Bulk material proportional two-division device and control method
Through the combination device of electro-hydraulic chute adjustment and strip-shaped material separation plate combination, the problem of inaccurate proportional distribution of bulk materials in the prior art is solved, and accurate distribution and remote control are achieved without being affected by the belt conveyor, thereby improving the The utilization rate and allocation accuracy of the equipment are achieved.
Patent Information
- Application Number
- CN202010063325.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-01-20
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2040-01-20
AI Technical Summary
The existing two-part device for bulk material ratios has problems such as large space occupation, many equipment, and easy to block materials. It is affected by the deviation of the belt conveyor and the unstable material flow thickness, resulting in inaccurate distribution ratio and low equipment utilization.
The electro-hydraulic chute adjustment device, a three-way bifurcation chute, a strip-shaped material partition plate combination and a code-positioned strip-shaped material partition plate flip device. The material flow is realized through the adjustment of the electro-hydraulic chute adjustment plate and a strip-shaped material partition plate. The proportional distribution ensures that the flow width remains unchanged, and the material distribution ratio is remotely controlled through the encoding positioning mechanism.
It realizes proportional distribution that is not affected by the deviation of belt conveyors and the unstable flow thickness, meets the requirements of unchanged flow width, improves the allocation accuracy and equipment utilization, and supports remote control of the transformation ratio.
Smart Images

Figure CN111153173B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a bulk material dividing device, in particular to a bulk material proportional two-dividing device and a control method. Background Art
[0002] The existing belt conveyor transports bulk materials. There are three methods to divide the bulk materials into two parts in proportion through the head of the belt conveyor:
[0003] 1. Set up a distribution buffer bin under the head of the belt conveyor, such as Figure 7 As shown, the upper part of the buffer bin is a connected bin, and the lower part is divided into two discharge ports, each of which is provided with a quantitative feeding device. After a certain amount of materials transported by the belt conveyor are stored in the buffer bin, they are respectively transported to the downstream equipment in proportion through the quantitative feeding devices under the two discharge ports of the buffer bin.
[0004] 2. Below the head of the belt conveyor, a vertical plate is set along the center line of the belt conveyor to divide the material flow into two parts in proportion along the width of the material flow.
[0005] 3. Below the head of the belt conveyor, facing the thickness direction of the belt conveyor material flow, a vertical plate is set in the middle of the belt conveyor material flow thickness direction. The material flow is divided into two parts in proportion along the thickness of the material flow.
[0006] The main problems of the existing bulk material proportional two-division device are: the first method of setting up a buffer bin, the buffer bin occupies a large space, requires more equipment, and the buffer bin is easy to be blocked; the second method of proportionally distributing the material flow width is greatly affected by the deviation of the belt conveyor, and the width of the material flow is reduced by a corresponding proportion, which is not conducive to the layout and equipment utilization of downstream equipment; the third method of proportionally distributing the material flow thickness is greatly affected by the uneven thickness of the bulk material transported on the belt conveyor, has a high requirement on the upstream feeding proportionality, the vertical plate is greatly impacted by the material, and the stability and adjustability of the vertical plate is poor. Summary of the invention
[0007] In order to overcome the shortcomings of the existing device for dividing bulk materials transported by a belt conveyor into two parts in proportion, the present invention provides a bulk material proportional two-part device and a control method. The present invention is not affected by the deviation of the belt conveyor and the unstable material flow thickness; it ensures that the material flow width remains unchanged from the original conveying width; and it can realize remote control of the bulk material proportional two-part when changing the proportion and changing the conveying of similar materials.
[0008] In order to achieve the above object, the present invention adopts the following technical solutions:
[0009] A bulk material proportion two-division device comprises an electro-hydraulic chute adjustment device, a three-way forked chute, a strip dividing plate assembly and a coding and positioning strip dividing plate flipping device; the electro-hydraulic chute adjustment device is installed in the head chute of a belt conveyor, and is located in the front part of the forward direction of the material flow; the three-way forked chute is connected to the bottom of the head chute of the belt conveyor; the strip dividing plate assembly is installed in the three-way forked chute, and is located at the bifurcation of the three-way forked chute; the coding and positioning strip dividing plate flipping device is installed at the bottom of the strip dividing plate assembly, the coding and positioning strip dividing plate flipping device is connected to the strip dividing plate assembly, and the coding and positioning strip dividing plate flipping device adjusts the strip dividing plate assembly.
[0010] The electro-hydraulic chute adjustment device includes an electro-hydraulic push rod, an articulated frame and a chute adjustment plate; the articulated frame is fixedly connected to the two ends of the top of the chute at the head of the belt conveyor, the chute adjustment plate is hinged to the articulated frame through a hinge shaft, the base of the electro-hydraulic push rod is fixedly connected to the chute at the head of the belt conveyor, and the push rod of the electro-hydraulic push rod is fixedly connected to the chute adjustment plate.
[0011] The three-way bifurcated chute is in an inverted Y shape, the top of the three-way bifurcated chute is fixedly connected to the bottom of the head chute of the belt conveyor, and the bifurcated part is located in the middle of the head chute of the belt conveyor.
[0012] The strip dividing plate combination includes a strip dividing plate, a support shaft and a bearing seat; one end of multiple groups of strip dividing plates is passed through the support shaft, and the other end is placed on the fixed steel plate on the inner wall of the three-way forked chute; the support shaft is installed on the bearing seat, and the bearing seat is installed on the outer wall of the three-way forked chute.
[0013] The outer wall of the three-way bifurcated chute is provided with a cleaning door at the installation position of the bearing seat.
[0014] The coding positioning strip material dividing plate flipping device comprises a coding positioning telescopic cylinder, a connecting shaft, a strip material dividing plate flipping U-shaped pulling head and a motor; the motor is connected to the coding positioning telescopic cylinder, and the coding positioning telescopic cylinder is connected to the strip material dividing plate flipping U-shaped pulling head through the connecting shaft.
[0015] A bulk material proportion two-part control method specifically includes the following methods:
[0016] 1) Select the width of the strip dividing plate according to the nature of the conveyed material;
[0017] 2) The distribution ratio of the strip material distribution plate is adjusted by coding and positioning the strip material distribution plate turning device to determine the distribution ratio and material flow position;
[0018] 3) Adjust the chute adjustment plate of the electro-hydraulic chute adjustment device according to the speed and transportation volume of the material, so that the thickness center of the material flow falls and aligns with the support shaft of the strip material distribution plate combination after the material is loaded;
[0019] 4) Compare by measuring the downstream material distribution amounts; when the deviation is too large, adjust the quantity distribution of the strip material distribution plates again through the coding positioning strip material distribution plate flipping device, adjust the angle of the chute adjustment plate through the electro-hydraulic push rod, and repeat the measurement after fixing until the set material distribution amount ratio is reached.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] 1) The device is not affected by the deviation of the belt conveyor and the unstable thickness of the material flow;
[0022] 2) Ensure that the material flow width is equal to the original conveying width;
[0023] 3) Remote control can be achieved when changing proportions and materials;
[0024] 4) According to the requirements of the distribution ratio of bulk materials, the quantity distribution of the distribution plate and the angle of the electro-hydraulic chute adjustment plate can be adjusted through the coding positioning strip distribution plate flipping mechanism to achieve remote control of the proportion of bulk materials. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention.
[0026] Figure 2 It is a schematic diagram of the three-dimensional structure of the present invention in working state.
[0027] Figure 3 It is a schematic diagram of the three-way bifurcated chute structure of the present invention.
[0028] Figure 4 It is a schematic diagram of the three-dimensional structure of the electro-hydraulic chute regulating plate of the present invention.
[0029] Figure 5 It is a schematic diagram of the three-dimensional structure of the strip dividing plate combination and the coding positioning strip dividing plate flipping mechanism of the present invention.
[0030] Figure 6 It is a process flow chart of the present invention.
[0031] Figure 7 This is a schematic diagram of the buffer bin structure.
[0032] In the figure: 1-Electro-hydraulic chute adjustment device 2-Three-way bifurcated chute 3-Strip material distribution plate combination 4-Encoding positioning strip material distribution plate flipping device 5-Electro-hydraulic push rod 6-Chute adjustment plate 7-Belt conveyor head chute 8-Strip material distribution plate 9-Encoding positioning telescopic cylinder 10-Connecting shaft 11-Strip material distribution plate flip U-shaped dial head 12-Motor 13-Support shaft 14-Bearing seat 15-Scale 16-Hinged frame 17-Sweeping door DETAILED DESCRIPTION
[0033] The specific embodiments of the present invention are further described below, but are not intended to limit the scope of the present invention:
[0034] like Figure 1 , Figure 2 As shown, a bulk material proportional two-division device comprises an electro-hydraulic chute regulating device 1, a three-way bifurcated chute 2, a strip dividing plate assembly 3 and a coding and positioning strip dividing plate turning device 4.
[0035] The electro-hydraulic chute adjustment device 1 is installed in the head chute 7 of the belt conveyor, and is located in the front part of the forward direction of the material flow. The three-way forked chute 2 is connected to the bottom of the head chute 7 of the belt conveyor. The strip dividing plate assembly 8 is installed in the three-way forked chute 2, and is located at the fork of the three-way forked chute 2; the coding and positioning strip dividing plate flipping device 4 is installed at the bottom of the strip dividing plate assembly 3, and the coding and positioning strip dividing plate flipping device 4 is connected to the strip dividing plate assembly 3. The coding and positioning strip dividing plate flipping device 4 adjusts the strip dividing plate assembly 3.
[0036] like Figure 3 As shown, the three-way bifurcated chute 2 is an inverted Y-shaped chute, the top of the three-way bifurcated chute 2 is fixedly connected to the bottom of the belt conveyor head chute 7, and the bifurcated part is located in the middle of the belt conveyor head chute 7. A cleaning door 17 is provided on the outer wall of the three-way bifurcated chute 2 at the installation position of the bearing seat 14. When foreign objects carried by the material are difficult to fall, the cleaning door 17 can be opened to remove the foreign objects.
[0037] like Figure 4 As shown, the electro-hydraulic chute regulating device 1 includes an electro-hydraulic push rod 5, an articulated frame 16 and a chute regulating plate 6. The two articulated frames 16 are respectively fixed on the top of the side plate of the belt conveyor head chute 7 and the rear of the belt conveyor head chute 7. Both ends of the chute regulating plate 6 are respectively hinged on the two articulated frames 16 through hinge shafts. The base of the electro-hydraulic push rod 5 is fixed on the rear plate of the belt conveyor head chute 7, located in the middle of the rear plate, and the push rod of the electro-hydraulic push rod 5 is fixed on the chute regulating plate 6. The push rod of the electro-hydraulic push rod 5 is extended and retracted to drive the chute regulating plate 6 to rotate around the hinge shaft.
[0038] like Figure 5 As shown, the strip material dividing plate assembly 3 includes a strip material dividing plate 8, a support shaft 13 and a bearing seat 14. One end of the plurality of strip material dividing plates 8 is passed through the support shaft 13, and the other end is placed on the fixed steel plate on the inner wall of the three-way forked chute 2; the support shaft 13 is mounted on the bearing, the bearing is mounted on the bearing seat 14, and the bearing seat 14 is mounted on the outer wall of the three-way forked chute 2.
[0039] The coding positioning strip material dividing plate flipping device includes a coding positioning telescopic cylinder 9, a connecting shaft 10, a strip material dividing plate flipping U-shaped pulling head 11 and a motor 12; the motor 12 is connected to the coding positioning telescopic cylinder 9, and the coding positioning telescopic cylinder 9 is connected to the strip material dividing plate flipping U-shaped pulling head 11 through the connecting shaft 10.
[0040] like Figure 6 As shown, the working process of the present invention is as follows: the material conveyed by the belt conveyor, after the speed and amount of the material are adjusted by the electro-hydraulic chute regulating device 1, falls to the strip material dividing plate assembly 3, and then falls to the strip material dividing plate assembly in two parts according to the set ratio. They fall on two scales 15 respectively, and the weight is weighed by the scales 15, and the above steps are repeated until the set material distribution ratio is reached.
[0041] A bulk material proportion two-part control method specifically includes the following methods:
[0042] 1) Select the strip dividing plate width of the strip dividing plate 8 according to the properties of the conveyed material;
[0043] 2) adjusting the distribution ratio of the strip material distribution plate 8 by coding and positioning the strip material distribution plate turning device 4, and determining the distribution ratio and material flow position;
[0044] 3) Adjust the chute adjustment plate 6 of the electro-hydraulic chute adjustment device 1 according to the speed and transportation volume of the material, so that the thickness center of the material flow falls and aligns with the support shaft 13 of the strip-shaped dividing plate assembly 3 after the material is loaded;
[0045] 4) Compare by measuring the downstream material distribution amounts; when the deviation is too large, adjust the quantity distribution of the strip material distribution plates 8 again through the coding positioning strip material distribution plate flipping device 4, adjust the angle of the chute adjustment plate 6 through the electro-hydraulic push rod 5, and repeat the measurement after fixing until the set material distribution amount ratio is reached.
[0046] The present invention is not affected by the deviation of the belt conveyor and the unstable material flow thickness; it meets the requirement that the material flow width is equal to the original conveying width; remote control can be realized when changing the proportion and material; according to the distribution ratio requirements of the bulk material, the number distribution of the dividing plate and the angle of the electro-hydraulic chute adjustment plate can be adjusted by the coding positioning strip dividing plate flipping mechanism, so as to realize remote control of the proportion of bulk material distribution.
[0047] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A bulk material proportional two-division device, characterized in that: It includes an electro-hydraulic chute regulating device, a three-way forked chute, a strip material dividing plate assembly and a coding and positioning strip material dividing plate flipping device; the electro-hydraulic chute regulating device is installed in the head chute of the belt conveyor and is located in the front part of the forward direction of the material flow, the three-way forked chute is connected to the bottom of the head chute of the belt conveyor, the strip material dividing plate assembly is installed in the three-way forked chute and is located at the fork of the three-way forked chute; the coding and positioning strip material dividing plate flipping device is installed at the bottom of the strip material dividing plate assembly, the coding and positioning strip material dividing plate flipping device is connected to the strip material dividing plate assembly, and the coding and positioning strip material dividing plate flipping device adjusts the strip material dividing plate assembly; The electro-hydraulic chute adjustment device comprises an electro-hydraulic push rod, an articulated frame and a chute adjustment plate; the articulated frame is fixedly connected to the top two ends of the chute at the head of the belt conveyor, the chute adjustment plate is hinged to the articulated frame through an articulated shaft, the base of the electro-hydraulic push rod is fixedly connected to the chute at the head of the belt conveyor, and the push rod of the electro-hydraulic push rod is fixedly connected to the chute adjustment plate; The three-way bifurcated chute is in an inverted Y shape, the top of the three-way bifurcated chute is fixedly connected to the bottom of the head chute of the belt conveyor, and the bifurcated part is located in the middle of the head chute of the belt conveyor; The strip material dividing plate combination comprises a strip material dividing plate, a support shaft and a bearing seat; one end of the plurality of strip material dividing plates is passed through the support shaft, and the other end is placed on a fixed steel plate on the inner wall of the three-way forked chute; the support shaft is mounted on the bearing seat, and the bearing seat is mounted on the outer wall of the three-way forked chute; The outer wall of the three-way bifurcated chute is provided with a cleaning door at the installation position of the bearing seat; The coding positioning strip material dividing plate flipping device comprises a coding positioning telescopic cylinder, a connecting shaft, a strip material dividing plate flipping U-shaped pulling head and a motor; the motor is connected to the coding positioning telescopic cylinder, and the coding positioning telescopic cylinder is connected to the strip material dividing plate flipping U-shaped pulling head through the connecting shaft.
2. A control method based on the bulk material proportional two-division device according to claim 1, characterized in that: The specific methods include the following: 1) Select the width of the strip dividing plate according to the nature of the conveyed material; 2) The distribution ratio of the strip material distribution plate is adjusted by coding and positioning the strip material distribution plate turning device to determine the distribution ratio and material flow position; 3) Adjust the chute adjustment plate of the electro-hydraulic chute adjustment device according to the speed and transportation volume of the material, so that the thickness center of the material flow falls and aligns with the support shaft of the strip material distribution plate combination after the material is loaded; 4) Compare by measuring the downstream material distribution amounts; when the deviation is too large, adjust the quantity distribution of the strip material distribution plates again through the coding positioning strip material distribution plate flipping device, adjust the angle of the chute adjustment plate through the electro-hydraulic push rod, and repeat the measurement after fixing until the set material distribution amount ratio is reached.