Intelligent measurement robot system and measurement method based on BIM
Through the BIM-based intelligent measurement robot system, automatic control and multi-sensor fusion technology are used to solve the low efficiency and accuracy problems of traditional construction measurement, achieve efficient and accurate three-dimensional coordinate data collection, and improve construction progress and quality.
Patent Information
- Application Number
- CN201910897895.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-09-23
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2039-09-23
AI Technical Summary
Traditional construction measurement methods are inefficient, long-term, labor-intensive, and have low measurement accuracy and accuracy due to human factors, which limits construction progress and quality.
A BIM-based intelligent measurement robot system is adopted, including a mobile chassis, a master control device, a leveling device and an intelligent total station. It realizes rapid leveling and automated measurement of measurement equipment through automated control and multi-sensor fusion technology, and uses BIM technology for in-house operations. Automatic extraction and analysis of data.
It significantly improves the efficiency and quality of construction measurement, shortens the leveling time of measurement equipment, reduces rework caused by human errors, and improves measurement accuracy and efficiency.
Smart Images

Figure CN110470283B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of civil engineering technology, and in particular to a system for quickly collecting and analyzing high-precision three-dimensional absolute coordinate data of completed construction surfaces of projects such as roads, bridges and building construction. Background Art
[0002] At present, the collection of three-dimensional absolute coordinate data of the completed construction surface still mainly relies on the manual erection and leveling of measuring instruments to perform point-by-point contact measurement. This measurement method is not only inefficient, has a long cycle, and is labor-intensive, but also has low measurement precision and accuracy due to human factors, which greatly restricts the project construction progress and quality. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide an intelligent measurement robot system and measurement method based on BIM, aiming at the problems commonly existing in traditional construction measurement, such as cumbersome calculation of internal data, low efficiency of field measurement, high labor intensity and long cycle. The device carries a master control device and a leveling device on a mobile chassis to realize rapid leveling and automatic measurement control of the measurement equipment, and uses BIM technology to realize automatic extraction and analysis of internal measurement data, thereby greatly improving the efficiency and quality of construction measurement.
[0004] The technical solution adopted by the present invention to solve the above-mentioned technical problems is:
[0005] A BIM-based intelligent measurement robot system, comprising a measurement robot, a handheld terminal, and a 360° prism;
[0006] The measuring robot comprises a mobile chassis, a master control device, a leveling device, and an intelligent total station;
[0007] The master control device includes a master control box, a wireless router, a positioning module and an industrial computer. The master control box is fixedly installed on the mobile chassis, the wireless router and the positioning module are installed in the master control box, and the signal receiving antennas of the two extend out of the master control box. The industrial computer is installed on the bottom plate of the master control box; the wireless router is connected to the handheld terminal to realize communication and data exchange between the industrial computer and the handheld terminal; the positioning module realizes the rough positioning of the measuring robot; the industrial computer is the control core of the whole system, all instructions of the handheld terminal need to be distributed by the industrial computer, and the instruction feedback information of all devices is collected and processed by the industrial computer;
[0008] The mobile chassis includes a walking mechanism and a chassis controller, the chassis controller is connected to the industrial computer, the walking mechanism is connected to the chassis controller, and its walking state is controlled by the chassis controller;
[0009] The leveling device is installed on the main control box, and the intelligent total station is installed on the top of the leveling device. The intelligent total station is leveled to a horizontal state through the leveling device; there are three 360° prisms, which are respectively set on three control points with known coordinates on site; the intelligent total station has the functions of automatic prism search and prism-free ranging; the leveling device and the intelligent total station are respectively connected to the industrial computer, and the two transmit measurement signals to the industrial computer and receive control instructions from the industrial computer.
[0010] In the above scheme, the master control device also includes a third battery pack and a status display. The third battery pack is installed in a dedicated slot inside the master control box, and its charging interface is installed on the outer casing of the master control box. The third battery pack is used to power the internal equipment, leveling device and intelligent total station of the master control box; the status display is installed on the outer casing of the master control box, and can intuitively display the operating status of all equipment.
[0011] In the above scheme, the leveling device includes a lower table, an electric cylinder, an electric push rod, an upper table, a transfer column, a sensor base, and an inclination sensor; the lower table is fixedly installed on the main control box, there are three electric cylinders, which are distributed in a triangle on the lower table, a servo motor is installed next to each electric cylinder, and an electric push rod is installed on each electric cylinder, and the upper table is installed on the upper ends of the three electric push rods; the lower end of the transfer column is installed on the upper table, the sensor base is installed on the upper end of the transfer column, and the inclination sensor is installed on the sensor base.
[0012] In the above scheme, the lower end of the electric cylinder is connected to the lower table through a lower hinge, and the upper end of the electric push rod is connected to the upper table through an upper hinge; the lower hinge and the upper hinge are both Hooke hinges, which can rotate along the X-axis and Y-axis directions, so that the upper table can adapt to the inclination angle change of ±25°.
[0013] In the above scheme, the adapter column is a hollow round tube, and the signal line and the power line can be passed through the inside; the lower end of the adapter column is connected to the upper table through a lower flange, and the upper end of the adapter column is connected to the sensor base through an upper flange.
[0014] In the above scheme, the leveling device also includes a sensor protection cover, which is connected to the base through countersunk bolts. The inclination sensor is arranged in the sensor protection cover, and the top surface of the sensor protection cover is provided with studs for connecting to the intelligent total station.
[0015] In the above scheme, a motor brake is installed on the upper end of each servo motor to lock the motor in the event of a sudden power outage to prevent the push rod from falling rapidly and damaging the measuring equipment.
[0016] In the above scheme, the mobile chassis also includes a chassis shell, a rear drive, a front drive, a first battery pack, a second battery pack, a storage device, an algorithm box, a laser radar, and a status indicator light; the chassis shell is installed on the walking mechanism as a mounting carrier for various devices on the mobile chassis; the rear drive is used to drive the rear wheels of the chassis, and the front drive is used to drive the front wheels of the chassis; the first battery pack and the second battery pack are used to power the chassis, one of which is used as a backup battery. When one power supply fails, it can be quickly switched to another power supply, and it is divided into two battery packs, which can effectively reduce the weight and charging time of a single battery; the laser radar is installed at the front end of the mobile chassis and can automatically identify and bypass obstacles within 3m; the storage device is used to store chassis navigation path data, control instruction data, and point cloud data collected by the laser radar; the algorithm box is used to analyze and calculate the point cloud data collected by the laser radar, and automatically identify the type, size and motion parameters of obstacles; the status indicator light is used to display the remaining power and working status of the mobile chassis.
[0017] In the above scheme, the arrangement principle of the three 360° prisms is: arranged on the same side or both sides of the survey area, and maintain line of sight with the total station, and any two control points and the total station cannot be on the same straight line.
[0018] The present invention also proposes a measurement method of the above-mentioned BIM-based intelligent measurement robot system, which comprises the following steps:
[0019] Step 1: Create a BIM model of the area to be tested according to the design drawings;
[0020] Step 2: Use the BIM model to extract the design data of the area to be measured, plan the driving trajectory of the measuring robot, and then import the relevant data into the handheld terminal via WIFI;
[0021] Step 3: After arriving at the construction site, first set up three 360° prisms according to the planned location, and then transmit the data in the handheld terminal to the industrial computer of the master control device through the local area network;
[0022] Step 4: The master control device controls the mobile chassis to travel a short distance in a straight line, and the positioning module automatically records the position coordinates of the mobile chassis during the movement. The system determines the approximate position and direction of the intelligent total station based on the GPS position coordinates;
[0023] Step 5: After the trolley stops, the master control device sends a leveling command to the leveling device through the industrial computer. The leveling device completes the rough leveling of the intelligent total station according to the inclination data of the inclination sensor, and then completes the fine leveling of the intelligent total station according to the internal inclination data of the intelligent total station.
[0024] Step 6: The system automatically calculates the angle and direction of rotation required for irradiating the three known point prisms according to the current GPS coordinates of the intelligent total station, and then controls the intelligent total station to irradiate the three known point prisms respectively to complete automatic station setting;
[0025] Step 7: After the intelligent total station completes its own positioning and orientation, it first performs layout according to the coordinate data of the measured point extracted from the BIM model, then starts the prism-free distance measurement function, measures the three-dimensional coordinate value of the layout point, and transmits the measured data to the handheld terminal through the industrial computer;
[0026] Step 8. The software on the handheld terminal can automatically compare the deviation between the measured coordinate data and the designed coordinate data, and can also import the measured data into the BIM model for more detailed analysis;
[0027] Step 9. After completing the measurement of this station, the mobile chassis will automatically plan a driving path based on the current position and target position, move to the next measuring station, and repeat the above measurement process.
[0028] The beneficial effects of the present invention are:
[0029] 1. The intelligent measurement robot system of the present invention uses BIM technology to realize the automatic extraction and analysis of internal measurement data, which not only effectively shortens the internal work time, but also greatly reduces the rework caused by human errors;
[0030] 2. The intelligent measuring robot system of the present invention adopts multi-sensor fusion leveling technology to automatically level the measuring equipment. The leveling device completes the rough leveling of the intelligent total station according to the inclination data of the inclination sensor, and then completes the fine leveling of the intelligent total station according to the internal inclination data of the intelligent total station, which significantly shortens the leveling time of the measuring equipment and reduces the labor intensity of the measuring personnel;
[0031] 3. The intelligent measurement robot system of the present invention uses an intelligent total station to automatically illuminate three prisms at known positions for automatic station setting, and uses a prism-free ranging function to quickly collect the three-dimensional coordinates of the completed construction surface, greatly improving the efficiency and quality of construction measurement;
[0032] 4. The intelligent measurement robot system of the present invention can also automatically lay out according to BIM model data, and has great potential application value in indoor installation application scenarios. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:
[0034] Figure 1 It is a schematic diagram of the working principle of the BIM-based intelligent measurement robot system of the present invention;
[0035] Figure 2It is a structural diagram of a measuring robot of a BIM-based intelligent measuring robot system of the present invention;
[0036] Figure 3 yes Figure 2 A schematic diagram of the functional structure of the mobile chassis of the measuring robot shown;
[0037] Figure 4 yes Figure 2 A schematic diagram of the functional structure of the master control device of the measuring robot shown;
[0038] Figure 5 yes Figure 2 A schematic structural diagram of a leveling device of the measuring robot shown;
[0039] Figure 6 yes Figure 5 A schematic diagram of a leveling method of the leveling device shown;
[0040] Figure 7 It is a schematic diagram of the communication and control system of the BIM-based intelligent measurement robot system of the present invention;
[0041] Figure 8 It is a flowchart of the internal work flow of the BIM-based intelligent measurement robot system of the present invention;
[0042] Fig. 9 It is a field work flow diagram of the BIM-based intelligent measurement robot system of the present invention;
[0043] Fig.10 It is a schematic diagram of the path planning method of the measuring robot;
[0044] Fig.11 It is the design block diagram of the mobile chassis obstacle avoidance algorithm of the measurement robot;
[0045] Fig.12 This is a schematic diagram of the automatic station setting principle of the intelligent total station;
[0046] Fig.13 It is the core software development framework of the BIM-based intelligent measurement robot system of the present invention.
[0047] In the figure: 10, mobile chassis; 11, walking mechanism; 12, chassis shell; 131, rear drive; 132, front drive; 14, chassis controller; 151, first battery pack; 152, second battery pack; 16, storage device; 17, algorithm box; 18, laser radar; 19, status indicator; 20, master control device; 21, master control box; 22, wireless router; 23, positioning module; 24, industrial computer; 25, third battery pack; 26, status display; 30, leveling device; 301, Lower table; 302, lower hinge; 303, electric cylinder; 304, servo motor; 305, motor brake; 306, electric push rod; 307, upper hinge; 308, upper table; 309, lower flange; 310, adapter column; 311, upper flange; 312, sensor base; 313, inclination sensor; 314, protective cover; 315, stud; 40, intelligent total station; 50, handheld terminal; 61, first 360° prism; 62, second 360° prism; 63, third 360° prism. DETAILED DESCRIPTION
[0048] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.
[0049] like Figure 1 As shown, a BIM-based intelligent measurement robot system includes a measurement robot, a handheld terminal 50, and a 360° prism.
[0050] like Figure 2 As shown, the measuring robot includes a mobile chassis 10, a master control device 20, a leveling device 30, and an intelligent total station 40. The master control device 20 is installed on the mobile chassis 10, the leveling device 30 is installed on the master control device 20, and the intelligent total station 40 is installed on the top of the leveling device 30. The intelligent total station 40 is leveled to a horizontal state by the leveling device 30. There are three 360° prisms, namely the first 360° prism 61, the second 360° prism 62, and the third 360° prism 63. The three prisms are respectively arranged at three control points of known coordinates on site, and the angles with the intelligent total station 40 are in the range of 45°-135°. The arrangement principle of the three prisms (control points): the three control points are arranged on the same side or both sides of the measuring area, and maintain line of sight with the total station. Any two control points and the total station cannot be on the same straight line. The intelligent total station 40 has the functions of automatic prism search and prism-free distance measurement, and the automatic control of the intelligent total station 40 can be realized through secondary development. On the construction completion surface within a radius of 20m, the prism-free measurement accuracy of the intelligent total station 40 can reach within 1mm.
[0051] like Figure 4As shown, the master control device 20 includes a master control box 21, a wireless router 22, a positioning module 23, an industrial computer 24, a third battery pack 25 and a status display 26. The master control box 21 is fixedly mounted on the mobile chassis 10 by quick-release bolts, the wireless router 22 and the positioning module 23 are installed in the master control box 21, and its signal receiving antenna extends out of the master control box 21, and the industrial computer 24 is installed on the bottom plate of the master control box 21. The positioning module 23 is connected to the wireless router 22 through a network cable, the wireless router 22 is connected to the industrial computer 24 through a network cable, and the wireless router 22 is connected to the handheld terminal 50 through WIFI, so as to realize the communication and data exchange between the industrial computer 24 and the handheld terminal 50. The positioning module 23 realizes the rough positioning of the measuring robot by receiving GPS / Beidou positioning satellite signals or Qianxun location signals, and its absolute positioning accuracy can reach the sub-meter level. The industrial computer 24 is the control core of the entire system. All instructions from the handheld terminal 50 must be distributed through the industrial computer 24, and the instruction feedback information of all devices is collected and processed by the industrial computer 24. A variety of device control software is installed on the industrial computer 24 and the handheld terminal 50 (see Fig.13 ), which can realize automatic control of the mobile chassis 10, the leveling device 30 and the intelligent total station 40. The third battery pack 25 is installed in a dedicated slot inside the main control box 21, and its charging interface is installed on the outer shell of the main control box 21. The third battery pack 25 is used to power the internal devices of the main control box 21, the leveling device 30 and the intelligent total station 40. The status display 26 is installed on the outer shell of the main control box 21, which can intuitively display the operating status of all devices.
[0052] like Figure 3As shown, the mobile chassis 10 includes a running mechanism 11, a chassis housing 12, a rear driver 131, a front driver 132, a chassis controller 14, a first battery pack 151, a second battery pack 152, a storage device 16, an algorithm box 17, a laser radar 18, and a status indicator light 19. The mobile chassis 10 is an autonomous driving vehicle (such as an AGV car) or a manually driven vehicle (such as a car, a battery car, a trolley, etc.), and the running mode of its running mechanism 11 can be wheeled, tracked, tracked, legged, or wheel-leg combined. The autonomous driving vehicle can be equipped with an obstacle detection module as needed to realize the autonomous driving function of complex scenes. The running mechanism 11 is connected to the chassis controller 14 via a data cable and is controlled by the chassis controller 14. The chassis housing 12 is installed on the running mechanism 11 as a mounting carrier for various devices on the mobile chassis 10. The rear driver 131 is used to drive the rear wheel, and the front driver 132 is used to drive the front wheel. The first battery pack 151 and the second battery pack 152 provide power for the mobile chassis 10. One of the batteries is used as a backup battery. When one power source fails, it can quickly switch to the other power source. The two battery packs can effectively reduce the weight and charging time of a single battery. The laser radar 18 is installed at the front end of the mobile chassis 10 and can automatically identify and bypass obstacles within 3m. The laser radar 18 is connected to the algorithm box 17 via a data cable and transmits the identification signal to the algorithm box 17. The algorithm box 17 is used to analyze and calculate the point cloud data collected by the laser radar 18, automatically identify the type, size and motion parameters of the obstacle, and the obstacle avoidance algorithm can be found in Fig.11 The storage device 16 is used to store chassis navigation path data, control instruction data, point cloud data collected by the laser radar 18, etc. The chassis controller 14 is connected to the industrial computer 24 of the master control device 20 via the CAN bus and is controlled by the industrial computer 24. The algorithm box 17 is connected to the chassis controller 14 via a network cable. The status indicator light 19 is used to display the remaining power and working status of the mobile chassis 10.
[0053] like Figure 5As shown, the leveling device 30 includes a lower table 301, a lower hinge 302, an electric cylinder 303, a servo motor 304, a motor brake 305, an electric push rod 306, an upper hinge 307, an upper table 308, a lower flange 309, a transfer column 310, an upper flange 311, a sensor base 312, an inclination sensor 313, a protective cover 314, and a stud 315. The lower table 301 is fixedly mounted on the main control box 21, and there are three electric cylinders 303, which are distributed in a triangular shape on the lower table 301. A servo motor 304 is correspondingly installed next to each electric cylinder 303, and an electric push rod 306 is installed on each electric cylinder 303. The upper table 308 is installed on the upper ends of the three electric push rods 306. The lower end of the electric cylinder 303 is connected to the lower table 301 through the lower hinge 302, and the upper end of the electric push rod 306 is connected to the upper table 308 through the upper hinge 307. The lower hinge 302 and the upper hinge 307 are both Hooke hinges, which can rotate along the X-axis and Y-axis directions (two vertical directions in the plane where the table is located), so that the upper table 308 can adapt to the inclination angle change of ±25°. A motor brake 305 is installed at the upper end of each servo motor 304, which is used to lock the servo motor 304 in the event of a sudden power failure to prevent the electric push rod 306 from falling quickly and damaging the measuring equipment. The transfer column 310 is a hollow metal round tube, and the signal line and power line can be passed inside. The lower end of the transfer column 310 is connected to the upper table 308 through the lower flange 309, and the upper end of the transfer column 310 is connected to the sensor base 312 through the upper flange 311, and the inclination sensor 313 is installed on the sensor base 312. The sensor protection cover 314 is connected to the base through a countersunk bolt, and the inclination sensor 313 is arranged in the sensor protection cover 314. The top surface of the sensor protection cover 314 is provided with a stud 315 for connecting with the intelligent total station 40. When receiving the leveling command, the system determines the highest leg according to the current tilt state of the table and keeps it still, and the other two legs are lifted up until the tilt angle of the table is within 0.01°. The system completes the leveling and locks the legs. Figure 6 shown.
[0054] Further optimized, in this embodiment, the third battery pack 25 is a pluggable lithium-ion battery, whose output voltage is 24V DC and capacity is 30AH.
[0055] Further optimization, in this embodiment, the electric cylinder 303 is a high-precision electric cylinder with a repeatability of 0.02mm, an effective stroke of 100mm, and a ball screw transmission. The servo motor 304 has a rated power of 150W and a power supply voltage of DC24V. The inclination sensor 313 uses a high-precision dual-axis inclination sensor 313 with a repeatability of 0.005° and a resolution of 0.001°.
[0056] For further optimization, in this embodiment, the master control device 20 can be mounted on different mobile chassis 10 to meet the measurement application requirements of different construction scenes.
[0057] Further optimization, in this embodiment, the wireless router 22 is an industrial-grade wireless router 22, which can ensure a wireless communication distance of more than 100m in radius in a field construction scenario.
[0058] Further optimization, in this embodiment, the handheld terminal 50 is a portable mobile device such as an IPAD, a smart phone, or a laptop computer.
[0059] The measurement method of the BIM-based intelligent measurement robot system comprises the following steps:
[0060] Step 1. Create a BIM model of the area to be measured based on the design drawings. BIM modeling software is a special software for construction measurement that is secondary developed based on the commonly used BIM modeling software. The software is installed on the working computer of the project department. It can quickly create a BIM model for construction measurement based on design data such as plane, elevation and section drawings, and use the model to automatically extract all coordinates to be measured and laid out.
[0061] Step 2: Use the BIM model to plan the station and path, such as Figure 8 As shown, the design data of the area to be measured is extracted, and the driving trajectory of the measuring robot is planned, and then the relevant data is imported into the handheld terminal 50 via WIFI.
[0062] Step 3: After arriving at the construction site, first set up three 360° prisms according to the planned positions, and then transmit the data in the handheld terminal 50 to the industrial computer 24 of the master control device 20 through the local area network.
[0063] Step 4: The master control device 20 controls the mobile chassis 10 to travel a short distance in a straight line. The positioning module 23 automatically records the position coordinates of the mobile chassis 10 during the movement. The system determines the approximate position and direction of the intelligent total station 40 based on the GPS position coordinates.
[0064] Step 5: After the trolley stops steadily, the master control device 20 sends a leveling instruction to the leveling device 30 through the industrial computer 24. The leveling device 30 completes the rough leveling of the intelligent total station 40 according to the inclination data of the inclination sensor 313, and then completes the fine leveling of the intelligent total station 40 according to the internal inclination data of the intelligent total station 40.
[0065] Step 6: The system automatically calculates the angle and direction of rotation required for irradiating the three known point prisms according to the current GPS coordinates of the intelligent total station 40, and then controls the intelligent total station 40 to irradiate the three known point prisms respectively to complete the automatic station setting. Fig.12As shown, three 360° prisms are set at A(x A ,y A )、B(x B ,y B )、C(x C ,y C ) three control points, and then set up the total station at the unknown point P(x P ,y P ), the total station uses the automatic search and collimation functions to collimate points A, B, and C respectively, and observes the lengths of the three sides D PA , D PB , D PC , then:
[0066] D 2 PA =(x A -x p ) 2 +(y A -y P ) 2 (1)
[0067] D 2 PB =(x B -x p ) 2 +(y B -y P ) 2 (2)
[0068] D 2 PC =(x C -x p ) 2 +(y C -y P ) 2 (3)
[0069] Expand the three equations separately and simplify them to get:
[0070] (-2x A +2x B )x p +(-2y A +2y B )y p =-x A 2 +x B 2 -y A 2 +y B 2 +D PA 2 -DPB 2 (4)
[0071] (-2x A +2x C )x p +(-2y A +2y C )y p =-x A 2 +x C 2 -y A 2 +y C 2 +D PA 2 -D PC 2 (5)
[0072] (-2x B +2x C )x p +(-2y B +2y C )y p =-x B 2 +x C 2 -y B 2 +y C 2 +D PB 2 -D PC 2 (6)
[0073] Obviously, P(xP, yP) can be obtained by any two of the above three equations. We can solve P(xP, yP) by using equations (4) and (5). P1 ,y P1 )’s coordinates:
[0074]
[0075]
[0076] Similarly, by solving equations (5), (6) and (4), (6), we can also obtain P(x P2 ,y P2 ) and P(x P3 ,y P3 ) coordinates. Since there is an error in the measurement of the side length, we can use P(x P1 ,y P1 )、P(x P2,y P2 )、P(x P3 ,y P3 ) to perform adjustment calculation and calculate a more accurate P(x P ,y P ) coordinate values.
[0077] Step 7: After the intelligent total station 40 completes its own positioning and orientation, it first extracts the test points from the BIM model (see Figure 1 The coordinate data (P01-P15) in the figure is laid out, and then the prism-free distance measurement function is started to measure the three-dimensional coordinate values of the layout points, and the measured data is transmitted to the handheld terminal 50 through the industrial computer 24.
[0078] Step 8: The software on the handheld terminal 50 can automatically compare the deviation between the measured coordinate data and the designed coordinate data, and can also import the measured data into the BIM model for more detailed analysis.
[0079] Step 9: After completing the measurement of the current station, the mobile chassis 10 will automatically plan a driving path according to the current position and the target position, move to the next measuring station, and repeat the above measurement process.
[0080] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0081] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation modes, which are merely illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the present invention and the claims, all of which are within the protection of the present invention.
Claims
1. A measurement method of an intelligent measurement robot system based on BIM, characterized in that: The BIM-based intelligent measurement robot system includes a measurement robot, a handheld terminal, and a 360° prism; the measurement robot includes a mobile chassis, a master control device, a leveling device, and an intelligent total station; the master control device includes a master control box, a wireless router, a positioning module, and an industrial computer, the master control box is fixedly installed on the mobile chassis, the wireless router and the positioning module are installed in the master control box, the signal receiving antennas of the two extend out of the master control box, and the industrial computer is installed on the bottom plate of the master control box; the wireless router is connected to the handheld terminal to realize communication and data exchange between the industrial computer and the handheld terminal; the positioning module realizes the rough positioning of the measurement robot; the industrial computer is the control core of the entire system, all instructions of the handheld terminal need to be distributed through the industrial computer, and the instruction feedback information of all devices is collected and processed by the industrial computer; the mobile chassis includes a walking mechanism and a chassis controller, the chassis controller is connected to the industrial computer, the walking mechanism is connected to the chassis controller, and its walking state is controlled by the chassis controller; The leveling device is installed on the main control box, and the intelligent total station is installed on the top of the leveling device. The intelligent total station is leveled to a horizontal state through the leveling device; There are three 360° prisms, which are respectively arranged at three control points of known coordinates on site. The arrangement principle of the three 360° prisms is: arranged on the same side or both sides of the measurement area, and maintain line of sight with the total station, and any two control points and the total station cannot be on the same straight line; the intelligent total station has the functions of automatic prism search and prism-free distance measurement; the leveling device and the intelligent total station are respectively connected to the industrial computer, and the two transmit measurement signals to the industrial computer and receive control instructions from the industrial computer; The measuring method comprises the following steps: Step 1: Create a BIM model of the area to be tested according to the design drawings; Step 2: Use the BIM model to extract the design data of the area to be measured, plan the driving trajectory of the measuring robot, and then import the relevant data into the handheld terminal via WIFI; Step 3: After arriving at the construction site, first set up three 360° prisms according to the planned location, and then transmit the data in the handheld terminal to the industrial computer of the master control device through the local area network; Step 4: The master control device controls the mobile chassis to travel a short distance in a straight line, and the positioning module automatically records the position coordinates of the mobile chassis during the movement. The system determines the approximate position and direction of the intelligent total station based on the GPS position coordinates; Step 5: After the trolley stops, the master control device sends a leveling command to the leveling device through the industrial computer. The leveling device completes the rough leveling of the intelligent total station according to the inclination data of the inclination sensor, and then completes the fine leveling of the intelligent total station according to the internal inclination data of the intelligent total station. Step 6: The system automatically calculates the angle and direction of rotation required for irradiating the three known point prisms according to the current GPS coordinates of the intelligent total station, and then controls the intelligent total station to irradiate the three known point prisms respectively to complete automatic station setting; Specific principle: three 360° prisms are set at A(x A ,y A )、B(x B ,y B )、C(x C ,y C ) three control points, and then set up the total station at the unknown point P(x P ,y P ), the total station uses the automatic search and collimation functions to collimate points A, B, and C respectively, and observes the lengths of the three sides D PA , D PB , D PC , then: D 2 PA =(x A -x p ) 2 +(y A -y P ) 2 (1) D 2 PB =(x B -x p ) 2 +(y B -y P ) 2 (2) D 2 PC =(x C -x p ) 2 +(y C -y P ) 2 (3) Expand the three equations separately and simplify them to get: (-2x A +2x B )x p +(-2y A +2y B )y p =-x A 2 +x B 2 -y A 2 +y B 2 +D PA 2 -D PB 2 (4) (-2x A +2x C )x p +(-2y A +2y C )y p =-x A 2 +x C 2 -y A 2 +y C 2 +D PA 2 -D PC 2 (5) (-2x B +2x C )x p +(-2y B +2y C )y p =-x B 2 +x C 2 -y B 2 +y C 2 +D PB 2 -D PC 2 (6) Obviously, P(xP, yP) can be obtained by any two of the above three equations. By solving equations (4) and (5), P(x P1 ,y P1 )’s coordinates: Similarly, by solving equations (5), (6) and (4), (6), we can also obtain P(x P2 ,y P2 ) and P(x P3 ,y P3 ) coordinates. Since there is an error in the measurement of the side length, we use P(x P1 ,y P1 )、P(x P2 ,y P2 )、P(x P3 ,y P3 ) to perform adjustment calculation and calculate a more accurate P(x P ,y P ) coordinate value; Step 7: After the intelligent total station completes its own positioning and orientation, it first performs layout according to the coordinate data of the measured point extracted from the BIM model, then starts the prism-free distance measurement function, measures the three-dimensional coordinate value of the layout point, and transmits the measured data to the handheld terminal through the industrial computer; Step 8: The software on the handheld terminal can automatically compare the deviation between the measured coordinate data and the designed coordinate data, and can also import the measured data into the BIM model for more detailed analysis; Step 9. After completing the measurement at this station, the mobile chassis will automatically plan a driving path based on the current position and target position, move to the next measuring station, and repeat the above measurement process.
2. The measurement method of the BIM-based intelligent measurement robot system according to claim 1, characterized in that: The master control device also includes a third battery pack and a status display. The third battery pack is installed in a dedicated slot inside the master control box, and its charging interface is installed on the outer shell of the master control box. The third battery pack is used to power the internal equipment, leveling device and intelligent total station of the master control box; the status display is installed on the outer shell of the master control box, and can intuitively display the operating status of all equipment.
3. The measurement method of the BIM-based intelligent measurement robot system according to claim 1, characterized in that: The leveling device includes a lower table, an electric cylinder, an electric push rod, an upper table, a transfer column, a sensor base, and an inclination sensor; the lower table is fixedly installed on the main control box, there are three electric cylinders, which are distributed in a triangle on the lower table, a servo motor is installed next to each electric cylinder, an electric push rod is installed on each electric cylinder, and the upper table is installed on the upper ends of the three electric push rods; the lower end of the transfer column is installed on the upper table, the sensor base is installed on the upper end of the transfer column, and the inclination sensor is installed on the sensor base.
4. The measurement method of the BIM-based intelligent measurement robot system according to claim 3 is characterized in that: The lower end of the electric cylinder is connected to the lower table through a lower hinge, and the upper end of the electric push rod is connected to the upper table through an upper hinge; the lower hinge and the upper hinge are both Hooke hinges, which can rotate along the X-axis and Y-axis directions, so that the upper table can adapt to the inclination angle change of ±25°.
5. The measurement method of the BIM-based intelligent measurement robot system according to claim 3 is characterized in that: The transfer column is a hollow round tube, and the signal line and the power line can be passed through the inside; the lower end of the transfer column is connected to the upper table through a lower flange, and the upper end of the transfer column is connected to the sensor base through an upper flange.
6. The measurement method of the BIM-based intelligent measurement robot system according to claim 3, characterized in that: The leveling device also includes a sensor protection cover, which is connected to the base through a countersunk bolt. The inclination sensor is arranged in the sensor protection cover, and a stud is provided on the top surface of the sensor protection cover for connecting with the intelligent total station.
7. The measurement method of the BIM-based intelligent measurement robot system according to claim 3, characterized in that: A motor holding brake is installed at the upper end of each servo motor to lock the motor in the event of a sudden power outage to prevent the push rod from falling rapidly and damaging the measuring equipment.
8. The measurement method of the BIM-based intelligent measurement robot system according to claim 1, characterized in that: The mobile chassis also includes a chassis shell, a rear drive, a front drive, a first battery pack, a second battery pack, a storage device, an algorithm box, a laser radar, and a status indicator light; the chassis shell is installed on the walking mechanism as a mounting carrier for various devices on the mobile chassis; the rear drive is used to drive the rear wheels of the chassis, and the front drive is used to drive the front wheels of the chassis; the first battery pack and the second battery pack are used to power the chassis, one of which is used as a backup battery. When one power supply fails, it can be quickly switched to another power supply, and it is divided into two battery packs, which can effectively reduce the weight and charging time of a single battery; the laser radar is installed at the front end of the mobile chassis and can automatically identify and bypass obstacles within 3m; the storage device is used to store chassis navigation path data, control instruction data, and point cloud data collected by the laser radar; the algorithm box is used to analyze and calculate the point cloud data collected by the laser radar, and automatically identify the type, size and motion parameters of obstacles; the status indicator light is used to display the remaining power and working status of the mobile chassis.
Citation Information
Patent Citations
Double-block accurate adjustment and positioning measuring system for ballastless track
CN104179102A
Automatic control track measuring trolley and track measuring method
CN106400627A
Intelligent robot monitoring system and method based on TM30
CN107631718A
Movable high-precision measuring robot system and measuring method thereof
CN110241696A
Full-automated shield automatic guiding system
CN201521304U