A reinforced concrete wall structure and construction method thereof

By designing a reinforced concrete wall structure using composite wall panels and embedded parts and its construction method, the existing reinforced concrete wall structure has been solved, and the effect of reducing labor intensity and construction time and improving structural strength and environmental protection is achieved.

CN111472480BActive Publication Date: 2025-02-28ANHUI JIEXIANG CONSTRUCTION CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010383519.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-08
Publication Date
2025-02-28
Estimated Expiration
2040-05-08

AI Technical Summary

Technical Problem

The existing reinforced concrete wall structure has high construction strength and requires a large amount of wood as a formwork, which takes a long time, has a high work intensity for workers, and is not simple enough to install.

Method used

A reinforced concrete wall structure and its construction method are designed. Composite wall panels are used to wrap the sides of the steel bar main body, wall embedded parts and clamps are installed to facilitate fixing and protecting the steel bar main body, and needle-shaped fixing seats and reinforcement ribs are provided on the base to enhance structural strength.

Benefits of technology

It reduces the wood formwork required for construction, reduces the labor intensity and construction time of workers, improves the convenience of installation and structural strength, and is environmentally friendly to use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111472480B_ABST
    Figure CN111472480B_ABST
Patent Text Reader

Abstract

The present invention discloses a reinforced concrete wall structure and a construction method thereof, comprising a steel bar main body, a base connected to the steel bar main body, and a composite wall panel; the base is fixedly installed at the lower end of the steel bar main body for fixing the steel bar main body; the composite wall panel is arranged on the side of the steel bar main body for wrapping the side of the steel bar main body, the composite wall panel is provided with a fixing groove matched with the steel bar main body, a connection point is provided within 200mm of the four edges of the composite wall panel and in the middle of the composite wall panel, a wall connection block is provided at the connection point position between the composite wall panels embedded on both sides, and the adjacent composite wall panels are fastened to the wall connection block; a plurality of steel bar bent hoops are provided at the corners of the steel bar main body for connection and fixing. The beneficial effects of the present invention are that a large amount of wood is not required as a template during construction and the wall is removed after it is dried, the labor intensity is small, the installation is convenient, the cost is greatly reduced, and it is green and environmentally friendly when used.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction, in particular to a reinforced concrete wall structure and a construction method thereof. Background Art

[0002] The load-bearing system composed of reinforced concrete walls is called shear wall structure, which refers to a series of reinforced concrete walls set in the house structure for the main purpose of bearing horizontal loads (and also bearing vertical loads within the corresponding range). The higher the floor, the greater the impact of wind loads on it. In high-rise and super-high-rise house structures, horizontal loads will play a major role, and the house needs a large lateral resistance. The current mixed structure wall has low wall material strength and heavy weight, and the lateral resistance of the frame structure is weak, so it is only used in multi-story houses. Therefore, a new structure is needed in high-rise and super-high-rise house structures. System, which is the shear wall structural system; shear walls can be divided into reinforced concrete shear walls, steel plate shear walls, steel concrete shear walls and reinforced block shear walls according to structural materials. Among them, reinforced concrete shear walls are the most commonly used, with good integrity and high strength; at present, reinforced concrete walls are mainly used in daily life, which have high construction strength and require a large amount of wood as formwork during construction. After the wall is dry, the formwork needs to be removed, which takes a long time and has high work intensity for workers. In addition, with the development of housing construction technology, convenient and simple assembly is also an outstanding requirement of people for housing construction.

[0003] In view of the above situation, it is necessary to improve the existing reinforced concrete walls so that they can adapt to the current needs for the use of reinforced concrete wall structures. Summary of the invention

[0004] The purpose of the present invention is to solve the problem that reinforced concrete walls are mainly used in daily life. The construction intensity is high and a large amount of wood needs to be used as a template during construction. The template needs to be removed after the wall is dried, which takes a long time and the workers have a high workload. In addition, the current wall structure is not simple to install. Therefore, we have designed a reinforced concrete wall structure and its construction method, which are easy to install and can reduce the intensity of manual labor.

[0005] To achieve the above-mentioned purpose, the technical solution of the present invention is a reinforced concrete wall structure, comprising a steel bar main body, a base connected to the steel bar main body, and a composite wall panel; the base is fixedly installed on the lower end of the steel bar main body for fixing the steel bar main body; the composite wall panel is arranged on the side of the steel bar main body for wrapping the side of the steel bar main body, and the composite wall panel is provided with a fixing groove matching the steel bar main body, and connection points are provided within 200 mm of the four edges of the composite wall panel and in the middle of the composite wall panel, and wall connection blocks are provided at the connection points between the composite wall panels embedded on both sides, and the adjacent composite wall panels are fastened to the wall connection blocks; a plurality of steel bar bent hoops are provided at the corners of the steel bar main body for connection and fixation.

[0006] As a further supplement to the present solution, a plurality of needle-shaped fixing seats for fixing the steel bar body are arranged above the base, and reinforcing ribs are arranged between the base and the needle-shaped fixing seats for fixing.

[0007] As a further supplement to the present solution, the composite wall panel is provided with a wall embedded part near the inner side of the steel bar body, and the wall embedded part includes a clamping plate and a steel plate arranged at the end of the clamping plate, and the clamping plate is threadedly connected to the steel plate.

[0008] As a further supplement to the present solution, a polystyrene board is provided on the composite wall panel near the inner surface of the steel bar body, and a connecting protrusion is provided between the composite wall panel and the polystyrene board and is fixed by bonding with polyurethane foam adhesive.

[0009] As a further supplement to the present solution, a fixing member is provided above the base and between the steel bar bodies, and the fixing member includes a support column and a connecting plate.

[0010] As a further supplement to the present solution, a clamping block is provided on the composite wall panel near the inner side of the steel bar body, the cross section of the clamping block is in a concave shape rotated at a certain angle, and the width of the concave groove is set according to the width of the steel bar body.

[0011] Among them, an optional construction method of a reinforced concrete wall structure includes the following construction steps performed in sequence:

[0012] (1) Install the base at the setting plane of the main steel bar installation, install the fixing parts on the base by embedded bolts, and then connect a number of needle-shaped fixing seats for strengthening the solidification force of concrete on the base by screws;

[0013] (2) Select the steel bar body as required, and then select the composite wall panel according to the steel bar body, wherein the height of the composite wall panel is 10-20 cm higher than the height of the steel bar body, and when the composite wall panel is installed on the steel bar body, the wall embedded parts and the clamping blocks thereon can be effectively connected with the steel bar body, the wall embedded parts are arranged at the connection points and are effectively fixed by the steel plates thereon, and the clamping blocks effectively accommodate the side surfaces of the steel bar body, so that the steel bar body is buckled in the clamping blocks, and the shaking amplitude thereof is reduced;

[0014] (3) Install polystyrene board on the inner side of the composite wall panel close to the main body of the steel bar, and apply polyurethane foam glue on the connecting protrusion between the two to bond and fix them, so as to play an effective role in heat preservation;

[0015] (4) placing the structure installed in step (2) and step (3) on a base, wherein the fixing member on the base is placed at the center of the steel bar body, and the needle-shaped fixing seats are evenly distributed in the steel bar body;

[0016] (5) Pour concrete.

[0017] As a further supplement to the present solution, a prefabricated beam is provided at one end of the steel bar body away from the base, and the prefabricated beam is recessed into the composite wall panel, and the recessed depth of the prefabricated beam is consistent with the height of the composite wall panel above the steel bar body.

[0018] Its beneficial effect is that a large amount of wood is not required as a template during construction and the wall will be removed after it is dry. The labor intensity is low, the installation is convenient, the cost is greatly reduced, and it is green and environmentally friendly when used; the composite wall panel is installed on the side of the steel body, which is convenient for pouring and protects the steel body. A polystyrene board is also provided inside to play a role in heat preservation; a needle-shaped fixing seat and reinforcing ribs are provided on the base to further fix the bottom surface of the steel body, so that the steel body can be effectively fixed; the composite wall panel is provided with wall embedded parts, which can effectively make the composite wall panel and the steel body integrated during pouring, thereby increasing the structural strength. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0020] Figure 2 It is a schematic diagram of the structure of the composite wallboard of the present invention;

[0021] Figure 3 It is a structural schematic diagram of the base of the present invention;

[0022] In the figure, 1. base; 11. needle-shaped fixing seat; 12. reinforcing rib; 131. support column; 132. connecting plate; 2. composite wall panel; 21. fixing groove; 22. wall connecting block; 221. clamping plate; 222. steel plate; 23. clamping block; 3. polystyrene board; 4. prefabricated beam. DETAILED DESCRIPTION

[0023] First of all, the original intention of the design of the present invention is to explain that reinforced concrete walls are mainly used in daily life, but the commonly used reinforced concrete wall structure has high construction strength, and a large amount of wood is needed as a template during construction. The template needs to be removed after the wall is dried, which takes a long time and the workers have high work intensity. In addition, during the work process, the existing wall structure is inconvenient to assemble. In order to reduce the labor intensity and working hours and facilitate people to assemble it to make it more suitable for the current market, the present invention provides a reinforced concrete wall structure and a construction method thereof, which is easy to install and can reduce the labor intensity.

[0024] It should be noted in advance that the transformation basis of the present invention is the existing reinforced concrete wall structure, which is common in daily house construction. The steel bars are first fixed, then wood is used as a template, and finally concrete is poured. This working method requires a lot of manual labor, and the wood is inconvenient to disassemble after use as a template, and the labor intensity is high.

[0025] In order to make the technical solution more clear to those skilled in the art, Figure 1-3 The specific structure and principle of each of the above-mentioned mechanisms are explained as follows: a reinforced concrete wall structure comprises a steel bar main body, a base 1 connected to the steel bar main body, and a composite wall panel 2; the base 1 is fixedly installed at the lower end of the steel bar main body for fixing the steel bar main body; the composite wall panel 2 is arranged on the side of the steel bar main body for wrapping the side of the steel bar main body, the composite wall panel 2 is provided with a fixing groove 21 cooperating with the steel bar main body, connection points are provided within 200 mm of the four edges of the composite wall panel 2 and in the middle of the composite wall panel 2, and wall connection blocks 22 are provided at the connection points between the composite wall panels 2 embedded on both sides, and the adjacent composite wall panels 2 are fastened to the wall connection blocks 22; a plurality of steel bar bent hoops are provided at the corners of the steel bar main body for connection and fixing; wherein, the composite wall panel 2 can effectively wrap the steel bar main body while facilitating the subsequent concrete pouring, and has a simple structure and is convenient to use.

[0026] Among them, in order to facilitate the effective fixation of the steel bar body, the base 1 is further supplemented as follows: a plurality of needle-shaped fixing seats 11 for fixing the steel bar body are arranged above the base 1, which can play a role of preliminary fixation of the steel bar body and limit its range of movement; reinforcing ribs 12 are arranged between the base 1 and the needle-shaped fixing seats 11 for fixing, which can fix the needle-shaped fixing seats 11 and limit the range of left and right movement of the steel bar body; fixing parts are arranged above the base 1 and between the steel bar bodies, and the fixing parts include support columns 131 and connecting plates 132, which play a role of structural support, and can effectively connect the base 1 and the steel bar body together during casting, thereby enhancing the structural strength of the connection.

[0027] In order to effectively connect the composite wall panel 2 with the steel bar main body and strengthen the connection strength between the two, the following is a further supplement to the composite wall panel 2. The composite wall panel 2 is provided with a wall embedded part near the inner side of the steel bar main body. The wall embedded part includes a clamping plate 221 and a steel plate 222 arranged at the end of the clamping plate 221. The clamping plate 221 is threadedly connected to the steel plate 222, which can effectively fix the composite wall panel 2 and the steel bar main body together during pouring, and can enhance the structural strength of the connection between the two. The composite wall panel 2 is provided with a clamping block 23 near the inner side of the steel bar main body. The cross-section of the clamping block 23 is a concave shape rotated at a certain angle. The width of the groove is set according to the width of the steel bar main body, which can limit the side of the steel bar main body and prevent it from shaking.

[0028] In order to improve the internal thermal insulation, the composite wall panel 2 is provided with a polystyrene board 3 near the inner surface of the steel bar body, and a connecting protrusion (not shown) is provided between the composite wall panel 2 and the polystyrene board 3 and is fixed by polyurethane foam adhesive, which can play a role in thermal insulation of the interior;

[0029] Among them, an optional construction method of a reinforced concrete wall structure includes the following construction steps performed in sequence:

[0030] (1) Install the base 1 at the setting steel bar main body installation plane, install the fixing parts on the base 1 by embedded bolts, and then connect a number of needle-shaped fixing seats 11 for strengthening the solidification force of concrete on the base 1 by screws;

[0031] (2) Select the steel bar body as required, and then select the composite wall panel 2 according to the steel bar body, wherein the height of the composite wall panel 2 is 10-20 cm higher than the height of the steel bar body, and when the composite wall panel 2 is installed on the steel bar body, the wall embedded parts and the clamping block 23 thereon can be effectively connected with the steel bar body, the wall embedded parts are arranged at the connection points and are effectively fixed by the steel plate 222 thereon, and the clamping block 23 effectively accommodates the side of the steel bar body, so that the steel bar body is buckled in the clamping block 23, and its shaking amplitude is reduced;

[0032] (3) Install the polystyrene board 3 on the inner side of the composite wall panel 2 close to the main body of the steel bar, and apply polyurethane foam glue on the connecting protrusion between the two to bond and fix them, so as to play an effective role in heat preservation;

[0033] (4) placing the structure installed in step (2) and step (3) on the base 1, wherein the fixing piece on the base 1 is placed at the center of the steel bar body, and the needle-shaped fixing seats 11 are evenly distributed in the steel bar body;

[0034] (5) Pour concrete.

[0035] In order to effectively fix the two ends of the steel bar body and facilitate pouring, a precast beam 4 is provided at one end of the steel bar body away from the base 1. The precast beam 4 is recessed into the composite wall panel 2, and the recessed depth of the precast beam 4 is consistent with the height of the composite wall panel 2 above the steel bar body.

[0036] The above technical solutions only reflect the preferred technical solutions of the technical solutions of the present invention. Some changes that may be made to certain parts thereof by technicians in this technical field all reflect the principles of the present invention and fall within the protection scope of the present invention.

Claims

1. A reinforced concrete wall structure, comprising a steel bar body, characterized in that: It also includes a base and a composite wall panel connected to the steel bar body; the base is fixedly installed on the lower end of the steel bar body for fixing the steel bar body; the composite wall panel is arranged on the side of the steel bar body for wrapping the side of the steel bar body, and the composite wall panel is provided with a fixing groove that cooperates with the steel bar body, and connection points are provided within 200mm of the four edges of the composite wall panel and in the middle of the composite wall panel. Wall connection blocks are provided at the connection points between the composite wall panels embedded on both sides, and the adjacent composite wall panels are fastened to the wall connection blocks; a plurality of steel bar bent hoops are provided at the corners of the steel bar body for connection and fixation.

2. A reinforced concrete wall structure according to claim 1, characterized in that: A plurality of needle-shaped fixing seats for fixing the steel bar body are arranged above the base, and reinforcing ribs are arranged between the base and the needle-shaped fixing seats for fixing.

3. A reinforced concrete wall structure according to claim 1, characterized in that: The composite wall panel is provided with a wall embedded part near the inner side of the steel bar body. The wall embedded part includes a clamping plate and a steel plate arranged at the end of the clamping plate. The clamping plate is threadedly connected to the steel plate.

4. A reinforced concrete wall structure according to claim 1, characterized in that: The composite wall panel is provided with a polystyrene board near the inner surface of the steel bar body, and a connecting protrusion is provided between the composite wall panel and the polystyrene board, which are fixed by bonding with polyurethane foam adhesive.

5. A reinforced concrete wall structure according to claim 1, characterized in that: A fixing piece is arranged above the base and between the steel bar bodies, and the fixing piece comprises a supporting column and a connecting plate.

6. A reinforced concrete wall structure according to claim 1, characterized in that: The composite wall panel is provided with a clamping block near the inner side of the steel bar body. The cross section of the clamping block is in a concave shape rotated at a certain angle, and the width of the concave groove is set according to the width of the steel bar body.

7. A construction method of a reinforced concrete wall structure according to any one of claims 1 to 6, characterized in that: The following construction steps are included in order: (1) Install the base at the setting plane of the main steel bar installation, install the fixing parts on the base by embedded bolts, and then connect a number of needle-shaped fixing seats for strengthening the solidification force of concrete on the base by screws; (2) Select the steel bar body as required, and then select the composite wall panel according to the steel bar body, wherein the height of the composite wall panel is 10-20 cm higher than the height of the steel bar body, and when the composite wall panel is installed on the steel bar body, the wall embedded parts and the clamping blocks thereon can be effectively connected with the steel bar body, the wall embedded parts are arranged at the connection points and are effectively fixed by the steel plates thereon, and the clamping blocks effectively accommodate the side surfaces of the steel bar body, so that the steel bar body is buckled in the clamping blocks, and the shaking amplitude thereof is reduced; (3) Install polystyrene board on the inner side of the composite wall panel close to the main body of the steel bar, and apply polyurethane foam glue on the connecting protrusion between the two to bond and fix them, so as to play an effective role in heat preservation; (4) placing the structure installed in step (2) and step (3) on a base, wherein the fixing member on the base is placed at the center of the steel bar body, and the needle-shaped fixing seats are evenly distributed in the steel bar body; (5) Pour concrete.

8. A construction method for a reinforced concrete wall structure according to claim 7, characterized in that: A prefabricated beam is arranged at one end of the steel bar body away from the base. The prefabricated beam is recessed into the composite wall panel. The recessed depth of the prefabricated beam is consistent with the height of the composite wall panel above the steel bar body.

Citation Information

Patent Citations

  • Reinforced concrete wall structure

    CN212613203U