A stress verification method for the anchor structure of a prefabricated viaduct steel column

By welding the column base flanges at the bottom of the viaduct steel columns, and embedding multi-layer flanges in the concrete bearing Taichung, and connecting anchor bolts, the problem that the existing anchor structure cannot adapt to under high stress is solved, and the problem of the existing anchor structure being unable to adapt to the situation of high stress is achieved. Steady anchoring and prefabricated assembly functions of steel columns on concrete support.

CN107268441BActive Publication Date: 2024-11-29SHANGHAI MUNICIPAL ENG DESIGN INST (GRP) CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN201710378658.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2017-05-25
Publication Date
2024-11-29
Estimated Expiration
2037-05-25

AI Technical Summary

Technical Problem

The existing viaduct steel column anchor structure cannot be effectively adapted under high stress, which can easily lead to the yield of the concrete bearing and local flange instability.

Method used

Using prefabricated assembled anchor structure, by welding the column base flanges at the bottom of the steel columns and pre-built at least two layers of flanges arranged up and down in the concrete bearing Taichung, the stress area and contact area of ​​the concrete are increased by bolts. , strengthen the bonding force between steel and concrete, and conduct stress verification to determine the final dimensions.

Benefits of technology

It realizes efficient anchoring of steel columns on the concrete support platform to avoid concrete yield and flange instability, and maintain stability when subjected to eccentric axial compression and bending moment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN107268441B_ABST
    Figure CN107268441B_ABST
Patent Text Reader

Abstract

The present invention discloses an anchoring structure for prefabricated and assembled steel columns of viaducts, which is characterized in that a column base flange is welded at the bottom of the steel column, and at least two layers of flanges arranged up and down are pre-embedded in the concrete cap, the at least two layers of flanges are connected by anchor bolts, and the upper ends of the anchor bolts extend above the concrete cap, and the column base flange is connected to the anchor bolts. The present invention disperses and transmits the large and complex forces on the steel column from the three surfaces in contact with concrete, namely the column base flange, the upper flange, and the lower flange, to the concrete cap through an anchoring system composed of flanges and anchor bolts. The present invention can more efficiently anchor the viaduct steel column to the concrete cap, while realizing the function of prefabrication and assembly, and the cap concrete is not easily damaged when subjected to large eccentric axial pressure and bending moment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of anchoring of viaduct steel columns and concrete caps, and in particular to a stress checking method for the anchoring structure of prefabricated assembled viaduct steel columns, which can more effectively anchor the viaduct steel columns on the concrete caps and realize the function of prefabrication and assembly. Background Art

[0002] In the past, viaduct columns were basically made of concrete. With the improvement of economic and technological levels, and the country's strong promotion of prefabricated buildings, the use of steel columns has become more and more common, and the anchoring structure of steel columns has also received more and more attention. The existing anchoring structures generally have the following two forms: (1) direct insertion, and (2) embedded steel bars or prestressed cable anchoring.

[0003] These two types of anchoring structures can be barely used when the stress on the steel column is not too large. However, when some important structures, such as elevated bridge columns, are subjected to large and complex stress at the base, these two types of anchoring structures cannot adapt well. For example, when the direct insertion type is subjected to a large bending moment at the base of the column, one side of the joint with the concrete is prone to cracking. When the embedded steel bar or prestressed cable anchoring type is subjected to a large axial force and a large bending moment at the base of the column, the stress area of ​​the contact surface of the pedestal concrete is small, which can easily cause the pedestal concrete to yield.

[0004] Therefore, a more efficient anchoring structure is needed to adapt to the application development of steel columns. Summary of the invention

[0005] The purpose of the present invention is to provide a stress verification method for the anchoring structure of a prefabricated and assembled viaduct steel column, which can more efficiently anchor the viaduct steel column on a concrete cap and realize the function of prefabrication and assembly.

[0006] In order to achieve the above-mentioned purpose, the technical solution of the present invention is: a stress verification method for the anchoring structure of a prefabricated assembled viaduct steel column, characterized in that a column base flange is welded at the bottom of the steel column, and at least two layers of flanges arranged up and down are pre-embedded in the concrete pedestal, and the at least two layers of flanges are connected by anchor bolts, and the upper ends of the anchor bolts extend to above the concrete pedestal, penetrate into the bolt holes of the column base flange, and are fixed by nuts.

[0007] Preferably, the column base flange is composed of two layers of upper and lower steel plates and a stiffening column steel plate in the middle, which greatly enhances the rigidity of the flange and avoids local instability of the flange due to insufficient rigidity within the plane of a single layer of steel plate.

[0008] Since the strength of concrete is only a fraction of that of steel, under the same stress conditions, the stress area of ​​concrete must be increased to avoid the situation where concrete yields first. Preferably, at least two layers of flanges, an upper flange and a lower flange, are pre-embedded in the concrete of the base. Each layer of flange consists of an upper and lower layer of steel plates and a middle web and reinforcement. This increases the contact area between the flange and the concrete of the base, enhances the bonding strength between steel and concrete, and allows internal forces to be transmitted more smoothly between steel and concrete. It also greatly increases the self-generated stiffness of the flange, avoiding local instability of the flange due to insufficient stiffness within the plane of a single-layer steel plate.

[0009] Furthermore, in order to prevent the local instability of the flange, after the sizes of the upper flange, lower flange, anchor bolts and column base flange are preliminarily set, the anchor structure is stress-checked according to the following steps to determine the final size, wherein a number of anchor bolts are set on the four sides of the steel column:

[0010] A. Check the stress of anchor bolts. Calculate the maximum axial force of an anchor bolt P = (Nx / n) + (My / Wy1), where Nx is the pressure on the top of the column, n is the number of anchor bolts, My is the bending moment on the bottom of the column, and Wy1 is the section coefficient. Calculate the stress of the anchor bolt δs = P / As, where As is the effective area of ​​a single anchor bolt, and determine whether the stress of the anchor bolt is less than the stress threshold;

[0011] B. Calculation of the stress of the flange at the base of the column.

[0012] B1. According to the corresponding compressive stress verification method, flange stiffening thickness

[0013] Calculate tr1.req = P / (2*be*δba) and determine whether it is less than the designed flange stiffening thickness;

[0014] B2. Calculation of flange stiffening compressive stress

[0015] Calculate δb = P / (2*be*tr) and determine whether it is less than the allowable compression stress;

[0016] B3. Verify flange stiffening thickness according to corresponding shear stress

[0017] Calculate tr2.req = P / {2(Hb-2*Rs)*δa} and determine whether it is less than the designed flange stiffening thickness;

[0018] B4. Calculation of flange stiffening shear stress

[0019] Calculate τb = P / {2(Hb-2*Rs)*tr} and determine whether it is less than the allowable shear stress;

[0020] B5. Stress calculation of flange steel plate

[0021] Calculate the stress of the steel plate δu=M*yu / I, and determine whether it is less than the allowable compression stress;

[0022] Calculate the stress of the lower steel plate δL=M*yL / I, and determine whether it is less than the allowable compression stress;

[0023] Among them, be is the effective length of the stiffener under compression, δba is the allowable compression stress, tr is the thickness of the flange stiffener, Hb is the stiffener height, Rs is the height of the through-weld hole, yu is the distance from the upper steel plate to the neutral axis, yL is the distance from the lower steel plate to the neutral axis, and I is the section stiffness;

[0024] C. Upper flange stress verification

[0025] C1. Corresponding to the allowable compressive stress of concrete, calculate the width of the upper flange steel plate

[0026] Calculate bf.req = P / (δca*L) and determine whether it is less than the design width;

[0027] C2. Check the actual concrete stress.

[0028] Calculate δb = P / (bf*L) and determine whether it is less than the allowable compressive stress of concrete;

[0029] C3. According to the corresponding shear stress, the web thickness is calculated

[0030] Calculate tw.req = P / (4*τa*Hw) to determine whether it is less than the design thickness;

[0031] C4. Upper flange steel plate thickness verification

[0032] Calculate δc = P / {2*(tw*bw+tr*bd)} and determine whether it is less than the allowable compression stress;

[0033] Where δca is the allowable compressive stress of concrete, L is the anchor bolt spacing, bf is the width of the upper flange steel plate, tw is the web thickness, bw is the effective force-bearing length corresponding to the web and nut, tr is the flange stiffener thickness, and bd is the effective force-bearing length corresponding to the stiffener and nut.

[0034] The present invention transmits the large and complex forces on the steel column to the concrete cap through the anchoring system composed of flanges and anchor bolts from the three surfaces of the column base flange, upper flange and lower flange that are in contact with concrete. The present invention can more efficiently anchor the viaduct steel column to the concrete cap, while realizing the function of prefabrication and assembly, and is not easily damaged when subjected to large eccentric axial pressure and bending moment. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 This is a schematic diagram of an existing anchoring structure.

[0036] Figure 2 It is another existing simplified diagram of anchoring structure.

[0037] Figure 3 It is a structural schematic diagram of an embodiment of the present invention.

[0038] Figure 4 It is a force diagram of an embodiment of the present invention.

[0039] Figure 5 It is a schematic elevation view of a flange structure of a column base according to an embodiment of the present invention.

[0040] Figure 6 for Figure 5 Floor plan of the building.

[0041] Figure 7 It is a schematic elevation view of an upper flange or lower flange structure according to an embodiment of the present invention.

[0042] Figure 8 for Figure 7 Floor plan of the building.

[0043] The figure includes: steel column 1, concrete cap 2, column base flange 3, anchor bolts 4, upper flange 5, lower flange 6, steel bars or prestressed cables 7, steel plates 8, webs 9, and stiffeners 10. DETAILED DESCRIPTION

[0044] The following describes the implementation of the present invention through specific examples and in conjunction with the accompanying drawings. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific examples, and the details in this specification can also be modified and changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.

[0045] The present invention is an anchoring structure for a prefabricated and assembled viaduct steel column, which mainly comprises a steel column 1 and a concrete pedestal 2, a column base flange 3, anchor bolts 4, an upper flange 5, and a lower flange 6. The present invention is characterized in that a column base flange 3 is welded at the bottom of the steel column 1, an upper flange 5 and a lower flange 6 are pre-embedded in the concrete pedestal 2, corresponding bolt holes are arranged on the upper flange and the lower flange, the upper flange 5 and the lower flange 6 are connected by anchor bolts 4, the lower end of the anchor bolts 4 is connected to the bolt hole of the lower flange, the middle part of the anchor bolts 4 is connected to the bolt hole of the upper flange, the upper end of the anchor bolts 4 extends to above the concrete pedestal 2, the column base flange 3 is also provided with corresponding bolt holes, after the anchor bolts 4 are inserted into the bolt holes of the column base flange 3, nuts are tightened to realize the connection between the column base flange 3 and the anchor bolts 4.

[0046] The top of the steel column 1 is subjected to the reaction force transmitted from the upper structure of the bridge through the support, which is transmitted to the base of the steel column 1 through the column body of the steel column 1 itself, and then part of the force is transmitted to the top surface of the concrete pedestal 2 through the flange 3 at the base of the column, and part of the force is transmitted to the anchor bolt 4. The force transmitted to the anchor bolt 4 is transmitted to the upper flange 5 and the lower flange 6 through the anchor bolt 4 itself, and finally transmitted to the concrete pedestal 2 through the joint surface of the upper flange 5 and the lower flange 6 with the concrete pedestal 2. The ultimate goal is to transmit the forces of the upper and lower structures of the bridge to the earth.

[0047] In various embodiments of the present invention, preferably, an anchoring structure system consisting of a column base flange 3, anchor bolts 4, an upper flange 5, and a lower flange 6 is used to anchor the steel column into the concrete cap.

[0048] like Figure 5 and Figure 6 As shown, the column base flange is composed of an upper and lower layer of steel plates and a stiffening column steel plate arranged between the upper and lower layers of steel plates, which greatly enhances the stiffness of the flange and avoids local instability of the flange due to insufficient stiffness within the plane of a single layer of steel plates.

[0049] A plurality of bolt holes are arranged on the flange of the column base, and a stiffening column steel plate is symmetrically arranged on both sides of each bolt hole.

[0050] like Figure 7 and Figure 8 As shown, at least two layers of flanges, an upper flange and a lower flange, are embedded in the concrete of the foundation. Each layer of flange includes an upper and lower layer of steel plates 8, a web 9 arranged between the upper and lower layers of steel plates, and a stiffening column steel plate 10 arranged perpendicular to the web.

[0051] Since steel has many advantages, such as high tensile and compressive strength, relatively light weight, easy factory production, mature technology, and recyclability, steel columns will be used more and more in the future. Especially now that the country advocates prefabricated buildings, steel columns have high application value in prefabricated bridges and can also be used in some places where construction site conditions are very restricted, providing solutions to solve difficulties in the project.

[0052] According to a preferred embodiment of the present invention, a method for anchoring a prefabricated assembled viaduct steel column is characterized in that the method comprises the following steps:

[0053] A. Pre-tie the steel bars of the concrete cap;

[0054] B. An upper flange, a lower flange and anchor bolts are embedded in the concrete cap, the lower end of the anchor bolt is connected to the upper flange, the middle of the anchor bolt is connected to the lower flange, and the upper end of the anchor bolt extends to the top of the concrete cap;

[0055] C. Pouring the cap concrete;

[0056] D. Lift the steel column into place and insert the anchor bolts into the bolt holes of the flange at the base of the column;

[0057] Tighten the bolts to complete the anchoring.

[0058] The present invention transmits the large and complex forces on the steel column 1 to the concrete cap 2 through the three surfaces in contact with concrete, namely, the column base flange 3, the upper flange 5 and the lower flange 6, through the anchoring system composed of the flanges and the anchor bolts 4.

[0059] When the steel column 1 is subjected to eccentric axial pressure N and bending moment M, the force model of each part is as follows Figure 4 As shown in the figure, it can be seen that the force at the base of the column is dispersedly transmitted to the concrete cap through the anchoring system composed of multiple flanges and anchor bolts. The force mechanism is clear and the transmission path is clear. Therefore, this anchoring system solves the force transmission between materials with different characteristics - steel and concrete.

[0060] According to the preferred embodiment of the present invention, it is assumed that the steel column is 1.5mX1.5m, and 6 M80 (S45CN) anchor bolts are set on each of the four sides of the steel column. The column top is subjected to a pressure of 15000kN, and the column bottom is subjected to a bending force of 2800kN*m and a shear force of 250kN. (a) The anchor bolt stress verification of this anchoring structure is as follows:

[0061] The effective area of ​​a single anchor bolt As = 5024 mm 2

[0062] Section coefficient Wy1=13.204m

[0063] Maximum axial force on one anchor bolt

[0064] P=(Nx / n)+(My / Wy1)

[0065] =(15000 / 24)+(2800 / 13.204)

[0066] =625+212.1

[0067] =837.1(kN)=837100(N)

[0068] δs=P / As=837100 / 5024=166.6(N / mm2)

[0069] <σsa=210.0(N / mm2) Safety (b) The column base flange verification of this anchor structure is as follows:

[0070] ① Flange reinforcement thickness requirements (corresponding to compressive stress)

[0071] tr1.req=P / (2*be*δba)=15.2mm <tr=20mm

[0072] ② Calculation of flange stiffening compressive stress

[0073] δb=P / (2*be*tr)=140.5(N / mm2)<δba=185(N / mm2)Safety

[0074] ③ Flange reinforcement thickness requirements (corresponding to shear stress)

[0075] tr2.req=P / {2(Hb-2*Rs)*τa}=12.5mm <tr=20mm

[0076] ④ Calculation of flange stiffening shear stress

[0077] τb=P / {2(Hb-2*Rs)*tr}=65.4<τa=105(N / mm2)Safety

[0078] Here, the maximum axial force of an anchor bolt is P = 837.1kN / bolt = 837100N / bolt. The nut diameter Dw = 180mm

[0079] Reinforcement spacing Br = 130mm

[0080] The effective force length corresponding to the stiffener and nut is bw = 99mm

[0081] The effective length of stiffening compression be=bw+50mm=149mm

[0082] Flange steel plate thickness tbu = 20mm

[0083] Stiffening height Hb = 400mm

[0084] Welding hole height Rs = 40mm

[0085] Allowable compressive stress of steel δba = 185.0 N / mm2

[0086] Allowable shear stress of steel τa= 105.0 N / mm2

[0087] Flange reinforcement thickness tr = 20mm

[0088] ⑤Stress calculation of flange steel plate

[0089] Eccentricity e = 125 mm

[0090] Bending moment M = P*e = 837100*125 = 104637500 N·mm

[0091] Section stiffness I = 220670000mm4

[0092] The distance from the upper steel plate to the neutral axis is yu = 220 mm

[0093] The distance from the lower steel plate to the neutral axis yL = 220 mm (the neutral axis is the center line between the upper and lower steel plates)

[0094] The stress of the upper steel plate δu=M*yu / I=104.3N / mm2<δba=185N / mm2 is safe. The stress of the lower steel plate δL=M*yL / I=104.3N / mm2<δba=185N / mm2 is safe. (c) The upper flange of this anchor structure is verified as follows:

[0095] ① Upper flange steel plate width requirements (corresponding to the allowable compressive stress of concrete)

[0096] bf.req=P / (δca*L)=837100 / (20.0*260.0)=161.0mm

[0097] Actual use width bf = 300mm> 161.0mm safety

[0098] ②Actual concrete stress

[0099] δb=P / (bf*L)=10.7N / mm2<20.0N / mm 2

[0100] ③ Web thickness verification (corresponding to shear stress)

[0101] tw.req=P / (4*τa*Hw)=837100 / (4*105.0*250)=8.0mm

[0102] Actual thickness tw = 16mmτ = P / (4*tw*HW) = 52.3N / mm2<105.0N / mm2Safety

[0103] ④ Upper flange steel plate thickness verification

[0104] δc=P / {2*(tw*bw+tr1*bd)}=837100 / {2*(16*125+20*125)}

[0105] =93.0N / mm2<δca=185.0N / mm2Safety

[0106] Here, the maximum axial force of an anchor bolt is P = 837.1 kN / bolt = 837100 N / bolt

[0107] Upper flange steel plate width bf = 300mm

[0108] The thickness of the steel plate on the lower pressure side of the upper flange is tf = 30mm

[0109] The allowable compressive stress of steel is δba=185.0N / mm2

[0110] Anchor bolt spacing L = 260mm

[0111] Allowable shear stress of steel τa=105.0N / mm2

[0112] Web height Hw = 250 mm

[0113] The thickness of the middle stiffening plate tr1 = 20 mm

[0114] The effective length between the web and the nut is bw = 125 mm

[0115] The effective length of the stiffener corresponding to the nut bd = 125mm

[0116] Web thickness tw = 16 mm

[0117] Allowable compressive stress of concrete δca=20.0N / mm2

[0118] (d) The verification calculation of the lower flange of this anchor structure is similar to that of the upper flange.

Claims

1. A stress calculation method for the anchor structure of a prefabricated viaduct steel column, characterized in that A column base flange is welded at the bottom of the steel column, and at least two layers of flanges arranged up and down are pre-embedded in the concrete pedestal. The at least two layers of flanges are connected by anchor bolts, and the upper ends of the anchor bolts extend above the concrete pedestal, penetrate into the bolt holes of the column base flange, and are fixed by nuts; the at least two layers of flanges are an upper flange and a lower flange; the column base flange is composed of an upper and lower layer of steel plates and a middle reinforcement combined with a column steel plate; each layer of flange is composed of an upper and lower layer of steel plates and a middle web and reinforcement; after preliminarily setting the sizes of the upper flange, lower flange, anchor bolts and column base flange, the anchor structure is stress-checked according to the following steps to determine the final size, wherein a number of anchor bolts are respectively arranged on the four sides of the steel column: A. Check the stress of anchor bolts. Calculate the maximum axial force of an anchor bolt P = (Nx / n) + (My / Wy1), where Nx is the pressure on the top of the column, n is the number of anchor bolts, My is the bending moment on the bottom of the column, and Wy1 is the section coefficient. Calculate the stress of the anchor bolt δs = P / As, where As is the effective area of ​​a single anchor bolt, and determine whether the stress of the anchor bolt is less than the stress threshold; B. Calculation of the stress of the flange at the base of the column. B1. According to the corresponding compressive stress verification method, flange stiffening thickness Calculate tr1.req = P / (2*be*δba) and determine whether it is less than the designed flange stiffening thickness; B2. Calculation of flange stiffening compressive stress Calculate δb = P / (2*be*tr) and determine whether it is less than the allowable compression stress; B3. Verify flange stiffening thickness according to corresponding shear stress Calculate tr2.req = P / {2(Hb-2*Rs)*δa} and determine whether it is less than the designed flange stiffening thickness; B4. Calculation of flange stiffening shear stress Calculate τb = P / {2(Hb-2*Rs)*tr} and determine whether it is less than the allowable shear stress; B5. Stress calculation of flange steel plate Calculate the stress of the steel plate δu=M*yu / I, and determine whether it is less than the allowable compression stress; Calculate the stress of the lower steel plate δL=M*yL / I, and determine whether it is less than the allowable compression stress; Among them, be is the effective length of the stiffener under compression, δba is the allowable compression stress, tr is the thickness of the flange stiffener, Hb is the stiffener height, Rs is the height of the through-weld hole, yu is the distance from the upper steel plate to the neutral axis, yL is the distance from the lower steel plate to the neutral axis, and I is the section stiffness; C. Upper flange stress verification C1. Corresponding to the allowable compressive stress of concrete, calculate the width of the upper flange steel plate Calculate bf.req = P / (δca*L) and determine whether it is less than the design width; C2. Check the actual concrete stress. Calculate δb = P / (bf*L) and determine whether it is less than the allowable compressive stress of concrete; C3. According to the corresponding shear stress, the web thickness is calculated Calculate tw.req = P / (4*τa*Hw) to determine whether it is less than the design thickness; C4. Upper flange steel plate thickness verification Calculate δc = P / {2*(tw*bw+tr*bd)} and determine whether it is less than the allowable compression stress; Where δca is the allowable compressive stress of concrete, L is the anchor bolt spacing, bf is the width of the upper flange steel plate, tw is the web thickness, bw is the effective force-bearing length corresponding to the web and the nut, tr is the flange stiffening thickness, and bd is the effective force-bearing length corresponding to the stiffening and the nut; D. Check the stress of lower flange.

Citation Information

Patent Citations

  • Intense weathered rock formation prestress expanded-base anchor bolt foundation of wind generating set

    CN103790175A

  • Prefabricated anchor structure of assembling overpass steel stand

    CN207130624U