A stress applying device for foundation pit retaining structure and construction method thereof
By setting up stress application devices around the foundation pit, and using anchor piles and tension ropes to control the deformation of the enclosure, the problems of low construction speed and efficiency of the foundation pit in the existing technology are solved, and the safety, convenience and cost reduction of the construction environment are achieved .
Patent Information
- Application Number
- CN201710951610.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2017-10-13
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2037-10-13
AI Technical Summary
When the construction period of the existing foundation pit enclosure structure is urgent, the design content has horizontal support on the inside of the enclosure structure, resulting in reduced earth excavation and structural construction speed and efficiency, and there are problems such as high cost of measures to seize the construction period.
Stress applying devices are arranged around the foundation pit, including anchor piles and tension ropes buried outside the enclosure body, and stress applied on the enclosure body is adjusted through the tensile adjustment device, to control deformation of the enclosure body, and avoid internal support.
Without internal support, stress is adjusted through the tension rope system to improve the construction speed and efficiency of the foundation pit, shorten the construction period, reduce costs, and ensure the safety and convenience of the construction environment.
Smart Images

Figure CN107524152B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building construction, in particular to a construction method of a foundation pit retaining structure. Background Art
[0002] Under the general environment of deepening economic construction, foundation pit retaining is an indispensable part of many projects. How to quickly and efficiently complete the construction of foundation pit projects is an issue that needs to be focused on in various projects. Many foundation pit projects involve applying horizontal stress to the retaining structure to enhance the stability of the foundation pit retaining body. At present, most foundation pits adopt the method of prestressing the inner side of the foundation pit. The prestressing of the retaining body on the inner side of the foundation pit is mainly carried out through horizontal support bodies combined with support devices (such as hydraulic jacks, etc.). However, for engineering construction with tight schedules, if the design content includes horizontal support on the inner side of the retaining structure, it means that the speed and efficiency of earth excavation or the main construction of the engineering structure will be greatly reduced, and there are problems such as high cost of measures to rush the construction schedule. Summary of the invention
[0003] Purpose of the invention: The purpose of the present invention is to address the deficiencies of the prior art and provide a stress applying device which is arranged on the outside of the foundation pit retaining structure with a certain operable space distance around the foundation pit and provided with construction anchor piles. The stress applied to the retaining body is adjusted according to the deformation of the retaining body without internal support, and the deformation of the retaining body is controlled to a certain extent, so as to ensure a safe and convenient foundation pit construction environment.
[0004] Another object of the present invention is to provide a construction method of the above-mentioned stress applying device.
[0005] Technical solution: The stress applying device for the foundation pit retaining structure of the present invention comprises a retaining body serving as foundation pit protection, a plurality of anchor piles buried outside the retaining body, and a tensioning rope system connecting each anchor pile with the retaining body; the tensioning rope system comprises a tension adjusting device, through which the stress applied by the anchor piles on the retaining body is adjusted.
[0006] A further preferred technical solution of the present invention is that the tensioning rope system includes a plurality of steel ropes and basket bolts installed on each steel rope, the steel ropes connect the enclosure and a plurality of anchor piles into one, and the basket bolts tension and tighten the steel ropes to adjust the stress applied by the anchor piles on the enclosure.
[0007] Preferably, the enclosure is composed of steel sheet piles buried outside the foundation pit, and the steel sheet piles are interlocked and connected.
[0008] Preferably, the steel sheet piles constituting the enclosure are connected as a whole by channel steels, and the channel steels are located 25 to 35 cm from the top of the steel sheet piles.
[0009] Preferably, the distance between two adjacent anchor piles is 5-8 m, and the anchor piles are connected by channel steel.
[0010] The construction method of the foundation pit retaining structure stress applying device of the present invention comprises the following steps:
[0011] (1) Implementation of the enclosure: First, the construction site of the enclosure is leveled, and the steel sheet pile driving and extraction equipment is brought in for assembly and inspection; the designed steel sheet pile driving position is measured and marked, and the pile position is clearly marked with gray lines and positioning points; the steel sheet piles are driven according to the design and plan requirements, and the steel sheet piles are connected to each other using the bite connection method to form the enclosure;
[0012] (2) Implement enclosure connection: Use channel steel to connect the enclosure steel sheet piles 25-35 cm below the top of the steel sheet piles. The connection method is welding. Each steel sheet pile must be in effective contact with the channel steel.
[0013] (3) Driving anchor piles: Driving anchor piles outside the retaining structure, with a spacing of 5 to 8 m between two adjacent anchor piles;
[0014] (4) Connecting the anchor pile group: Connect each anchor pile using the same connection method as step (2);
[0015] (5) Implement the tensioning rope system: Use the tensioning rope system to connect the anchor pile group and the retaining structure. After the connection construction is completed, the tensioning rope system is tensioned and tightened to apply stress to the retaining structure;
[0016] (6) Observation of deformation of the retaining structure and control of deformation by applying stress to the tensioning rope system: earth excavation is carried out after the tensioning rope system is tensioned and tightened. The displacement of the top of the steel sheet pile is monitored before and during earth excavation. When the displacement rate of the steel sheet pile is too large, the stress of the tensioning rope system is adjusted to make the retaining structure quickly stabilize.
[0017] (7) Removal of stress-applying device: After the main structure construction is accepted and the foundation pit is backfilled, the stress applied by the tensioning rope system is released first, and then the removal and removal of the steel sheet piles and anchor piles are carried out.
[0018] Preferably, there is a distance between the steel sheet pile driving position and the outer contour of the main structure to facilitate the construction of the main structure.
[0019] As a preferred option, after the location of the steel sheet piles is determined, pipeline and underground obstacle exploration is carried out at the location where the steel sheet piles are driven, and relevant pipelines are checked, relocated, and adjacent pipelines are reinforced and protected.
[0020] Preferably, when the steel sheet piles or anchor piles cannot contact the channel steel due to positioning deviation during driving, auxiliary inserts should be provided to ensure reliable connection.
[0021] Preferably, the tensioning rope system includes a plurality of steel ropes and basket bolts installed on each steel rope, the steel ropes connect the enclosure and a plurality of anchor piles into one, the basket bolts tension and tighten the steel ropes to adjust the stress applied by the anchor piles on the enclosure; the specifications of the steel ropes and basket bolts are selected according to the design stress conditions of the foundation pit and the soil conditions.
[0022] Beneficial effects: The foundation pit retaining structure stress applying device and construction method of the present invention have a certain operable space distance around the foundation pit. Under the condition of construction anchor piles, an adjustable stress tensioning rope system is set to connect the anchor piles with the retaining body. In the absence of internal support, the stress applied to the retaining body is adjusted by the tensioning rope system according to the deformation of the retaining body, and the deformation of the retaining body is controlled to a certain extent. During the construction process, the working environment in the foundation pit can be made safe and convenient, which greatly improves the speed of foundation pit excavation and structure construction, improves work efficiency, shortens the construction period, and at the same time, the cost of applying stress is low and the operation is simple, which improves economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a structural schematic diagram of the stress applying device for the foundation pit retaining structure of the present invention;
[0024] Figure 2 It is a construction plan view of the stress applying device for the foundation pit retaining structure of the present invention;
[0025] Figure 3 It is a construction flow chart of the stress applying device for the foundation pit retaining structure of the present invention;
[0026] In the figure, 1-anchor pile, 2-enclosing structure, 3-basket bolt, 4-wire rope, 5-channel steel. DETAILED DESCRIPTION
[0027] The technical solution of the present invention is described in detail below with reference to the accompanying drawings, but the protection scope of the present invention is not limited to the embodiments.
[0028] Embodiment 1: A stress applying device for a foundation pit retaining structure comprises a retaining body 2 for protecting the foundation pit, a plurality of anchor piles 1 buried outside the retaining body 2, and a tensioning rope system connecting each anchor pile 1 with the retaining body 2.
[0029] The enclosure 2 is composed of steel sheet piles buried outside the foundation pit, and each steel sheet pile is interlocked. The steel sheet piles constituting the enclosure 2 are connected as a whole by channel steel 5, and the channel steel 5 is located 30 cm from the top of the steel sheet pile.
[0030] The distance between two adjacent anchor piles 1 is 6m, and the anchor piles 1 are connected by channel steels 5.
[0031] The tensioning rope system includes a plurality of steel wire ropes 4 and a basket bolt 3 installed on each steel wire rope 4. The steel wire ropes 4 connect the enclosure 2 and a plurality of anchor piles 1 as a whole. The basket bolts 3 tension and tighten the steel wire ropes 4 to adjust the stress applied by the anchor piles 1 on the enclosure 2.
[0032] The construction method of the above-mentioned foundation pit retaining structure stress applying device comprises the following steps:
[0033] (1) Implementation of the enclosure: First, the construction site of the enclosure 2 is leveled, and the steel sheet pile driving and extraction equipment is brought in for assembly and inspection; the designed steel sheet pile driving position is measured and marked, and the pile position is clearly marked with gray lines and positioning points; a reasonable distance must be considered between the steel sheet pile driving position and the outer contour of the main structure to facilitate the construction of the main structure; after the steel sheet pile position is determined, pipelines and underground obstacles are explored at the steel sheet pile driving position, and relevant pipelines are checked, relocated, and adjacent pipelines are reinforced and protected; steel sheet piles are driven according to the design and plan requirements, and each steel sheet pile is connected to each other using the bite connection method to form the enclosure 2;
[0034] (2) Implement enclosure connection: 30 cm below the top of the steel sheet pile, use channel steel 5 to connect the enclosure steel sheet piles. The connection method is welding. Each steel sheet pile must be in effective contact with the channel steel 5. Auxiliary inserts should be installed at the position where the steel sheet pile cannot contact the channel steel 5 due to positioning deviation during driving.
[0035] (3) Driving anchor piles: Driving anchor piles 1 outside the enclosure, with a distance of 6 m between two adjacent anchor piles 1;
[0036] (4) Connecting the anchor pile group: Use the same connection method as step (2) to connect each anchor pile 1. Auxiliary inserts should be provided at the positions where the anchor pile 1 cannot contact the channel steel 5 due to the positioning deviation during driving.
[0037] (5) Implement the tensioning rope system: install and tension the steel wire rope 4 and the basket bolt 3, and use the steel wire rope 4 to connect the anchor pile 1 and the retaining structure 2. After the connection construction is completed, tension the tensioning rope system through the basket bolt 3 to apply stress to the retaining structure 2. The specifications of the steel wire rope 4 and the basket bolt 3 are selected according to the stress conditions of the foundation pit design and the soil conditions;
[0038] (6) Observation of deformation of the retaining structure and control of deformation by applying stress to the tensioning rope system: earth excavation is carried out after the tensioning rope system is tensioned and tightened. The displacement of the top of the steel sheet pile is monitored before and during earth excavation. When the displacement rate of the steel sheet pile is too large, the stress of the tensioning rope system is adjusted so that the retaining structure 2 quickly tends to a stable state.
[0039] (7) When the wire rope and the turnbuckle bolt are under stress, large machinery and pedestrians are strictly prohibited from passing through the area covered by the wire rope 4; a dedicated person is assigned to monitor the status of the enclosure 2, the wire rope 4 and the turnbuckle bolt 3. If the deformation of the enclosure 2 exceeds the warning value, emergency measures are taken to ensure safety;
[0040] (7) Removal of the stress applying device: After the main structure construction is accepted and the foundation pit is backfilled, first release the stress of the basket bolts 3 and the wire rope 4, and then remove and pull out the steel sheet piles and anchor piles 1.
[0041] As described above, although the present invention has been shown and described with reference to specific preferred embodiments, it should not be construed as limiting the present invention itself. Various changes in form and details may be made without departing from the spirit and scope of the present invention as defined in the appended claims.
Claims
1. A construction method for a stress applying device for a foundation pit retaining structure, Features: The device used includes a protective body for protecting the foundation pit, a plurality of anchor piles buried outside the protective body, and a tension rope system connecting each anchor pile with the protective body; the tension rope system includes a tension regulating device, through which the stress applied by the anchor pile on the protective body is adjusted; The tension rope system includes a plurality of steel wire ropes and a turnbuckle bolt installed on each steel wire rope, wherein the steel wire ropes connect the enclosure and a plurality of anchor piles as a whole, and the turnbuckle bolts tension and tighten the steel wire ropes to adjust the stress applied by the anchor piles on the enclosure; The enclosure is composed of steel sheet piles buried outside the foundation pit, and the steel sheet piles are interlocked and connected; The steel sheet piles constituting the enclosure are connected as a whole by channel steels, and the channel steels are located 25 to 35 cm from the top of the steel sheet piles; The distance between two adjacent anchor piles is 5~8 m, and the anchor piles are connected by channel steel; There is a gap between the steel sheet pile driving position and the outer contour of the main structure; The construction method comprises the following steps: (1) Implementation of the enclosure: First, the construction site of the enclosure is leveled, and the steel sheet pile driving and extraction equipment is brought in for assembly and inspection; the designed steel sheet pile driving position is measured and marked, and the pile position is clearly marked with gray lines and positioning points; the steel sheet piles are driven according to the design and plan requirements, and the steel sheet piles are connected to each other using the bite connection method to form the enclosure; (2) Implement enclosure connection: Use channel steel to connect the enclosure steel sheet piles 25-35 cm below the top of the steel sheet piles. The connection method is welding. Each steel sheet pile must be in effective contact with the channel steel. (3) Driving anchor piles: Driving anchor piles outside the retaining structure, with a spacing of 5 to 8 m between two adjacent anchor piles; (4) Connecting the anchor pile group: Connect each anchor pile using the same connection method as step (2); (5) Implement the tensioning rope system: Use the tensioning rope system to connect the anchor pile group and the retaining structure. After the connection construction is completed, the tensioning rope system is tensioned and tightened to apply stress to the retaining structure; (6) Observation of deformation of the retaining structure and control of deformation by applying stress to the tensioning rope system: earth excavation is carried out after the tensioning rope system is tensioned and tightened. The displacement of the top of the steel sheet pile is monitored before and during earth excavation. When the displacement rate of the steel sheet pile is too large, the stress of the tensioning rope system is adjusted to make the retaining structure quickly stabilize. (7) Removal of stress-applying device: After the main structure construction is accepted and the foundation pit is backfilled, the stress applied by the tensioning rope system is released first, and then the removal and removal of the steel sheet piles and anchor piles are carried out.
2. The construction method according to claim 1, It is characterized in that In step (1), after the location of the steel sheet piles is determined, pipeline and underground obstacle exploration is carried out at the location where the steel sheet piles are to be driven, and the relevant pipelines are checked, relocated, and adjacent pipelines are reinforced and protected.
3. The construction method according to claim 1, It is characterized in that In steps (2) and (4), when the steel sheet piles or anchor piles cannot contact the channel steel due to positioning deviation during driving, auxiliary inserts should be provided to ensure reliable connection.
4. The construction method according to claim 1, It is characterized in that In step (5), the tensioning rope system includes a plurality of steel wire ropes and a turnbuckle bolt installed on each steel wire rope, the steel wire ropes connect the enclosure and a plurality of anchor piles into one, the turnbuckle bolts tension and tighten the steel wire ropes to adjust the stress applied by the anchor piles on the enclosure; the specifications of the steel wire ropes and the turnbuckle bolts are selected according to the stress conditions of the foundation pit design and the soil conditions.