A method for draining, consolidating and improving soil by using straw piles

By using inverted conical pile heads and straw piles with woven straw pile body, combined with compressive pile core and lining ring, the long cycle and high cost problems in the consolidation and improvement of blown fill soil are solved, and fast and environmentally friendly Soil improvement and greening effect.

CN110685270BActive Publication Date: 2024-11-22HUBEI FENGTIAO YUSHUN AGRICULTURAL TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911006681.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-10-22
Publication Date
2024-11-22
Estimated Expiration
2039-10-22

AI Technical Summary

Technical Problem

The existing consolidation and improvement methods of blown fill soil have problems such as long cycles, high costs and pollution, and the improvement effect on soil is poor, making it difficult to meet the needs of engineering construction and greening.

Method used

Straw piles are used, including inverted conical pile heads, straw pile body and compression-resistant pile core. The pile heads have the functions of slow release and foaming. The straw pile body is made of woven straw and degradable fiber cloth, and is equipped with a wooden lining ring. And steel pipe compression-resistant pile cores, the drainage consolidation and improvement of soil through pressing piles and regular drainage.

Benefits of technology

The rapid consolidation and improvement of blown fill soil has been achieved, construction costs have been reduced, pollution has been reduced, water permeability, breathability and greening efficiency of the soil have high social and economic benefits, and can be reused.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110685270B_ABST
    Figure CN110685270B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of improving blown fill soil with straw piles, and in particular to a method for draining, consolidating and improving blown fill soil by using straw piles. The straw pile is pressed into the blown fill soil, and the diameter of the pile head top is larger than the diameter of the straw pile body. When the straw pile is pressed into the blown fill soil, the contact between the blown fill soil and the straw pile body can be delayed to reduce resistance. The compression-resistant pile core is pulled out, and the compression-resistant pile core is made of a steel pipe. After the pile pressing is completed, the pile can be pulled out from the straw pile body for recycling. The straw pile can form a hollow straw drainage cavity by using the good permeability of the straw itself and the water-permeable and mud-isolating property of a degradable fiber cloth. An inner lining ring is provided in the straw pile body to prevent the straw pile body from collapsing into the hollow cavity after being squeezed by the blown fill soil, avoid clogging, and facilitate water to be discharged from the hollow cavity. A drainage pipe is regularly inserted into the straw pile body for drainage to consolidate the blown fill soil. The pile head will slowly decompose and the straw pile body will rot and degrade, which can increase the organic matter of the blown fill soil and improve the looseness, water permeability and air permeability of the local blown fill soil.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of improving dredger fill soil with straw piles, and in particular to a method for draining, consolidating and improving dredger fill soil with straw piles. Background Art

[0002] Dredger fill soil generally has the characteristics of low bulk density, large porosity, high water content, extremely low strength, high compressibility and low permeability. The foundation or roadbed composed of dragger fill soil has very poor strength and generally cannot be used directly for engineering construction. At the same time, the water permeability and air permeability of dragger fill soil are extremely poor, and the natural consolidation speed is very slow, making it difficult for ordinary green plants and greening trees to grow. If engineering construction, greening, etc. are required on the dragger fill soil site, artificial treatment is required.

[0003] At present, there are three methods for consolidating and improving blown fill: natural consolidation, replacement, grouting and preloading. The consolidation method is to improve the blown fill through natural aging, and this method has a long cycle. The replacement method is to replace the surface blown fill with a soil layer with superior physical properties. Although this method has a short cycle and quick results, it requires high transportation costs, destroys fertile farmland, and has poor economic benefits. The grouting method is to sink a straw drainage body into the blown fill, insert a metal pipe into the drainage body and inject slurry to form a silt pile. This method is expensive and pollutes the soil, so it is not suitable for surface greening of blown fill. The preloading method is to apply external pressure to the soil or generate negative pressure on the soil, so that the water in the soil is squeezed into the drainage body to reduce the water content of the bottom soil, thereby achieving a consolidation effect. This method has a high investment cost.

[0004] The existing treatment methods cannot effectively consolidate and improve the dredger fill, and may also cause some pollution and waste of resources. Summary of the invention

[0005] In view of the above shortcomings of the prior art, the present invention provides a method for draining, consolidating and improving blown fill soil using straw piles, which can effectively overcome the problems of long cycle, pollution and high cost in the prior art methods for improving blown fill soil.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0007] A straw pile for drainage consolidation and improvement of blown fill soil comprises a pile head, a straw pile body and a compression-resistant pile core; a connecting rod is arranged at the upper end of the pile head, and the pile head and the straw pile body are connected by the connecting rod; inner lining rings are evenly arranged from top to bottom inside the straw pile body; and the compression-resistant pile core is inserted into the inner lining rings.

[0008] Furthermore, the pile head is in an inverted cone shape, and the diameter of the pile head top is larger than the diameter of the straw pile body.

[0009] Furthermore, the material of the pile head is a material with slow-release and foaming functions in water, and the pile head is formed by high-pressure extrusion.

[0010] Furthermore, the straw pile body is made by weaving straw into a curtain and rolling up a degradable fiber cloth on the surface which is fastened by an external tie rope.

[0011] Furthermore, the material of the compression pile core is steel pipe.

[0012] Furthermore, the lining ring is made of wood material.

[0013] The present invention also discloses a method for draining, consolidating and improving the soil body of dredger fill soil by using straw piles, and the specific steps are as follows:

[0014] 1. Determine the location of the pile and the vertical and horizontal spacing of the straw piles on the horizontal plane;

[0015] 2. Connect the pile head and the straw pile body;

[0016] 3. Dig a pre-pressing hole at the pile pressing position;

[0017] 4. Carry out pile pressing;

[0018] 5. After the straw pile is pressed into the blown fill soil, the straw pile is left to stand, and then the compression pile core is pulled out;

[0019] 6. Regularly drain the cavity formed by the straw pile.

[0020] Compared with the known public technology, the technical solution provided by the present invention has the following beneficial effects:

[0021] (1) The straw pile has a simple structure and is easy to construct. The diameter of the pile head is slightly larger than the diameter of the straw pile body, which can delay the contact between the dredged fill soil and the pile body when pressing in, reducing resistance and facilitating the pressing in of the straw pile.

[0022] (2) A compressive steel pipe is provided inside the straw pile body, and the straw pile has high compressive bearing capacity, making it easy to complete the pile construction; after the construction is completed, the steel pipe can be recycled and reused;

[0023] (3) The straw pile body is made of straw woven into a curtain with a biodegradable fiber cloth wrapped around the surface. The straw pile body is water-permeable, air-permeable and mud-resistant. The pile core cavity will not be filled with blown-fill soil, which is convenient for regular drainage.

[0024] (4) The straw pile body is evenly provided with inner lining rings, which can prevent the straw pile body from collapsing into the cavity due to the extrusion of the blown fill soil, and can provide space for the subsequent drainage operation for a long time. The inner lining ring is made of wood material and can be degraded and absorbed;

[0025] (5) The pile head is a material with slow-release and foaming functions in water. It slowly decomposes in water to produce bubbles, increasing the contact surface area with the dredger fill soil and forming a drainage channel, making drainage and consolidation faster and more effective;

[0026] (6) The straw pile utilizes the good permeability of the straw itself and the water-permeable and mud-isolating properties of the degradable fiber cloth to form a hollow straw drainage cavity. An inner lining ring is provided inside the hollow tube of the straw pile body to prevent the straw pile body from collapsing into the hollow cavity after being squeezed by the blown-fill soil, thus avoiding blockage and facilitating the discharge of water from the hollow cavity, thereby draining and consolidating the blown-fill soil. Over time, the pile head will slowly decompose, and the straw pile body will rot and degrade and merge with the soil, which can increase the organic matter in the soil and improve the looseness, water permeability and air permeability of the local soil.

[0027] (7) The straw pile can provide necessary space and nutrients for the tree roots, and the greening efficiency is high after filling;

[0028] (8) The materials of the pile head and the straw pile body will not produce any pollution in the soil, the materials are easy to obtain, and the compression pile core can be recycled, so this method has high social and economic benefits;

[0029] (9) This method is repeatable and can be used to drain, consolidate and improve the same soil multiple times. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0031] Figure 1 This is a schematic diagram of the cross-sectional structure of a straw pile of the present invention;

[0032] Figure 2 It is a schematic diagram of the pile head structure of the present invention;

[0033] Figure 3 This is a schematic diagram of the partial structure of the cross-section of the straw pile of the present invention;

[0034] Figure 4 For the present invention Figure 3 AA cross-sectional structural diagram;

[0035] Figure 5 A schematic diagram of the straw pile and drainage fixing process of the present invention;

[0036] The numbers in the figure represent: 1-pile head; 2-straw pile body; 3-compression pile core; 4-connecting rod; 5-degradable fiber cloth; 6-inner lining ring; 7-outer binding rope; 8-air bubble; 9-drainage pipe; A-straw pile pressed into the push fill state; B-straw pile with the compression pile core pulled out; C-pile head decomposition state; D-straw pile decomposition and fusion state with blown fill. DETAILED DESCRIPTION

[0037] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] The present invention will be further described below in conjunction with the embodiments.

[0039] Example

[0040] Reference Figures 1 to 4 A straw pile for drainage, consolidation and improvement of blown fill soil, comprising a pile head 1, a straw pile body 2 and a compression-resistant pile core 3; a connecting rod 4 is arranged at the upper end of the pile head 1, and the pile head 1 and the straw pile body 2 are connected by the connecting rod 4; inner lining rings 6 are evenly arranged from top to bottom inside the straw pile body 2; the compression-resistant pile core 3 is inserted into the inner lining ring 6.

[0041] Specifically, refer to Figure 1 The pile head 1 is in an inverted cone shape, and the top diameter of the pile head 1 is larger than the diameter of the straw pile body 2. When pressed in, it can delay the contact between the dredged fill soil and the straw pile body 2, reduce resistance, and facilitate the pressing in of the straw pile.

[0042] Specifically, the material of the pile head 1 is a material with slow-release and foaming functions in water. The pile head 1 is made of aluminum carbonate that is tightly molded under high pressure and a layer of slow-release film is wrapped on its surface. The pile head 1 will slowly decompose, increasing the surface area in contact with the fill soil and forming a drainage channel. The drainage consolidation is faster and more effective. The pile head 1 is formed by high-pressure extrusion.

[0043] Specifically, refer to Figure 3 and Figure 4 The straw pile body 2 is made of straw woven into a curtain and the surface is wrapped with a degradable fiber cloth 5 fastened by an external tie rope 7. The straw pile body 2 rots and degrades over time and merges with the dredger fill soil, which can increase the organic matter of the dredger fill soil and improve the looseness, water permeability and air permeability of the local dredger fill soil without polluting the soil.

[0044] Specifically, the material of the compression pile core 3 is a steel pipe, which can be recycled and reused, thus saving resources.

[0045] Specifically, the inner lining ring 6 is made of wood material, which can be made of bamboo poles, has low manufacturing cost and is easy to obtain. The wood material can be degraded in the blown fill over time and will not pollute the soil.

[0046] Reference Figures 1 to 5 A method for draining, consolidating and improving the soil body of blown fill soil by using straw piles. The pile head 1 of the straw pile will slowly decompose, increase the contact surface area with the blown fill soil body, form a drainage channel, and drain and consolidate faster with better effect; the straw pile body 2 of the straw pile will rot and degrade over time and merge with the blown fill soil body, which can increase the organic matter of the blown fill soil body and improve the looseness, water permeability and air permeability of the local blown fill soil body. The specific steps are as follows:

[0047] 1. Determine the location of the piles and the vertical and horizontal spacing of the straw piles on the horizontal plane to effectively improve the entire range of the blown fill soil;

[0048] 2. Connect the pile head 1 and the straw pile body 2, the pile head 1 and the straw pile body 2 are connected by a connecting rod 4;

[0049] 3. Dig pre-pressing holes at the pile pressing position to facilitate the pressing of the straw pile and prevent deviation in the pressing position;

[0050] 4. During the pile pressing, the diameter of the top of the pile head 1 is larger than that of the straw pile body 2, which can delay the contact between the dredged fill soil and the straw pile body 2 during the pressing process, reduce resistance, and facilitate the pressing of the straw pile;

[0051] 5. After the straw pile is pressed into the blown fill soil, the straw pile is left to stand, and then the compression pile core 3 is pulled out. The compression pile core 3 is made of a steel pipe and can be pulled out from the straw pile body 2 for recycling after the pile pressing is completed;

[0052] 6. Regularly drain the cavity formed by the straw pile body 2. The straw pile utilizes the good permeability of the straw itself and the water-permeable and mud-isolating properties of the degradable fiber cloth to form a hollow straw drainage cavity. An inner lining ring 6 is provided in the straw pile body 2 to prevent the straw pile body 2 from collapsing into the hollow cavity after being squeezed by the blown fill soil, thereby avoiding blockage and facilitating the discharge of water from the hollow cavity. Regularly insert the drainage pipe 9 into the straw pile body 2 for drainage to consolidate the blown fill soil.

[0053] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A straw pile for drainage, consolidation and improvement of blown fill soil, comprising a pile head (1), a straw pile body (2) and a compression pile core (3); characterized in that: A connecting rod (4) is arranged at the upper end of the pile head (1), and the pile head (1) is connected to the straw pile body (2) via the connecting rod (4); inner lining rings (6) are evenly arranged from top to bottom inside the straw pile body (2); The compression-resistant pile core (3) is inserted into the inner lining ring (6); the pile head (1) is in the shape of an inverted cone, and the diameter of the top of the pile head (1) is larger than the diameter of the straw pile body (2); the material of the pile head (1) is a material having slow-release and foaming functions in water, and the pile head (1) is formed by high-pressure extrusion; the straw pile body (2) is made of straw woven into a curtain and having a degradable fiber cloth (5) fastened on the surface by an external tie rope (7) wound around; the material of the compression-resistant pile core (3) is a steel pipe; the inner lining ring (6) is a wooden material; There is a compressive steel pipe inside the straw pile body. The straw pile has high compressive bearing capacity and is easy to complete the pile construction. After the construction is completed, the steel pipe can be recycled and reused. Liner rings are evenly arranged inside the straw pile body, which can prevent the straw pile body from collapsing into the cavity due to the squeezing of the blown fill soil, and can provide space for subsequent pumping and drainage operations for a long time. The liner rings are made of wood material that can be degraded and absorbed.

2. A method for draining, consolidating and improving dredger fill soil by using the straw piles described in claim 1, the specific steps being as follows: S1. Determine the pile pressing position and the vertical and horizontal spacing of the straw piles on the horizontal plane; S2. Connecting the pile head (1) and the straw pile body (2); S3. Dig a pre-pressing hole at the pile pressing position; S4. Carry out pile pressing; S5. After the straw pile is pressed into the blown fill soil, the straw pile is left to stand, and then the compression pile core is pulled out (3); S6. Regularly drain the cavity formed by the straw pile (2).