A node connection device between a curtain wall structure and a building main body

By designing a node connection device that includes ear plates, sleeves, and elastic elements, the problem of releasing and automatically restoring the degree of freedom in the connection between the curtain wall structure and the main building was solved, realizing energy storage and the release of rotational degree of freedom, and improving the safety and aesthetics of the curtain wall structure.

CN111622401BActive Publication Date: 2024-11-15SHANGHAI MECHANIZED CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010584540.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-06-23
Publication Date
2024-11-15
Estimated Expiration
2040-06-23

AI Technical Summary

Technical Problem

The existing connection devices between the curtain wall structure and the main building are inadequate in terms of the types and values ​​of degrees of freedom released and the ability to automatically restore the initial configuration, resulting in complex connection structures that lack energy storage and recovery capabilities.

Method used

A node connection device is adopted, including a first ear plate, a second ear plate, an outer sleeve, an inner sleeve, a guide rod, first and second elastic elements, and a lifting plate. Energy storage and release are achieved through the compression and reset of the elastic elements, and rotational freedom is released by the pin connection.

Benefits of technology

It improves the deformation adaptability and safety of the curtain wall structure, maintains the aesthetics of the building facade, and can restore the initial state after the external load disappears.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111622401B_ABST
    Figure CN111622401B_ABST
Patent Text Reader

Abstract

The present invention provides a node connection device between a curtain wall structure and a building main body, comprising a first ear plate, a second ear plate, an outer sleeve, an inner sleeve, a guide rod, a first elastic member, a second elastic member and a lifting plate; one end of the outer sleeve is open, the first ear plate is fixed on the outer wall of the bottom surface of the outer sleeve, and the guide rod is fixed on the inner wall of the bottom surface of the outer sleeve; both ends of the inner sleeve are open; the outer sleeve is sleeved on the inner sleeve, and the free end of the guide rod is located in the inner sleeve; the guide rod is provided with a first positioning preload and a second positioning preload; a first elastic member is provided between the first positioning preload and the end of the inner sleeve, and a second elastic member is provided between the first positioning preload and the second positioning preload; one end of the lifting plate is located between the second elastic member and the second positioning preload, and is connected to the second elastic member, and the second ear plate is fixed on the other end of the lifting plate. The node connection device of the present invention can absorb external load energy, and release energy after the external load disappears, so as to restore the initial state of the curtain wall.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of construction engineering, and in particular to a node connection device between a curtain wall structure and a building main body. Background Art

[0002] The glass curtain wall frame and the main body of the building often use a connection method in which one end is fixed and the other end is released, so as to minimize the adverse effects of the support deformation of the glass curtain wall frame structure on the curtain wall glass. As for the connection structure of the release end, different degrees of freedom release requirements will have different connection structure forms. The higher the requirements, the more special and complex the connection structure form. The so-called release requirements include the type of released degrees of freedom, the direction of the degrees of freedom, and the number of degrees of freedom.

[0003] At present, common node forms include plate connection with oblong holes, sleeve connection, pin connection and joint bearing connection. The plate connection structure with oblong holes and the sleeve connection are mainly used to release the translational freedom in one direction. Due to the preload of the bolts, the friction force of the node when sliding is greater than that of the latter. The pin connection and joint bearing connection structures are mainly used to release the rotational freedom. The former can only release the freedom in one direction, while the latter can release the freedom in two directions, but the machining accuracy of the joint bearing is required to be higher.

[0004] It is not difficult to see that the above connection structure has the following shortcomings: (1) the type of degree of freedom released is relatively single; (2) the value of the degree of freedom released is very small; (3) it does not have the ability to automatically return to the initial configuration.

[0005] Therefore, it is necessary to provide a telescopic connector as a node connection structure between the glass curtain wall and the main body of the building, which can meet the requirements of freedom release as well as energy storage and recovery capabilities. Summary of the invention

[0006] The object of the present invention is to provide a node connection device between a curtain wall structure and a building main body, which can absorb external load energy and release energy after the external load disappears, thereby restoring the initial state of the building curtain wall and maintaining the beauty of the building facade.

[0007] To achieve the above-mentioned purpose, the present invention provides a node connection device between a curtain wall structure and a building body, the node connection device comprising a first ear plate, a second ear plate, an outer sleeve, an inner sleeve, a guide rod, a first elastic member, a second elastic member and a lifting plate; the outer sleeve is a hollow shell with an opening at one end and a closed end; the first ear plate is fixed to the outer wall of the bottom surface of the outer sleeve at the other end away from the opening, one end of the guide rod is fixed to the inner wall of the bottom surface of the outer sleeve at the other end close to the opening, and the other end of the guide rod is a free end; the inner sleeve is a hollow shell with openings at both ends, and comprises a first elastic member and a second elastic member; the second elastic member and a lifting plate ... inner wall of the bottom surface of the outer sleeve at the other end The guide rod has a first opening on one end surface, a second opening on the second end surface, and a hollow chamber located inside the inner sleeve and connecting the first opening and the second opening; the opening of the outer sleeve is sleeved on the inner sleeve so that the guide rod passes through the first opening, and the free end of the guide rod is located in the hollow chamber of the inner sleeve with a gap between the guide rod and the second opening; the guide rod is provided with a first positioning preload and a second positioning preload, and the second positioning preload is provided at the end of the guide rod close to its free end; the guide rod is sleeved with a The first elastic member, the second elastic member is sleeved on the guide rod between the first positioning preload member and the second positioning preload member; one end of the lifting plate is arranged between the second elastic member and the second positioning preload member, and is connected to the second elastic member, one end of the second ear plate is fixed to the other end of the lifting plate through the second opening, and the other end of the second ear plate is located outside the hollow chamber; the first positioning preload member, the second positioning preload member, the first elastic member, the second elastic member and the lifting plate are all located in the hollow chamber of the inner sleeve; the first ear plate is used to The building body is pin-connected; the second ear plate is used to be pin-connected to the curtain wall structure; when the second ear plate is stretched, the inner sleeve is configured to move along a first vector direction, and the first end face of the inner sleeve is used to cooperate with the first positioning preload to compress the first elastic member; when the second ear plate is compressed, the lifting plate is configured to move along a second vector direction, and the lifting plate is used to cooperate with the first positioning preload to compress the second elastic member; the first vector direction is the direction from the first ear plate to the second ear plate, and the second vector direction is opposite to the first vector direction.

[0008] Furthermore, the guide rod is a threaded shaft, the first positioning preload member is a first positioning preload nut threadedly connected to the guide rod, and the second positioning preload member is a second positioning preload nut threadedly connected to the free end of the guide rod.

[0009] Furthermore, the first elastic member includes a first disc spring, and the first positioning pre-tightening nut is used to cooperate with the first end face of the inner sleeve to pre-tighten the first disc spring; the second elastic member includes a second disc spring, and the second positioning pre-tightening nut is used to cooperate with the lifting plate and the first positioning pre-tightening nut to pre-tighten the second disc spring.

[0010] Further, the lifting plate includes a cylindrical portion with openings at both ends and a top plate; the cylindrical portion includes a bottom plate with a third opening and an annular side plate vertically connected to the bottom plate; the bottom plate and the annular side plate enclose the cylindrical portion with openings at both ends, and the openings at both ends of the cylindrical portion are the third opening and a fourth opening opposite to the third opening respectively; the free end of the guide rod passes through the third opening so that the second positioning pre-tightening nut and the free end of the guide rod are both located in the cavity of the cylindrical portion, and the bottom plate is located between the second positioning pre-tightening nut and the second disc spring, and is connected to the second disc spring; one side of the top plate includes an annular buckle portion near its edge, and the shape of the buckle portion matches the shape of the fourth opening, the top plate is snapped into the fourth opening of the cylindrical portion through the buckle portion, and the cylindrical portion and the buckle portion of the top plate can slide relative to each other along the axial direction of the cylindrical portion; one end of the second ear plate passes through the second opening and is fixed to the other side of the top plate; a gap is left between the free end of the guide rod and the top plate.

[0011] Furthermore, a friction reducing member is provided between the outer wall of the inner sleeve and the inner wall of the outer sleeve.

[0012] Furthermore, the inner sleeve and the outer sleeve are both cylindrical shell sleeves.

[0013] Furthermore, a groove is provided on the outer wall of the first end face of the inner sleeve, and a sealing ring is embedded therein, and a groove is also provided on the other side of the top plate, and a sealing ring is embedded therein.

[0014] Furthermore, the length of the outer sleeve in the extension direction is smaller than the length of the inner sleeve in the extension direction, and is larger than the compression amount of the first disc spring.

[0015] In summary, the present invention provides a node connection device between a curtain wall structure and a building main body, which is used to protect the curtain wall structure. Regardless of whether the curtain wall structure is under tension or compression, energy storage is achieved by compressing the elastic member inside the node connection device, and when the external force interference factor of the curtain wall structure is reduced or disappears, the curtain wall structure can be restored to its original state during the resetting process of the compressed elastic member. In addition, since the ear plates at both ends of the node connection device are respectively connected to the building main body and the curtain wall structure through a pin shaft, a chain rod effect can be achieved, thereby achieving a rotation effect. When the curtain wall structure is subjected to vertical loads or temperature, the side connected to the curtain wall structure can rotate around the side connected to the building main body, thereby achieving the effect of releasing internal forces. In this way, the effect of simultaneously releasing the rotational freedom and translational freedom in the plane is achieved.

[0016] The present invention uses the node connection device to make the curtain wall structure deform greatly when subjected to external loads. On the one hand, it can reduce the restraining effect of the curtain wall structure on the main body of the building and improve the ability of the curtain wall structure to adapt to structural deformation; on the other hand, it can reduce the additional internal force in the curtain wall structure and improve the safety of the curtain wall structure. In addition, the device can absorb the energy of the external force, release the energy after the external load disappears, and restore the curtain wall to its initial position, thereby maintaining the beauty of the building facade. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 A schematic diagram of a node connection device between a curtain wall structure and a building body provided in Embodiment 1 of the present invention.

[0018] Figure 2 This is a schematic diagram of the node connection structure between the curtain wall structure and the building main body provided in the second embodiment of the present invention.

[0019] Figure 3 A schematic diagram of a node connection device between a curtain wall structure and a building main body under pressure provided in Example 1 of the present invention.

[0020] Figure 4 A schematic diagram of a tension-bearing node connection device between a curtain wall structure and a building main body provided in Embodiment 1 of the present invention.

[0021] The reference numerals are described as follows:

[0022] 10-first ear plate, 20-outer sleeve, 30-inner sleeve, 31-friction reducing member, 32-sealing ring, 40-second ear plate, 50-guide rod, 51-first elastic member, 52-second elastic member, 53-first positioning pre-tightening member, 54-second positioning pre-tightening member, 60-lifting plate, 100-building body, 200-curtain wall structure. DETAILED DESCRIPTION

[0023] The specific implementation of the present invention will be described in more detail below in conjunction with the schematic diagram. The advantages and features of the present invention will become clearer based on the following description. It should be noted that the drawings are all in a very simplified form and are not in exact proportions, and are only used to facilitate and clearly assist in explaining the purpose of the embodiments of the present invention.

[0024] In the description of the present invention, it is necessary to understand that the terms "center", "up", "down", "left", "right", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0025] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0026] Figure 1 and Figure 2The present invention is a schematic diagram of a node connection device between a curtain wall structure and a building main body. The node connection device between a curtain wall structure and a building main body provided in this embodiment includes a first ear plate 10, a second ear plate 40, an outer sleeve 20, an inner sleeve 30, a guide rod 50, a first elastic member 51, a second elastic member 52 and a lifting plate 60; the outer sleeve 20 is a hollow shell with an opening at one end and a closed end at the other end, the first ear plate 10 is fixed to the outer wall of the bottom surface of the outer sleeve 20 at the other end away from the opening, one end of the guide rod 50 is fixed to the inner wall of the bottom surface of the outer sleeve 20 at the other end close to the opening, and the other end of the guide rod 50 is a free end; the inner sleeve 30 is a hollow shell with openings at both ends. , which includes a first opening opened on the first end face, a second opening opened on the second end face, and a hollow chamber located inside the inner sleeve 30 and communicating with the first opening and the second opening; the opening of the outer sleeve 20 is sleeved on the inner sleeve 30 so that the guide rod 50 passes through the first opening, and the free end of the guide rod 50 is located in the hollow chamber of the inner sleeve 30, with a gap between the second opening; a first positioning pre-tightening member 53 and a second positioning pre-tightening member 54 are provided on the guide rod 50, and the second positioning pre-tightening member 54 is provided at the end of the guide rod 50 close to its free end; a first positioning pre-tightening member 53 is sleeved on the guide rod 50 between the first positioning pre-tightening member 53 and the first end face The first elastic member 51 is provided, and the second elastic member 52 is sleeved on the guide rod 50 between the first positioning preload member 53 and the second positioning preload member 54; one end of the lifting plate 60 is arranged between the second elastic member 52 and the second positioning preload member 53, and is connected to the second elastic member 52, one end of the second ear plate 40 is fixed to the other end of the lifting plate 60 through the second opening, and the other end of the second ear plate 40 is located outside the hollow chamber; the first positioning preload member 53, the second positioning preload member 54, the first elastic member 51, the second elastic member 52 and the lifting plate 60 are all located in the hollow chamber of the inner sleeve 30; the first The ear plate 10 is used to be connected to the pin shaft of the building body; the second ear plate 40 is used to be connected to the pin shaft of the curtain wall structure; when the second ear plate 40 is stretched by force, the inner sleeve 30 is configured to be movable along a first vector direction, and the first end surface of the inner sleeve 30 is used to cooperate with the first positioning preload 53 to compress the first elastic member 51; when the second ear plate 40 is compressed by force, the lifting plate 60 is configured to be movable along a second vector direction, and the lifting plate 60 is used to cooperate with the first positioning preload 51 to compress the second elastic member 52; the first vector direction is the direction from the first ear plate 10 to the second ear plate 40, and the second vector direction is opposite to the first vector direction.

[0027] When the node connection device between the curtain wall structure and the building main body provided by the present invention is implemented, refer to Figure 3 When the curtain wall structure is under pressure, the second ear plate 40 connected to the curtain wall structure will be under pressure. At this time, the second ear plate 40 will drive the jacking plate 60 connected thereto to move along the second vector direction. The jacking plate 60 cooperates with the first positioning preload member 51 to compress the second elastic member 52, so that the second elastic member 52 is in the compression energy storage stage, and due to the existence of the first positioning preload member 53, it will not affect the first elastic member 51. When the second elastic member 52 enters the compression limit state, the curtain wall structure no longer deforms, and the pressure that cannot be released is transmitted to the main structure of the building through the guide rod. When the pressure on the curtain wall structure side decreases or even disappears, the second elastic member 52 releases the energy absorbed before, so that the curtain wall structure returns to its original state.

[0028] See also Figure 4 When the curtain wall structure side is pulled, the second ear plate 40 connected to the curtain wall structure will be pulled, thereby driving the other end of the lifting plate 60 connected to the second ear plate 40 to move along the first vector direction. When the other end of the lifting plate 60 moves, it will drive the inner sleeve 30 to move along the first vector direction. At this time, the first end surface of the inner sleeve 30 will cooperate with the first positioning preload 53 to compress the first elastic member 51, and make the first elastic member 51 in the compression energy storage stage. Similarly, due to the existence of the first positioning preload 53, it will not affect the second elastic member 52. When the first elastic member 51 enters the compression limit state, the curtain wall structure no longer deforms, and the pressure that cannot be released is transmitted to the main structure of the building through the guide rod. When the pressure on the curtain wall structure side decreases or even disappears, the first elastic member 51 releases the energy absorbed before, so that the curtain wall structure returns to its original state.

[0029] In addition, after the first ear plate 10 and the second ear plate 40 are respectively connected to the building body 100 and the curtain wall structure 200 through a pin shaft, a chain rod effect can be achieved to realize a rotation effect. When the curtain wall structure 200 is subjected to vertical load or temperature, the side connected to the curtain wall structure 200 can rotate around the side connected to the building body, thereby achieving the effect of releasing internal force.

[0030] In addition, as described above, the guide rod 50 can adopt a threaded shaft, the first positioning pre-tightening member 53 is a first positioning pre-tightening nut threadedly connected to the guide rod 50, and the second positioning pre-tightening member 54 is a second positioning pre-tightening nut threadedly connected to the free end of the guide rod 50. The first elastic member 51 includes a first disc spring, and the first positioning pre-tightening nut is used to cooperate with the first end face of the inner sleeve 30 to compress and pre-tighten the first disc spring, thereby applying a pre-tightening force to the first disc spring, thereby ensuring the normal operation of the disc spring. In specific operations, the pre-tightening force can be applied to the disc spring by adjusting the threaded connection position of the first positioning pre-tightening nut on the guide rod 50; similarly, the second elastic member 52 includes a second disc spring, and the second positioning pre-tightening nut is used to cooperate with the lifting plate 60 and the first positioning pre-tightening nut to pre-tighten the second disc spring.

[0031] Preferably, the lifting plate 60 includes a cylindrical portion with openings at both ends and a top plate; the cylindrical portion includes a bottom plate with a third opening and an annular side plate vertically connected to the bottom plate; the bottom plate and the annular side plate enclose the cylindrical portion with openings at both ends, and the openings at both ends of the cylindrical portion are the third opening and a fourth opening opposite to the third opening respectively; the free end of the guide rod 50 passes through the third opening so that the second positioning pre-tightening nut and the free end of the guide rod 50 are both located in the cavity of the cylindrical portion, and the bottom plate is located between the second positioning pre-tightening nut and the second disc-shaped spring springs and is connected to the second disc spring; one side of the top plate includes an annular snap-in portion near its edge, the shape of the snap-in portion matches the shape of the fourth opening, the top plate is snapped into the fourth opening of the cylindrical portion through the snap-in portion, and the cylindrical portion and the snap-in portion of the top plate can slide relative to each other along the axial direction of the cylindrical portion; one end of the second ear plate 40 passes through the second opening and is fixed to the other side of the top plate; a gap is left between the free end of the guide rod 50 and the top plate, and the gap is used as a movement space when the lifting plate 60 and the second disc spring are compressed.

[0032] Furthermore, the outer sleeve 20 and the inner sleeve 30 are generally cylindrical shell sleeves, and from the perspective of saving materials, the length of the outer sleeve 20 in the extension direction is smaller than the length of the inner sleeve 30 in the extension direction. In addition, the length of the outer sleeve 20 in the extension direction also needs to be greater than the compression amount of the first disc spring to prevent the inner sleeve 30 from slipping out of the outer sleeve 20 due to the compression of the first disc spring when the curtain wall structure is pulled.

[0033] Preferably, see Figure 1A friction reducing member 31 is also provided on the gap between the outer sleeve 20 and the inner sleeve 30 . The friction reducing member 31 is made of a friction reducing material and can reduce the friction force when the outer sleeve 20 and the inner sleeve 30 slide relative to each other.

[0034] Furthermore, a groove is provided on the outer wall of the first end face of the inner sleeve 30, and a sealing ring is embedded therein, and a groove is also provided on the other side of the top plate of the jacking plate and a sealing ring is embedded therein, thereby improving the sealing performance of the node connection device in the initial state and preventing water from corroding the internal elastic parts. Of course, those skilled in the art know that the position of the groove of the sealing ring is not limited to the above-mentioned method, and a groove can also be provided on the surface where the outer sleeve 20 is connected to the inner sleeve 30 to embed the sealing ring, or a groove can be provided on the surface where the inner sleeve 30 contacts the top plate to embed the sealing ring.

[0035] In summary, the present invention provides a node connection device between a curtain wall structure and a building main body, which is used to protect the curtain wall structure. Regardless of whether the curtain wall structure is under tension or compression, energy storage is achieved by compressing the elastic member inside the node connection device, and when the external force interference factor of the curtain wall structure is reduced or disappears, the curtain wall structure can be restored to its original state during the resetting process of the compressed elastic member. In addition, since the ear plates at both ends of the node connection device are respectively connected to the building main body and the curtain wall structure through a pin shaft, a chain rod effect can be achieved, thereby achieving a rotation effect. When the curtain wall structure is subjected to vertical loads or temperature, the side connected to the curtain wall structure can rotate around the side connected to the building main body, thereby achieving the effect of releasing internal forces. In this way, the effect of simultaneously releasing the rotational freedom and translational freedom in the plane is achieved.

[0036] The present invention uses the node connection device to make the curtain wall structure deform greatly when subjected to external loads. On the one hand, it can reduce the restraining effect of the curtain wall structure on the main body of the building and improve the ability of the curtain wall structure to adapt to structural deformation; on the other hand, it can reduce the additional internal force in the curtain wall structure and improve the safety of the curtain wall structure. In addition, the device can absorb the energy of the external force, release the energy after the external load disappears, and restore the curtain wall to its initial position, thereby maintaining the beauty of the building facade.

[0037] The above is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any technician in the relevant technical field, without departing from the scope of the technical solution of the present invention, makes any form of equivalent replacement or modification to the technical solution and technical content disclosed in the present invention, which does not depart from the content of the technical solution of the present invention and still falls within the protection scope of the present invention.

Claims

1. A node connection device between a curtain wall structure and a building main body, characterized in that: The node connection device includes a first ear plate, a second ear plate, an outer sleeve, an inner sleeve, a guide rod, a first elastic member, a second elastic member and a lifting plate; The outer sleeve is a hollow shell with one end open and the other end closed, the first ear plate is fixed to the outer wall of the bottom surface of the outer sleeve away from the opening at the other end, one end of the guide rod is fixed to the inner wall of the bottom surface of the outer sleeve close to the opening at the other end, and the other end of the guide rod is a free end; The inner sleeve is a hollow shell with openings at both ends, comprising a first opening on a first end surface, a second opening on a second end surface, and a hollow chamber located inside the inner sleeve and communicating with the first opening and the second opening; The opening of the outer sleeve is sleeved on the inner sleeve so that the guide rod passes through the first opening, and the free end of the guide rod is located in the hollow chamber of the inner sleeve with a gap between the free end and the second opening; The guide rod is provided with a first positioning pre-tightening member and a second positioning pre-tightening member, the second positioning pre-tightening member is provided at the end of the guide rod close to the free end thereof; the first elastic member is sleeved on the guide rod between the first positioning pre-tightening member and the first end surface, and the second elastic member is sleeved on the guide rod between the first positioning pre-tightening member and the second positioning pre-tightening member; One end of the lifting plate is disposed between the second elastic member and the second positioning pre-tightening member and is connected to the second elastic member, one end of the second ear plate passes through the second opening and is fixed to the other end of the lifting plate, and the other end of the second ear plate is located outside the hollow cavity; The first positioning pre-tightening member, the second positioning pre-tightening member, the first elastic member, the second elastic member and the lifting plate are all located in the hollow chamber of the inner sleeve; The first ear plate is used to be connected to the building main body with a pin; the second ear plate is used to be connected to the curtain wall structure with a pin; When the second ear plate is subjected to tension, the inner sleeve is configured to move along a first vector direction, and the first end surface of the inner sleeve is used to cooperate with the first positioning preload to compress the first elastic member; when the second ear plate is subjected to compression, the lifting plate is configured to move along a second vector direction, and the lifting plate is used to cooperate with the first positioning preload to compress the second elastic member; The first vector direction is a direction from the first ear plate to the second ear plate, and the second vector direction is opposite to the first vector direction.

2. A node connection device between a curtain wall structure and a building main body according to claim 1, characterized in that: The guide rod is a threaded shaft, the first positioning pre-tightening member is a first positioning pre-tightening nut threadedly connected to the guide rod, and the second positioning pre-tightening member is a second positioning pre-tightening nut threadedly connected to the free end of the guide rod.

3. A node connection device between a curtain wall structure and a building main body according to claim 2, characterized in that: The first elastic member includes a first disc spring, and the first positioning pre-tightening nut is used to cooperate with the first end surface of the inner sleeve to pre-tighten the first disc spring; The second elastic member includes a second disc spring, and the second positioning pre-tightening nut is used to cooperate with the lifting plate and the first positioning pre-tightening nut to pre-tighten the second disc spring.

4. A node connection device between a curtain wall structure and a building main body according to claim 3, characterized in that: The jacking plate includes a cylindrical portion with openings at both ends and a top plate; The cylindrical portion includes a bottom plate having a third opening and an annular side plate vertically connected to the bottom plate; the bottom plate and the annular side plate enclose the cylindrical portion to form a cylindrical portion with openings at both ends, and the openings at both ends of the cylindrical portion are the third opening and a fourth opening opposite to the third opening respectively; The free end of the guide rod passes through the third opening so that the second positioning pre-tightening nut and the free end of the guide rod are both located in the cavity of the cylindrical portion, and the bottom plate is located between the second positioning pre-tightening nut and the second disc spring and is connected to the second disc spring; One side of the top plate includes an annular snap-fit ​​portion near its edge, the shape of the snap-fit ​​portion matching the shape of the fourth opening. The top plate is snap-fitted into the fourth opening of the cylindrical portion via the snap-fit ​​portion, and the cylindrical portion and the snap-fit ​​portion of the top plate are relatively slidable along the axial direction of the cylindrical portion. One end of the second ear plate passes through the second opening and is fixed to the other side of the top plate. A gap is left between the free end of the guide rod and the top plate.

5. The node connection device between a curtain wall structure and a building main body according to claim 4, characterized in that: A friction reducing member is provided between the outer wall of the inner sleeve and the inner wall of the outer sleeve.

6. The node connection device between a curtain wall structure and a building main body according to claim 5, characterized in that: The inner sleeve and the outer sleeve are both cylindrical shell sleeves.

7. The node connection device between a curtain wall structure and a building main body according to claim 6, characterized in that: A groove is provided on the outer wall of the first end face of the inner sleeve and a sealing ring is embedded therein. A groove is also provided on the other side of the top plate and a sealing ring is embedded therein.

8. The node connection device between a curtain wall structure and a building main body according to claim 7, characterized in that: The length of the outer sleeve in the extending direction is smaller than the length of the inner sleeve in the extending direction and is larger than the compression amount of the first disc spring.