A mobile construction waste resource utilization equipment

By designing mobile construction waste resource utilization equipment, including crushing stations, screening stations and light substance processors, the problems of fixed and poor treatment effects of existing construction waste treatment equipment have been solved, and the mobility and efficiency of the equipment have been achieved. Resource-based utilization to generate recycled aggregates that meet national standards.

CN107999518BActive Publication Date: 2024-11-12HUNAN XD HEAVY EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201711437313.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2017-12-26
Publication Date
2024-11-12
Estimated Expiration
2037-12-26

AI Technical Summary

Technical Problem

The existing construction waste treatment equipment is fixed, covering a large area and cannot be moved, which increases the cost of treatment and lacks adaptive treatment to construction waste, and has poor treatment effect.

Method used

A mobile construction waste resource utilization equipment including a mobile construction waste crushing station, a screening station, a light substance processor and a water tank is designed. It uses impact crushers, vibrating screens, blowers and water tanks and other components to continuously Vibration conveying, iron removal, screening and light substance treatment to generate regenerated aggregates that meet the requirements.

Benefits of technology

It realizes the compact structure of the equipment, stable operation, low production cost, simple operation, and high environmental adaptability. The generated aggregate meets the national standard requirements of recycled aggregates, and solves the problem of equipment mobility and processing effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN107999518B_ABST
    Figure CN107999518B_ABST
Patent Text Reader

Abstract

A mobile construction waste resource utilization equipment and method, the equipment includes a mobile construction waste crushing station, a mobile construction waste screening station, a mobile light material processor I, a mobile light material processor II and a mobile water tank; the mobile construction waste crushing station includes a feed bin, a feeder, an unearthed belt conveyor, a feed port I, an impact crusher, a feed trough, a main belt conveyor, an iron remover, a return belt conveyor I, a frame I, a power system I, a hydraulic system I, an electronic control system I and a transport system I; the mobile construction waste screening station includes a feeding belt conveyor, a vibrating screen, a fine aggregate belt conveyor, a 1# coarse aggregate belt conveyor, a 2# coarse aggregate belt conveyor, a return belt conveyor II, a frame II, a power system II, a hydraulic system II, an electronic control system II and a transport system II. The present invention is composed of modular equipment, does not require any civil engineering work in terms of transfer and transportation, and has good environmental adaptability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to mobile construction waste resource utilization equipment. Background Art

[0002] With the acceleration of the process of new urbanization in China, phenomena such as construction waste "surrounding cities", "piling up mountains" and "filling rivers" are emerging one after another, and the harmless and resource-based disposal of construction waste is imminent.

[0003] However, as of April 2016, the amount of construction waste processed in large and medium-sized cities across the country was less than 5%.

[0004] After being crushed, construction waste can be used as recycled aggregate in road base and building base construction, and can also be used to produce building materials such as permeable pavement bricks, recycled concrete, and municipal facilities products. It can be seen that crushing construction waste is of great significance to the resource utilization of construction waste.

[0005] Crushing and processing construction waste requires construction waste crushing and processing equipment. Therefore, the market demand for construction waste crushing and processing equipment is becoming more and more urgent, and construction waste crushing and processing equipment has a broad market prospect.

[0006] The existing fixed construction waste crushing equipment in my country occupies a large area and cannot be moved. It needs to use transportation equipment to transport the construction waste to the construction waste treatment plant, which increases the cost of construction waste treatment. In addition, the existing construction waste treatment equipment is all crushing and screening equipment used in mines, lacking the adaptability to treat construction waste, and the treatment effect is not obvious. Summary of the invention

[0007] The technical problem to be solved by the present invention is to overcome the defects in existing construction waste treatment equipment and provide a mobile construction waste resource utilization equipment and method which is convenient to move, stable in operation, reliable in work and low in production cost.

[0008] The technical solution adopted by the present invention to solve the technical problem is:

[0009] A mobile construction waste resource utilization equipment, comprising a mobile construction waste crushing station, a mobile construction waste screening station, a mobile light material processor I, a mobile light material processor II and a mobile water tank;

[0010] The mobile construction waste crushing station includes a feed bin, a feeder, an unearthed belt conveyor, a feed port Ⅰ, an impact crusher, a feed trough, a main belt conveyor, an iron remover, a return belt conveyor Ⅰ, a frame Ⅰ, a power system Ⅰ, a hydraulic system Ⅰ, an electronic control system Ⅰ and a transport system Ⅰ; the feed bin, the feeder, the feed port Ⅰ, the impact crusher, the feed trough, and the main belt conveyor are connected in sequence, the unearthed belt conveyor is connected to the feeder, the iron remover is installed above the main belt conveyor, and the return belt conveyor Ⅰ is connected to the feed port Ⅰ;

[0011] The mobile construction waste screening station comprises a feeding belt conveyor, a vibrating screen, a fine aggregate belt conveyor, a 1# coarse aggregate belt conveyor, a 2# coarse aggregate belt conveyor, a return belt conveyor II, a frame II, a power system II, a hydraulic system II, an electronic control system II and a transport system II; the feeding belt conveyor is connected to the main belt conveyor and the vibrating screen, the vibrating screen is connected to the fine aggregate belt conveyor, the 1# coarse aggregate belt conveyor, the 2# coarse aggregate belt conveyor and the return belt conveyor II, and the return belt conveyor II is connected to the return belt conveyor I;

[0012] The mobile light material processor I includes a feed port II, a blower fan I, a light material cleaner I, a discharging belt conveyor I, a water tank I, a transport frame I and an electronic control system III; the feed port II is connected to the 2# coarse aggregate belt conveyor and the water tank I, the blower fan I is installed below the feed port II, the light material cleaner I is installed above the water tank I, the water tank I is connected to the discharging belt conveyor I, the transport frame I is installed below the water tank I, and the electronic control system III is installed on the transport frame I;

[0013] The mobile light material processor II includes a feed port III, a blowing fan II, a light material cleaner II, a discharging belt conveyor II, a water tank II, a transfer frame II and an electronic control system IV; the feed port III is connected to the 1# coarse aggregate belt conveyor and the water tank II, the blowing fan II is installed below the feed port III, the light material cleaner II is installed above the water tank II, the water tank II is connected to the discharging belt conveyor II, the transfer frame II is installed below the water tank II, and the electronic control system IV is installed on the transfer frame II.

[0014] Furthermore, the frame I is the installation body of the mobile construction waste crushing station, the power system I, the hydraulic system I, and the electronic control system I are respectively installed on the frame I, and the transfer system I is installed at the lower part of the frame I to support the frame I and perform the walking function.

[0015] Furthermore, the frame II is the installation body of the mobile construction waste screening station, the power system II, the hydraulic system II, and the electronic control system II are respectively installed on the frame II, and the transfer system II is installed at the lower part of the frame II to support the frame II and perform the walking function.

[0016] Furthermore, the mobile water tank includes a water tank III and a transport frame III. The water tank III is equipped with a water pump, which provides a dust reduction water source for the mobile construction waste crushing station and the mobile construction waste screening station through the water pump and the water pipe, and replenishes water for the mobile light material processor I and the mobile light material processor II.

[0017] The light material processor I and the light material processor II have a feed deceleration function.

[0018] The method for resource utilization of construction waste of the present invention comprises the following specific steps:

[0019] The construction waste is loaded into the feeding bin of the mobile construction waste crushing station by a loader or excavator. The feeder at the bottom of the feeding bin transports the construction waste to the feeding port Ⅰ of the impact crusher in a continuous vibration manner. While the feeder is continuously feeding, the miscellaneous soil in the construction waste is separated and discharged by the unloading belt conveyor. The construction waste after soil removal enters the impact crusher from the feeding port Ⅰ for crushing. The crushed construction waste falls into the feeding trough at the bottom of the impact crusher. The feeding trough feeds by continuous vibration and transports the crushed construction waste to the main belt conveyor. An iron remover is installed above the main belt conveyor. The main belt conveyor transports the crushed construction waste and separates the magnetic metal (iron) in the construction waste at the same time; the construction waste after iron removal is transported by the main belt conveyor to the feeding belt conveyor of the mobile screening station, and then transported by the feeding belt conveyor to the vibrating screen; the construction waste after iron removal is screened by the vibrating screen: aggregates larger than 40mm cannot pass through the first layer of screen, and are diverted by the guide trough at the end of the first layer of screen of the vibrating screen to the return belt conveyor II of the screening station, and then transported by the return belt conveyor II of the screening station to the return belt conveyor I of the crushing station, and finally enter the feed port of the impact crusher for re-crushing; aggregates smaller than 40mm Aggregates smaller than 20 mm can pass through the second screen, but aggregates with a size of 20 to 40 mm cannot pass through the second screen, and are diverted to the 1# coarse aggregate conveyor by the guide trough at the end of the second screen of the vibrating screen; aggregates smaller than 20 mm can pass through the second screen, but aggregates with a size of 10 to 20 mm cannot pass through the third screen, and are diverted to the 2# coarse aggregate conveyor by the guide trough at the end of the third screen of the vibrating screen; aggregates smaller than 10 mm pass through the third screen and fall on the fine aggregate conveyor, which is discharged by the fine aggregate conveyor; the 1# coarse aggregate conveyor conveys 20 to 40 mm aggregates to the mobile light material processor II , the 2# coarse aggregate belt conveyor transports 10-20mm aggregate to the mobile light material processor I. First, it passes through the feed port and falls into the water tank of the light material processor. The light material with lighter specific gravity floats up and is blown to the sweeper by the blowing fan and swept away by the sweeper; the aggregate with heavier specific gravity sinks and falls on the belt conveyor at the bottom of the water tank. The belt conveyor brings the aggregate out of the water, thus generating recycled aggregate that meets the requirements; the mobile water tank provides dust reduction water source for the mobile construction waste crushing station and the mobile construction waste screening station through water pumps and water pipes, and replenishes water for the mobile light material processors I and II.

[0020] The invention has compact structure, convenient equipment combination, stable operation, reliable work, good maintainability, simpler operation, high environmental adaptability, and the produced aggregate can meet the national standard requirements of recycled aggregate. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a structural schematic diagram of an embodiment of a mobile construction waste resource utilization equipment of the present invention;

[0022] Figure 2 The present invention is a process flow chart of the mobile construction waste resource utilization method. DETAILED DESCRIPTION

[0023] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0024] Reference Figure 1 The mobile construction waste resource utilization equipment of this embodiment includes a mobile construction waste crushing station, a mobile construction waste screening station, a mobile light material processor I, a mobile light material processor II and a mobile water tank;

[0025] The mobile construction waste crushing station includes a feed bin 10, a feeder, an unearthed belt conveyor 11, a feed port Ⅰ, an impact crusher, a feed trough, a main belt conveyor 7, an iron remover, a return belt conveyor Ⅰ, a frame Ⅰ, a power system Ⅰ, a hydraulic system Ⅰ, an electronic control system Ⅰ and a transport system Ⅰ; the feed bin 10, the feeder, the feed port Ⅰ, the impact crusher, the feed trough, and the main belt conveyor 7 are connected in sequence, the unearthed belt conveyor 11 is connected to the feeder, the iron remover is installed above the main belt conveyor 7, and the return belt conveyor Ⅰ9 is connected to the feed port Ⅰ; the frame Ⅰ is the installation body of the mobile construction waste crushing station, the power system Ⅰ, the hydraulic system Ⅰ, and the electronic control system Ⅰ are respectively installed on the frame Ⅰ, and the transport system Ⅰ is installed at the lower part of the frame Ⅰ to support the frame Ⅰ and perform the walking function;

[0026] The mobile construction waste screening station includes a feeding belt conveyor 8, a vibrating screen, a fine aggregate belt conveyor 1, a 1# coarse aggregate belt conveyor 14, a 2# coarse aggregate belt conveyor 5, a return belt conveyor II6, a frame II, a power system II, a hydraulic system II, an electronic control system II and a transport system II; the feeding belt conveyor 8 is connected to the vibrating screen, and the vibrating screen is connected to the fine aggregate belt conveyor 1, the 1# coarse aggregate belt conveyor 14, the 2# coarse aggregate belt conveyor 5, and the return belt conveyor II6; the return belt conveyor II6 is connected to the return belt conveyor I9; the frame II is the installation body of the mobile construction waste screening station, the power system II, the hydraulic system II, and the electronic control system II are respectively installed on the frame II, and the transport system II is installed at the lower part of the frame II to support the frame II and perform the walking function;

[0027] The mobile light material processor I comprises a feed port II4, a blower fan I, a light material cleaner I, a discharging belt conveyor I2, a water tank I, a transport frame I and an electronic control system III; the feed port II4 is connected to the 2# coarse aggregate belt conveyor 5 and the water tank I, the blower fan I is installed below the feed port II, the light material cleaner I is installed above the water tank I, the water tank I is connected to the discharging belt conveyor I, the transport frame I is installed below the water tank I, and the electronic control system III is installed on the transport frame I;

[0028] The mobile light material processor II includes a feed port III 13, a blowing fan II, a light material cleaner II, a discharging belt conveyor II 16, a water tank II, a transport frame II and an electronic control system IV; the feed port III 13 is connected to the 1# coarse aggregate belt conveyor 14 and the water tank II, the blowing fan II is installed below the feed port III 13, the light material cleaner II is installed above the water tank II, the water tank II is connected to the discharging belt conveyor II, the transport frame II is installed below the water tank II, and the electronic control system IV is installed on the transport frame II;

[0029] The mobile water tank includes a water tank III and a transport frame III. The water tank III is equipped with a water pump, which provides a dust reduction water source for a mobile construction waste crushing station and a mobile construction waste screening station through the water pump and a water pipe, and replenishes water for a mobile light material processor I and a mobile light material processor II.

[0030] After the mobile construction waste resource utilization device arrives at the site, the feed bin 10 of the mobile construction waste crushing station is close to the construction waste, and a miscellaneous soil discharge area needs to be reserved outside the unearthed belt conveyor 11; the loading belt conveyor 8 of the mobile construction waste screening station is connected to the end of the main belt conveyor 7 of the mobile construction waste crushing station; the return belt conveyor Ⅱ6 of the mobile construction waste screening station is connected to the end of the return belt conveyor Ⅰ9 of the mobile construction waste crushing station; the 2# coarse aggregate belt conveyor 5 of the mobile construction waste screening station is connected to the feed port Ⅱ4 of the mobile light material processor Ⅰ, and the discharge of 10-20mm aggregate is reserved outside the discharge belt conveyor Ⅰ2 of the mobile light material processor Ⅰ Area; the 1# coarse aggregate belt conveyor 14 of the mobile construction waste screening station is connected to the feed port Ⅲ13 of the mobile light material processor Ⅱ, and a discharge area for 20 to 40 mm aggregate is reserved outside the discharge belt conveyor 16 of the mobile light material processor Ⅱ; a discharge area for 0 to 10 mm aggregate is reserved outside the fine aggregate belt conveyor 1 of the mobile construction waste screening station; the mobile water tank 12 is parked near the mobile construction waste crushing station, and the power supply provided by the mobile construction waste crushing station is used to power the water pump, and a water pipe is used to supply water to the mobile construction waste crushing station, the mobile construction waste screening station, the mobile light material processor Ⅰ, and the mobile light material processor Ⅱ.

[0031] Reference Figure 2 The method for recycling construction waste in this embodiment comprises the following specific steps:

[0032] Construction waste is loaded into the feed bin of the mobile construction waste crushing station by a loader or excavator. The feeder at the bottom of the feed bin transports the construction waste to the feed port Ⅰ of the impact crusher in a continuous vibration manner. While the feeder is continuously feeding, the miscellaneous soil in the construction waste is separated and discharged by the unloading belt conveyor. The construction waste after soil removal enters the impact crusher through the feed port Ⅰ for crushing. The crushed construction waste falls into the feed trough at the bottom of the impact crusher. The feed trough feeds by continuous vibration and transports the crushed construction waste to the main belt conveyor. A self-unloading iron remover is installed above the main belt conveyor. , while the main belt conveyor transports the crushed construction waste, it also separates the magnetic metal (iron) in the construction waste; the construction waste after iron removal is transported by the main belt conveyor to the feeding belt conveyor of the mobile screening station, and then transported to the vibrating screen by the feeding belt conveyor; the construction waste after iron removal is screened by the vibrating screen: aggregates larger than 40mm cannot pass through the first layer of screen, and are diverted by the guide trough at the end of the first layer of screen of the vibrating screen to the return belt conveyor II of the screening station, and then transported by the return belt conveyor II of the screening station to the return belt conveyor I of the crushing station, and finally enter the feed port of the impact crusher for re-crushing; aggregates smaller than 40mm Aggregates can pass through the first screen, but aggregates of 20-40 mm cannot pass through the second screen, and are diverted by the guide trough at the end of the second screen to form the 1# coarse aggregate conveyor; Aggregates smaller than 20 mm can pass through the second screen, but aggregates of 10-20 mm cannot pass through the third screen, and are diverted by the guide trough at the end of the third screen to form the 2# coarse aggregate conveyor; Aggregates smaller than 10 mm pass through the third screen and fall on the fine aggregate conveyor, which is discharged by the fine aggregate conveyor; The 1# coarse aggregate conveyor transports 20-40 mm aggregates to the mobile light material processor II , the 2# coarse aggregate belt conveyor transports 10-20mm aggregate to the mobile light material processor I. First, it passes through the feed port and falls into the water tank of the light material processor. The light material with lighter specific gravity floats up and is blown to the sweeper by the blowing fan and swept away by the sweeper; the aggregate with heavier specific gravity sinks and falls on the belt conveyor at the bottom of the water tank. The belt conveyor brings the aggregate out of the water, thus generating recycled aggregate that meets the requirements; the mobile water tank provides dust reduction water source for the mobile construction waste crushing station and the mobile construction waste screening station through water pumps and water pipes, and replenishes water for the mobile light material processors II and mobile light material processors I.

[0033] In this embodiment, the mobile construction waste crushing station and the mobile construction waste screening station have the ability to move on their own, and use a diesel engine as a power source, or 380V industrial electricity as a power source. The mobile light material processor and the mobile water tank are towed by external equipment, and are powered by the mobile construction waste screening station, or 380V industrial electricity as a power source.

[0034] The present invention is composed of modular equipment, does not require any civil engineering works in terms of transfer and transportation, and has good environmental adaptability.

[0035] The processing capacity of this embodiment is 150-200 t / h, and it is mainly used for harmless and resourceful treatment of construction waste, and can also be used for the recycling of solid waste generated in transportation construction.

Claims

1. A mobile construction waste resource utilization equipment, the equipment comprising a mobile construction waste crushing station, a mobile construction waste screening station, a mobile light material processor I, a mobile light material processor II and a mobile water tank; The mobile construction waste crushing station includes a feed bin, a feeder, an unearthed belt conveyor, a feed port Ⅰ, an impact crusher, a feed trough, a main belt conveyor, an iron remover, a return belt conveyor Ⅰ, a frame Ⅰ, a power system Ⅰ, a hydraulic system Ⅰ, an electronic control system Ⅰ and a transport system Ⅰ; the feed bin, the feeder, the feed port Ⅰ, the impact crusher, the feed trough, and the main belt conveyor are connected in sequence, the unearthed belt conveyor is connected to the feeder, the iron remover is installed above the main belt conveyor, and the return belt conveyor Ⅰ is connected to the feed port Ⅰ; The mobile construction waste screening station comprises a feeding belt conveyor, a vibrating screen, a fine aggregate belt conveyor, a 1# coarse aggregate belt conveyor, a 2# coarse aggregate belt conveyor, a return belt conveyor II, a frame II, a power system II, a hydraulic system II, an electronic control system II and a transport system II; the feeding belt conveyor is connected to the main belt conveyor and the vibrating screen, the vibrating screen is connected to the fine aggregate belt conveyor, the 1# coarse aggregate belt conveyor, the 2# coarse aggregate belt conveyor and the return belt conveyor II, and the return belt conveyor II is connected to the return belt conveyor I; The mobile light material processor I comprises a feed port II, a blowing fan I, a light material cleaner I, a discharging belt conveyor I, a water tank I, a transfer frame I and an electric control system III; The feed port II is connected to the 2# coarse aggregate belt conveyor and the water tank I, the blowing fan I is installed below the feed port II, the light material cleaner I is installed above the water tank I, the water tank I is connected to the discharging belt conveyor I, the transfer frame I is installed below the water tank I, and the electric control system III is installed on the transfer frame I; The mobile light material processor II includes a feed port III, a blowing fan II, a light material cleaner II, a discharging belt conveyor II, a water tank II, a transport frame II and an electronic control system IV; the feed port III is connected to the 1# coarse aggregate belt conveyor and the water tank II, the blowing fan II is installed below the feed port III, the light material cleaner II is installed above the water tank II, the water tank II is connected to the discharging belt conveyor II, the transport frame II is installed below the water tank II, and the electronic control system IV is installed on the transport frame II; It also includes a method for utilizing the construction waste resource utilization equipment, the specific steps of which are: The construction waste is loaded into the feed bin of the mobile construction waste crushing station by a loader or excavator. The feeder at the bottom of the feed bin transports the construction waste to the feed port I of the impact crusher in a continuous vibration manner. While the feeder is continuously feeding, the miscellaneous soil in the construction waste is separated and discharged by the unearthing belt conveyor. The construction waste after soil removal enters the impact crusher through the feed port I for crushing. The crushed construction waste falls into the feed trough at the bottom of the impact crusher. The feed trough feeds by continuous vibration and transports the crushed construction waste to the main belt conveyor. An iron remover is installed above the main belt conveyor to separate the magnetic metals in the construction waste while the main belt conveyor transports the crushed construction waste. The construction waste after iron removal is transported by the main belt conveyor to the feeding belt conveyor of the mobile screening station, and then transported to the vibrating screen by the feeding belt conveyor; The construction waste after iron removal is screened by the vibrating screen: aggregates larger than 40mm cannot pass through the first layer of screen, and are diverted by the guide trough at the end of the first layer of screen to the return belt conveyor of the screening station, and then transported by the return belt conveyor of the screening station to the return belt conveyor of the crushing station, and finally enter the feed port of the impact crusher for re-crushing; aggregates smaller than 40mm can pass through the first layer of screen, but aggregates of 20-40mm cannot pass through the second layer of screen, and are diverted by the guide trough at the end of the second layer of screen to the 1# coarse aggregate conveyor; aggregates smaller than 20mm can pass through the second layer of screen, but aggregates of 10-20mm cannot pass through the third layer of screen, and are diverted by the guide trough at the end of the third layer of screen to the 2# coarse aggregate conveyor; aggregates smaller than 1 Aggregates with a diameter of 0 mm pass through the third layer of screen and fall on the fine aggregate conveyor, which is then discharged by the fine aggregate conveyor; the 1# coarse aggregate conveyor conveys 20-40 mm aggregate to the mobile light material processor II, and the 2# coarse aggregate conveyor conveys 10-20 mm aggregate to the mobile light material processor I. They first pass through the feed port and fall into the water tank of the light material processor. Light materials with lighter specific gravity float up and are blown to the sweeper by the blowing fan and swept away by the sweeper; aggregates with heavier specific gravity sink and fall on the conveyor belt at the bottom of the water tank, which brings them out of the water, thus generating recycled aggregates that meet the requirements; the mobile water tank provides dust reduction water sources for the mobile construction waste crushing station and the mobile construction waste screening station through water pumps and water pipes, and replenishes water for the mobile light material processor.

2. The mobile construction waste resource utilization equipment according to claim 1 is characterized in that: The frame I is the installation body of the mobile construction waste crushing station. The power system I, hydraulic system I, and electronic control system I are respectively installed on the frame I. The transfer system I is installed at the lower part of the frame I to support the frame I and perform the walking function.

3. The mobile construction waste resource utilization equipment according to claim 1 or 2, characterized in that: The frame II is the installation body of the mobile construction waste screening station. The power system II, hydraulic system II, and electronic control system II are respectively installed on the frame II. The transfer system II is installed at the lower part of the frame II to support the frame II and perform the walking function.

4. The mobile construction waste resource utilization equipment according to claim 1 or 2, characterized in that: The mobile water tank includes a water tank III and a transport frame III. The water tank III is equipped with a water pump, which provides a dust reduction water source for a mobile construction waste crushing station and a mobile construction waste screening station through the water pump and a water pipe, and replenishes water for a mobile light material processor I and a mobile light material processor II.

5. The mobile construction waste resource utilization equipment according to claim 3 is characterized by: The mobile water tank includes a water tank III and a transport frame III. The water tank III is equipped with a water pump, which provides a dust reduction water source for a mobile construction waste crushing station and a mobile construction waste screening station through the water pump and a water pipe, and replenishes water for a mobile light material processor I and a mobile light material processor II.

6. The mobile construction waste resource utilization equipment according to claim 1 or 2, characterized in that: The iron remover is a self-unloading iron remover.

7. The mobile construction waste resource utilization equipment according to claim 3 is characterized by: The iron remover is a self-unloading iron remover.

8. The mobile construction waste resource utilization equipment according to claim 4 is characterized by: The iron remover is a self-unloading iron remover.