Breakable connection device
By adopting the design of fixed components with different strengths in the marine bollards, it is ensured that the first fixed component breaks when the cable tension is overloaded, protecting the bollards and concrete, solving the problems of high maintenance costs and equipment damage in the existing technology, and realizing It achieves rapid recovery and reduced maintenance costs.
Patent Information
- Application Number
- CN201910095531.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-01-31
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2039-01-31
AI Technical Summary
In the existing technology, when the cable tension of a marine bollard exceeds the safe load, it is easy to cause the anchor bolts to break, the bollard to break, or the cable to break, resulting in high maintenance costs, time-consuming and equipment damage.
The breakable connection device is adopted, and the first fixed member and the second fixed member with different strengths are provided to ensure that when the cable tension exceeds the safe load, the first fixed member breaks first to protect the bollard and concrete from damage, which is convenient Replace connecting bolts for quick return to service.
It protects the bollards and concrete when the cable tension is overloaded, reduces maintenance costs, simplifies the replacement process, and ensures the stability and safety of dock facilities.
Smart Images

Figure CN109594525B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of marine equipment, in particular to a breakable connection device. Background Art
[0002] A mooring post is a facility installed on a dock for mooring ships. The mooring post and the ship are connected by putting the ship's cable on the mooring post. In the prior art, the mooring post is directly fixed to the concrete using anchor bolts. This connection method may lead to three situations when the cable tension exceeds the safe load. First, the anchor bolt breaks or detaches from the concrete; second, the anchor bolt does not break but the mooring post itself breaks; third, neither the anchor bolt nor the mooring post breaks but the cable breaks.
[0003] For the first case, it is necessary to re-pour concrete and then fix the mooring post with new anchor bolts. The concrete takes a long time to solidify, so the labor cost and material cost of maintenance are high and the maintenance takes a long time. The repaired mooring post cannot be put into use immediately. For the second case, it is necessary to reinstall a new mooring post. The price of the mooring post is relatively high, so the cost is high. For the third case, after the cable is broken, on the one hand, the strength of the mooring post deteriorates, and on the other hand, the equipment on the ship where the cable is broken is greatly damaged. Summary of the invention
[0004] The present invention is intended to provide a breakable connection device to solve the problem in the prior art that when the mooring post encounters a cable tension exceeding the safety load, the anchor bolts, the mooring post or the cable may be broken.
[0005] In order to achieve the above object, the basic scheme of the present invention is as follows:
[0006] A breakable connection device comprises a mooring post and a base, wherein the base and the mooring post are fixedly connected via a first fixing member, and the base and the concrete of the dock are fixedly connected via a second fixing member, wherein the strength of the first fixing member is lower than that of the second fixing member.
[0007] Compared with the prior art, the following are the beneficial effects:
[0008] First, when the tension of the cable connected to the mooring post exceeds the safe load, because the strength of the first fixing component is lower than that of the second fixing component, the first fixing component will break before the second fixing component, thereby ensuring that even if the tension of the cable exceeds the safe load, the mooring post, the cable and the base can all remain intact, and because the strength of the second fixing component is greater than that of the first fixing component, the connection strength of the second fixing component is not damaged; at this time, as long as a new first fixing component is replaced, the mooring post can be quickly restored to use and still have good strength.
[0009] Secondly, through the combination of the base, the first fixing member and the second fixing member of different strengths, it is ensured that the breaking part of the mooring post when overloaded occurs on the first fixing member with low strength, thereby protecting the concrete from damage and the safety of the mooring post, making replacement simple and convenient, and reducing the maintenance cost of the dock.
[0010] Furthermore, the first fixing member includes a connecting bolt and a connecting nut, the second fixing member includes a fixing bolt and a fixing nut, the performance level of the connecting bolt is lower than the performance level of the fixing bolt, and the base and the mooring post are both provided with a first through hole for the connecting bolt to pass through; the base is also provided with a second through hole for the fixing bolt to pass through.
[0011] Beneficial effect: The connecting bolts have a lower performance level than the fixing bolts, that is, the tensile strength and yield strength of the connecting bolts are lower than those of the fixing bolts, that is, the connection strength of the first fixing component is lower than the connection strength of the second fixing component, ensuring that when the tension of the cable exceeds the safety load, the first fixing component will break before the second fixing component.
[0012] When the connecting bolts are broken or need to be replaced regularly, only the connecting bolts need to be replaced. Compared with welding, riveting and snap-on connection, the connection and replacement using bolts and nuts is simpler, and the maintenance and repair costs are relatively low.
[0013] Furthermore, the first through holes and the second through holes are arranged at intervals.
[0014] Beneficial effect: The first through holes and the second through holes are arranged at intervals, so that the connecting bolts and the fixing bolts are also arranged at intervals, ensuring the stability of the connection between the mooring post, the base and the concrete.
[0015] Furthermore, the specification size of the connecting bolt is smaller than the specification size of the fixing bolt.
[0016] Beneficial effect: The specification size of the connecting bolt is smaller than that of the fixing bolt, which further ensures that the overall strength of the connecting bolt is lower than that of the fixing bolt, that is, it ensures that when the connecting bolt breaks, the fixing bolt remains intact.
[0017] Furthermore, a first groove is provided at the lower portion of the first through hole of the base, and a second groove is provided at the upper portion of the second through hole.
[0018] Beneficial effect: After the connecting bolts fix the base and the mooring post, the head of the connecting bolt is located in the first groove, which prevents the head of the connecting bolt from protruding from the bottom surface of the base, thereby causing the base to be lifted up, the contact area between the base and the concrete to become smaller, and ultimately the connection strength between the base and the concrete to be reduced.
[0019] Similarly, the head of the fixing bolt is located in the second groove, which can also avoid the situation where the connection strength between the base and the mooring post is reduced due to the fixing bolt separating the base and the mooring post.
[0020] Furthermore, the first through hole of the base is a threaded through hole.
[0021] Beneficial effect: The connecting bolt can form a fixed connection with the base through the first threaded through hole, which ensures that the connecting bolt will not fall out of the base directly after being installed on the base from bottom to top; on the other hand, the contact surface between the connecting bolt and the base is wider, so the connection strength is higher.
[0022] Furthermore, a third through hole is provided at the center of the base.
[0023] Beneficial effect: The third through hole reduces the material at the center of the base. Compared with the case without the third through hole, the material cost of the base is higher and the molding difficulty is greater.
[0024] Furthermore, a third groove is provided on the upper portion of the first through hole of the mooring post.
[0025] Beneficial effect: The existence of the third groove enables the bolt rod of the connecting bolt to be located in the third groove, thereby reducing the probability of the connecting bolt being damaged by other foreign objects. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a structural exploded diagram of an embodiment of the present invention;
[0027] Figure 2 for Figure 1 A front view of an embodiment of the present invention;
[0028] Figure 3 for Figure 2 A top view of a base in an embodiment of the present invention;
[0029] Figure 4 for Figure 2 Bottom view of the base in an embodiment of the present invention. DETAILED DESCRIPTION
[0030] The following is further described in detail through specific implementation methods:
[0031] The reference numerals in the drawings of the specification include: bollard 1, base 2, connecting bolt 3, fixing bolt 4, connecting nut 5, fixing nut 6, third groove 7, first groove 8, first through hole 9, second groove 10, second through hole 11, third through hole 12, concrete 13.
[0032] The embodiment is basically as follows Figures 1 to 4 As shown:
[0033] The breakable connection device comprises a mooring post 1, a base 2, a first fixing member and a second fixing member. The first fixing member forms a fixed connection between the base 2 and the mooring post 1, and the second fixing member forms a fixed connection between the base 2 and the concrete 13 of the dock. The mooring post 1 is located above the base 2.
[0034] The first fixing member includes a connecting bolt 3 and a connecting nut 5, and the second fixing member includes a fixing bolt 4 and a fixing nut 6. The connecting bolt 3 is lower than the fixing bolt 4 in terms of performance level and specification size, that is, the fixing bolt 4 is a high-strength bolt; the base 2 and the mooring post 1 are both provided with a first through hole 9 for the connecting bolt 3 to pass through, the mooring post 1 and the first through hole 9 of the base 2 are connected, and the connecting bolt 3 and the connecting nut 5 form a fixed connection between the mooring post 1 and the base 2 through the first through hole 9; the base 2 is also provided with a second through hole 11 for the fixing bolt 4 to pass through, and the fixing bolt 4 can cooperate with the fixing nut 6 to fix the base 2 and the concrete 13 through the second through hole 11.
[0035] A first groove 8 is formed at the lower part of the first through hole 9 of the base 2 , a second through hole 11 is formed on the base 2 , a second groove 10 is formed at the upper part of the second through hole 11 , and a third groove 7 is formed at the upper part of the first through hole 9 of the mooring post 1 .
[0036] The first through hole 9 and the second through hole 11 on the base 2 are arranged at intervals, and a third through hole 12 is opened at the center of the base 2 .
[0037] The first through hole 9 on the base 2 is a threaded through hole.
[0038] The connecting bolts 3 and the fixing bolts 4 are both covered with washers of matching sizes when connecting the fastening base 2 and the mooring post 1 .
[0039] The specific implementation process is as follows:
[0040] Install bollard 1:
[0041] First, manually pass the connecting bolt 3 from bottom to top, the connecting bolt 3 is threadedly connected to the first through hole 9 on the base 2, and the head of the connecting bolt 3 is located in the first groove 8; second, the base 2 with the connecting bolt 3 is placed on the concrete 13 of the dock, and the high-strength fixing bolt 4 is screwed into the concrete 13 through the second through hole 11, and then the fixing nut 6 and the washer are connected to the fixing bolt 4, so that the base 2 and the concrete 13 are fixedly connected. After the fixing bolt 4 is connected, ensure that the top of the fixing bolt 4 and the fixing nut 6 are both located in the second groove 10; third, manually match the mooring post 1 with the base 2, so that the bolt rod of the connecting bolt 3 is passed through the first through hole 9 of the mooring post 1, and the connecting nut 5 and the washer are used to connect to the connecting bolt 3, so that the base 2 and the mooring post 1 are fixedly connected, and the installation of the mooring post 1 is completed.
[0042] When the tension of the cable connected to the mooring post 1 exceeds the safety load, the connecting bolt 3 will break before the fixing bolt 4 because the strength of the connecting bolt 3 is lower than that of the fixing bolt 4, thereby ensuring that even if the tension of the cable exceeds the safety load, the mooring post 1, the cable, the base 2 and the fixing bolt 4 can all remain intact, and because the strength of the fixing bolt 4 is greater than that of the connecting bolt 3, the connection strength of the fixing bolt 4 is not damaged; at this time, as long as the new connecting bolt 3 is replaced, the mooring post 1 can be quickly restored to use and still have good strength.
[0043] Connecting bolt 3 replacement:
[0044] When the connecting bolt 3 is broken or needs to be replaced regularly, first, the connecting nut 5 is removed from the connecting bolt 3; second, the mooring post 1 is removed; third, the fixing nut 6 is loosened to make the base 2 lose connection with the concrete 13; fourth, the connecting bolt 3 on the base 2 is removed and replaced with a new connecting bolt 3; then the mooring post 1 is installed and fixed according to the second and third steps when installing the mooring post 1.
[0045] The combination of the base 2, the connecting bolts 3 of different strengths and the fixing bolts 4 ensures that the breaking part of the mooring post 1 when overloaded occurs on the connecting bolts 3 of low strength, thereby protecting the concrete 13 from damage and the safety of the mooring post 1. The replacement is simple and convenient, thereby reducing the maintenance cost of the dock.
[0046] The above is only an embodiment of the present invention, and the common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the structure of the present invention, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. A breakable connection device, including a mooring post, characterized in that: It also includes a base, wherein the base is fixedly connected to the mooring post via a first fixing member, and the base is fixedly connected to the concrete of the dock via a second fixing member, wherein the strength of the first fixing member is lower than that of the second fixing member; The first fixing member includes a connecting bolt and a connecting nut, and the second fixing member includes a fixing bolt and a fixing nut. The performance level of the connecting bolt is lower than that of the fixing bolt. The base and the bollard are both provided with a first through hole for the connecting bolt to pass through, and the first through hole is a threaded through hole. The base is also provided with a second through hole for the fixing bolt to pass through. The first through holes and the second through holes are arranged at intervals; The specification size adopted by the connecting bolt is smaller than the specification size of the fixing bolt.
2. The breakable connection device according to claim 1, characterized in that: A first groove is provided at the lower part of the first through hole of the base, and a second groove is provided at the upper part of the second through hole.
3. The breakable connection device according to claim 1, characterized in that: A third through hole is provided at the center of the base.
4. The breakable connection device according to claim 1, characterized in that: A third groove is provided on the upper portion of the first through hole of the mooring post.
Citation Information
Patent Citations
Breakable connecting device
CN209958298U
Break bollard
US4437427A