A kind of aluminum electrolysis anode guide rod automatic repair ring production line and repair method
By introducing annular tracks and transportation trolleys on the aluminum electrolytic anode guide rod production line, forming assembly line operations, the problems of short service life and low repair efficiency of the anode guide rod are solved, and efficient repair process and cost reduction are achieved.
Patent Information
- Application Number
- CN201911087358.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-08
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2039-11-08
AI Technical Summary
In the prior art, the anode guide rod is prone to fall off or crack during use, has a short service life, resulting in high operating costs and low operating efficiency, and the welded surface needs to be machined and polished, which increases the process and time.
A circular automatic repair production line of aluminum electrolytic anode guide rod was designed, and the ground ring track and transportation trolley were used to achieve rapid transportation and repair of the anode guide rod. Multiple stations were set up for flame cutting, welding and milling to form assembly line operations. Adapt to multiple production processes.
It improves the efficiency and quality of the anode guide rod repair, reduces operational and labor costs, simplifies processes, and improves operating efficiency.
Smart Images

Figure CN110774009B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of aluminum electrolysis anode production, and in particular relates to an aluminum electrolysis anode guide rod automatic repair annular production line and a repair method. Background Art
[0002] Anode guide rod assemblies are the main structure of electrolytic aluminum and the key link of the current path. They are numerous and easy to damage. For a long time, cast anode steel claws have to rely on manual welding repair before they can be used again after a short period of use.
[0003] In the prior art, the invention patent 201210000264.8 applied by Rao Yunfu discloses a repair device for anode steel claws, which adopts the following technical scheme: The repair device for electrolytic aluminum anode steel claws includes: an operating platform and a column platform, on which a control console, a slag furnace, a crucible, and a slag bag are arranged, and the control console is a programmable control console, which controls the slag furnace, the crucible, the slag bag, and the column platform through program settings. The device reduces the labor intensity of people and improves labor efficiency; at the same time, it can repair steel claws of different models and has strong adaptability.
[0004] In addition, the invention patent 201810173661.2 applied by the North China University of Water Resources and Hydropower discloses a brazing material for repairing anode steel claws and its preparation method. The brazing material includes a cylindrical brazing material and a semi-annular brazing material. The corrosion section of the anode steel claw head to be repaired is cut off, and a boss is processed at the lower end. The upper end of the round steel replacing the corrosion section is processed with a groove. The cylindrical brazing material is placed in the groove, and the semi-annular brazing material is placed on the edge of the groove; the cylindrical brazing material is a thin strip of brazing material coated with a brazing flux layer on the surface, which is folded multiple times along the length direction into a short strip of brazing material in which the brazing flux and the brazing flux alternate with each other. , and then wound with the short side as the axis; the semi-annular solder is cut into a semi-annular solder strip by a solder strip coated with a solder flux layer on the surface, and the strips are stacked in multiple layers; the solder strips include 50-55 parts of copper, 37.5-41 parts of zinc, 3.6-4.3 parts of manganese, 1.9-2.6 parts of cobalt, 0.7-0.95 parts of iron, 1.6-1.9 parts of copper-plated graphene and 0.1-0.3 parts of trace elements by weight; the brazing material of this scheme is specially used to repair anode steel claws. The resistivity of the repaired steel claws is significantly reduced, the conductivity is good, the strength is high, and the service life is long.
[0005] In addition, the invention patent 201811237081.1 applied by Chongqing Tiantai Aluminum Co., Ltd. discloses an anode steel claw repair device, including a grinding device for grinding the surface of the waste steel claw and a recasting device for repairing the steel claw; the recasting device includes an end face grinding plate, a gear plate, a support and a base from top to bottom, and also includes a transmission shaft vertically installed on the base and extending through the base and extending from its bottom end face, the first driving gear and the gear plate are meshed and driven to reduce speed, and the second driving gear and the driven gear on the rotating shaft are meshed and driven to increase speed. The recasting device includes a workbench and a number of casting molds arranged on the workbench, the casting molds are arranged in a straight line on the workbench and the spacing between each other can be adjusted along the straight line direction; the depth at which the manipulator places the steel claw in the casting cavity should ensure that the gap between the inserted steel claw part and the casting cavity can form a molding cavity for casting the incomplete part of the steel claw. The anode steel claw repair equipment greatly reduces the waste of raw materials of the steel claw, and not only has high repair efficiency but also excellent repair effect.
[0006] The above existing technologies have made some innovations in the anode guide rod repair technology, but have not taken into account the following problems: Due to the limitations of the welding process and the uncertainty of manual operation, the anode steel claws have a high pressure drop during use, are easy to fall off or crack, and have a short service life. These problems will greatly increase the operating costs of the enterprise and also lead to a large number of operators. Some technologies also machine and grind the welding surface of the anode guide rod, which increases the process of repairing the anode guide rod, and the processing and grinding time is long, which greatly reduces the operating efficiency. Therefore, how to solve these problems is a very meaningful research topic for technicians in this field. Summary of the invention
[0007] The purpose of the present invention is to provide an automated repair production line and a repair method for aluminum electrolysis anode guide rods, thereby improving the repair efficiency and repair quality of aluminum electrolysis anode guide rods and reducing operating costs and labor costs.
[0008] The technical solution of the present invention is:
[0009] This scheme proposes a circular automated repair production line for the repair of aluminum electrolysis anode guide rods, which includes a ground circular track laid on the ground and a tooling track trolley equipped with anode guide rods running on the ground circular track; it also includes an on-line turning table, a CNC flame cutting machine, a steel rod loading robot, a steel rod feeding device, a steel claw welding machine, a double anode turning positioner, a CNC flame cutting machine, a guide rod cutting machine, an explosive block loading robot, an explosive block feeding device, an explosive block welding machine, a guide rod welding machine and a guide rod plane milling equipment arranged along the ground circular track.
[0010] The present invention utilizes a transport trolley and a circular track to enable the anode guide rod to be quickly transported between various workstations. At the same time, the anode guide rod is directly repaired on the trolley, so that the operation of the anode guide rod between different workstations is faster and more efficient, forming an assembly line operation for anode guide rod repair, and greatly improving the efficiency of anode guide rod repair. At the same time, the assembly line of the present invention can adapt to a variety of production processes. Through the use of workstations, two anode guide rod repair processes can be realized, namely, anode guide rods that do not require aluminum guide rod separation and anode guide rods that require aluminum guide rod separation.
[0011] According to the process requirements of aluminum electrolysis anode guide rod repair, the present invention sets a loading station, a flame cutting station, a steel rod loading station, a steel claw welding station, a double anode flipping station, a guide rod cutting station, an explosive block loading and welding station, a guide rod welding station, a guide rod plane milling station and a line-off station. The above stations are arranged in sequence along a circular track according to the production process of aluminum electrolysis anode guide rod repair.
[0012] The transport trolley is used as a transportation tool for the anode guide rods, and transports the anode guide rods between various workstations along the production line. At the same time, the transport trolley has a special fixture to fix the anode guide rods, so that the transport trolley can be used as a workbench for repairing the anode guide rods. After the transport trolley transports the anode guide rods to the designated workstation, the repair equipment at the workstation directly repairs the anode guide rods. After completing the process, the trolley continues to the next workstation.
[0013] The present invention utilizes a transport trolley and a circular track as a tool for transporting and fixing anode guide rods, which greatly increases the flexibility of the entire production line. The anode guide rods can be quickly transported between various workstations, and the anode guide rods are directly repaired on the trolley, making the operation of the anode guide rods between different workstations faster and more efficient, forming an assembly line operation for anode guide rod repair, and greatly improving the efficiency of anode guide rod repair. At the same time, the production line of the present invention can adapt to a variety of production processes. Through the use of workstations, two anode guide rod repair processes can be realized, namely, anode guide rods that do not require aluminum guide rod separation and anode guide rods that require aluminum guide rod separation. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of a ring-shaped automated repair production line for repairing aluminum electrolysis anode guide rods of the present invention;
[0015] Figure 2 Schematic diagram of the state of the online flip table before flipping;
[0016] Figure 3 Schematic diagram of the state of the online flip table after flipping;
[0017] Figure 4 Partial structural diagram of the tooling platform of the tooling track trolley;
[0018] Figure 5Steel bar feeding device structure diagram;
[0019] Figure 6 Schematic diagram of the structure and working status of the dual anode flip positioner.
[0020] The markings in the attached drawings are: 1-ground circular track, 2-tooling track trolley, 3-on-line turning table, 4-CNC flame cutting machine, 5-steel rod feeding robot, 6-steel rod feeding device, 7-steel claw welding machine, 8-double anode turning positioner, 9-CNC flame cutting machine, 10-guide rod cutting machine, 11-explosive block feeding robot, 12-explosive block feeding device, 13-explosive block welding machine, 14-guide rod welding machine, 15-guide rod plane milling equipment, 16-anode guide rod, 17-steel claw fixing fixture 1, 18-steel claw fixing hydraulic Cylinder one, 19- flip frame, 20- fixed frame, 21- flip hydraulic cylinder, 22- work table, 23- guide rod fixing fixture, 24- guide rod fixing hydraulic cylinder, 25- steel claw fixing hydraulic cylinder two, 26- steel claw fixing fixture two, 27- steel claw fixed end adjustment slide rail, 28- steel claw fixed end adjustment hydraulic cylinder, 29- raw steel rod, 30- steel rod feeding roller, 31- sawing machine, 32- length positioning device, 33- jacking module, 34- pneumatic chuck, 35- chuck seat, 36- slide, 37- frame, 38- up and down adjustment hydraulic cylinder. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0022] Embodiments of the present invention: Figure 1 As shown, the design of the present invention includes a ground circular track 1, a track trolley with a tooling 2 running on the ground track, an on-line turning table 3 arranged along the circular track 1, a CNC flame cutting machine 4, a steel rod loading robot 5, a steel rod feeding device 6, a steel claw welding machine 7, a double anode turning positioner 8, a CNC flame cutting machine 9, a guide rod cutting machine 10, an explosive block loading robot 11, an explosive block feeding device 12, a special machine for explosive block welding 13, a special machine for guide rod welding 14, and a guide rod plane milling equipment 15.
[0023] In the present invention, the CNC flame cutting machine 4, the CNC flame cutting machine 9, the guide rod cutting machine 10, and the guide rod surface milling equipment 15 are all existing equipment that are suitable for the production line.
[0024] The steel bar loading robot 5 and the explosive block loading robot 11 include two parts: a robot and a clamp. The robot is an existing equipment product, and the clamp can be used to clamp steel bars and explosive blocks. It can be designed according to the specific robot model and steel bar size.
[0025] The three types of equipment, namely, the steel claw welding machine 7, the explosion block welding machine 13 and the guide rod welding machine 14, are divided into two parts, a robot and a welding gun, and both the robot and the welding gun are existing equipment products.
[0026] The explosive block is a steel-aluminum explosive welding block produced in the existing process. The explosive block feeding device 12 takes the explosive block and transports it to the corresponding workstation, and the explosive block welding machine 13 performs welding operations.
[0027] The specific structure and connection relationship of the above existing devices are not described here, and those skilled in the art are fully aware of them.
[0028] On-line flip table 3 Figure 2-3 As shown in FIG. 1 , the main functional components include a steel claw fixing fixture 17, a steel claw fixing hydraulic cylinder 18, a turning frame 19, a fixing frame 20 and a turning hydraulic cylinder 21. The anode guide rod 16 is hoisted onto the turning frame 19 by a hoisting device, and the steel claw fixing hydraulic cylinder 18 pushes the steel claw fixing fixture 17 forward to tighten and fix the anode guide rod 16. After fixing, Figure 2 After the anode guide rod 16 is fixed, the turning hydraulic cylinder 21 drives the turning frame 19 to rotate around the rotating axis of the fixed frame 20, so that the entire turning frame 19 rotates 90°. Figure 3 The anode guide rod is turned over and laid flat on the tooling track trolley 2, and then the steel claw fixing fixture 17 is loosened, and the upper line turning table 3 is withdrawn and reset.
[0029] like Figure 4 As shown, the tooling track trolley 2 includes a track trolley body and a trolley fixture. The track trolley body adopts an existing track trolley and will not be described in detail here. The trolley fixture part includes a work surface 22, a guide rod fixing fixture 23, a guide rod fixing hydraulic cylinder 24, a steel claw fixing hydraulic cylinder 25, a steel claw fixing fixture 26, a steel claw fixing end adjustment slide rail 27, and a steel claw fixing end adjustment hydraulic cylinder 28. The anode guide rod 16 is placed on the work surface 22 of the tooling trolley 2 by the upper line turning table 3, and then the guide rod fixing hydraulic cylinder 24 drives the guide rod fixing fixture 23 to fix the anode guide rod 16. Since the guide rod and the steel claw need to be cut and separated during the operation, after the guide rod part is fixed, the steel claw part also needs to be fixed. The steel claw part is fixed by the steel claw fixing hydraulic cylinder 25 driving the steel claw fixing fixture 26. In addition, the steel claw fixing part can also slide back and forth along the steel claw fixing end adjustment slide rail 27 under the drive of the steel claw fixing end adjustment hydraulic cylinder 28 to adjust the distance between the guide rod and the steel claw.
[0030] like Figure 5As shown, the steel bar feeding device 6 includes a steel bar feeding roller 30 and a sawing machine 31. The raw steel bar 29 is hoisted onto the steel bar feeding roller 30. After the length of the steel bar is determined by a length positioning device 32 installed on the sawing machine 31, the raw steel bar 29 is sawed by the sawing machine 31 into steel bars of appropriate size for welding.
[0031] like Figure 6 As shown, the double anode flip positioner 6 includes a pneumatic chuck 34, a chuck seat 35, a slide 36, a frame 37 and an up-and-down adjustment hydraulic cylinder 38. When the double anode guide rod needs to be reversed, the pneumatic chuck 34 fixes the double anode guide rod, and under the drive of the up-and-down adjustment hydraulic cylinder 38, the chuck seat 35 moves upward along the slide 36 on the frame 37, and at the same time, the jacking module 33 installed on the tooling trolley lifts the double anode guide rod to make the double anode guide rod out of the clamping position, and then the pneumatic chuck rotates to drive the double anode guide rod to flip 180°, thereby completing the flip position of the double anode guide rod.
[0032] The repair of anode guide rod is divided into two major processes: guide rod separation welding and steel claw separation welding.
[0033] For the anode guide rod 16 that does not need to be separated from the aluminum guide rod, only the steel claw separation welding process needs to be completed. In specific implementation, the transported anode guide rod 16 is turned over and laid down by the on-line turning table 3, and then turned over to the tooling track trolley 2, and the anode guide rod 16 is fixed by the tooling track trolley 2. The fixed anode guide rod 16 is transported to the flame cutting station by the tooling track trolley 2, and the steel rod of the anode guide rod 16 is cut off by the CNC flame cutting machine 4.
[0034] The tooling rail trolley 2 continues to transport to the steel bar loading station, where the steel bar feeding device 6 provides new steel bars, and the steel bar loading robot 5 places the new steel bars on the tooling rail trolley 2. The tooling rail trolley 2 transports the anode guide rod and the new steel bar to the steel claw welding station, where the steel claw welding machine 7 welds the steel claws.
[0035] If the repaired object is a double anode guide rod, the tooling rail trolley 2 needs to advance to the double anode flipping and positioning station after welding on one side of the anode guide rod 16, and use the double anode flipping and positioning machine 8 to flip and position it. After flipping, the tooling rail trolley 2 returns backward to the steel rod loading station and the steel claw welding station to weld the steel rod on the other side.
[0036] After welding is completed, the tool rail trolley is transported to the milling station and the aluminum guide rod plane is milled by the guide rod cutting machine 10. After milling, the tool rail trolley 2 transports the anode guide rod 16 to the offline station for offline.
[0037] For the anode guide rod 16 that needs to be separated from the aluminum guide rod, two major processes, guide rod separation welding and steel claw separation welding, need to be completed.
[0038] In specific implementation, the steel claw separation welding is the same as the above-mentioned repair process of the anode guide rod 16 without the need for aluminum guide rod separation. After the welding of the steel rod is completed, the anode guide rod 16 is transported to the next flame cutting station by the tooling track trolley 2, and the steel side of the explosion block is cut off by the CNC flame cutting machine 9, and then the guide rod and the explosion block are cut by the guide rod cutting machine 10 at the guide rod cutting station.
[0039] After the cutting is completed, at the explosive block loading and welding station, the explosive block feeding device 12 and the explosive block loading robot 11 place the explosive block at a designated position on the tooling track trolley 2, and the explosive block welding machine 13 is used to complete the welding of the explosive block steel side and the steel claw.
[0040] Then it moves to the guide rod welding station, where the aluminum side of the explosion block and the guide rod are welded by the guide rod welding machine 14. After all welding operations are completed, the tooling track trolley 2 transports the anode guide rod 16 to the milling station and uses the guide rod cutting machine 10 to mill the aluminum guide rod plane.
[0041] After the milling is completed, the tooling track trolley 2 transports the anode guide rod 16 to the offline station for offline.
[0042] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A repair method for an automated repair ring production line for aluminum electrolysis anode guide rods, Features: The production line comprises a ground circular track (1) laid on the ground and a tooling track trolley (2) equipped with an anode guide rod (16) running on the ground circular track (1); it also comprises an on-line turning table (3) arranged along the ground circular track (1), a first CNC flame cutting machine (4), a steel bar feeding robot (5), a steel bar feeding device (6), a steel claw welding machine (7), a double anode turning positioner (8), a second CNC flame cutting machine (9), a guide rod cutting machine (10), an explosive block feeding robot (11), an explosive block feeding device (12), an explosive block welding machine (13), a guide rod welding machine (14) and a guide rod plane milling device (15); The repair method comprises the following steps for repairing the anode guide rod (16) that does not require separation of the aluminum guide rod: the transported anode guide rod (16) is turned over and laid down by using an on-line turning table (3), and then turned over onto a tooling track trolley (2), and the anode guide rod (16) is fixed by using a tooling; the fixed anode guide rod (16) is transported to a flame cutting station by the tooling track trolley (2), and the steel rod of the anode guide rod (16) is cut off by a first CNC flame cutting machine (4); the tooling track trolley (2) is further transported to a steel rod loading station, and the anode guide rod (16) is cut off by a first CNC flame cutting machine (4); the anode guide rod (16) is transported to a steel rod loading station by the tooling track trolley (2), and the steel rod of the anode guide rod (16) is cut off by a first CNC flame cutting machine (4); the anode guide rod (16) is transported to a steel rod loading station by the tooling track trolley (2), and the steel rod of the anode guide rod (16) is cut off by a first CNC flame cutting machine (4); the steel rod of the anode guide rod (16) is further ... The steel bar feeding device (6) provides new steel bars, and the steel bar loading robot (5) places the new steel bars on the tooling track trolley (2); the tooling track trolley (2) transports the anode guide rod (16) and the new steel bars to the steel claw welding station, and the steel claws are welded by the steel claw welding special machine (7); after the welding is completed, the tooling track trolley (2) transports the anode guide rod (16) to the milling station, and the aluminum guide rod plane is milled by the guide rod cutting machine (10); after the milling is completed, the tooling track trolley (2) transports the anode guide rod (16) to the offline station for offline; For the anode guide rod (16) that needs to be separated from the aluminum guide rod, the repair work is divided into two parts: the separation welding of the steel rod and the separation welding of the guide rod; the repair is carried out according to the following steps: the transported anode guide rod (16) is turned over and laid down by using the on-line turning table (3), and then turned over to the tooling track trolley (2), and the anode guide rod (16) is fixed by the tooling; the fixed anode guide rod (16) is transported to the flame cutting station by the tooling track trolley (2), and the steel rod of the anode guide rod (16) is cut off by the first CNC flame cutting machine (4); the tooling track trolley (2) continues to be transported to the steel rod loading station, and a new steel rod is provided by the steel rod feeding device (6), and the steel rod loading robot (5) places the new steel rod on the tooling track trolley (2); after the welding of the steel rod is completed, the tooling track trolley (2) transports the anode guide rod (16) to the next flame cutting station The explosive block is placed at a workstation, and the steel side of the explosive block is cut off by a second CNC flame cutting machine (9), and then the workstation moves to the guide rod cutting workstation and uses a guide rod cutting machine (10) to cut the guide rod and the explosive block; after the cutting is completed, the explosive block is placed at a designated position on the tooling track trolley (2) by an explosive block feeding device (12) and an explosive block loading robot (11) at the explosive block loading and welding workstation, and a special machine for welding the explosive block steel side and the steel claw is used to complete the welding; then the workstation moves to the guide rod welding workstation, and a special machine for welding the guide rod (14) completes the welding of the aluminum side of the explosive block and the guide rod; after all welding operations are completed, the tooling track trolley (2) transports the anode guide rod (16) to the milling workstation, and uses the guide rod cutting machine (10) to mill the aluminum guide rod plane; after the milling is completed, the tooling track trolley (2) transports the anode guide rod (16) to the offline workstation for offline.
2. The repair method according to claim 1, Features: The repairing steps for the double anode guide rod are as follows: after the tooling track trolley (2) completes welding on one side of the anode guide rod (16), it moves forward to the double anode flipping and positioning station, and uses the double anode flipping and positioning machine (8) to perform flipping and positioning. After flipping, the tooling track trolley (2) returns to the steel rod loading station and the steel claw welding station to perform steel rod welding on the other side.