A power grid modeling method and system
Through the power grid modeling method based on on-demand adaptation, the virtual resource elastic expansion technology and the integrated graph-model splicing model are used to solve the problem of mismatch between traditional simulation resources and exercise scale, and the on-demand configuration of the power grid model and the entire network are realized. Real-time synchronization improves the training efficiency and analysis capabilities of the power system.
Patent Information
- Application Number
- CN201810705142.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-07-02
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2038-07-02
AI Technical Summary
Traditional simulation physical resources and exercise scale cannot adapt to each other, and cannot meet the power grid modeling needs in the new integrated operation mode of regulation, especially in the face of massive data challenges in large-scale failures or natural disasters.
Using the power grid modeling method based on on-demand adaptation, through the virtual resource elastic expansion technology, the user's simulation scenario information is used to match the database template, establish a server-side library environment, and use the graph-model integration method to splice the simulation model to generate the power grid Model, realize on-demand configuration of resources and real-time synchronization of the entire network.
It realizes the high utilization of resources and the elastic control of business processes, improves the resource utilization rate of simulation training, improves the efficiency of power system personnel, and can quickly conduct power grid analysis.
Smart Images

Figure CN109145362B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system simulation, and in particular to a power grid modeling method and system. Background Art
[0002] At present, the integrated control automation system has been widely used, and power grid companies at all levels have also attached increasing importance to the simulation training of production management personnel. Although the traditional dispatcher training simulation system has played an important role in internal training exercises and joint anti-accident exercises, it is still difficult to meet the training business needs of dispatchers, monitors, operation and maintenance station operators and other relevant production and operation personnel under the new integrated control mode in terms of integrity, authenticity, real-time, interactivity, scalability, and intelligence. It cannot meet the challenges of massive data simulation in large power grids. Once a large-scale failure or natural disaster occurs in a complex power grid, operators are often at a loss when faced with a large amount of information.
[0003] Cloud computing enables large-scale resource pooling for computing and storage, achieving economies of scale; distributed architecture and load balancing capabilities enable flexible expansion and contraction of resources according to business needs; the existing multi-level control simulation system lacks information integration, and the ability of various units to collaboratively handle accidents is insufficient. It is necessary to build a multi-level control joint training simulation system with a full range, full process, and full scenario that is highly consistent with the power grid. The integrated control system includes multiple levels such as dispatching, monitoring, operation and maintenance, and substation. Different personnel need to use the power grid model for business analysis. The object models of different businesses are quite different. There are multiple simulation scenarios running at the same time, and each scenario has multiple users. However, the existing power grid modeling methods are often static, and traditional simulation physical resources and exercise scales have the disadvantage of being unable to adapt to each other. How to solve the disadvantages of traditional simulation physical resources and exercise scales that cannot adapt to each other, realize on-demand use of power grid models and real-time synchronization of the entire network, and realize business process training that conforms to the new integrated control operation mode is a research difficulty. Summary of the invention
[0004] In order to overcome the shortcomings of the above-mentioned prior art, the present invention provides a power grid modeling method and system based on on-demand adaptation, which adopts virtual resource elastic expansion technology, solves the shortcomings that traditional simulation physical resources and exercise scale cannot adapt to each other, realizes on-demand configuration of the power grid model, and completes on-demand elastic creation of the simulation environment.
[0005] In order to achieve the above-mentioned object of the invention, the present invention adopts the following technical scheme:
[0006] A power grid modeling method, the method comprising:
[0007] Matching database templates based on user's simulation scenario information;
[0008] Establish the server-side library environment according to the database template;
[0009] The simulation model is spliced by integrating graphics and models;
[0010] The spliced simulation model is loaded into the library environment of the server, and the simulation environment is started to generate a power grid model.
[0011] Preferably, before establishing the server-side library environment according to the database template, the process further includes:
[0012] Input simulation scenario information according to the predefined simulation model input range;
[0013] Match the database template according to the simulation scenario; among them,
[0014] The simulation model input scope includes a list of regions and plants, levels of external network equivalent buffers, and simulation model parameters.
[0015] Furthermore, the definition of the external network equal value buffer level includes: setting the input level according to the simulation accuracy, wherein the input level is at least 3 layers.
[0016] Further, the simulation model parameters include power grid type attributes and monitoring type attributes;
[0017] The grid type attributes include steady-state, dynamic, and transient information;
[0018] The monitoring type attribute settings include standard templates, detailed templates, and information on whether to include safety automatic devices.
[0019] Preferably, the matching of the database template based on the simulation scenario information under the user includes:
[0020] According to the simulation scenario information, the database templates are matched one by one using the pre-set matching rule library;
[0021] Based on user information, modify the matched database template information;
[0022] Based on the simulation model parameters, the mandatory fields and optional fields are loaded from the matching rule library.
[0023] Further, the database template information includes record information and domain information of a general basic model table; wherein the general basic model table includes a region table, a plant station table, a voltage level table, a bay table, a busbar table, a circuit breaker table, a switch table, a ground switch table, a generator table, a line table, a line endpoint table, a transformer table, a winding table, a load table, a capacitor table, and a protection signal table;
[0024] The record information includes whether the general basic model table has been created and the maximum number of records.
[0025] Preferably, the establishment of the server-side library environment includes:
[0026] Create a scheduling task based on the matched database template information;
[0027] Complete the establishment of the library environment on the server side based on the scheduling task;
[0028] After the library environment is created, release the database template.
[0029] Furthermore, the establishment of the server-side library environment also includes:
[0030] When multiple users create a server-side library environment at the same time, wait until the previous user's library environment is created before modifying the matching database template information.
[0031] Preferably, the method of splicing the simulation model by integrating the image and the model includes:
[0032] The cloud platform searches for simulation scene information within a predefined simulation model input range, and parses the simulation model from the simulation scene information;
[0033] When the cloud platform determines that there is no database template currently associated with the simulation model, the cloud platform directly splices the simulation model, or, when it determines that there is a database template currently associated with the simulation model, the cloud platform uses the database template to splice the simulation model.
[0034] The associated database template that exists is updated.
[0035] Preferably, the step of loading the simulation model into the library environment comprises:
[0036] Load the simulation model file containing the external network equivalent information into the real-time library environment to create a power grid model that meets the simulation model input range;
[0037] Create graphic information that matches the model and load it into the real-time library environment;
[0038] The cross-section data required for simulation is loaded into the real-time library environment, the power grid model is generated and verified.
[0039] Furthermore, the power grid model verification includes model coarse detection verification, topology analysis verification, protection signal naming rule verification and initial power flow verification.
[0040] A power grid modeling system, the system comprising:
[0041] A matching module, used to obtain user and simulation scenario information, and match the database template based on the simulation scenario information of the user;
[0042] The construction module is used to establish the server-side library environment according to the database template;
[0043] An adaptation module, used for splicing the simulation model in a way of image-model integration;
[0044] The generation module is used to load the spliced simulation model into the library environment of the server side and start the simulation environment to generate the power grid model.
[0045] Compared with the closest prior art, the technical solution provided by the present invention has the following beneficial effects:
[0046] The present invention provides a power grid modeling method and system based on on-demand adaptation. In the process of power grid modeling, an on-demand adaptive elastic resource technology is adopted. The database template is matched based on the user's simulation scene information; a server-side library environment is established according to the database template; the simulation model is spliced in a graphic-model integration manner; the spliced simulation model is loaded into the server-side library environment, and the simulation environment is started to generate a power grid model. This solution can solve the shortcomings of traditional simulation physical resources and exercise scales that cannot adapt to each other, and realize high resource utilization and elastic control of business processes.
[0047] The real-time database required for power system modeling and calculation is often fixed in dimension and immutable. It makes full use of cloud computing technology to flexibly configure the database dimensions, encapsulate model-related services, realize on-demand configuration of power grid models, and complete on-demand elastic creation of simulation environments.
[0048] By subscribing to a unified power grid model service in the cloud, various business needs such as control, monitoring, operation and maintenance, and substation can be met, and flexible construction and elastic management of power grid models can be achieved. This can improve resource utilization of simulation training, enhance the efficiency of power system personnel, and enable power system personnel to conduct power grid analysis quickly and conveniently. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 It is a general flow chart of power grid modeling based on on-demand adaptation in an embodiment of the present invention.
[0050] Figure 2 It is a schematic diagram of a power grid modeling method based on on-demand adaptation in an embodiment of the present invention. DETAILED DESCRIPTION
[0051] The present invention is further described in detail below with reference to the accompanying drawings. The present invention provides a power grid modeling method and system based on on-demand adaptation, which adopts on-demand adaptive elastic resource technology in the power grid modeling process, can solve the shortcomings of traditional simulation physical resources and exercise scale that cannot adapt to each other, and realize high resource utilization and elastic control of business processes.
[0052] like Figure 1 A power grid modeling method is shown, the method comprising:
[0053] S1 matches the database template based on the user's simulation scenario information;
[0054] S2 establishes the server-side library environment according to the database template;
[0055] S3 uses the method of image-model integration to splice the simulation model;
[0056] S4 loads the spliced simulation model into the library environment of the server and starts the simulation environment to generate a power grid model.
[0057] The power grid model serves as the basis for all power system analysis and is used to provide support for advanced application software such as network analysis, state estimation, power flow calculation, and safety analysis, ultimately achieving optimized analysis and auxiliary decision-making for the power system.
[0058] Step S1 matches the database template based on the simulation scenario information of the user, including:
[0059] a. According to the simulation scene information, use the pre-set matching rule library to match the database templates one by one; the simulation scene information mentioned here is the input, the matching rule library is the intermediate processing method, and the database template is the output. The database template is used to generate the library environment. For example: the input simulation scene information is the customer's needs, such as how big the bathroom is with or without a window, how big the living room is with or without a balcony, and how many bedrooms are needed, while the database template is the architectural drawing (one-bedroom, two-bedroom, four-bedroom, loft, villa), and the library environment builds the actual house according to the architectural drawing.
[0060] b. Modify the matched database template information based on user information;
[0061] c. Based on the simulation model parameters, the required fields and optional fields are loaded from the matching rule library.
[0062] The database template information includes record information and domain information of a general basic model table; wherein the general basic model table includes a region table, a plant station table, a voltage level table, a bay table, a busbar table, a circuit breaker table, a switch table, a ground switch table, a generator table, a line table, a line endpoint table, a transformer table, a winding table, a load table, a capacitor table, and a protection signal table;
[0063] The record information includes whether the general basic model table has been created and the maximum number of records.
[0064] The step a, matching different types of database templates one by one through a pre-set matching rule library, includes:
[0065] Based on the self-learning matching algorithm, that is, the initial value first calculates the number of lines and buses of the model as X, and then sets the thresholds of the fuzzy algorithm to 0.2, 0.4, 0.6, and 0.8. If the actual number of lines and buses is the largest number of lines and buses in the entire network, 0-0.2, 0.2-0.4, 0.4-0.6, 0.6-0.8, and 0.8-1 will respectively select small, medium, large, large, and extra-large templates. The single threshold will be adaptively fuzzy adjusted according to the changes in the actual user selection, and finally form the final threshold.
[0066] Step S2, before establishing the server-side library environment according to the database template, also includes:
[0067] Input simulation scenario information according to the predefined simulation model input range;
[0068] Match the database template according to the simulation scenario; the model input range is obtained using the server-side input tool.
[0069] The simulation model input scope includes the region and plant station list, the level of the external network equivalent buffer zone, and the simulation model parameters.
[0070] The definition of the external network equal value buffer level includes: setting the input level according to the simulation accuracy, wherein the input level is at least 3 layers.
[0071] The simulation model parameters include power grid type attributes and monitoring type attributes;
[0072] Among them, the grid type attributes include steady-state, dynamic, and transient information;
[0073] The monitoring type attribute settings include standard templates, detailed templates, and whether to include information on safety automatic devices.
[0074] The customization of the database template in step S2 is to use the server-side module to enter the information according to the scenario, and use the intelligent matching rule library to perform flexible matching of the database template to maximize the use of resources. The modification of the database template is to enter the data according to the model range obtained in step S1, use the pre-defined matching rule library to match templates of different dimensions, and modify the corresponding database template information.
[0075] Step S2, establishing the server-side library environment includes:
[0076] Create a scheduling task based on the matched database template information;
[0077] Complete the establishment of the library environment on the server side based on the scheduling task;
[0078] After the library environment is created, release the database template.
[0079] In addition, establishing the server-side library environment also includes:
[0080] When multiple users create a server-side library environment at the same time, wait until the previous user's library environment is created before modifying the matching database template information.
[0081] Step S3, splicing the simulation model by integrating the image and model, includes:
[0082] The cloud platform searches for simulation scene information within a predefined simulation model input range, and parses the simulation model from the simulation scene information;
[0083] When the cloud platform determines that there is no database template associated with the simulation model, it directly splices the simulation model; or, when it determines that there is a database template associated with the simulation model, it uses the database template to update the existing associated database template.
[0084] The specific splicing method mainly includes three parts: boundary definition, model cutting, and model docking; among them, boundary definition: the boundary is a group of equipment that defines the range between different areas. In the process of splicing multi-area models of the power system, transformers and lines are usually selected as boundary devices.
[0085] Model cutting: The most important step before model splicing is model cutting. The purpose of cutting is to exclude model equipment that does not belong to this area. In this way, there is no redundant description in the full model after splicing, which also reflects the distributed modeling idea of whoever manages is responsible.
[0086] Model docking: After the models of both parties are cut and the user of the boundary device is determined, the device object in the buffer of the stitching program is already the complete model after stitching, and the device object is complete without any omissions or redundancy.
[0087] For example, the provincial survey includes 6 stations: 123456; the local survey includes 5 stations: 56789; 56 is a repeated part (similar to a boundary). After model splicing, the full model is 123456789, a total of 9 stations. Assume that 4 is the first-level buffer network of the local survey, 3 is the second-level buffer network of the local survey, and 2 is the third-level buffer network of the local survey. If the local survey only performs the first-level buffer network, only 456789 stations are needed, and so on.
[0088] Step S4 loads the simulation model into the library environment and includes:
[0089] Load the simulation model file containing the external network equivalent information into the real-time library environment to create a power grid model that meets the simulation model input range;
[0090] Create graphic information that matches the model and load it into the real-time library environment;
[0091] The cross-section data required for simulation is loaded into the real-time library environment, the power grid model is generated and verified.
[0092] Among them, the power grid model verification includes model rough detection verification, topology analysis verification, protection signal naming rule verification and initial power flow verification.
[0093] Based on the same technical concept, the present invention also provides a power grid modeling system, comprising:
[0094] A matching module, used to obtain user and simulation scenario information, and match the database template based on the simulation scenario information of the user;
[0095] The construction module is used to establish the server-side library environment according to the database template;
[0096] An adaptation module, used for splicing the simulation model in a way of image-model integration;
[0097] It is used to load the spliced simulation model into the library environment on the server side and start the simulation environment to generate a power grid model.
[0098] The matching module includes:
[0099] A matching unit, used to match the database templates one by one using a preset matching rule library according to the simulation scenario information;
[0100] A modification unit, used to modify the matched database template information based on user information;
[0101] The field loading unit is used to load mandatory fields and optional fields from the matching rule library based on simulation model parameters.
[0102] The building blocks include:
[0103] A scheduling unit, used to create a scheduling task based on the matched database template information;
[0104] An establishing unit, used to complete the establishment of a library environment on the server side based on the scheduling task;
[0105] The release unit is used to release the database template after the library environment is created.
[0106] The waiting unit is used to modify the matched database template information after the previous user's library environment is created when multiple users create the server-side library environment at the same time.
[0107] Adaptation module, including:
[0108] A parsing unit, used for the cloud platform to search for simulation scene information within a predefined simulation model entry range, and parse the simulation model from the simulation scene information;
[0109] A processing unit is used to directly splice the simulation model when the cloud platform determines that there is no database template associated with the simulation model, or to use the database template to update the currently existing associated database template when it is determined that there is a database template associated with the simulation model.
[0110] The generation module comprises:
[0111] A file loading unit, used to load the simulation model file containing external network equivalent information into the real-time library environment, and create a power grid model that meets the simulation model input range;
[0112] A creation unit is used to create graphic information matching the model and load it into the real-time library environment;
[0113] The generation unit is used to load the cross-section data required for simulation into the real-time library environment, generate the power grid model and perform power grid model verification.
[0114] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0115] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0116] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0117] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
Claims
1. A power grid modeling method, characterized in that: The method comprises: Matching database templates based on user's simulation scenario information; Establish the server-side library environment according to the database template; The simulation model is spliced by integrating graphics and models; Load the spliced simulation model into the library environment of the server, and start the simulation environment to generate a power grid model; Wherein, loading the simulation model into the library environment comprises: Load the simulation model file containing the external network equivalent information into the real-time library environment to create a power grid model that meets the simulation model input range; Create graphic information that matches the model and load it into the real-time library environment; Load the cross-section data required for simulation into the real-time library environment, generate the power grid model and perform power grid model verification; The user-based simulation scenario information matching database template includes: According to the simulation scenario information, the database templates are matched one by one using the pre-set matching rule library; Based on user information, modify the matched database template information; Based on the simulation model parameters, the mandatory fields and optional fields are loaded from the matching rule library; The method of using a preset matching rule library to match database templates one by one includes: Calculate the number of lines and buses in the simulation model; According to the number of lines and the number of buses, a threshold of the fuzzy algorithm is set based on a self-learning matching algorithm; Matching a database template according to a threshold of the fuzzy algorithm; The method of splicing the simulation model by integrating the image and model includes: The cloud platform searches for simulation scene information within a predefined simulation model input range, and parses the simulation model from the simulation scene information; When the cloud platform determines that there is no database template associated with the simulation model, the simulation model is directly spliced; or, when it is determined that there is a database template associated with the simulation model, the database template is used to update the currently existing associated database template; The step of splicing the simulation model comprises: Selecting boundary devices from the simulation model; Based on the selected boundary devices, the simulation model is cut into models; The simulation model after model cutting is docked to obtain a spliced simulation model.
2. The method according to claim 1, characterized in that The step of establishing the server-side library environment according to the database template also includes: Input simulation scenario information according to the predefined simulation model input range; Match the database template according to the simulation scenario; among them, The simulation model input scope includes a list of regions and plants, levels of external network equivalent buffers, and simulation model parameters.
3. The method according to claim 2, characterized in that The definition of the external network equal value buffer level includes: setting the input level according to the simulation accuracy, wherein the input level is at least 3 levels.
4. The method according to claim 2, characterized in that: The simulation model parameters include power grid type attributes and monitoring type attributes; The grid type attributes include steady-state, dynamic, and transient information; The monitoring type attribute settings include standard templates, detailed templates, and information on whether to include safety automatic devices.
5. The method according to claim 1, characterized in that The database template information includes record information and domain information of a general basic model table; wherein the general basic model table includes a region table, a plant station table, a voltage level table, a bay table, a busbar table, a circuit breaker table, a switch table, a ground switch table, a generator table, a line table, a line endpoint table, a transformer table, a winding table, a load table, a capacitor table, and a protection signal table; The record information includes whether the general basic model table has been created and the maximum number of records.
6. The method according to claim 1, characterized in that The server-side library environment is established as follows: Create a scheduling task based on the matched database template information; Complete the establishment of the library environment on the server side based on the scheduling task; After the library environment is created, release the database template.
7. The method according to claim 6, characterized in that The step of establishing a server-side library environment further includes: When multiple users create a server-side library environment at the same time, wait until the previous user's library environment is created before modifying the matching database template information.
8. The method according to claim 1, characterized in that The power grid model verification includes model rough detection verification, topology analysis verification, protection signal naming rule verification and initial power flow verification.
9. A power grid modeling system, characterized in that: The system comprises: A matching module, used to obtain user and simulation scenario information, and match a database template based on the simulation scenario information of the user; The construction module is used to establish the server-side library environment according to the database template; An adaptation module, used for splicing the simulation model in a way of image-model integration; A generation module is used to load the spliced simulation model into the library environment of the server side, and start the simulation environment to generate a power grid model; The generation module loads the simulation model into the library environment, including: Load the simulation model file containing the external network equivalent information into the real-time library environment to create a power grid model that meets the simulation model input range; Create graphic information that matches the model and load it into the real-time library environment; Load the cross-section data required for simulation into the real-time library environment, generate the power grid model and perform power grid model verification; The matching module matches the database template based on the simulation scenario information of the user, including: According to the simulation scenario information, the database templates are matched one by one using the pre-set matching rule library; Based on user information, modify the matched database template information; Based on the simulation model parameters, the mandatory fields and optional fields are loaded from the matching rule library; The matching module matches the database templates one by one according to the simulation scenario information using a pre-set matching rule library, including: Calculate the number of lines and buses based on the self-learning matching algorithm; According to the number of lines and the number of buses, a threshold of the fuzzy algorithm is set; Matching a database template according to a threshold of the fuzzy algorithm; The generation module uses the image-model integration method to splice the simulation model, including: The cloud platform searches for simulation scene information within a predefined simulation model input range, and parses the simulation model from the simulation scene information; When the cloud platform determines that there is no database template associated with the simulation model, the simulation model is directly spliced; or, when it is determined that there is a database template associated with the simulation model, the database template is used to update the currently existing associated database template; The step of splicing the simulation model comprises: Selecting boundary devices from the simulation model; Based on the selected boundary devices, the simulation model is cut into models; The simulation model after model cutting is docked to obtain a spliced simulation model.
