A construction structure and method for transition section between plastic drainage board and CFG pile soft foundation treatment

By filling soil in the plastic drainage plate and CFG pile reinforcement area in graded and performing asymmetric pre-pressure, the problem of difference in composite foundation settlement is solved, the consolidation and strength of soft soil is improved, and the safety of road operations is ensured. .

CN110185022BActive Publication Date: 2024-11-26CHINA RAILWAY ERJU 1ST ENG CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910621478.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-07-10
Publication Date
2024-11-26
Estimated Expiration
2039-07-10

AI Technical Summary

Technical Problem

During construction projects on soft soil foundations, the difference in the stiffness of composite foundations between plastic drainage plates and CFG piles reinforcement methods leads to a large difference in settlement during construction and after completion, endangering driving safety. The existing overload pre-pressure method has not fully considered this difference.

Method used

Using the construction method of graded filling, two heights of soil are filled above the plastic drainage plate and CFG pile reinforcement area, and the overloaded soil is unloaded after the soil is consolidated, reducing the stiffness difference through asymmetric prepression. , ensure that the foundation strength and settlement are consistent.

Benefits of technology

Effectively reduce or eliminate the settlement difference between plastic drainage plates and CFG pile reinforcement methods, improve the consolidation and strength of soft soil, ensure the safety of road operation, and meet the normal use requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110185022B_ABST
    Figure CN110185022B_ABST
Patent Text Reader

Abstract

The present invention provides a construction structure and method for a transition section of a plastic drain board and a CFG pile soft foundation treatment. The method is to pile up soil bodies of at least two heights above the transition area in a graded filling manner after the plastic drain board and the CFG pile are driven into the soil layer. After the filling is completed, a certain preloading time is maintained. After the foundation soil body reaches the required consolidation degree and strength, the overloaded soil body is unloaded, and then the roadbed and pavement structure layer are constructed. The differential settlement between the two treatment methods is reduced or even eliminated, thereby ensuring the safety of road operation. The invention belongs to the field of soft foundation construction of roadbed engineering.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a construction structure and method of a transition section between a plastic drainage board and a CFG pile soft foundation treatment, and belongs to the field of soft foundation construction of roadbed engineering. Background Art

[0002] In my country, soft soil is widely distributed in inland areas, coastal areas and plains. Since soft soil has the characteristics of high water content and low bearing capacity, when constructing projects on soft soil, there are often phenomena such as insufficient bearing capacity and large post-construction settlement. Therefore, when the soil layer is a soft soil layer, it needs to be reinforced. In actual engineering treatment, due to the limitations of soil properties, geological landforms and construction period, two or more foundation treatment methods are often used to jointly reinforce the soft foundation. Common treatment methods include driving plastic drainage boards or CFG piles into the soil layer. At this time, due to the large difference in stiffness of the composite foundation formed after treatment, there will be large differences in settlement during construction and after completion. If the embankment is directly built in the transition area between the two reinforcement methods without treatment, it is likely to endanger driving safety. In engineering, the overload preloading method is often used for treatment, which is to pile up loads symmetrically on both sides of the transition section. However, this treatment method does not fully consider the stiffness difference between the two composite foundations. During construction and after completion, the transition section will produce a large differential settlement. Therefore, it is necessary to propose a reasonable treatment method based on the characteristics of these two reinforcement methods to reduce the settlement during construction and after construction. Summary of the invention

[0003] The present invention provides a construction structure and method for a transition section of a plastic drainage board and a CFG pile soft foundation treatment, so as to reduce or even eliminate the differential settlement between the two treatment methods, thereby ensuring the safety of road operation.

[0004] In order to solve the above problems, a construction method of the transition section of plastic drainage board and CFG pile soft foundation treatment is proposed. In this method, after the plastic drainage board and CFG piles are driven into the soil layer, at least two heights of soil are piled up above the transition area in a graded filling manner. After the filling is completed, a certain preloading time is maintained. After the foundation soil reaches the required consolidation degree and strength, the overloaded soil is unloaded, and then the roadbed and pavement structure layer are constructed.

[0005] In the above method, the overload preloading soil is consistent with the roadbed filling material, the slope of the two sides of the preloading soil is 1:1.5, and a 4% herringbone slope is set horizontally from the top to the outside. The width b and height h1 of the piled soil are determined by the overload ratio and the design load, and the overload ratio is 1.4-1.6;

[0006] In the above method, two levels of soil are piled up above the transition area in a graded filling manner. The two levels of soil are respectively filled directly above the plastic drain board reinforcement area and the CFG pile reinforcement area. The filling height of the soil in the plastic drain board reinforcement area is 4 times the height of the CFG pile reinforcement area.

[0007] The main steps of the above method are as follows:

[0008] 1) According to the design requirements, the design load and overload ratio are obtained to determine the weight of the piled soil;

[0009] 2) The width and height of the piled soil are calculated from the weight of the piled soil;

[0010] 3) After the construction of plastic drainage board and CFG pile is completed, the soil is graded and filled. When filling, the soil is piled up and leveled, and the top surface is kept flat;

[0011] 4) After the loading is completed, maintain the preload, unload the overloaded soil after the soil consolidation degree reaches the requirement, and then proceed with the road construction.

[0012] The present invention also provides a construction structure of a transition section between a plastic drain board and a CFG pile soft foundation treatment, comprising a first soil body and a second soil body, wherein the first soil body and the second soil body are both filled above the transition section between the plastic drain board reinforcement area and the CFG pile reinforcement area, and the first soil body is filled directly above the plastic drain board reinforcement area, and the second soil body is filled directly above the CFG pile reinforcement area, and the height of the first soil body is three to five times the height of the second soil body.

[0013] In the aforementioned construction structure, the first soil body and the second soil body are an integrated structure, the height of the first soil body is four times the height of the second soil body, and the first soil body and the second soil body have the same width above the plastic drainage board reinforcement area and the CFG pile reinforcement area.

[0014] Compared with the prior art, the method of the present invention can discharge the pore water in the soft soil through a certain period of preloading, so that the soft soil can be consolidated before the roadbed is built, and the strength of the soft soil foundation can be improved, thereby reducing or even eliminating the post-construction settlement and ensuring the safety of road operation; at the same time, the method takes into account that the composite foundation stiffness of the plastic drainage board reinforcement area is less than that of the CFG pile reinforcement area, and adopts an asymmetric preloading method, which can better reduce the stiffness difference between the transition sections, thereby reducing the settlement difference during construction and after construction, and meeting the normal use requirements of the road. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the cross-sectional structure of the present invention. DETAILED DESCRIPTION

[0016] In order to make the objectives, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0017] Example

[0018] Reference Figure 1 The present embodiment provides a construction structure of a transition section between a plastic drain board and a CFG pile soft foundation treatment, including a first soil body 1 and a second soil body 2. The first soil body 1 and the second soil body 2 are an integrated structure. The first soil body 1 and the second soil body 2 are both filled above the transition section between the plastic drain board reinforcement area 3 and the CFG pile reinforcement area 4, and the first soil body 1 is filled directly above the plastic drain board reinforcement area 3, and the second soil body 2 is filled directly above the CFG pile reinforcement area 4. The height of the first soil body 1 is four times the height of the second soil body 2, and the widths of the first soil body 1 and the second soil body 2 above the plastic drain board reinforcement area 3 and the CFG pile reinforcement area 4 are the same.

[0019] The construction method is as follows: after the plastic drainage board and CFG piles are driven into the soil layer, two heights of soil are piled up above the transition area in a graded filling manner. After the filling is completed, a certain preloading time is maintained. After the foundation soil reaches the required consolidation degree and strength, the overloaded soil is unloaded, and then the roadbed and pavement structure layer are constructed. The overloaded preloaded soil is consistent with the roadbed body filling material. The slope rate of the side slopes on both sides of the preloaded soil is 1:1.5, and a 4% herringbone slope is set horizontally outward from the top. The width b and height h1 of the piled soil are determined by the overload ratio and the designed use load, and the overload ratio is 1.4-1.6. The two heights of soil are piled up above the transition area in a graded filling manner, and the two heights of soil are respectively filled directly above the plastic drainage board reinforcement area 3 and the CFG pile reinforcement area 4.

[0020] The main steps are as follows:

[0021] 1) According to the design requirements, the design load and overload ratio are obtained to determine the weight of the piled soil;

[0022] 2) The width and height of the piled soil are calculated from the weight of the piled soil;

[0023] 3) After the construction of plastic drainage board and CFG pile is completed, the soil is graded and filled. When filling, the soil is piled up and leveled, and the top surface is kept flat;

[0024] 4) After the loading is completed, maintain the preload, unload the overloaded soil after the soil consolidation degree reaches the requirement, and then proceed with the road construction.

[0025] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction method for a transition section between a plastic drainage board and a CFG pile soft foundation treatment, characterized in that: The method is to pile up two heights of soil above the transition area in a graded filling manner after the plastic drain board and CFG piles are driven into the soil layer. After the filling is completed, pre-compression is performed. After the foundation soil reaches the required consolidation degree and strength, the overloaded soil is unloaded, and then the roadbed and pavement structure layers are constructed. The two heights of soil are respectively filled directly above the plastic drain board reinforcement area and the CFG pile reinforcement area. The filling height of the plastic drain board reinforcement area is 4 times the height of the CFG pile reinforcement area. The main steps of the above method are as follows: 1) According to the design requirements, the design load and overload ratio are obtained to determine the weight of the piled soil; 2) The width and height of the piled soil are calculated from the weight of the piled soil; 3) After the construction of plastic drainage board and CFG pile is completed, the soil is graded and filled. When filling, the soil is piled up and leveled, and the top surface is kept flat; 4) After the loading is completed, maintain the preload, unload the overloaded soil after the soil consolidation degree reaches the requirement, and then proceed with the road construction.

2. The construction method of the transition section between the plastic drainage board and the CFG pile soft foundation treatment according to claim 1 is characterized by: The overloaded preloaded soil is consistent with the roadbed filling material. The slope of the side slopes on both sides of the preloaded soil is 1:1.5, and a 4% herringbone slope is set horizontally outward from the top. The width b and height h1 of the loaded soil are determined by the overload ratio and the design load. The overload ratio is 1.4~1.6.