An overhead anti-settlement system for depot warehouses suitable for soft strata
By excavating rectangular grooves and pouring concrete platforms on the ground of the urban EMU maintenance depot, combined with a laser displacement monitoring system, the problem of foundation settlement in soft soil layers was solved, achieving an anti-settlement effect that was simple and easy to install, and ensuring the foundation's stability. Safety and normal maintenance work.
Patent Information
- Application Number
- CN201910889376.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-09-19
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2039-09-19
AI Technical Summary
Municipal EMUs use maintenance depots that are prone to settlement when the foundation is on soft soil, resulting in low safety. Existing compensation structures such as springs and hydraulics have problems such as uneven fixed compensation distances, easy structural damage, and high costs.
A depot warehouse overhead anti-settlement system including a rectangular groove, an overhead plate, a settlement monitoring equipment room and a laser displacement monitoring system was designed. A platform covering the entire site was formed by excavating a rectangular groove on the ground of the maintenance warehouse and pouring concrete. , combined with the laser displacement monitoring system to monitor and alert the settlement situation in real time.
It achieves the anti-settlement effect of simple setting method, low cost and easy installation, avoids damage caused by foundation settlement, improves the strength and safety of the foundation, ensures the normal progress of maintenance work, and has great social and economic benefits.
Smart Images

Figure CN110761261B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of anti-settlement of depot warehouses, and in particular relates to an overhead anti-settlement system for depot warehouses suitable for soft strata. Background Art
[0002] The gradual acceleration of urbanization has led to an increase in civil engineering construction, and the phenomenon of soft soil foundations has become more and more common. If the foundation soil is soft soil, its bearing capacity and shear resistance are weak. Especially when subjected to vibration or large loads, the foundation strength will drop significantly and become fluid, which will then cause partial or overall shear failure of the foundation and form foundation settlement. Foundation settlement refers to the sinking of the foundation surface caused by the compaction of the foundation soil layer under the action of additional stress. Excessive settlement, especially uneven settlement, will cause the building to tilt and crack, making it unable to be used normally.
[0003] At present, with the rapid development of urban EMUs in my country, the operation and maintenance of urban EMUs has become increasingly important. In areas with abundant rainfall and frequent typhoon disasters, the foundation settlement problem is very prominent, which will cause the operation and maintenance depot of urban EMUs to be unable to be used normally. General anti-settlement facilities include compensation structures, which are mainly divided into two categories, one is to use springs for compensation, and the other is to use hydraulics for compensation.
[0004] In summary, the current urban EMU operation and maintenance depot built on soft soil has the following main problems:
[0005] 1) Generally speaking, most foundations are prone to subsidence because the soil underneath is soft or the bottom is close to the groundwater layer, which affects the use of the foundation. As a result, the urban EMU operation and inspection depot built on the soft soil foundation cannot be used normally, and the safety is very low.
[0006] 2) If springs are used as compensation structures for foundation settlement, there will be several problems, such as fixed compensation distance, uneven compensation distance, and easy damage to the structure.
[0007] 3) If hydraulic pressure is used as the compensation structure for foundation settlement, the main problems faced are high compensation cost, overly complex structure, and difficulty in installation and manufacturing. Summary of the invention
[0008] In response to at least one of the above defects or improvement needs in the prior art, the present invention provides an overhead anti-subsidence system for vehicle depot warehouses suitable for soft strata. The system has a simple setting and is easy to install. It is used to prevent the subsidence of the foundation of the urban EMU operation and maintenance depot built on the soft soil layer, thereby ensuring the safe use of the urban EMU operation and maintenance depot.
[0009] To achieve the above object, according to one aspect of the present invention, there is provided an overhead anti-settling system for depot warehouses suitable for soft strata, wherein:
[0010] It includes rectangular grooves, overhead plates, settlement monitoring equipment room, control console, and laser displacement monitoring system;
[0011] A plurality of rectangular grooves are excavated downwardly on the ground of the maintenance storehouse, extending longitudinally along the track and distributed at intervals between the side wall of the maintenance storehouse and the track bridge and between two adjacent track bridges;
[0012] The overhead plate is a complete platform covering the entire maintenance depot floor formed by pouring concrete into the rectangular groove and continuing to pour concrete upward;
[0013] The settlement monitoring equipment room is arranged outside the maintenance warehouse column of the maintenance warehouse; the control console is arranged in the settlement monitoring equipment room and connected to the laser displacement monitoring system;
[0014] The laser displacement monitoring system comprises a laser emitting device and a reflecting plate. The laser emitting device is arranged on the inner side of a column of the maintenance warehouse, and the reflecting plate is arranged on the overhead plate.
[0015] Preferably, the depth of the rectangular groove is greater than its width and greater than the thickness of the upwardly cast plane.
[0016] Preferably, the overhead plate is coated with epoxy flooring.
[0017] Preferably, the settlement monitoring equipment room includes an equipment room door, a monitoring camera, a monitoring line, and a data storage platform;
[0018] The control console and the data storage station are connected to the laser displacement monitoring system through the monitoring line.
[0019] Preferably, the console includes a lighting lamp, a radio receiving device, a switch, an alarm indicator light and a console alarm, and the various components are electrically connected.
[0020] Preferably, the laser emitting device comprises a laser emitter, a radio transmitter, a switch, a status indicator light, a laser emitting device alarm, and a power indicator light;
[0021] The laser emitting device transmits data with the control console via the radio transmitter to determine whether laser reflection is interrupted.
[0022] Preferably, the laser emitting devices and reflective plates are arranged in pairs along the longitudinal direction of the track.
[0023] Preferably, the laser transmitter emits laser light onto the reflective plate on the overhead plate. When subsidence occurs, the laser reflection is interrupted, the status indicator light flashes red, the alarm of the laser transmitter sounds an alarm, the radio transmitter starts to transmit radio signals to the radio receiving device, the console processes the signal, and the alarm and alarm indicator light of the console send out sound and light alarms.
[0024] The above-mentioned preferred technical features can be combined with each other as long as they do not conflict with each other.
[0025] In general, the above technical solution conceived by the present invention has the following beneficial effects compared with the prior art:
[0026] 1. Compared with the anti-subsidence facilities with compensation structures, the integrated anti-subsidence facilities are simple to set up, low in cost, easy to install, and have sufficient strength to effectively prevent the occurrence of subsidence.
[0027] 2. The integrated anti-subsidence facility can prevent the damage caused by subsidence in the maintenance depot of urban EMUs, and can ensure that the maintenance work of urban EMUs is completed in the maintenance depot with quality and quantity, which can generate greater social and economic benefits.
[0028] 3. The integrated anti-subsidence facility has a large force-bearing area, can resist uplift and overturning forces, has good conductivity and anti-scouring properties, and can effectively improve the strength of the foundation.
[0029] 4. For safety reasons, a laser displacement monitoring system is also set up. This monitoring system can monitor the occurrence of settlement in real time and fully ensure the safety of maintenance workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is an overall front view schematic diagram of an overhead anti-settling system for a depot warehouse applicable to soft strata according to an embodiment of the present invention;
[0031] Figure 2 yes Figure 1 Schematic cross-sectional view along the AA direction;
[0032] Figure 3 yes Figure 2 A partial enlarged schematic diagram of point B in the middle;
[0033] Figure 4 2 is a schematic diagram of the lower part of an overhead anti-settling system for a depot warehouse applicable to soft strata according to an embodiment of the present invention;
[0034] Figure 5 It is a schematic diagram of a front view of a settlement monitoring equipment room of an overhead anti-settlement system for a depot warehouse applicable to soft strata according to an embodiment of the present invention;
[0035] Figure 6 It is a schematic diagram of a top view of a settlement monitoring equipment room of an overhead anti-settlement system for a depot warehouse applicable to soft strata according to an embodiment of the present invention;
[0036] Figure 7 It is a schematic diagram of a control console of an overhead anti-settling system for a depot warehouse applicable to soft strata according to an embodiment of the present invention;
[0037] Figure 8 Schematic diagram of a laser emitting device of an overhead anti-settling system for a depot warehouse applicable to soft strata according to an embodiment of the present invention;
[0038] Fig. 9 Schematic diagram of a reflector plate of an overhead anti-settling system for a depot warehouse applicable to soft strata according to an embodiment of the present invention;
[0039] Fig.10 It is a schematic diagram of the working process of the overhead anti-subsidence system for a vehicle depot warehouse applicable to soft strata according to an embodiment of the present invention. DETAILED DESCRIPTION
[0040] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in each embodiment of the present invention described below can be combined with each other as long as they do not conflict with each other. The present invention is further described in detail below in conjunction with specific embodiments.
[0041] As a preferred embodiment of the present invention, Figure 1-9 As shown, the present invention provides an overhead anti-subsidence system for a vehicle depot warehouse suitable for soft strata, which mainly includes a rectangular groove 1, a track bridge 2, an overhead plate 3, a maintenance warehouse 4, a maintenance warehouse column 5, a subsidence monitoring equipment room 6, a control console 7, and a laser displacement monitoring system.
[0042] like Figure 1-4 As shown, a plurality of rectangular grooves 1 are excavated downwards on the ground of the maintenance depot 4, extending longitudinally along the track and spaced apart between the side wall of the maintenance depot 4 and the track bridge 2 and between two adjacent track bridges 2, and the urban EMU 10 to be maintained runs on the track bridge 2.
[0043] Before pouring the floor of the maintenance storehouse 5, a rectangular groove 1 (shown by the shadow) with a depth of 0.6 meters and a width of 0.35 meters is dug downward along the longitudinal direction of the track, and the rectangular grooves 1 are evenly spaced between the side wall of the maintenance storehouse 4 and the track bridge 2 and the two adjacent track bridges 2. Concrete is poured into the rectangular groove 1. After the rectangular groove 1 is filled, it is poured upward by 0.1 meters until a complete platform covering the entire maintenance storehouse floor is formed, and the overhead plate 3 is formed. The overhead plate 3 is coated with epoxy flooring to prevent water from seeping into the foundation.
[0044] like Figure 1 , 5 As shown in , 6, the settlement monitoring equipment room 6 is arranged on the outside of the maintenance warehouse column 5 of the maintenance warehouse 4; it mainly includes an equipment room door 601, a monitoring camera 602, a monitoring line 603, and a data storage table 604; the control console 7 and the data storage table 604 are connected to the laser displacement monitoring system through the monitoring line 603.
[0045] like Figure 7 As shown, the control console 7 is arranged in the settlement monitoring equipment room 6, and the control console 7 includes a lighting lamp 701, a radio receiving device 702, a switch 703, an alarm indicator light 704 and a control console alarm 705, and each component is electrically connected.
[0046] like Figure 8-9 As shown, the laser displacement monitoring system includes a laser emitting device 8 and a reflector 9. The laser emitting device 8 is connected to the inner side of the maintenance warehouse column 5 by bolts, and the reflector 9 is arranged on the overhead plate 3. Multiple pairs of the laser emitting devices 8 and reflector plates 9 are arranged along the longitudinal direction of the track.
[0047] The laser emitting device 8 includes a laser emitter 801, a radio transmitter 802, a switch 803, a status indicator light 804, a laser emitting device alarm 805 and a power indicator light 806; the laser emitting device 8 transmits data with the console 7 via the radio transmitter 802 to determine whether the laser reflection is interrupted. The wireless distance is more than 200 meters, and a special wireless coding method is used, which has strong anti-interference ability.
[0048] like Fig.10As shown, when the present invention is implemented, the laser transmitter 801 emits laser light to illuminate the reflective plate 9 attached to the overhead plate 3. When settlement occurs, the laser reflection is interrupted, the status indicator light 804 emits a red flash, the alarm bell 805 of the laser emitting device sounds an alarm, the radio transmitter 802 is started, and transmits radio to the radio receiving device 702. The console 7 processes the signal, and the console alarm bell 705 and the alarm indicator light 704 sound and light alarms. Since there are status indicators and alarm bells on the laser emitting device 8, the location and distance of settlement can be accurately determined even at night.
[0049] In summary, the specific advantages of the present invention are as follows:
[0050] 1. Compared with the anti-subsidence facilities with compensation structures, the integrated anti-subsidence facilities are simple to set up, low in cost, easy to install, and have sufficient strength to effectively prevent the occurrence of subsidence.
[0051] 2. The integrated anti-subsidence facility can prevent the damage caused by subsidence in the maintenance depot of urban EMUs, and can ensure that the maintenance work of urban EMUs is completed in the maintenance depot with quality and quantity, which can generate greater social and economic benefits.
[0052] 3. The integrated anti-subsidence facility has a large force-bearing area, can resist uplift and overturning forces, has good conductivity and anti-scouring properties, and can effectively improve the strength of the foundation.
[0053] 4. For safety reasons, a laser displacement monitoring system is also set up. This monitoring system can monitor the occurrence of settlement in real time and fully ensure the safety of maintenance workers.
[0054] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An overhead anti-settlement system for depot warehouses suitable for soft strata, characterized by: It comprises a rectangular groove (1), an overhead plate (3), a settlement monitoring equipment room (6), a control console (7), and a laser displacement monitoring system; A plurality of rectangular grooves (1) are excavated downwardly from the ground of the maintenance storehouse (4), extending longitudinally along the track and distributed at intervals between the side wall of the maintenance storehouse (4) and the track bridge (2) and between two adjacent track bridges (2); The overhead plate (3) is a complete platform that covers the entire maintenance depot floor, formed by pouring concrete into the rectangular groove (1) and continuing to pour concrete upward. The settlement monitoring equipment room (6) is arranged outside the maintenance warehouse column (5) of the maintenance warehouse (4); the control console (7) is arranged in the settlement monitoring equipment room (6) and is connected to the laser displacement monitoring system; the settlement monitoring equipment room (6) comprises an equipment room door (601), a monitoring camera (602), a monitoring line (603), and a data storage table (604); the control console (7) and the data storage table (604) are connected to the laser displacement monitoring system via the monitoring line (603); the control console (7) comprises a lighting lamp (701), a radio receiving device (702), a switch (703), an alarm indicator light (704), and a control console alarm (705), and the components are electrically connected; The laser displacement monitoring system comprises a laser emitting device (8) and a reflecting plate (9); the laser emitting device (8) is arranged on the inner side of a maintenance warehouse column (5); and the reflecting plate (9) is arranged on the overhead plate (3).
2. The overhead anti-settling system for depot warehouses in soft strata as claimed in claim 1 is characterized by: The overhead plate (3) is coated with epoxy flooring.
3. The overhead anti-settling system for depot warehouses in soft strata as claimed in claim 1 is characterized by: The laser emitting device (8) comprises a laser emitter (801), a radio transmitter (802), a switch (803), a status indicator light (804), a laser emitting device alarm (805) and a power indicator light (806); The laser emitting device (8) transmits data with the control console (7) via the radio transmitter (802) to determine whether laser reflection is interrupted.
4. The overhead anti-settling system for depot warehouses in soft strata as claimed in claim 1 is characterized by: The laser emitting devices (8) and reflecting plates (9) are arranged in pairs along the longitudinal direction of the track.
5. The overhead anti-settling system for depot warehouses in soft strata as claimed in claim 3 is characterized by: The laser transmitter (801) emits laser light to illuminate the reflective plate (9) on the overhead plate (3). When settlement occurs, laser reflection is interrupted, the status indicator light (804) emits a red flash, the alarm bell (805) of the laser transmitter sounds an alarm, the radio transmitter (802) starts to transmit radio to the radio receiving device (702), the control console (7) processes the signal, and the alarm bell (705) and the alarm indicator light (704) of the control console sound and light alarms.