Rigid frame bridge structure and construction method
By using steel sleeves and studs to connect the piers and steel beams, combined with corrugated steel webs and micro-expansion agent concrete, the cracking and construction problems of traditional rigid frame bridges were solved, resulting in a high-efficiency, lightweight and durable bridge structure.
Patent Information
- Application Number
- CN201910593667.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-07-03
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2039-07-03
AI Technical Summary
Traditional rigid frame bridges are prone to cracking at the junction of the piers and the main beam, as well as in the negative bending moment zone. They also have long construction periods and high costs, which affect the structural durability.
The design adopts vertical prestressed piers combined with steel sleeves. The steel beams are connected to the concrete bridge deck by studs, avoiding the use of prestressed steel bars. Combined with corrugated steel webs and micro-expansion agent concrete, the structural stiffness and crack resistance are improved.
This effectively avoids cracking at the junction of bridge piers and steel beams and in the negative bending moment zone, reduces the amount of prestressing work, shortens the construction period, improves spanning capacity and structural stiffness, and reduces construction difficulty.
Smart Images

Figure CN110409279B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of structural engineering, and in particular to a rigid frame bridge structure and a construction method. Background Art
[0002] like Figure 1 As shown in FIG. 1 , a typical rigid frame bridge structure system is composed of a foundation 100, a bridge pier 200 and a main beam 300. The most significant feature of a rigid frame bridge is that the main beam 300 and the bridge pier 200 are fixedly connected (e.g. Figure 1 The bridge pier 200 is connected in the form of a pier 200 (in the middle I), so the bridge pier 200 participates in the force of the main beam 300 and resists various loads borne by the main beam 300. The advantage of this is that the bridge pier 200 participates in the force of the main beam 300 and can provide additional rigidity for the main beam 300 and share the internal force of the main beam 300. Therefore, the rigid frame bridge has a greater spanning capacity than the traditional pure beam structure. Compared with other beam bridges, the mechanical properties of the pier 200 of the rigid frame bridge more obviously affect the mechanical behavior of the main beam 300 and the overall performance of the bridge structure.
[0003] like Figure 2 As shown in the figure, it is the internal force diagram of the rigid frame bridge under the typical working condition. It can be seen that since the pier 200 of the rigid frame bridge participates in the force of the main beam 300, the pier 200 is subjected to a large bending moment at the joint part between the pier 200 and the main beam 300 and the joint part between the pier 200 and the foundation 100. If the structural design is unreasonable, it may cause excessive bending moment at the upper and lower ends of the pier 200, causing cracking of the pier concrete, especially in the pier-beam joint area. In the traditional design, especially in the rigid frame bridge structure system of medium and low piers, cracking is very easy to occur. In addition to the cracking problem at the pier-beam joint and the foundation position, there is a very large negative bending moment at the top of the pier of the rigid frame bridge. Traditional rigid frame bridges generally use concrete structures. In order to prevent the cracking of the concrete structure, a large number of prestressed steel bars are configured in the positive and negative bending moment areas of the rigid frame bridge, especially the negative bending moment area. The engineering workload is extremely large, which affects the construction period and increases the construction cost.
[0004] In addition, since traditional rigid frame bridges generally use a full concrete structure system with prestressed tendons to control cracks in the bridge body, the creep and shrinkage of concrete materials under long-term loads, as well as the relaxation of prestressed tendons, are factors that are likely to cause long-term deflection and cracking of the bridge beam, affecting the durability of the structure, and making subsequent maintenance very difficult. Summary of the invention
[0005] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, one purpose of the first aspect of the present invention is to provide a rigid frame bridge structure, wherein the concrete bridge deck at the bottom of the pier of the rigid frame bridge, the joint between the pier and the steel beam, and the negative bending moment area has no cracking problem, the rigid frame bridge has light weight, large structural rigidity and bearing capacity, large spanning capacity, short construction period, and low construction difficulty.
[0006] The rigid frame bridge structure according to the first embodiment of the present invention comprises:
[0007] A pier, wherein the pier is a vertical prestressed pier and comprises a concrete pier body and a steel sleeve, wherein the steel sleeve is sleeved on the upper part of the concrete pier body and the top of the steel sleeve is flush with the top of the concrete pier body;
[0008] A steel beam, the steel beam comprising a top plate, a bottom plate and a web plate connected between the top plate and the bottom plate, the bottom plate of the steel beam being fixed to the top of the pier and being welded to the top end of the steel sleeve, a plurality of first common studs being arranged on the top plate in the positive bending moment zone of the steel beam, and a plurality of pull-out-resistant but non-shear-resistant studs being arranged on the top plate in the negative bending moment zone of the steel beam;
[0009] A concrete bridge deck is cast and fixed on the top plate, and the first common bolts and the pull-out but not shear-resistant bolts on the top plate are embedded in the concrete bridge deck to form a combined effect with the concrete bridge deck.
[0010] According to the rigid frame bridge structure of the first embodiment of the present invention, compared with the traditional prestressed concrete rigid frame bridge structure system, the cracking problem of the concrete bridge deck at the bottom of the pier of the rigid frame bridge, the joint between the pier and the steel beam, and the negative bending moment area can be avoided. At the same time, the rigid frame bridge is lighter in weight, has greater structural rigidity and bearing capacity, and therefore has a greater spanning capacity than the traditional rigid frame bridge. In addition, the main beam (including the steel beam and the concrete deck) of the first embodiment of the present invention does not need to be applied with any prestress, so the amount of prestressing engineering is greatly reduced during construction, shortening the construction period, reducing the construction difficulty, and avoiding the long-term deflection problem caused by the loss of prestress in the main beam of the traditional rigid frame bridge in the later stage and the shrinkage and creep of concrete.
[0011] According to an embodiment of the first aspect of the present invention, the cross-section of the steel beam is a box-type cross-section, and the box-type cross-section is a closed box-type or a cracked box-type.
[0012] According to an embodiment of the first aspect of the present invention, the web is a corrugated steel web.
[0013] According to an embodiment of the first aspect of the present invention, the material of the concrete bridge deck is ordinary concrete or concrete mixed with a micro-expansion agent.
[0014] According to an embodiment of the first aspect of the present invention, the concrete bridge deck is a panel formed by directly casting on the top plate, or the concrete bridge deck is a panel formed by casting on a precast concrete slab pre-laid on the top plate.
[0015] According to an embodiment of the first aspect of the present invention, it also includes a concrete layer cast and fixed on the bottom plate of the negative bending moment area of the steel beam, and a plurality of second ordinary bolts are arranged on the bottom plate of the negative bending moment area of the steel beam. The second ordinary bolts are buried in the concrete layer to form a combined effect with the concrete layer.
[0016] According to a further embodiment of the first aspect of the present invention, the pier also includes prestressed tendons, which vertically penetrate the concrete pier and the upper ends of the prestressed tendons extend out of the top of the concrete pier body and pass through the bottom plate of the negative bending moment zone of the steel beam, and are anchored in the concrete layer on the bottom plate.
[0017] According to an embodiment of the first aspect of the present invention, a plurality of third common bolts are arranged on the inner wall of the steel sleeve, and the third common bolts are buried in the concrete pier body.
[0018] According to an embodiment of the first aspect of the present invention, the length of the steel sleeve is half the height of the concrete pier body.
[0019] The second aspect of the present invention further provides a construction method of a rigid frame bridge structure according to any one embodiment of the first aspect of the present invention.
[0020] The construction method according to the second aspect of the present invention comprises the following construction steps:
[0021] On-site pier construction: pouring the lower half of the concrete pier body on site, positioning and installing the steel sleeve, using the steel sleeve as a construction template for the upper half of the concrete pier body, and pouring the upper plate half of the concrete pier body;
[0022] The steel beam is prepared in the factory: in the factory, a plurality of the first common studs are arranged on the top plate of the steel beam in the positive bending moment zone, and a plurality of the pull-out resistant but not shear resistant studs are arranged on the top plate of the steel beam in the negative bending moment zone.
[0023] On-site installation of steel beams: installing the steel beams in the positive bending moment area and the steel beams in the negative bending moment area on-site by cantilever assembly, and connecting the bottom plate of the steel beams in the negative bending moment area at the top of the pier to the steel sleeve by welding, and the cantilever assembly connection between the steel beams in the positive bending moment area and the steel beams in the negative bending moment area is connected by high-strength bolts or welding;
[0024] Casting concrete bridge deck: after the steel beam is installed, first cast the concrete bridge deck in the positive bending moment area, and then cast the concrete bridge deck in the negative bending moment area;
[0025] Tensioning the vertical prestress of the bridge pier: After the concrete bridge deck is formed, tension the vertical prestress on the top of the bridge pier until the bottom of the bridge pier is in a uniformly compressed state, remove the construction equipment, and complete the structural construction.
[0026] According to the construction method of the second embodiment of the present invention, the main beam (including steel beam and concrete panel) part does not need to be applied with any prestress, so the amount of prestressing work during construction is greatly reduced, the construction period is shortened, the construction difficulty is reduced, and the long-term deflection and cracking problems caused by the loss of prestress in the main beam of the traditional rigid frame bridge in the later period and the shrinkage creep of concrete are avoided. Compared with the traditional prestressed concrete rigid frame bridge structure system, the rigid frame bridge obtained by the construction method of the second embodiment of the present invention can avoid the cracking problem of the concrete bridge deck at the bottom of the pier of the rigid frame bridge, the joint between the pier and the steel beam, and the negative bending moment area. At the same time, the rigid frame bridge is lighter in weight, and has greater structural stiffness and bearing capacity. Therefore, compared with the traditional rigid frame bridge, it has a large spanning capacity.
[0027] According to an embodiment of the second aspect of the present invention, in the step of preparing the steel beam in the factory, a plurality of second ordinary bolts are arranged on the bottom plate of the steel beam in the negative bending moment zone; correspondingly, in the step of installing the steel beam on site, after the steel beam in the negative bending moment zone is installed, the concrete layer is poured on the bottom plate of the steel beam in the negative bending moment zone, and the second ordinary bolts are buried in the concrete layer, and after the concrete layer is formed, the subsequent segments are suspended.
[0028] According to a further embodiment of the second aspect of the present invention, in the on-site pier construction step, vertical prestressed tendons are embedded in the process of pouring the concrete pier body; correspondingly, in the on-site steel beam installation step, the upper ends of the prestressed tendons are made to pass through the bottom plate of the steel beam in the negative bending moment area, so that when the concrete layer is poured on the bottom plate of the steel beam in the negative bending moment area, the upper ends of the prestressed tendons are embedded in the concrete layer.
[0029] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0031] Figure 1 It is a schematic diagram of a rigid frame bridge structure in the prior art.
[0032] Figure 2 yes Figure 1 Internal force diagram of the rigid frame bridge structure under typical working conditions.
[0033] Figure 3 It is a side schematic diagram of a rigid frame bridge according to an embodiment of the first aspect of the present invention.
[0034] Figure 4 for Figure 3 Schematic diagram of the longitudinal section.
[0035] Figure 5 for Figure 3 Schematic diagram of AA in the middle.
[0036] Figure 6 for Figure 3 Schematic diagram of the middle BB.
[0037] Figure 7 for Figure 3 Schematic diagram of the CC in the middle.
[0038] FIG8( a ) is a side view of a state of on-site bridge pier construction in the construction method of the second embodiment of the present invention.
[0039] FIG8( b ) is a schematic cross-sectional view of FIG8( a ).
[0040] FIG9( a ) is a side view showing another state of on-site pier construction in the construction method of an embodiment of the second aspect of the present invention.
[0041] FIG9( b ) is a schematic cross-sectional view of FIG9( a ).
[0042] Figure 10(a) is a side view of a state of on-site installation of steel beams in the construction method of the second embodiment of the present invention.
[0043] FIG10( b ) is a schematic cross-sectional view of FIG10( a ).
[0044] Figure 11(a) is a side view of another state of the on-site installation of the steel beam in the construction method of the second embodiment of the present invention.
[0045] FIG11( b ) is a schematic cross-sectional view of FIG11( a ).
[0046] Fig.12 A schematic diagram of the state of pouring a concrete bridge deck in the construction method of an embodiment of the second aspect of the present invention.
[0047] Fig.13 This is another schematic diagram of the state of pouring a concrete bridge deck in the construction method of an embodiment of the second aspect of the present invention.
[0048] Reference numerals:
[0049] Rigid Frame Bridge Structure 1000
[0050] Pier 1 Concrete pier body 11 Steel sleeve 12 Prestressed tendons 13 Third common bolt 14
[0051] Steel beam 2 Top plate 21 Bottom plate 22 Web plate 23
[0052] First common stud 24 Pull-out resistant but not shear resistant stud 25 Second common stud 26
[0053] Concrete bridge deck 3
[0054] Concrete layer 4 DETAILED DESCRIPTION
[0055] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0056] Combine the following Figures 3 to 7 A rigid frame bridge structure 1000 according to an embodiment of the first aspect of the present invention is described.
[0057] like Figures 3 to 7 As shown, according to the first embodiment of the present invention, the rigid frame bridge structure 1000 comprises a pier 1, a steel beam 2 and a concrete bridge deck 3. The pier 1 is a vertical prestressed pier and comprises a concrete pier body 11 and a steel sleeve 12. The steel sleeve 12 is sleeved on the upper part of the concrete pier body 11 and the top of the steel sleeve 12 is flush with the top of the concrete pier body 11. The steel beam 2 comprises a top plate 21, a bottom plate 22 and a web 23 connected between the top plate 21 and the bottom plate 22. The bottom plate 22 of the pier 2 is fixed to the top of the pier 1 and is welded to the top of the steel sleeve 12. A plurality of first common studs 24 are arranged on the top plate 21 in the positive bending moment zone of the steel beam 2, and a plurality of pull-out and non-shear studs 25 are arranged on the top plate 21 in the negative bending moment zone of the steel beam 2. The concrete bridge deck 3 is cast and fixed on the top plate 21, and the first common studs 24 and the pull-out and non-shear studs 25 on the top plate 21 are buried in the concrete bridge deck 3, forming a combined effect with the concrete bridge deck 3.
[0058] Specifically, the pier 1 is a vertical prestressed pier 1; that is, after the bridge is built, applying vertical prestress to the pier 1 can adjust the stress distribution at the bottom of the pier 1, so that the pier 1 is in a favorable state of uniform compression of the entire cross section as much as possible, so that no tensile stress is generated at the bottom of the pier 1, and cracking of the bottom of the pier 1 is avoided. The pier 1 includes a concrete pier body 11 and a steel sleeve 12, the steel sleeve 12 is sleeved on the upper part of the concrete pier body 11 and the top of the steel sleeve 12 is flush with the top of the concrete pier body 11; that is, the concrete pier body 11 plays a major supporting role, and the steel sleeve 12 is wrapped around the upper part of the concrete pier body 11. Through the combined action of the steel sleeve 12 and the concrete pier body 11, the rigidity of the pier 1 is improved.
[0059] The steel beam 2 includes a top plate 21, a bottom plate 22, and a web 23 connected between the top plate 21 and the bottom plate 22. The bottom plate 22 of the steel beam 2 is fixed to the top of the pier 1 and is welded to the top of the steel sleeve 12. That is to say, the steel beam 2 is supported by the bottom plate 22 fixed to the top of the bridge section. The bottom plate 22 is welded to the top of the steel sleeve 12, which is a steel structure connection form. Since the outer surface of the pier-beam joint is wrapped with a steel plate, there is no risk of cracking of the pier-beam joint under the action of bending moment, which solves the problem of easy cracking of the pier-beam joint under long-term load in the traditional design of rigid frame bridges. At the same time, the steel sleeve 12 can also serve as a template during construction, reducing the template engineering volume during the construction of the pier 1. In addition, through the combined action of the steel sleeve 12 and the pier 1, the rigidity of the pier 1 is improved, and the vertical rigidity of the bridge structure is also improved. A plurality of first common bolts 24 are arranged on the top plate 21 of the positive moment zone of the steel beam 2, so as to be connected with the concrete bridge deck 3 in the positive moment zone to form a combined effect, so as to improve the rigidity and bearing capacity of the main beam in the positive moment zone, i.e., the steel beam 2 and the concrete bridge deck 3 in the positive moment zone. A plurality of pull-out-resistant but non-shear-resistant bolts 25 are arranged on the top plate 21 of the negative moment zone of the steel beam 2, so as to release the combined effect of the concrete bridge deck 3 and the steel beam 2 in the negative moment zone, and prevent the concrete bridge deck 3 in the negative moment zone from cracking due to the coordinated deformation with the steel beam 2 in the negative moment zone.
[0060] The concrete bridge deck 3 is cast and fixed on the top plate 21, and the first common studs 24 and the pull-out and non-shear studs 25 on the top plate 21 are buried in the concrete bridge deck 3, forming a combined effect with the concrete bridge deck 3. It can be understood that the first common studs 24 on the top plate 21 in the positive moment zone are connected to the concrete bridge deck 3 in the positive moment zone, forming a combined effect, which can improve the rigidity and bearing capacity of the main beam in the positive moment zone, that is, the steel beam 2 in the positive moment zone and the concrete bridge deck 3 as a whole. The pull-out and non-shear studs 25 on the top plate 21 in the negative moment zone can release the combined effect of the concrete bridge deck 3 and the steel beam 2 in the negative moment zone, and prevent the concrete bridge deck 3 in the negative moment zone from cracking due to the coordinated deformation with the steel beam 2 in the negative moment zone.
[0061] According to the rigid frame bridge structure 1000 of the first aspect of the present invention, compared with the traditional prestressed concrete rigid frame bridge structure 1000 system, the cracking problem of the bottom of the pier 1 of the rigid frame bridge, the joint between the pier 1 and the steel beam 2, and the concrete bridge deck 3 in the negative bending zone can be avoided. At the same time, the rigid frame bridge is lighter in weight, has greater structural rigidity and bearing capacity, and therefore has a greater spanning capacity than the traditional rigid frame bridge. In addition, the main beam (including the steel beam 2 and the concrete deck) of the first aspect of the present invention does not need to be applied with any prestress, so the amount of prestressing engineering is greatly reduced during construction, shortening the construction period, reducing the construction difficulty, and avoiding the long-term deflection problem caused by the loss of prestress in the main beam of the traditional rigid frame bridge in the later stage and the shrinkage creep of concrete.
[0062] According to an embodiment of the first aspect of the present invention, the cross section of the steel beam 2 is a box cross section, and the box cross section can be a closed box cross section or a cracked box cross section. It can be understood that the steel beam 2 with a box cross section has strong torsion resistance, is convenient for cast-in-place construction, and has a light weight.
[0063] According to an embodiment of the first aspect of the present invention, the web 23 is a corrugated steel web. It is understandable that the web 23 adopts a corrugated steel web structure, which can reduce the axial stiffness of the main beam, reduce the bending moment of the axial deformation of the main beam under the temperature load on the pier 1 pier-beam junction and the pier bottom and foundation junction, and reduce the thrust on the foundation.
[0064] According to an embodiment of the first aspect of the present invention, the material of the concrete bridge deck 3 can be ordinary concrete, which has good economy; or the material of the concrete bridge deck 3 can be concrete mixed with a micro-expansion agent, which can appropriately reduce the shrinkage rate of the concrete and help avoid the cracking problem of the concrete bridge deck 3.
[0065] According to an embodiment of the first aspect of the present invention, the concrete bridge deck 3 is a panel formed by directly casting on the top plate 21, or the concrete bridge deck 3 is a panel formed by casting on a precast concrete slab pre-laid on the top plate 21. Therefore, the construction is simple.
[0066] According to an embodiment of the first aspect of the present invention, it further includes a concrete layer 4 cast and fixed on the bottom plate 22 of the negative bending moment area of the steel beam 2, and a plurality of second common studs 26 are arranged on the bottom plate 22 of the negative bending moment area of the steel beam 2, and the second common studs 26 are buried in the concrete layer 4 to form a combined effect with the concrete layer 4. It can be understood that the second common studs 26 are arranged on the bottom plate 22 of the negative bending moment area of the steel beam 2, and at the same time, a layer of concrete layer 4 is cast on the bottom plate 22 of the negative bending moment area of the steel beam 2 to form a combined effect with the bottom plate 22 of the negative bending moment area of the steel beam 2, thereby improving the stiffness and bearing capacity of the main beam in the negative bending moment area.
[0067] According to a further embodiment of the first aspect of the present invention, the pier 1 further includes a prestressed tendon 13, which vertically penetrates the concrete pier 1 and the upper end of the prestressed tendon 13 extends out of the top of the concrete pier body 11 and passes through the bottom plate 22 of the negative bending moment area of the steel beam 2, and is anchored in the concrete layer 4 on the bottom plate 22. By providing the prestressed tendon 13, vertical prestressing can be applied to the pier 1 from the upper part of the concrete layer 4 on the bottom plate 22 in the negative bending moment area by the tensioning method; at the same time, it is also convenient to monitor the tensile stress level of the concrete on both sides of the bottom of the pier 1, so that the tensile stress on both sides is basically consistent.
[0068] According to an embodiment of the first aspect of the present invention, a plurality of third common bolts 14 are arranged on the inner wall of the steel sleeve 12, and the third common bolts 14 are buried in the concrete pier body 11. This is conducive to enhancing the combined effect of the steel sleeve 12 and the concrete pier body 11.
[0069] According to an embodiment of the first aspect of the present invention, the length of the steel sleeve 12 is half the height of the concrete pier body 11. Thus, the rigidity of the pier 1 can be improved and the construction is convenient.
[0070] The second aspect of the present invention further provides a method for constructing a rigid frame bridge according to any one embodiment of the first aspect of the present invention.
[0071] Combine the following Figure 8(a) to Figure 13 The construction method of the second embodiment of the present invention is described below. The construction method includes the following construction steps:
[0072] On-site pier construction: Figure 8(a) to Figure 9(b) As shown, the lower half of the concrete pier body 11 is cast on site, and the steel sleeve 12 is positioned and installed. The steel sleeve 12 is used as the construction template for the upper half of the concrete pier body 11, and the upper plate half of the concrete pier body 11 is cast. During the casting process, pay attention to pre-embedded prestressed tendon pipes for the later tensioning of the prestressed tendons 13.
[0073] Preparation of steel beams in the factory: In the factory, a plurality of first common studs 24 are arranged on the top plate 21 of the steel beam 2 in the positive bending moment zone, and a plurality of pull-out but not shear-resistant studs 25 are arranged on the top plate 21 of the steel beam 2 in the negative bending moment zone, and the prepared steel beams 2 are transported to the site.
[0074] On-site installation of steel beams: The steel beams 2 in the positive bending moment zone and the steel beams 2 in the negative bending moment zone are installed on-site by cantilever assembly, wherein, as shown in FIG. 10( a) and FIG. 10( b), the steel beams 2 in the negative bending moment zone are installed at the top of the pier 1, and the bottom plate 22 of the steel beams 2 in the negative bending moment zone is connected to the steel sleeve 12 by welding. Meanwhile, considering the stress concentration at the weld and the possible tearing under fatigue load, a triangular stiffening rib can be used to reinforce between the steel sleeve 12 and the bottom plate 22, that is, the two right-angled sides of the triangular stiffening rib are welded to the bottom plate 22 and the outer wall of the sleeve respectively; the cantilever assembly connection between the steel beams 2 in the positive bending moment zone and the steel beams 2 in the negative bending moment zone is connected by high-strength bolts or welding.
[0075] Concrete bridge deck pouring: After the steel beam 2 is installed, Fig.12 and Fig.13 As shown, the concrete bridge deck 3 in the positive bending moment area is cast first, and then the concrete bridge deck 3 in the negative bending moment area is cast. It should be noted here that in order to make the distribution of the internal force of the structure as reasonable as possible when the bridge is completed, it is recommended to cast the concrete bridge deck 3 in the positive bending moment area at both ends first, then cast the concrete bridge deck 3 in the positive bending moment area in the middle of the span, and finally cast the concrete bridge deck 3 in the negative bending moment area. The concrete bridge deck 3 on the top plate 21 of the negative bending moment area is recommended to use shrinkage compensating concrete mixed with a micro-expansion agent to improve the crack resistance of the concrete bridge deck 3 in the negative bending moment area.
[0076] Tensioning the vertical prestress of the bridge pier: After the concrete bridge deck 3 is formed, tension the vertical prestress on the top of the bridge pier 1 until the bottom of the bridge pier 1 is in a uniformly compressed state, remove the construction equipment, and complete the structural construction.
[0077] According to the construction method of the second embodiment of the present invention, the main beam (including the steel beam 2 and the concrete bridge deck 3) does not need to be subjected to any prestressing force. Therefore, the amount of prestressing work during construction is greatly reduced, the construction period is shortened, the construction difficulty is reduced, and the long-term deflection and cracking problems caused by the loss of prestressing force in the main beam of the traditional rigid frame bridge and the shrinkage creep of concrete are avoided. Compared with the traditional prestressed concrete rigid frame bridge structure 1000 system, the rigid frame bridge obtained by the construction method of the second embodiment of the present invention can avoid the cracking problem of the bottom of the pier 1 of the rigid frame bridge, the joint between the pier 1 and the steel beam 2, and the concrete bridge deck 3 in the negative bending moment area. At the same time, the rigid frame bridge is lighter in weight, and has greater structural stiffness and bearing capacity. Therefore, compared with the traditional rigid frame bridge, it has a large spanning capacity.
[0078] According to an embodiment of the second aspect of the present invention, in the step of preparing the steel beam 2 in the factory, a plurality of second common bolts 26 are arranged on the bottom plate 22 of the steel beam 2 in the negative bending moment area; accordingly, in the step of installing the steel beam 2 on site, as shown in FIG. 11(a) and FIG. 11(b), after the steel beam 2 in the negative bending moment area is installed, a concrete layer 4 is poured on the bottom plate 22 of the steel beam 2 in the negative bending moment area, and the second common bolts 26 are buried in the concrete layer 4. After the concrete layer 4 is formed, the subsequent segments are suspended, that is, the steel beam 2 in the positive bending moment area is suspended. It should be noted here that the thickness of the concrete layer 4 poured on the bottom plate 22 of the steel beam 2 in the negative bending moment area is determined according to calculation, and is generally between 300-600 mm.
[0079] According to a further embodiment of the second aspect of the present invention, Figure 8(a) to Figure 11(b) As shown, in the on-site construction steps of the pier 1, the vertical prestressed tendons 13 are embedded in the process of pouring the concrete pier body 11; correspondingly, in the on-site installation steps of the steel beam 2, the upper ends of the prestressed tendons 13 are made to pass through the bottom plate 22 of the steel beam 2 in the negative bending moment area, so that when the concrete layer 4 is poured on the bottom plate 22 of the steel beam 2 in the negative bending moment area, the upper ends of the prestressed tendons 13 are embedded in the concrete layer 4.
[0080] According to an embodiment of the second aspect of the present invention, vertical stiffening ribs may be arranged on the inner wall of the steel sleeve 12 according to steel structure design specifications to ensure local stability of the steel sleeve 12 during construction.
[0081] According to an embodiment of the third aspect of the present invention, a plurality of third common bolts 14 are arranged on the inner wall of the steel sleeve 12 to enhance the combined effect with the concrete pier body 11 .
[0082] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0083] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A rigid frame bridge structure, characterized in that: include: A pier, wherein the pier is a vertical prestressed pier and comprises a concrete pier body and a steel sleeve, wherein the steel sleeve is sleeved on the upper part of the concrete pier body and the top of the steel sleeve is flush with the top of the concrete pier body; A steel beam, the steel beam comprising a top plate, a bottom plate and a web plate connected between the top plate and the bottom plate, the bottom plate of the steel beam being fixed to the top of the pier and being welded to the top end of the steel sleeve, a plurality of first common studs being arranged on the top plate in the positive bending moment zone of the steel beam, and a plurality of pull-out-resistant but non-shear-resistant studs being arranged on the top plate in the negative bending moment zone of the steel beam; A concrete bridge deck, wherein the concrete bridge deck is cast and fixed on the top plate, and the first common bolts and the pull-out-resistant but non-shear-resistant bolts on the top plate are embedded in the concrete bridge deck to form a combined effect with the concrete bridge deck; The cross section of the steel beam is a box section, and the box section is a closed box section or a cracked box section; It also includes pouring and fixing a concrete layer on the bottom plate of the negative bending moment area of the steel beam, a plurality of second common studs are arranged on the bottom plate of the negative bending moment area of the steel beam, and the second common studs are buried in the concrete layer to form a combined effect with the concrete layer; A plurality of third common bolts are arranged on the inner wall of the steel sleeve, and the third common bolts are buried in the concrete pier body.
2. The rigid frame bridge structure according to claim 1, characterized in that: The web is a corrugated steel web.
3. The rigid frame bridge structure according to claim 1, characterized in that: The material of the concrete bridge deck is ordinary concrete or concrete mixed with a micro-expansion agent.
4. The rigid frame bridge structure according to claim 1, characterized in that: The concrete bridge deck is a panel formed by directly casting on the top plate, or the concrete bridge deck is a panel formed by casting on a prefabricated concrete slab pre-laid on the top plate.
5. The rigid frame bridge structure according to claim 1, characterized in that: The pier also includes prestressed tendons, which vertically penetrate the concrete pier and the upper ends of which extend out of the top of the concrete pier body and pass through the bottom plate in the negative bending moment area of the steel beam, and are anchored in the concrete layer on the bottom plate.
6. The rigid frame bridge structure according to claim 1, characterized in that: The length of the steel sleeve is half the height of the concrete pier body.
7. A method for constructing a rigid frame bridge as claimed in any one of claims 1 to 6, characterized in that: The construction steps include: On-site pier construction: pouring the lower half of the concrete pier body on site, positioning and installing the steel sleeve, using the steel sleeve as a construction template for the upper half of the concrete pier body, and pouring the upper plate half of the concrete pier body; Preparing the steel beam in the factory: in the factory, arranging a plurality of the first common studs on the top plate of the steel beam in the positive bending moment area, and arranging a plurality of the pull-out resistant but non-shear resistant studs on the top plate of the steel beam in the negative bending moment area; On-site installation of steel beams: The steel beams in the positive bending moment area and the steel beams in the negative bending moment area are installed on-site in cantilevered assembly, and the bottom plate of the steel beam in the negative bending moment area at the top of the pier is connected to the steel sleeve by welding. The cantilevered assembly connection between the steel beams in the positive bending moment area and the steel beams in the negative bending moment area is connected by high-strength bolts or welding; Casting concrete bridge deck: after the steel beam is installed, first cast the concrete bridge deck in the positive bending moment area, and then cast the concrete bridge deck in the negative bending moment area; Tensioning the vertical prestress of the bridge pier: After the concrete bridge deck is formed, tension the vertical prestress on the top of the bridge pier until the bottom of the bridge pier is in a uniformly compressed state, remove the construction equipment, and complete the structural construction.
8. The method for constructing a rigid frame bridge according to claim 7, characterized in that: In the step of preparing the steel beam in the factory, a plurality of second common bolts are arranged on the bottom plate of the steel beam in the negative bending moment area; correspondingly, in the step of installing the steel beam on site, after the steel beam in the negative bending moment area is installed, the concrete layer is poured on the bottom plate of the steel beam in the negative bending moment area, and the second common bolts are buried in the concrete layer. After the concrete layer is formed, the subsequent segments are suspended.
9. The method for constructing a rigid frame bridge according to claim 8, characterized in that: In the on-site pier construction step, vertical prestressed tendons are embedded in the process of pouring the concrete pier body; correspondingly, in the on-site steel beam installation step, the upper ends of the prestressed tendons are passed through the bottom plate of the steel beam in the negative bending moment area, so that when the concrete layer is poured on the bottom plate of the steel beam in the negative bending moment area, the upper ends of the prestressed tendons are embedded in the concrete layer.