A steel-concrete composite beam

By setting up embedded steel bars and steel mesh in the reserved nail holes of steel-concrete composite beams and using post-pouring concrete filling, the problem of conflict between the steel bars and welding nails is solved, the construction quality and connection strength are improved, and the construction quality and connection strength are ensured. The installation and structural performance of steel-concrete composite beams are smooth.

CN111305047BActive Publication Date: 2024-12-03JIANGXI PROVINCIAL EXPRESSWAY INVESTMENT GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010253107.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-02
Publication Date
2024-12-03
Estimated Expiration
2040-04-02

AI Technical Summary

Technical Problem

During the construction of steel-concrete composite beams, prefabricated steel bar bridge decks and steel main beams often conflict with the position of steel bars and welded nails, resulting in difficulty in installation, slow construction speed and poor quality, reducing the strength and durability of the structure.

Method used

Design and reserve group nail holes and set up embedded steel bars and steel mesh. The welded nails are extended into the grid and then filled with concrete to enhance the connection strength. They are tied or welded to connect through the binding or welding of embedded steel bars and steel mesh. Ensure the correct positioning and positioning of the welded nails and steel bars.

Benefits of technology

It effectively avoids the positional conflict between the steel bars and the welded nails, improves the construction quality and speed, and enhances the strength and durability of the connection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111305047B_ABST
    Figure CN111305047B_ABST
Patent Text Reader

Abstract

The present invention discloses a steel-concrete composite beam, comprising a connected precast reinforced concrete bridge deck and a steel beam, wherein the precast reinforced concrete bridge deck is located at the top of the steel beam, the precast reinforced concrete bridge deck has a reserved group nail hole, embedded steel bars are arranged inside the precast concrete bridge deck, the embedded steel bars extend into the reserved group nail hole, the steel beam is provided with a group nail, the group nail comprises a plurality of welding nails, a steel mesh is arranged in the reserved group nail hole, and the steel mesh is in a grid shape. The reserved group nail hole is provided on the precast reinforced concrete bridge deck to ensure that the group nails on the steel beam can completely enter the reserved group nail hole, then a steel mesh is arranged in the reserved group nail hole, the welding nail extends into the grid of the steel mesh, the steel mesh is connected to the embedded steel bar, and the group nail hole concrete is poured after filling between the embedded steel bar, the steel mesh and the welding nail, so as to effectively avoid the problem of collision between the steel bars in the precast reinforced concrete bridge deck and the welding nail position on the steel beam.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel-concrete composite beams, in particular to a steel-concrete composite beam. Background Art

[0002] Steel-concrete composite beams have the advantages of both steel and concrete structures, and have significant technical, economic and social benefits. They have been increasingly widely used in urban overpasses and building structures in my country. In order to reduce the impact of concrete shrinkage on bridge stress, steel-concrete composite beams usually prefabricate reinforced concrete bridge decks and store them for more than 6 months to allow the concrete bridge decks to shrink freely in the early stage, and then install the bridge decks on the steel beams.

[0003] Before the bridge deck is installed on the steel beam, it is necessary to weld the rivet connector on the steel beam to ensure that the bridge deck and the steel beam are connected together to transmit force. For the composite beam of the precast concrete bridge deck, the rivets need to be arranged in groups, and the rivets are densely arranged in each group. The spacing between the rivets and the steel bars in the concrete bridge deck needs to be reserved in the design to ensure that the steel bars in the reserved group rivet holes do not collide with the rivets when the bridge deck is installed. Although the positions of the steel bars and rivets in the bridge deck can be set on the drawings in the design stage, there will be errors in the deviation of the rivet position from the design and the steel bar position from the design during the actual processing and manufacturing process. In the actual bridge construction process, the installation of precast concrete bridge decks often encounters the dilemma of conflict between the rivets and the steel bars and making them unable to be installed. The irregular practices of cutting the steel bars and removing the rivets are often used, resulting in slow construction speed, poor construction quality, and reduced strength and durability of the structure.

[0004] Therefore, how to change the existing technology in which the steel bars and the welding nails easily interfere with each other and cause conflicts and collisions when the prefabricated steel bridge deck and the steel main beam are installed has become an urgent problem to be solved by technical personnel in this field. Summary of the invention

[0005] The purpose of the present invention is to provide a steel-concrete composite beam to solve the problems existing in the above-mentioned prior art, avoid conflicts and collisions between the steel bars and the welding nails when the prefabricated steel bridge deck is installed with the steel main beam, and ensure the connection quality between the prefabricated steel bridge deck and the steel main beam.

[0006] To achieve the above-mentioned purpose, the present invention provides the following scheme: The present invention provides a steel-concrete composite beam, comprising a connected prefabricated reinforced concrete bridge deck and a steel beam, wherein the prefabricated reinforced concrete bridge deck is located on the top of the steel beam, the prefabricated reinforced concrete bridge deck has reserved group nail holes, embedded steel bars are arranged inside the prefabricated concrete bridge deck, part of the embedded steel bars extend into the reserved group nail holes, the length of the embedded steel bars extending into the reserved group nail holes meets the steel bar connection length requirements specified in the specification, and a group nail is arranged on the side of the steel beam facing the prefabricated reinforced concrete bridge deck, and the group nail includes a plurality of welded nails The axis of the rivet is perpendicular to the precast reinforced concrete bridge deck and the upper flange of the steel beam. A steel mesh is arranged in the reserved rivet hole. The steel mesh is in a grid shape. The rivet extends into the grid of the steel mesh. The steel mesh is connected to the embedded steel bars. Post-cast rivet hole concrete is also arranged in the reserved rivet hole. The post-cast rivet hole concrete is filled between the embedded steel bars, the steel mesh and the rivet. The post-cast rivet hole concrete is made of concrete material. The strength of the post-cast rivet hole concrete is greater than that of the precast reinforced concrete bridge deck.

[0007] Preferably, the number of the embedded steel bars is multiple, the spacing between adjacent embedded steel bars is consistent with the grid size of the steel mesh, the number of the steel mesh and the embedded steel bars is two layers, the two layers of the steel mesh are stacked along the axial direction of the welding nail, and the spacing between the two layers of the steel mesh matches the spacing between the two layers of the embedded steel bars.

[0008] Preferably, the steel mesh is connected to the embedded steel bars by binding or welding.

[0009] Preferably, the plurality of welding nails are arranged in a rectangular array, and the steel mesh is in a rectangular grid shape.

[0010] Preferably, the group of nails is located inside a rectangle surrounded by one end of the embedded steel bar extending into the reserved group of nail holes.

[0011] Preferably, the reserved nail group hole is in the shape of an inverted quadrangular pyramid, and the opening of the reserved nail group hole at one end away from the steel beam is larger than the opening of the end in contact with the upper flange plate of the steel beam.

[0012] Preferably, the reserved group nail holes are in the shape of an inverted regular quadrangular pyramid.

[0013] Preferably, the side length of the reserved nail group hole close to the opening of one end of the steel beam is smaller than the width of the upper flange plate of the steel beam.

[0014] Compared with the prior art, the present invention has achieved the following technical effects: the steel-concrete composite beam of the present invention comprises a connected prefabricated reinforced concrete bridge deck and a steel beam, the prefabricated reinforced concrete bridge deck is located on the top of the steel beam, the prefabricated reinforced concrete bridge deck has reserved group nail holes, embedded steel bars are arranged inside the prefabricated concrete bridge deck, part of the embedded steel bars extend into the reserved group nail holes, the length of the embedded steel bars extending into the reserved group nail holes meets the steel bar connection length requirements specified in the specification, a group nail is arranged on the side of the steel beam facing the prefabricated reinforced concrete bridge deck, and the group nails include The invention comprises a plurality of welding nails, the axes of which are perpendicular to the upper flange of the precast reinforced concrete bridge deck and the steel beam, a steel mesh is arranged in the reserved holes for the group of nails, the steel mesh is in a grid shape, the welding nails extend into the grid of the steel mesh, the steel mesh is connected with the embedded steel bars, and post-cast group nail hole concrete is also arranged in the reserved holes for the group of nails, the post-cast group nail hole concrete is filled between the embedded steel bars, the steel mesh and the welding nails, the post-cast group nail hole concrete is made of concrete material, and the strength of the post-cast group nail hole concrete is greater than that of the precast reinforced concrete bridge deck. The steel-concrete composite beam of the present invention has reserved nail group holes on the precast reinforced concrete bridge deck to ensure that the nail groups on the steel beam can completely enter the reserved nail group holes, and then a steel mesh is arranged in the reserved nail group holes to allow the welding nails to extend into the grid of the steel mesh. After the steel mesh is positioned, it is connected with the embedded steel bars, and finally the nail group holes are filled with concrete between the embedded steel bars, the steel mesh and the welding nails, thereby effectively avoiding the problem of collision between the steel bars in the precast reinforced concrete bridge deck and the welding nails on the steel beam, thereby ensuring the construction quality and improving the construction speed. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0016] Figure 1 It is a schematic diagram of the connection structure of the steel-concrete composite beam of the present invention;

[0017] Figure 2 It is a partial enlarged schematic diagram of the steel-concrete composite beam of the present invention;

[0018] Figure 3 It is a schematic structural diagram of a steel mesh of a steel-concrete composite beam of the present invention;

[0019] Figure 4 A schematic diagram of the structure of placing a layer of steel mesh in the reserved nail group holes of the steel-concrete composite beam of the present invention;

[0020] Figure 5 It is a structural schematic diagram of placing two layers of steel mesh in the reserved nail group holes of the steel-concrete composite beam of the present invention;

[0021] Figure 6 It is a structural schematic diagram of the steel-concrete composite beam of the present invention;

[0022] Among them, 1 is the precast reinforced concrete bridge deck, 2 is the steel beam, 3 is the reserved group nail holes, 4 is the embedded steel bars, 401 is the embedded steel bars in the longitudinal direction of the bridge, 402 is the embedded steel bars in the transverse direction of the bridge, 5 is the group nails, 6 is the welded nails, 7 is the steel mesh, 701 is the longitudinal direction of the bridge, 702 is the transverse direction of the bridge, and 8 is the post-cast group nail hole concrete. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] The purpose of the present invention is to provide a steel-concrete composite beam to solve the problems existing in the above-mentioned prior art, avoid conflicts and collisions between the steel bars and the welding nails when the prefabricated steel bridge deck is installed with the steel main beam, and ensure the connection quality between the prefabricated steel bridge deck and the steel main beam.

[0025] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0026] Please refer to Figure 1-6 ,in, Figure 1 is a schematic diagram of the connection structure of the steel-concrete composite beam of the present invention, Figure 2 It is a partial enlarged schematic diagram of the steel-concrete composite beam of the present invention, Figure 3 is a schematic structural diagram of a steel mesh of a steel-concrete composite beam of the present invention, Figure 4 This is a schematic diagram of the structure of placing a layer of steel mesh in the reserved nail group holes of the steel-concrete composite beam of the present invention. Figure 5 This is a schematic diagram of the structure in which two layers of steel mesh are placed in the reserved nail group holes of the steel-concrete composite beam of the present invention. Figure 6 It is a structural schematic diagram of the steel-concrete composite beam of the present invention.

[0027] The present invention provides a steel-concrete composite beam, comprising a connected prefabricated reinforced concrete bridge deck 1 and a steel beam 2, wherein the prefabricated reinforced concrete bridge deck 1 is located on the top of the steel beam 2, the prefabricated reinforced concrete bridge deck 1 has a reserved group nail hole 3, embedded steel bars 4 are arranged inside the prefabricated concrete bridge deck, part of the embedded steel bars 4 extend into the reserved group nail hole 3, the length of the embedded steel bars 4 extending into the reserved group nail hole 3 meets the steel bar connection length requirement specified in the specification, a group nail 5 is arranged on one side of the steel beam 2 facing the prefabricated reinforced concrete bridge deck 1, the group nail 5 includes a plurality of welding nails 6, the welding nails 6 The axis is perpendicular to the upper flange of the precast reinforced concrete bridge deck 1 and the steel beam 2. A steel mesh 7 is arranged in the reserved nail group holes 3. The steel mesh 7 is in a grid shape. The welding nails 6 extend into the grid of the steel mesh 7. The steel mesh 7 is connected to the embedded steel bars 4. Post-cast nail group hole concrete 8 is also arranged in the reserved nail group holes 3. The post-cast nail group hole concrete 8 is filled between the embedded steel bars 4, the steel mesh 7 and the welding nails 6. The post-cast nail group hole concrete 8 is made of concrete material. The strength of the post-cast nail group hole concrete 8 is greater than that of the precast reinforced concrete bridge deck 1.

[0028] The steel-concrete composite beam of the present invention has reserved nail group holes 3 on the precast reinforced concrete bridge deck 1 to ensure that the nail groups 5 on the steel beam 2 can completely enter the reserved nail group holes 3, and then a steel mesh 7 is arranged in the reserved nail group holes 3 to allow the welding nails 6 to extend into the grid of the steel mesh 7. After the steel mesh 7 is positioned, it is connected with the embedded steel bars 4. Finally, the nail group hole concrete 8 is filled and poured between the embedded steel bars 4, the steel mesh 7 and the welding nails 6, so as to effectively avoid the problem of collision between the steel bars in the precast reinforced concrete bridge deck 1 and the welding nails 6 on the steel beam 2, thereby ensuring the construction quality and improving the construction speed.

[0029] Specifically, there are multiple embedded steel bars 4, and the spacing between adjacent embedded steel bars 4 is consistent with the grid size of the steel mesh 7, ensuring that the embedded steel bars 4 can be connected to the steel mesh 7. In this specific embodiment, the steel mesh 7 and the number of embedded steel bars 4 are both two layers, and the two layers of steel mesh 7 are stacked along the axial direction of the welding nail 6. One layer of steel mesh 7 is arranged close to the bottom of the welding nail 6, and the other layer of steel mesh 7 is arranged close to the top of the welding nail 6. The spacing between the two layers of steel mesh 7 matches the spacing between the two layers of embedded steel bars 4.

[0030] In the actual construction process, the steel mesh 7 is connected to the embedded steel bars 4 by binding or welding. The binding connection is convenient to construct and the welding connection is firm.

[0031] More specifically, in order to improve the connection strength between the prefabricated reinforced concrete bridge deck 1 and the steel beam 2, and at the same time improve the force uniformity of the group of nails 5, a plurality of welding nails 6 are arranged in a rectangular array, and the steel mesh 7 is in a rectangular grid shape, so that the steel mesh 7 can be easily mounted on the outside of the welding nails 6.

[0032] It should be noted here that the steel mesh 7 includes longitudinal bridge steel bars 701 and transverse bridge steel bars 702. Correspondingly, the embedded steel bars 4 include longitudinal bridge embedded steel bars 401 and transverse bridge embedded steel bars 402. When the steel mesh 7 is connected to the embedded steel bars 4, the longitudinal bridge steel bars 701 are connected to the longitudinal bridge embedded steel bars 401, and the transverse bridge steel bars 702 are connected to the transverse bridge embedded steel bars 402.

[0033] In order to prevent the embedded steel bars 4 from affecting the installation and positioning of the steel mesh 7, the group nails 5 are located inside the rectangle formed by one end of the embedded steel bars 4 extending into the reserved group nail holes 3, that is, the rectangle formed by the group nails 5 is smaller than the rectangle formed by the end of the embedded steel bars 4 extending into the reserved group nail holes 3, so as to prevent the embedded steel bars 4 from interfering with the steel mesh 7 and the group nails 5.

[0034] Furthermore, the reserved nail group hole 3 is in the shape of an inverted quadrangular pyramid, and the opening of the reserved nail group hole 3 at one end away from the steel beam 2 is larger than the opening of the end in contact with the upper flange plate of the steel beam 2, which is convenient for the installation of the steel mesh 7 and the construction operation.

[0035] In this specific embodiment, the reserved nail group holes 3 are in the shape of an inverted regular tetrahedron, and accordingly, the steel mesh 7 is square, which is convenient for installation and positioning. Correspondingly, the area of ​​the upper steel mesh 7 is larger than that of the lower steel mesh 7.

[0036] Furthermore, the side length of the reserved nail group hole 3 near one end of the steel beam 2 is smaller than the width of the upper flange plate of the steel beam 2. When pouring the nail group hole concrete 8 after pouring, there is no need to set up an additional template, which improves the on-site construction speed.

[0037] The steel-concrete composite beam of the present invention has a reserved nail group hole 3 on the precast reinforced concrete bridge deck 1 to ensure that the nail group 5 on the steel beam 2 can completely enter the reserved nail group hole 3, and then a steel mesh 7 is arranged in the reserved nail group hole 3, so that the welding nail 6 extends into the grid of the steel mesh 7, and the steel mesh 7 is connected with the embedded steel bar 4 after positioning, and the steel mesh 7 and the embedded steel bar 4 are effectively overlapped to meet the profit transmission requirements and ensure the connection quality, and finally the post-cast nail group hole concrete 8 is filled between the embedded steel bar 4, the steel mesh 7 and the welding nail 6, effectively avoiding the problem of the steel bar in the precast reinforced concrete bridge deck 1 and the welding nail 6 on the steel beam 2. The strength of the post-cast nail group hole concrete 8 is greater than that of the precast reinforced concrete bridge deck 1, which ensures the construction quality and improves the construction speed. It should be noted here that the steel bar arrangement of the steel mesh 7 is consistent with the arrangement of the embedded steel bar 4 in the precast reinforced concrete bridge deck 1, ensuring effective overlap while ensuring the structural connection strength.

[0038] The present invention uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A steel-concrete composite beam, characterized in that: The invention comprises a connected prefabricated reinforced concrete bridge deck and a steel beam, wherein the prefabricated reinforced concrete bridge deck is located on the top of the steel beam, the prefabricated reinforced concrete bridge deck has a reserved group nail hole, embedded steel bars are arranged inside the prefabricated reinforced concrete bridge deck, part of the embedded steel bars extend into the reserved group nail hole, the length of the embedded steel bars extending into the reserved group nail hole meets the steel bar connection length requirement specified in the specification, a group nail is arranged on one side of the steel beam facing the prefabricated reinforced concrete bridge deck, the group nail comprises a plurality of welding nails, the axis of the welding nail is perpendicular to the prefabricated steel The reserved nail group holes are provided with a steel mesh, the steel mesh is in a grid shape, the welding nails extend into the grid of the steel mesh, the steel mesh is connected to the pre-embedded steel bars, and the reserved nail group holes are also provided with post-cast nail group hole concrete, the post-cast nail group hole concrete is filled between the pre-embedded steel bars, the steel mesh and the welding nails, the post-cast nail group hole concrete is made of concrete material, and the strength of the post-cast nail group hole concrete is greater than that of the prefabricated reinforced concrete bridge deck; The number of the embedded steel bars is multiple, the spacing between adjacent embedded steel bars is consistent with the grid size of the steel mesh, the number of the steel mesh and the embedded steel bars is two layers, the two layers of the steel mesh are stacked along the axial direction of the welding nails, and the spacing between the two layers of the steel mesh matches the spacing between the two layers of the embedded steel bars; the multiple welding nails are arranged in a rectangular array, and the steel mesh is in a rectangular grid; the group of nails is located inside the rectangle surrounded by one end of the embedded steel bar extending into the reserved group of nail holes, that is, the rectangle surrounded by the group of nails is smaller than the rectangle surrounded by the end of the embedded steel bar extending into the reserved group of nail holes.

2. The steel-concrete composite beam according to claim 1, characterized in that: The steel mesh is connected to the embedded steel bars by binding or welding.

3. The steel-concrete composite beam according to claim 1, characterized in that: The reserved nail group hole is in the shape of an inverted quadrangular pyramid, and the opening of the reserved nail group hole at one end away from the steel beam is larger than the opening of the end in contact with the upper flange plate of the steel beam.

4. The steel-concrete composite beam according to claim 3, characterized in that: The reserved nail group holes are in the shape of an inverted regular quadrangular pyramid.

5. The steel-concrete composite beam according to claim 4, characterized in that: The side length of the reserved nail group hole close to the opening of one end of the steel beam is smaller than the width of the upper flange plate of the steel beam.