a main supporting structure, a tank body, a vibrating screen and a weighing device, wherein the tank body is installed on the main supporting structure, and the main supporting structure is provided with a vibrating screen platform and a weighing platform, wherein the vibrating screen platform is located below the tank body, the vibrating screen is installed on the vibrating screen platform, the weighing platform is located below the vibrating screen platform beam, the weighing device is installed on the weighing platform beam, the upper platform beam of the vibrating screen platform is reinforced by the platform reinforcement device, and there is a vibration isolation gap between the weighing platform and the upper and lower pillars of the platform reinforcement device.