Circulating ash bed replacement system

Through the circulating ash bed replacement system, the bed replacement device and control and adjustment device are used to quickly replace the ash material, which solves the problem of long start-up time of the circulating fluidized bed semi-dry system and the water absorption of the ash material, and achieves shortened bed building time and system stability. sexual enhancement.

CN110721642BActive Publication Date: 2024-10-15SHANDONG ENERGY GRP CO LTD +1
View PDF 0 Cites -1 Cited by

Patent Information

Application Number
CN201911222920.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-03
Publication Date
2024-10-15
Estimated Expiration
2039-12-03

Smart Images

  • Figure CN110721642B_ABST
    Figure CN110721642B_ABST
Patent Text Reader

Abstract

The present invention discloses a circulating ash bed replacement system, including an absorption tower and a dust collector ash hopper connected to the absorption tower; and also including a bed replacement device, which connects the absorption tower and the ash bin and is used to transport the active ash in the ash bin to the absorption tower. By adding a bed replacement device, the problem of long startup time of the circulating fluidized bed semi-dry system is solved, and it is convenient to start and stop. It will replace the manual loading, unloading and transportation of sealed tank trucks, and realize the rapid establishment of a stable fluidized bed layer in the circulating fluidized bed semi-dry absorption tower. The bed construction time is shortened by 60%, and the rapidity and stability of the system are improved. By regularly conveying and replacing ash, the balance of circulating ash and moisture content is maintained, and the problems of water absorption, agglomeration and ash blockage of circulating ash are solved, thereby improving the stability, reliability and flexibility of system operation and reducing environmental risks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of environmental protection, and in particular to a circulating ash bed replacement system. Background Art

[0002] At present, ecological environmental protection, as the lifeline and lowest red line of the enterprise, faces severe challenges. Whether environmental protection equipment can be started quickly and operate stably and meet standards for a long period of time is the key to ensuring production.

[0003] Based on the principle of circulating fluidized bed, through the recycling of materials, absorbent, adsorbent and circulating ash form a dense phase bed in the reaction tower, and water is sprayed into the reaction tower. Various pollutants in the flue gas can undergo chemical reactions or physical adsorption in the reaction tower; the flue gas purified by the reaction tower enters the downstream dust collector to further purify the flue gas.

[0004] Multi-component pollutants in flue gas, such as SO2, NOx, almost all SO3, HCl, HF, heavy metal Hg, etc., can be absorbed and removed in the above process, with a desulfurization efficiency of more than 98% and a denitrification efficiency of more than 70%. The above technology is mature, stable, and efficient, without producing wastewater, with a small footprint and low investment and operating costs. It is suitable for flue gas desulfurization, denitrification, dust removal and coordinated control of multiple pollutants in circulating fluidized bed boilers in power plants, the steel industry, and the cement industry.

[0005] The circulating fluidized bed semi-dry integrated desulfurization, denitrification and dust removal process has a fast reaction speed and high efficiency, and can synergistically remove pollutants such as Hg, heavy metals, SO3, and dioxins. There is no sewage discharge, and the equipment system and chimney do not require anti-corrosion treatment. The flue gas temperature after the semi-dry reaction tower process is higher than 85°C, and there is no white "plume" when it is discharged into the atmosphere. More and more power plants and steel and cement industries choose the circulating fluidized bed semi-dry process for ultra-low emission environmental protection parameter control.

[0006] However, after the semi-dry circulating fluidized bed project is put into operation, there are often problems such as long start-up and bed construction time, strong water absorption of circulating ash, easy to clump, agglomerate, and block ash, and the pressure of operation and maintenance and cleaning work is relatively high. Summary of the invention

[0007] The purpose of the present invention is to provide a circulating ash bed replacement system, which has a short bed construction time. In a further technical solution, the problems of circulating ash absorbing water, agglomerating, and ash blocking can also be solved.

[0008] To achieve the above-mentioned objectives, the present invention provides a circulating ash bed building and replacement system, comprising an absorption tower and a dust collector ash hopper connected to the absorption tower; and also comprising a bed building and replacement device, which connects the absorption tower and the ash bin and is used to transport the active ash in the ash bin to the absorption tower.

[0009] Preferably, the bed building and replacement device also includes a feed valve connected to the ash bin, a compressed air intake valve connected to a compressed air source, and an output valve for outputting fluidized material; the interior of the bed building and replacement device is also provided with a level meter, a fluidizing air chamber, an injection pipe, a balanced exhaust valve and a gasification valve.

[0010] Preferably, it also includes a control and adjustment device connected between the bed building and replacement device and the absorption tower, which is used to adjust the ash delivery flow of the bed building and replacement device.

[0011] Preferably, it also includes a gas supply device connected to the pipeline between the absorption tower and the control and adjustment device, which is used to regulate the gas flow in the pipeline.

[0012] Preferably, the control and adjustment device and the gas supply device are both connected to a program control device.

[0013] Preferably, the pipeline between the absorption tower and the control and adjustment device is also connected to the dust collector ash hopper to replace the high-calcium ash in the dust collector ash hopper with the active ash in the ash bin.

[0014] The system of the present invention includes an absorption tower and a dust collector ash hopper connected to the absorption tower; and also includes a bed construction replacement device, which connects the absorption tower and the ash bin and is used to transport the active ash in the ash bin to the absorption tower. By adding the bed construction replacement device, the problem of long startup time of the circulating fluidized bed semi-dry system is solved, and it is convenient to start and stop. It will replace the manual loading, unloading and transportation of sealed tank trucks, and realize the rapid establishment of a stable fluidized bed layer in the circulating fluidized bed semi-dry absorption tower, shortening the bed construction time by 60%, and improving the rapidity and stability of the system.

[0015] In a further technical solution, the pipeline between the absorption tower and the control and adjustment device is also connected to the dust collector ash hopper, so that the high-calcium ash in the dust collector ash hopper is replaced with the active ash in the ash bin. By regularly transporting and replacing ash, the balance of circulating ash and moisture content is maintained, and the problems of circulating ash absorbing water, clumping, and ash blockage are solved, thereby improving the stability, reliability, and flexibility of system operation and reducing environmental risks.

[0016] In addition, the system of the present invention can be put into operation at any time, and the ash conveying flow rate can also be accurately controlled according to the system operation parameters. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0018] Figure 1 The figure is a schematic diagram of the structure of the circulating ash bed replacement system provided in the specific implementation mode of the present invention.

[0019] Figure 2 for Figure 1 Schematic diagram of the structure of the CSCEC bed replacement device.

[0020] Figure 1 , 2 The reference numerals in the figures are as follows:

[0021] 1-ash storage, 2-bed replacement device, 3-control and adjustment device, 4-absorption tower, 5-gas supply device, 6-program control device, 7-dust collector ash hopper;

[0022] 2.1-feed valve, 2.2-level meter, 2.3-fluidizing air chamber, 2.4-injection pipe, 2.5-balance exhaust valve, 2.6-compressed air inlet valve, 2.7-gasification valve, 2.8-output valve. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] The core of the present invention is to provide a circulating ash bed replacement system, please refer to Figure 1 , Figure 1 The figure is a schematic diagram of the structure of the circulating ash bed replacement system provided in the specific implementation mode of the present invention.

[0025] In a specific embodiment, the main parts of the circulating ash bed building and replacement system provided by the present invention include an absorption tower 4, a dust collector ash hopper 7 connected to the absorption tower 4, and a bed building and replacement device 2.

[0026] One side of the bed replacement device 2 is connected to the ash bin 1 , and the other side is connected to the absorption tower 4 , so that the absorption tower 4 and the ash bin 1 are connected, so that the active ash in the ash bin 1 can be transported to the absorption tower 4 .

[0027] A control and adjustment device 3 may be provided between the bed building and replacement device 2 and the absorption tower 4 to adjust the ash delivery flow of the bed building and replacement device 2 .

[0028] In addition, a gas supply device 5 may be provided, and the gas supply device 5 may be connected to the pipeline between the absorption tower 4 and the control and adjustment device 3, so that the gas flow in the relevant pipeline can be regulated.

[0029] Both the control and adjustment device 3 and the gas supply device 5 can realize signal connection with the program control device 6 so that the latter can make necessary adjustments to the working states of the control and adjustment device 3 and the gas supply device 5 .

[0030] The control and adjustment device 3 can adjust the feeding frequency in the bed building and replacement device 2 by setting the time. By setting the time, the conveying frequency can be increased or decreased to achieve the purpose of adjusting the ash conveying flow rate.

[0031] In order to achieve the replacement of circulating ash, the pipeline between the absorption tower 4 and the control and adjustment device 3 can be further connected to the dust collector ash hopper 7, so that the high-calcium ash in the dust collector ash hopper 7 can be replaced by the active ash in the ash bin 1.

[0032] Please refer to Figure 2 , Figure 2 for Figure 1 Schematic diagram of the structure of the CSCEC bed replacement device.

[0033] In a specific embodiment, the bed building and replacement device 2 further includes a feed valve 2.1, and is connected to the ash bin 1 through the feed valve 2.1; the bed building and replacement device 2 also includes a compressed air inlet valve 2.6 connected to a compressed air source, and an output valve 2.8 connected to the control and adjustment device 3.

[0034] A material level meter 2.2, a fluidizing air chamber 2.3, an injection material pipe 2.4, a balanced exhaust valve 2.5, a gasification valve 2.7 and the like may also be arranged inside the bed-building replacement device 2.

[0035] When working, the program control device 6 is controlled by the electromagnetic valve box. First, the balanced exhaust valve 2.5 is opened, and then the feed valve 2.1 is opened. At this time, the material above the feed port is added through the feed port. The material can be controlled according to the program design, for example, by the feeding time control, or by the material level meter 2.2.

[0036] The program control device 6 closes the feed valve 2.1 and the balance exhaust valve 2.5 according to the program settings, and at the same time the compressed air intake valve 2.6 is opened, and the compressed air is divided into three paths to enter the bed building replacement device 2 body, providing pressurization, fluidization, and conveying air sources inside the device, so that the material is fully fluidized, and the fluidized material is blown out through the injection pipe 2.4.

[0037] When the material is transported, the resistance in the pipeline is greatly reduced, and a low pressure signal is issued, and the program control automatically closes the compressed air inlet valve 2.6, thereby entering the second working cycle. In the program control device, two sets of working modes, automatic and manual, can usually be set for on-site operation.

[0038] The system of the present invention solves the problem of long startup time of the circulating fluidized bed semi-dry system by adding a bed building and replacement device. It is easy to start and stop, and will replace the manual loading, unloading and transportation of sealed tank trucks, thereby realizing the rapid establishment of a stable fluidized bed layer in the circulating fluidized bed semi-dry absorption tower, shortening the bed building time by 60%, and improving the rapidity and stability of the system.

[0039] In a further technical solution, the pipeline between the absorption tower and the control and adjustment device is also connected to the dust collector ash hopper, so that the high-calcium ash in the dust collector ash hopper is replaced with the active ash in the ash bin. By regularly transporting and replacing ash, the balance of circulating ash and moisture content is maintained, and the problems of circulating ash absorbing water, clumping, and ash blockage are solved, thereby improving the stability, reliability, and flexibility of system operation and reducing environmental risks.

[0040] In addition, the system of the present invention can be put into operation at any time, and the ash conveying flow rate can also be accurately controlled according to the system operation parameters.

[0041] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0042] The above is a detailed introduction to the circulating ash bed replacement system provided by the present invention. This article uses specific examples to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the present invention, the present invention can also be improved and modified in a number of ways, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

Claims

1. A circulating ash bed replacement method, comprising an absorption tower (4) and a dust collector ash hopper (7) connected to the absorption tower (4); It is characterized in that It also includes a bed building and replacement device (2), which connects the absorption tower (4) and the ash silo (1) and is used to transport the active ash in the ash silo (1) to the absorption tower (4), and maintain the balance of circulating ash and moisture content through regular ash transportation and replacement; It also includes a control and adjustment device (3) connected between the bed building and replacement device (2) and the absorption tower (4), and used to adjust the ash delivery flow of the bed building and replacement device (2); The pipeline between the absorption tower (4) and the control and adjustment device (3) is also connected to the dust collector ash hopper (7) so as to replace the high-calcium ash in the dust collector ash hopper (7) with the active ash in the ash bin (1).

2. The circulating ash bed replacement method according to claim 1, It is characterized in that The bed-building replacement device (2) further comprises a feed valve (2.1) connected to the ash bin (1), a compressed air intake valve (2.6) connected to a compressed air source, and an output valve (2.8) for outputting fluidized material; the bed-building replacement device (2) is also provided with a material level meter (2.2), a fluidizing air chamber (2.3), an injection material pipe (2.4), a balanced exhaust valve (2.5) and a gasification valve (2.7) inside.

3. The circulating ash bed replacement method according to claim 1, It is characterized in that It also includes a gas supply device (5) connected to the pipeline between the absorption tower (4) and the control and adjustment device (3), which is used to control the gas flow in the pipeline.

4. The circulating ash bed replacement method according to claim 3, It is characterized in that The control and adjustment device (3) and the gas supply device (5) are both connected to a program control device (6).