An automatic control device for releasing lead from a lead smelting furnace
By designing the automatic lead-release control device, the lead-release holes of the lead smelting furnace are automatically controlled by using the plunger and the speed reduction driver, combined with the heat storage function of the flow guide column, the problems of difficulties and safety hazards of workers in high temperature environments in traditional operations are solved. , realizes automation and safety improvement of lead release process.
Patent Information
- Application Number
- CN202010002571.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-01-02
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2040-01-02
AI Technical Summary
The traditional lead smelting furnace lead release operation has problems such as workers having difficulty operating in high temperature environments, high labor intensity, high safety hazards, and difficult to control the amount of lead release in high temperature environments.
An automatic lead-release control device is designed, including a plunger, plunger base and a speed reduction driver. The screw drives the speed reduction motor to control the opening and closing of the lead-release plug. The heat storage function of the flow guide column ensures that the lead-release hole remains conductive. state.
It realizes automatic control of lead release operation in high-temperature environments, reduces labor intensity, eliminates safety accidents, and ensures the controllability and safety of the lead release process.
Smart Images

Figure CN111023836B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a lead placing device for a lead smelting furnace, in particular to an automatic control device for placing lead in a lead smelting furnace. Background Art
[0002] After the smelting process of the lead smelting furnace is completed, the slag and lead need to be discharged. Usually, the lead discharge port is located at the lower part of one side of the smelting furnace. The traditional operation method is to use a sledgehammer to drive the wedge-shaped plugging wood into the lead discharge port and tighten it before adding materials in each shift, and seal it with yellow mud to prevent the lead from running away after the plugging wood is burned; after adding materials and smelting, slag and lead are discharged. When discharging lead, use a steel chisel to pry out the yellow mud and the tail of the wooden stick, and then use a sledgehammer to drive the steel chisel into the lead discharge pipe to discharge lead until the lead liquid in the furnace (leaving a certain amount of bottom lead) is discharged at one time. Only then can the plugging wood and yellow mud be used to tie up the lead discharge port and end the lead discharge. With this method, the wooden stick is often not tied tightly and the lead runs away; sometimes the lead discharge pipe is completely blocked by condensed solid lead, and the steel chisel cannot penetrate. It is necessary to use an oxygen flame to burn the mouth through the steel pipe manually, burn the solid lead in the lead discharge pipe at high temperature, or use a special puncher to dredge the solid lead in the lead discharge pipe. The above operations are all carried out in a high temperature environment, which makes the operation difficult and labor-intensive for the operators, and is prone to production safety accidents. Summary of the invention
[0003] The purpose of the present invention is to provide an automatic lead discharge control device for a lead smelting furnace which is simple to operate and easy to control, so as to solve the problems of high temperature operation of workers, high safety hazards and difficult control of the amount of lead discharge during the lead discharge process.
[0004] The object of the present invention is achieved as follows: an automatic lead discharge control device is installed on a lead discharge chute; a lead discharge hole is provided at the lower end of a smelting furnace, a lead discharge chute is provided outside the lead discharge hole, an outer shell is provided on the outer wall of the lead discharge chute, and refractory bricks are lined inside the outer shell; the angle between the lead discharge hole and the lead discharge chute is 20-40 degrees.
[0005] The lead release automatic control device includes: a plunger, a plunger base and a reduction drive; there are supports at both ends of the plunger base, the plunger is installed through the supports at both ends, and there is a reduction drive at one end of the plunger base, and the reduction drive drives the plunger to perform telescopic movement.
[0006] The plunger comprises: a guide column, a lead hole plug, a connecting rod and a screw rod; one end of the connecting rod is connected to the screw rod, and the other end is connected to the rear end of the lead hole plug, and the front end of the lead hole plug is connected to the guide column; the reduction drive drives the screw rod to rotate and pushes the lead hole plug forward or backward.
[0007] The guide column is a cylinder; or a conical cone; the guide column is hollow; or a solid.
[0008] The lead hole plug is a semi-sphere or a cone, the diameter of which is larger than the inner diameter of the lead hole, and the shape of the lead hole plug is consistent with the lead hole opening.
[0009] The plunger base comprises: a connecting rod sleeve, a bracket, a rotating shaft seat and a rotating shaft;
[0010] The connecting rod of the plunger penetrates the connecting rod sleeve and the rotating shaft seat, and can rotate with the connecting rod sleeve and the rotating shaft seat as a fulcrum;
[0011] The connecting rod sleeve is connected to one end of the screw base, and the other end of the screw base is connected to a rotating shaft seat; a rotating shaft is connected to each side of the rotating shaft seat, and the rotating shaft is fixedly installed on the upper end of the side wall of the lead chute through a bracket, and rotates on the rotating shaft seat with the rotating shaft as a fulcrum; a reduction drive is connected to the rear wall of the rotating shaft seat.
[0012] The deceleration driver comprises: a motor and a reducer, the output shaft of the motor is connected to the input shaft of the reducer, and directly drives the lead rod to operate, so as to open and close the lead hole and the lead hole plug.
[0013] Beneficial effect: Due to the adoption of the above scheme, before charging the smelting furnace in each shift, the reduction motor is turned on, and the lead discharge hole of the smelting furnace is sealed by driving the lead discharge hole plug through the screw rod. When the specified position of sealing the lead discharge hole is reached, the reduction motor stops running under the control of the lower limit switch, thereby ensuring that the lead discharge hole is well sealed; when the charge is melted by the high-temperature reduction reaction to meet the lead discharge requirement, the reduction motor is turned on to loosen the screw rod in the reverse direction, and the guide column is slowly lifted. When the lead discharge hole is fully opened, the reduction motor stops running under the control of the upper limit switch, and the lead liquid flows out of the lead discharge hole along the guide column, and flows out through the lead discharge port to the lead discharge chute for lead discharge.
[0014] It is possible to realize or stop lead discharge in the middle of lead discharge, which completely changes the past that once the lead discharge hole is opened, the lead discharge process cannot be stopped and a pot of lead must be discharged. The lead discharge process can be effectively controlled and lead discharge can be implemented as needed.
[0015] The guide column has a heat storage function. Even if solid lead condenses in the lead hole, the heat stored in the guide column can melt the solid lead and keep the lead hole conductive. There is no need for manual unblocking, which greatly reduces the labor intensity of workers and prevents the occurrence of production safety accidents caused by unblocking the lead hole.
[0016] When the lead placing operation is performed, the lead placing hole is not blocked and the operator is no longer in a high temperature environment, which saves time and labor. While greatly reducing the labor intensity, the lead placing time and flow rate can be effectively controlled, thereby achieving the purpose of the invention.
[0017] Advantages: The device uses a plunger to seal the lead discharge hole, and a guide column to drain the lead liquid. In the production process, it realizes a working state in which the lead is discharged smoothly when it is needed and blocked without leakage when it is needed. Compared with the existing technology, it has the advantages of reasonable structure and simple operation. This structure of lead liquid discharge method has low cost, no blockage, easy control, and maximizes safety under the premise of ensuring normal operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural schematic diagram of the lead discharge hole of the present invention in an unblocked state.
[0019] Figure 2 It is a structural schematic diagram of the lead-releasing hole blocked state of the present invention.
[0020] In the figure, 1. guide column; 2. lead discharge hole plug; 3. connecting rod; 4. connecting rod sleeve; 5. plunger base; 6. bracket; 7. shaft seat; 8. screw rod; 9. reduction drive; 10. shaft; 11. smelting furnace; 12. lead discharge hole; 13. lead discharge chute. DETAILED DESCRIPTION
[0021] Embodiment 1: The lead discharge automatic control device is installed on the lead discharge chute 13; a lead discharge hole 12 is provided at the lower end of the smelting furnace 11, a lead discharge chute 13 is provided outside the lead discharge hole 12, the outer wall of the lead discharge chute 13 is provided with an outer shell, and the inner wall of the outer shell is lined with refractory bricks; the angle between the lead discharge hole 12 and the lead discharge chute 13 is 20-40 degrees.
[0022] The lead release automatic control device includes: a plunger, a plunger base 5 and a reduction drive 9; the plunger base 5 has supports at both ends, the plunger is installed through the supports at both ends, and a reduction drive 9 is provided at one end of the plunger base 5, and the reduction drive 9 drives the plunger to perform telescopic movement.
[0023] The plunger includes: a guide column 1, a lead hole plug 2, a connecting rod 3 and a screw rod 8; one end of the connecting rod 3 is connected to the screw rod 8, and the other end is connected to the rear end of the lead hole plug 2, and the front end of the lead hole plug 2 is connected to the guide column 1; the reduction drive 9 drives the screw rod 8 to rotate and push the lead hole plug 2 forward or backward.
[0024] The guide column 1 is a cylinder; or a conical cone; the guide column 1 is hollow; or a solid.
[0025] The lead hole plug 2 is a semi-sphere or a cone, and its diameter is larger than the inner diameter of the lead hole 12 . The shape of the lead hole plug 2 matches the mouth of the lead hole 12 .
[0026] The plunger base 5 comprises: a connecting rod sleeve 4, a bracket 6, a rotating shaft seat 7 and a rotating shaft 10;
[0027] The connecting rod 3 of the plunger penetrates the connecting rod sleeve 4 and the rotating shaft seat 7, and can rotate with the connecting rod sleeve 4 and the rotating shaft seat 7 as a fulcrum;
[0028] The connecting rod sleeve 4 is connected to one end of the screw base 5, and the other end of the screw base 5 is connected to a rotating shaft seat 7; a rotating shaft 10 is connected to both sides of the rotating shaft seat 7, and the rotating shaft 10 is fixedly installed on the upper end of the side wall of the lead chute 13 through a bracket 6, and rotates on the rotating shaft seat 7 with the rotating shaft 10 as a fulcrum; a reduction drive 9 is connected to the rear wall of the rotating shaft seat 7,
[0029] The deceleration driver 9 comprises: a motor and a reducer, the output shaft of the motor is connected to the input shaft of the reducer, and directly drives the screw rod to operate, so as to open and close the lead hole and the lead hole plug.
Claims
1. An automatic control device for releasing lead from a lead smelting furnace. Its characteristics are: The lead placement automatic control device comprises: a plunger, a plunger base and a reduction drive; the plunger base has supports at both ends, the plunger is installed through the supports at both ends, and one end of the plunger base has a reduction drive, the reduction drive drives the plunger to perform telescopic movement; The plunger comprises: a guide column, a lead hole plug, a connecting rod and a screw rod; one end of the connecting rod is connected to the screw rod, and the other end is connected to the rear end of the lead hole plug, and the front end of the lead hole plug is connected to the guide column; the reduction drive drives the screw rod to rotate and pushes the lead hole plug forward or backward; The lead hole plug is a semi-sphere or a cone, the diameter of which is larger than the inner diameter of the lead hole, and the shape of the lead hole plug is consistent with the lead hole opening; The plunger base comprises: a connecting rod sleeve, a bracket, a rotating shaft seat and a rotating shaft; The connecting rod of the plunger penetrates the connecting rod sleeve and the rotating shaft seat, and can rotate with the connecting rod sleeve and the rotating shaft seat as a fulcrum; The connecting rod sleeve is connected to one end of the screw base, and the other end of the screw base is connected to a rotating shaft seat; a rotating shaft is connected to both sides of the rotating shaft seat, and the rotating shaft is fixedly installed on the upper end of the side wall of the lead chute through a bracket, and rotates on the rotating shaft seat with the rotating shaft as a fulcrum; a reduction drive is connected to the rear wall of the rotating shaft seat; Before charging the smelting furnace in each shift, the reduction motor is turned on, and the lead hole of the smelting furnace is sealed by driving the lead hole plug through the screw rod. When the specified position of sealing the lead hole is reached, the reduction motor stops running under the control of the lower limit switch, thereby ensuring that the lead hole is well sealed. When the charge is melted by the high-temperature reduction reaction and meets the lead release requirements, the reduction motor is turned on to loosen the screw rod in the reverse direction, and the guide column is slowly lifted. When the lead release hole is fully opened, the reduction motor stops running under the control of the upper limit switch, and the lead liquid flows out of the lead release hole along the guide column, and flows out through the lead release port to the lead release chute for lead release.
2. The automatic lead discharge control device for a lead smelting furnace according to claim 1, Its characteristics are: The guide column is a cylinder; or a conical cone; the guide column is hollow; or a solid.
3. The automatic lead discharge control device for a lead smelting furnace according to claim 1, Its characteristics are: The deceleration driver comprises: a motor and a reducer, the output shaft of the motor is connected to the input shaft of the reducer, and directly drives the lead rod to operate, so as to open and close the lead hole and the lead hole plug.
Citation Information
Patent Citations
Automatic ingot casting device of lead ingot casting machine
CN109648053A
Lead liquid transfer kettle
CN203030878U
Plumbous device is put to lead smelting furnace's controllable formula
CN206970686U
Heat-preservation lead discharging device of lead ingot casting machine
CN209716416U
Automatic lead discharging control device of lead smelting furnace
CN211373250U
