By adopting a double-layer steel frame structure and layered installation method in tunnel construction, the problem of large deformation of high-ground stress soft rock tunnels is solved, the initial support stiffness and construction stability of the tunnel are improved, and construction quality and safety are ensured.

CN110374637BActive Publication Date: 2024-11-26CHINA RAILWAY 16TH BUREAU GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910618879.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-07-10
Publication Date
2024-11-26
Estimated Expiration
2039-07-10

AI Technical Summary

Technical Problem

During tunnel construction, highland stress soft rock tunnels are prone to major deformation, resulting in problems such as cracking, peeling of sprayed concrete, twisting and breaking of steel frames. It is difficult for single-layer steel frames to effectively control large deformation, affecting construction quality, safety and progress.

Method used

The double-layer steel frame structure is adopted, including the upper step, lower step and the inner and outer layer steel frame of the arch. The design of fixed screws and installation holes increases the initial support stiffness, and a layered installation method is adopted to ensure the stable connection of each layer of steel frame. and docking.

Benefits of technology

It effectively improves the initial support stiffness of the tunnel, reduces deformation of the steel frame by ground stress, prevents large deformation of the tunnel, and improves the stability and safety of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110374637B_ABST
    Figure CN110374637B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of tunnel construction engineering, and provides a double-layer steel frame for a tunnel and an installation method thereof. The double-layer steel frame comprises an upper step inner steel frame and an upper step outer steel frame which match the contour of the upper step of the tunnel, a lower step inner steel frame and a lower step outer steel frame which match the contour of the lower step of the tunnel, and an inverted arch inner steel frame and an inverted arch outer steel frame which match the contour of the inverted arch of the tunnel; the lower ends of the upper step inner steel frame and the upper step outer steel frame are connected to the upper ends of the lower step inner steel frame and the lower step outer steel frame respectively, the lower end of the lower step inner steel frame is connected to the foundation plane, the outer side surface of the lower end of the lower step inner steel frame is connected to the upper end of the inverted arch inner steel frame with the arc opening facing upward, and the lower end of the lower step outer steel frame is connected to the upper end of the inverted arch outer steel frame with the arc opening facing upward. The double-layer steel frame is used to improve the initial support stiffness of the tunnel and solve the problem of large deformation of the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of tunnel construction engineering, and in particular relates to a tunnel double-layer steel frame and an installation method thereof. Background Art

[0002] In tunnel construction projects, the large deformation problem of high-in-situ stress soft rock tunnels has always attracted much attention. High-in-situ stress soft rock has the defects of weak surrounding rock, poor self-stabilization ability and high in-situ stress level. If the construction technical measures are not appropriate, it is easy to cause large deformation due to extrusion, resulting in cracking and peeling of tunnel shotcrete, twisting and breaking of steel frames, intrusion and replacement of initial support, cracking and falling of secondary linings, and even collapse, which seriously affects the quality, safety, progress and cost of tunnel construction. One of the methods to control large deformation is to increase the stiffness of the primary support. At present, it is difficult to achieve ideal results in controlling large deformation with a single-layer steel frame. Therefore, it is necessary to improve the installation structure and installation method of the steel frame to ensure large deformation requirements. Summary of the invention

[0003] The purpose of the present invention is to provide a double-layer steel frame for a tunnel, which adopts the double-layer steel frame to improve the initial support stiffness of the tunnel and solve the problem of large deformation of the tunnel.

[0004] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a double-layer steel frame for a tunnel, comprising an upper step inner steel frame and an upper step outer steel frame which match the contour of the tunnel upper step, a lower step inner steel frame and a lower step outer steel frame which match the contour of the tunnel lower step, and an inverted arch inner steel frame and an inverted arch outer steel frame which match the contour of the tunnel inverted arch; the lower ends of the upper step inner steel frame and the upper step outer steel frame are connected to the upper ends of the lower step inner steel frame and the lower step outer steel frame respectively, the lower end of the lower step inner steel frame is connected to a base plane, the outer side surface of the lower end of the lower step inner steel frame is connected to the upper end of the inverted arch inner steel frame with an arc opening facing upward, and the lower end of the lower step outer steel frame is connected to the upper end of the inverted arch outer steel frame with an arc opening facing upward.

[0005] Optionally, when the outer steel frame of the upper step is not installed, a temporary inverted arch is provided between the two lower ends of the inner steel frame of the upper step.

[0006] Optionally, the outer sides of the upper step inner steel frame, the lower step inner steel frame and the inverted arch inner steel frame are all provided with fixing screws, and the upper step outer steel frame, the lower step outer steel frame and the inverted arch outer steel frame are all provided with mounting holes that cooperate with the fixing screws.

[0007] Optionally, the mounting hole is a strip-shaped stepped hole, and the strip-shaped stepped hole is provided with two diameter-changing sections from the inside to the outside, and the width of the inner diameter-changing section is consistent with that of the fixing screw, and the width of the outer diameter-changing section is greater than that of the inner diameter-changing section.

[0008] Optionally, the upper step inner steel frame includes an arc top inner steel frame, and both ends of the arc top inner steel frame are connected to the arc top side inner steel frame; correspondingly, the upper step outer steel frame includes an arc top outer steel frame, and both ends of the arc top outer steel frame are connected to the arc top side outer steel frame.

[0009] Optionally, the inner steel frame of the inverted arch includes an inner steel frame at the bottom of the arc, and both ends of the inner steel frame at the bottom of the arc are connected to the inner steel frame on the side of the bottom of the arc; the corresponding outer steel frame of the inverted arch includes an outer steel frame at the bottom of the arc, and both ends of the outer steel frame at the bottom of the arc are connected to the outer steel frame on the side of the bottom of the arc.

[0010] Optionally, it also includes a supporting platform, which includes a base plate arranged on a base plane, the lower end of the inner steel frame of the lower step is connected to the base plate, and a reinforcing inclined plate is provided on the base plate and connected to the inner and outer side surfaces of the lower end of the inner steel frame of the lower step.

[0011] Optionally, the upper step inner steel frame, the lower step inner steel frame and the inverted arch inner steel frame are connected to the surrounding rock through fixed anchor rods.

[0012] The present invention also aims to provide a method for installing a double-layer steel frame in a tunnel, which uses a double-layer steel frame to improve the initial support stiffness of the tunnel and solve the problem of large deformation of the tunnel.

[0013] In order to achieve the above object, the present invention adopts the following technical scheme: a method for installing a double-layer steel frame in a tunnel, comprising the following steps:

[0014] A. Excavate the soil of the upper step of the tunnel and install the inner steel frame of the upper step corresponding to the surrounding rock of the upper step;

[0015] B. Excavate the soil of the lower step of the tunnel. When excavating the soil of the lower step, level the land below the lower end of the inner steel frame of the upper step to form a foundation plane. Then install the inner steel frame of the lower step corresponding to the surrounding rock of the upper step, and connect the upper and lower ends of the inner steel frame of the lower step to the lower end of the inner steel frame of the upper step and the foundation plane.

[0016] C. Excavate the soil of the tunnel invert arch, first pre-connect the inner steel frame of the invert arch with the outer steel frame of the invert arch, then install the inner steel frame of the invert arch corresponding to the surrounding rock around the invert arch, and connect the inner steel frame of the invert arch with the outer side surface of the lower end of the inner steel frame of the lower step;

[0017] D. Connect the lower end of the outer steel frame of the lower step to the upper end of the outer steel frame of the invert, and connect the outer steel frame of the lower step to the inner steel frame of the lower step; connect the lower end of the outer steel frame of the upper step to the upper end of the outer steel frame of the lower step, and connect the outer steel frame of the upper step to the inner steel frame of the upper step.

[0018] Optionally, in step A, a temporary inverted arch is connected between the two lower ends of the inner steel frame of the upper step, and in step D, the temporary inverted arch is removed when installing the outer steel frame of the upper step.

[0019] Compared with the prior art: the present invention arranges the upper step outer steel frame, the lower step outer steel frame and the invert outer steel frame to further increase the overall structural stability of the primary support steel frame, and prevent the subsequent influence of ground stress from causing large deformation of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of a double-layer steel frame of the present invention;

[0021] Figure 2 It is a schematic diagram of the connection between the inner steel frame and the outer steel frame;

[0022] Figure 3 This is a schematic diagram of the connection between the pedestal and the inner steel frame of the lower step.

[0023] Reference numerals:

[0024] 1. Inner steel frame of upper step; 11. Inner steel frame of arc top; 12. Inner steel frame of arc top side; 2. Outer steel frame of upper step; 21. Outer steel frame of arc top; 22. Outer steel frame of arc top side; 3. Inner steel frame of lower step; 4. Outer steel frame of lower step; 5. Inverted arch inner steel frame; 51. Inner steel frame of arc bottom; 52. Inner steel frame of arc bottom side; 6. Inverted arch outer steel frame; 61. Outer steel frame of arc bottom; 62. Outer steel frame of arc bottom side; 7. Temporary inverted arch; 81. Fixing screw; 82. Mounting hole; 9. Capping platform; 91. Base plate; 92. Strengthening inclined plate; 10. Fixing anchor rod. DETAILED DESCRIPTION

[0025] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. Based on the described embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art belong to the scope of protection of the present invention.

[0026] A double-layer steel frame for a tunnel, such as Figure 1 As shown, according to the tunnel contour line, the tunnel can be divided into a semicircular upper step area, a lower step area arranged downward and inwardly along the upper step area, and an inverted arch area. The corresponding side wall of the upper step area is provided with an upper step inner steel frame 1 and an upper step outer steel frame 2, the side wall of the lower step area is provided with a lower step inner steel frame 3 and a lower step outer steel frame 4, and the bottom of the inverted arch area is provided with an inverted arch inner steel frame 5 and an inverted arch outer steel frame 6;

[0027] The upper step area and the lower step area are excavated in sequence, and the upper step inner steel frame 1 and the lower step inner steel frame 3 are first fixed and installed. When the lower step area is excavated, a base plane is reserved so that the lower end of the lower step inner steel frame 3 is directly fixed on the base plane, which has the following advantages: if the base plane is not set, the upper step inner steel frame 1 and the lower step inner steel frame 3 may be deformed to a certain extent under the action of the ground stress exerted by the surrounding rock of the upper step area and the lower step area of ​​the tunnel, and the inner steel frame 5 of the invert arch is butted with the inner steel frame 3 of the lower step. However, after the foundation plane is set, part of the ground stress can be borne by the foundation plane, reducing the deformation of the upper step inner steel frame 1 and the lower step inner steel frame 3. Even if deformation occurs, there is a relatively large installation surface for selection and adjustment when the inner steel frame 5 of the inverted arch is connected to the outer side surface of the lower end of the inner steel frame 3 of the lower step. In addition, the present invention arranges the upper step outer steel frame 2, the lower step outer steel frame 4 and the inverted arch outer steel frame 6 to further increase the overall structural stability of the primary support steel frame, thereby preventing the influence of subsequent ground stress from causing large deformation of the tunnel.

[0028] In some embodiments, Figure 1 As shown, after fixing the upper step inner steel frame 1, a temporary inverted arch 7 is arranged between the two lower ends of the upper step inner steel frame 1, which can play a temporary support role to prevent the upper step inner steel frame 1 from being deformed by ground stress and affecting the subsequent docking and installation of the lower step inner steel frame 3 and the upper step inner steel frame 1.

[0029] In some embodiments, Figure 2 As shown, when installing the upper step outer steel frame 2, the lower step outer steel frame 4 and the inverted arch outer steel frame 6, the mounting holes 82 are aligned with the fixing screws 81 on the upper step inner steel frame 1, the lower step inner steel frame 3 and the inverted arch inner steel frame 5, and then fixed with nuts. Of course, in addition to the bolt connection method, those skilled in the art can also use other structural connectors to fix the inner steel frame and the outer steel frame, and can use a U-shaped plate to clamp the inner and outer steel frames for connection.

[0030] In some embodiments, Figure 2 As shown, due to the influence of ground stress, the upper step inner steel frame 1, the lower step inner steel frame 3 and the inverted arch inner steel frame 5 may undergo some deformation, resulting in the installation hole 82 being unable to be aligned with the fixing screw 81, so the installation hole 82 is strip-shaped to facilitate the cooperation with the fixing screw 81. In addition, in order to avoid the nut protruding from the outer side when installing, the installation hole 82 is set as a stepped hole to facilitate the nut to be embedded in the outer diameter reducing section.

[0031] In some embodiments, Figure 1As shown, the upper step inner steel frame 1 includes an arc top inner steel frame 11, and the two ends of the arc top inner steel frame 11 are connected to the arc top side inner steel frame 12; the corresponding upper step outer steel frame 2 includes an arc top outer steel frame 21, and the two ends of the arc top outer steel frame 21 are connected to the arc top side outer steel frame 22. The inverted arch inner steel frame 5 includes an arc bottom inner steel frame 51, and the two ends of the arc bottom inner steel frame 51 are connected to the arc bottom side inner steel frame 52; the corresponding inverted arch outer steel frame 6 includes an arc bottom outer steel frame 61, and the two ends of the arc bottom outer steel frame 61 are connected to the arc bottom side outer steel frame 62. The upper step inner steel frame 1, the upper step outer steel frame 2, the inverted arch inner steel frame 5 and the inverted arch outer steel frame 6 can be divided into several parts according to actual installation requirements, and they can be assembled into a whole in advance and then fixedly installed with the surrounding rock of the tunnel, or they can be fixedly installed with the surrounding rock of the tunnel one by one.

[0032] In some embodiments, Figure 3 As shown, when excavating the lower step area, a foundation plane is pre-trimmed, and concrete can be poured on this foundation plane to reinforce this area. During the pouring, the base 9 can be pre-buried in the foundation plane, and then the lower end of the inner steel frame 3 of the lower step is connected to the base plate 91, and a reinforcing inclined plate 92 is used for auxiliary fixation. Those skilled in the art can also use other mechanical structural parts for connection or welding to complete the fixation of the inner steel frame 3 of the lower step.

[0033] In some embodiments, Figure 1 As shown, the upper step inner steel frame 1, the lower step inner steel frame 3 and the inverted arch inner steel frame 5 are connected to the surrounding rock through fixed anchor rods 10.

[0034] A method for installing a double-layer steel frame in a tunnel comprises the following steps:

[0035] A. Excavate the soil of the upper step of the tunnel according to the tunnel contour and the reserved deformation amount, and use fixed anchor rods 10 to fix the upper step inner steel frame 1 corresponding to the surrounding rock of the upper step. A temporary inverted arch 7 is connected between the two lower ends of the upper step inner steel frame 1. The temporary inverted arch 7 plays a role of temporary support to prevent the upper step inner steel frame 1 from being deformed by the influence of ground stress;

[0036] B. Excavate the soil of the lower step of the tunnel according to the tunnel contour and the reserved deformation. When excavating the soil of the lower step, level the land below the lower end of the inner steel frame 1 of the upper step to form a foundation plane, pour concrete to reinforce this area, and embed the cap 9 in the foundation plane during pouring, connect the upper end of the inner steel frame 3 of the lower step with the lower end of the inner steel frame 1 of the upper step, and then connect the lower end of the inner steel frame 3 of the lower step with the base plate 91, use the reinforcing inclined plate 92 for auxiliary fixing, and use the fixed anchor rod 10 to fix the inner steel frame 3 of the lower step;

[0037] C. Excavate the tunnel inverted arch soil according to the tunnel contour and the reserved deformation amount, pre-connect the inverted arch inner steel frame 5 with the inverted arch outer steel frame 6, then fix the inverted arch inner steel frame 5 with the corresponding surrounding rock of the inverted arch circle by using the fixed anchor rod 10, and connect the inverted arch inner steel frame 5 with the outer side surface of the lower end of the lower step inner steel frame 3; pre-connecting the inverted arch inner steel frame 5 with the inverted arch outer steel frame 6 in this step has the following advantages: because the inverted arch inner steel frame 5 is at the bottom of the tunnel, it must withstand a large in-situ stress from top to bottom. If the inverted arch inner steel frame 5 is only a single layer, it is very likely to be greatly deformed, resulting in the inverted arch outer steel frame 6 not matching normally when connected with the inverted arch inner steel frame 5. Pre-connection can avoid the above problem, so that the inverted arch steel frame 5 can withstand a large in-situ stress;

[0038] D. Connect the lower end of the lower step outer steel frame 4 to the upper end of the inverted arch outer steel frame 6, and connect the lower step outer steel frame 4 to the lower step inner steel frame 3; after dismantling the temporary inverted arch 7, connect the lower end of the upper step outer steel frame 2 to the upper end of the lower step outer steel frame 4, and connect the upper step outer steel frame 2 to the upper step inner steel frame 1; in this step, the installation order of the lower step outer steel frame 4 and the upper step outer steel frame 2 can be adjusted according to actual conditions.

[0039] As for why the above method does not directly adopt the method of directly splicing the two layers of steel frames of the upper step or the two layers of steel frames of the lower step, or directly adopting the upper step steel frame or the lower step steel frame with larger thickness, it is because if the steel frame is too large, it will be more difficult to construct and install, and after the two layers of steel frames of the upper step or the two layers of steel frames of the lower step are pre-installed, if the steel frame is deformed, its deformed cross-section will be larger, which is not conducive to adjusting the subsequent installation of the steel frame. By adopting the layered installation method of the present invention, firstly, the construction and installation of the single-layer steel frame is more convenient. In addition, after adopting the temporary invert arch 7 and the pedestal 9, the deformation of the inner steel frame 1 of the upper step and the inner steel frame 3 of the lower step can be effectively avoided. The subsequent installation can also ensure the alignment and coordination of the subsequent steel frames. Even if some deformation occurs, the subsequent single-layer steel frame can be more easily adapted to make some adjustments, such as cutting and bending, compared with the thicker steel frame.

[0040] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for installing a double-layer steel frame in a tunnel, characterized in that: The double-layer steel frame of the tunnel comprises an upper step inner steel frame (1) and an upper step outer steel frame (2) which match the contour of the tunnel upper step, a lower step inner steel frame (3) and a lower step outer steel frame (4) which match the contour of the tunnel lower step, and an inverted arch inner steel frame (5) and an inverted arch outer steel frame (6) which match the contour of the tunnel inverted arch; The lower ends of the upper step inner steel frame (1) and the upper step outer steel frame (2) are connected to the upper ends of the lower step inner steel frame (3) and the lower step outer steel frame (4), respectively; the lower end of the lower step inner steel frame (3) is connected to the base plane; the outer side surface of the lower end of the lower step inner steel frame (3) is connected to the upper end of the inverted arch inner steel frame (5) with the arc opening facing upward; and the lower end of the lower step outer steel frame (4) is connected to the upper end of the inverted arch outer steel frame (6) with the arc opening facing upward; The upper step inner steel frame (1) comprises an arc top inner steel frame (11), and the two ends of the arc top inner steel frame (11) are connected to the arc top side inner steel frame (12); the corresponding upper step outer steel frame (2) comprises an arc top outer steel frame (21), and the two ends of the arc top outer steel frame (21) are connected to the arc top side outer steel frame (22); The inverted arch inner steel frame (5) comprises an arc bottom inner steel frame (51), and two ends of the arc bottom inner steel frame (51) are connected to the arc bottom side inner steel frame (52); the corresponding inverted arch outer steel frame (6) comprises an arc bottom outer steel frame (61), and two ends of the arc bottom outer steel frame (61) are connected to the arc bottom side outer steel frame (62); The outer side surfaces of the upper step inner steel frame (1), the lower step inner steel frame (3) and the inverted arch inner steel frame (5) are all provided with fixing screws (81); and the upper step outer steel frame (2), the lower step outer steel frame (4) and the inverted arch outer steel frame (6) are all provided with mounting holes (82) that cooperate with the fixing screws (81); The mounting hole (82) is a strip-shaped stepped hole, and the strip-shaped stepped hole is provided with two diameter-changing sections from the inside to the outside, and the width of the inner diameter-changing section is consistent with that of the fixing screw (81), and the width of the outer diameter-changing section is greater than the width of the inner diameter-changing section; The installation method of the double-layer steel frame of the tunnel includes the following steps: A. Excavate the soil of the upper step of the tunnel and install the inner steel frame (1) of the upper step corresponding to the surrounding rock of the upper step; B. excavating the soil of the lower step of the tunnel. When excavating the soil of the lower step, the ground below the lower end of the inner steel frame (1) of the upper step is leveled to form a foundation plane, and then the inner steel frame (3) of the lower step is installed corresponding to the surrounding rock of the upper step, and the upper end and the lower end of the inner steel frame (3) of the lower step are connected to the lower end of the inner steel frame (1) of the upper step and the foundation plane; C. Excavating the tunnel inverted arch soil, first pre-connecting the inverted arch inner steel frame (5) and the inverted arch outer steel frame (6), then installing the inverted arch inner steel frame (5) corresponding to the surrounding rock of the inverted arch, and connecting the inverted arch inner steel frame (5) to the outer side surface of the lower end of the lower step inner steel frame (3); D. Connect the lower end of the lower step outer steel frame (4) to the upper end of the inverted arch outer steel frame (6), and simultaneously connect the lower step outer steel frame (4) to the lower step inner steel frame (3); connect the lower end of the upper step outer steel frame (2) to the upper end of the lower step outer steel frame (4), and simultaneously connect the upper step outer steel frame (2) to the upper step inner steel frame (1).

2. The installation method of the double-layer steel frame of a tunnel according to claim 1 is characterized in that: When the upper step outer steel frame (2) is not installed, a temporary inverted arch (7) is provided between the two lower ends of the upper step inner steel frame (1).

3. The installation method of the double-layer steel frame of a tunnel according to claim 1 is characterized in that: It also includes a capping platform (9), the capping platform (9) including a base plate (91) arranged on a base plane, the lower end of the lower step inner layer steel frame (3) is connected to the base plate (91), and a reinforcing inclined plate (92) is provided on the base plate (91) and is connected to the inner and outer side surfaces of the lower end of the lower step inner layer steel frame (3).

4. The installation method of the double-layer steel frame of a tunnel according to claim 1 is characterized in that: The upper step inner steel frame (1), the lower step inner steel frame (3) and the inverted arch inner steel frame (5) are connected to the surrounding rock via fixed anchor rods (10).

5. The installation method of the double-layer steel frame of a tunnel according to claim 1 is characterized in that: In the step A, a temporary inverted arch (7) is connected between the two lower ends of the inner steel frame (1) of the upper step, and in the step D, the temporary inverted arch (7) is removed when the outer steel frame (2) of the upper step is installed.