A sewage interception, storage and drainage system and drainage control method thereof

By installing diversion and storage facilities on municipal combined sewer lines and combining them with a control system, the problems of construction difficulty and high cost in converting combined sewer systems into separate sewer systems have been solved. This has enabled the separation of clean and dirty water and the control of water pollution, thus improving the efficient operation of the drainage system.

CN111749317BActive Publication Date: 2024-11-08高小平
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910239345.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-03-27
Publication Date
2024-11-08
Estimated Expiration
2039-03-27

AI Technical Summary

Technical Problem

Converting existing combined sewer systems into separate sewer systems presents challenges in terms of construction difficulty and cost, and both direct discharge and interception drainage systems can lead to water pollution.

Method used

A sewage interception and storage drainage system is adopted. By setting up diversion and storage facilities on the municipal combined sewer line and combining them with a control system, including monitoring devices and controllers, the direction and flow rate of water are controlled according to parameters such as rainfall, intensity, flow rate and liquid level to achieve separation of clean and sewage.

Benefits of technology

By reducing urban construction and excavation, the system achieves separation of clean water and sewage, reduces construction difficulty and costs, effectively handles combined rainwater and sewage flow, rationally controls water discharge, and improves the efficient operation of the drainage system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111749317B_ABST
    Figure CN111749317B_ABST
Patent Text Reader

Abstract

The present invention provides a sewage interception, regulation and storage drainage system and a drainage control method thereof, wherein the sewage interception, regulation and storage drainage system realizes clean and dirty water diversion treatment while minimizing construction and excavation in urban areas; it can also solve the problem that rainwater and sewage mixed flow cannot be treated due to the fact that domestic sewage and rainwater diversion treatment has not been adopted in urban areas for a long time; moreover, a special control method is designed for the drainage system, and the control method can realize efficient and effective operation of the system. In addition, reasonable control is carried out for different rainfalls, and based on the system, the discharge, transportation and treatment of clean water and dirty water in different time periods are realized through only one pipeline, which greatly reduces the construction difficulty, saves construction costs, and realizes efficient clean and dirty water diversion.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of drainage systems, and in particular relates to a sewage interception and storage drainage system and a drainage control method thereof. Background Art

[0002] A direct-discharge combined sewer system means that the end of the municipal combined pipe discharges directly into natural water bodies, and domestic sewage and rainwater seriously pollute the water environment.

[0003] An interception-type combined sewer system refers to an existing combined sewer system that usually has an interception facility built in front of the sewage treatment plant at the end of the pipeline network. One outlet of the interception facility is connected to the sewage treatment plant, and the other outlet is connected to the natural water body. On sunny days, sewage enters the sewage treatment plant, and on rainy days, a large amount of rainwater mixed with domestic sewage enters the natural water body, causing serious water pollution.

[0004] Although the transformation of the combined sewer system into a separate sewer system can solve the problem of water pollution caused by the combined sewer network by separating rainwater and sewage, it is difficult to successfully transform due to the difficulty of construction and high cost. The transformation of the combined sewer system into a clean and sewage separation system also has the problems of difficulty of construction and high cost. Summary of the invention

[0005] In order to improve the deficiencies of the prior art, the present invention provides a drainage system comprising a municipal combined pipe, a plurality of access branch pipes, a plurality of diversion facilities, a plurality of regulating and storing facilities, and a sewage treatment facility.

[0006] Several diversion facilities are set up along the municipal combined pipe. Assuming that n diversion facilities are set up, the first diversion facility, the second diversion facility, ..., the nth diversion facility are recorded from the upstream of the municipal combined pipe.

[0007] The plurality of access branch pipes are respectively connected to the municipal confluence pipe;

[0008] The diversion facility includes a water inlet, a first water outlet, and a second water outlet, wherein:

[0009] The diversion facility near the sewage treatment facility, i.e., the nth diversion facility, further includes a third water outlet, a water inlet of which is connected to the end of the municipal combined pipe, a first water outlet of which is connected to the regulating and storage facility, a second water outlet of which is connected to the sewage treatment facility, and a third water outlet of which is connected to a natural water body;

[0010] In each diversion facility upstream of the nth diversion facility, its water inlet is connected to the municipal confluence pipe upstream thereof, its first water outlet is connected to the regulating and storage facility, and its second water outlet is connected to the municipal confluence pipe downstream thereof;

[0011] The number of the diversion facilities is set according to the total catchment area of ​​the municipal combining pipe connected to it. The catchment area corresponding to each diversion facility is 0.01-1 square kilometers, wherein the catchment area corresponding to the diversion facility refers to the catchment area of ​​the municipal combining pipe connected to it between a diversion facility near the upstream end of the municipal combining pipe and the upstream end of the municipal combining pipe, or the catchment area of ​​the municipal combining pipe connected to it between two diversion facilities.

[0012] According to the present invention, the access branch pipe is a combined branch pipe, a separate rainwater branch pipe or a separate sewage branch pipe.

[0013] According to the present invention, when a plurality of regulating and storing facilities are provided, one diversion facility is connected to one regulating and storing facility, or a plurality of diversion facilities are connected to one regulating and storing facility, or a diversion facility is connected to a plurality of regulating and storing facilities.

[0014] According to the present invention, each diversion facility corresponds to a catchment area of ​​0.02-0.8 square kilometers, such as 0.03-0.6 square kilometers.

[0015] According to the present invention, the diversion facility is selected from a diversion well, a discarding well or an intercepting well.

[0016] According to the present invention, the storage facility is selected from a storage tank, a box culvert or a pipe culvert.

[0017] According to the present invention, the sewage treatment facility is selected from a sewage treatment plant or an integrated treatment facility.

[0018] According to the present invention, a first hydraulic switch is arranged near the first water outlet to control the opening and closing of the first water outlet; a second hydraulic switch is arranged near the second water outlet to control the flow of the second water outlet; and a third hydraulic switch is arranged near the third water outlet to control the opening and closing of the third water outlet.

[0019] According to the present invention, the drainage system also includes a control system, which includes a controller and several monitoring devices. The monitoring devices are used to monitor various parameters required for the operation of the drainage system, such as rainfall, rainfall time, rainfall intensity, flow in the pipeline, liquid level in the diversion facility, etc.; the controller is respectively connected to the monitoring device, the first hydraulic switch, the second hydraulic switch and the third hydraulic switch, and the controller is used to control the action of the first hydraulic switch, the second hydraulic switch and the third hydraulic switch according to the parameters monitored by the monitoring device.

[0020] According to the present invention, the monitoring device includes a device for monitoring rainfall, such as a rain gauge, and the rain gauge is, for example, a weighing rain gauge, a tipping bucket rain gauge or a siphon rain gauge known in the art; for example, a rain gauge of model RS-100 produced by Tianxing Zhilian Company is selected; the device for monitoring rainfall is set at any position in the drainage system, and the controller is respectively connected to the device for monitoring rainfall, the first hydraulic switch, the second hydraulic switch and the third hydraulic switch, and the controller is used to control the operation of the first hydraulic switch, the second hydraulic switch and the third hydraulic switch according to the rainfall monitored by the device for monitoring rainfall. In the present invention, it is assumed that the rainfall at each position is basically the same, so it is only necessary to set a device for monitoring rainfall at any position in the drainage system.

[0021] According to the present invention, the monitoring device also includes several flow rate monitoring devices, and the flow rate monitoring devices are respectively arranged at the second water outlets near each diversion facility, and the controller is respectively connected to the flow rate monitoring devices near the second water outlets of each diversion facility and the second hydraulic switches in each diversion facility, and the controller is used to control the action of the second hydraulic switch at the second water outlet of the corresponding diversion facility according to the flow rate value monitored by the flow rate monitoring device, so as to realize flow control through the second water outlet. Wherein, the flow rate monitoring device is a flow meter, or a liquid level meter. The liquid level meter is, for example, selected from the HG5 type glass tube liquid level meter.

[0022] According to the present invention, the monitoring device also includes a device for monitoring time, such as a timer, such as an intelligent digital timer selected from model H12612; the device for monitoring time is set at any position in the drainage system. The purpose of setting the device for monitoring time is to monitor the rainfall time; and to monitor the rainfall intensity together with the device for monitoring rainfall. For example, the controller is respectively connected to the device for monitoring rainfall, the device for monitoring time, the first hydraulic switch, the second hydraulic switch and the third hydraulic switch, and the controller is used to obtain the monitored rainfall intensity according to the monitored rainfall and the monitored time, and control the first hydraulic switch, the second hydraulic switch and the third hydraulic switch to operate.

[0023] According to the present invention, the monitoring device also includes a plurality of devices for monitoring liquid levels, such as a liquid level gauge. The liquid level gauge is, for example, a HG5 type glass tube liquid level gauge. The plurality of devices for monitoring liquid levels are arranged in each diversion facility, and the purpose of arranging the plurality of devices for monitoring liquid levels is to monitor the liquid level in the corresponding diversion facility. The controller is respectively connected to the devices for monitoring liquid levels of each diversion facility and the first hydraulic switch in each diversion facility, and the controller is used to control the action of the first hydraulic switch at the first water outlet of the corresponding diversion facility according to the liquid level value monitored by the device for monitoring liquid levels, so as to realize the opening or closing control of the storage facility.

[0024] The present invention also provides a control method for the above sewage interception, storage and drainage system, and the method includes the following steps:

[0025] Set a rainfall threshold L0, a rainfall intensity threshold I0, a flow threshold Q of the second water outlet of each diversion facility 0i , and a liquid level threshold H in each diversion facility 0i ;

[0026] The rainfall L continuously monitored by the device for monitoring rainfall, the rainfall intensity value I jointly monitored by the device for monitoring rainfall and the device for monitoring time, the flow value Q continuously monitored by the device for monitoring the flow of each diversion facility i , and the liquid level value H continuously monitored by the device for monitoring the liquid level of each diversion facility i , where 1 ≤ i ≤ n;

[0027] The first judgment condition is that when I > I0 and L > L0, the first water control switch of the nth diversion facility is closed, the second water control switch is closed, and the third water control switch is opened, and the water in the municipal combined sewer is conveyed to the natural water body, and the first water control switches of other diversion facilities are closed, and the second water control switches are opened, and the water in the diversion facilities is diverted to the downstream municipal combined sewer;

[0028] The second judgment condition is that when I > I0 and L ≤ L0 or when I ≤ I0, the control methods of each diversion facility are as follows

[0029] If Q i ≤ Q 0i , when i = n, then control the first water control switch of the nth diversion facility to be closed, the second water control switch to be opened, and the third water control switch to be closed, and convey the water in the nth diversion facility to the sewage treatment facility for treatment; when 1 ≤ i < n, then control the first water control switch of the ith diversion facility to be closed, and the second water control switch to be opened, and convey the water in the municipal combined sewer to the downstream municipal combined sewer of the ith diversion facility

[0030] If Q i > Q 0i , the steps are as follows:

[0031] S1, when i = n, then control the first water control switch of the nth diversion facility to be closed, the second water control switch to perform flow limiting treatment, and the third water control switch to be closed, and convey the water in the nth diversion facility to the sewage treatment facility for treatment; when 1 ≤ i < n, then control the second water control switch of the ith diversion facility to perform flow limiting treatment, and convey the water in the municipal combined sewer to the downstream municipal combined sewer of the ith diversion facility at a certain flow rate;

[0032] S2, when the water level height H of the water body in the ith diversion facility i ≥ H 0i, then the first hydraulic switch at the first water outlet in the i-th diversion facility is turned on to transport part of the water in the municipal combined pipe to the regulating and storage facility connected to the i-th diversion facility.

[0033] Furthermore, a threshold value T0 of the interval between two rain showers is set, and the time monitoring device monitors the interval T between the two rain showers in real time. The first judgment condition is when I>I0 and L>L0 or I>I0 and L≤L0 and T≤T0, and the second judgment condition is when I>I0 and L≤L0 and T>T0 or when I≤I0.

[0034] According to the present invention, in the above steps, the maximum flow that the sewage treatment facility can handle is Q, assuming that the catchment area of ​​the municipal combined pipe connected is S, and the catchment area corresponding to the i-th diversion facility is S i , i=1,2,...,n, the flow threshold Q of the i-th diversion facility 0i =(S1+…+S i ) / S×Q.

[0035] Specifically,

[0036] Q 01 =S1 / S×Q,

[0037] Q 02 =(S1+S2) / S×Q,

[0038] Q 03 =(S1+S2+S3) / S×Q,

[0039] ...,

[0040] Q 0i =(S1+…+S i ) / S×Q,

[0041] ...,

[0042] Q 0n =(S1+S2+S3+…+S n ) / S×Q.

[0043] Beneficial effects of the present invention:

[0044] The present invention provides a sewage interception, regulation and drainage system, which realizes the separation of clean and dirty water while minimizing construction and excavation in urban areas; it can also solve the problem that the mixed flow of rainwater and sewage cannot be treated due to the lack of separation of domestic sewage and rainwater in urban areas for a long time; moreover, a special control method is designed for the drainage system, and the control method can realize efficient and effective operation of the system. In addition, reasonable control is carried out on different rainfalls. Based on the system, the discharge, transportation and treatment of clean water and dirty water in different time periods are realized through only one pipeline, which greatly reduces the construction difficulty, saves construction costs, and realizes efficient separation of clean and dirty water.

[0045] In the present invention, the regulating and storage facilities are arranged in the urban area. The regulating and storage facilities are arranged according to the constructible area of ​​the urban area. Multiple diversion facilities can be connected to one regulating and storage facility, or multiple regulating and storage facilities can be connected with diversion facilities. The regulating and storage facilities are designed in a dispersed manner to reasonably utilize the available space in the urban area. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 This is a schematic structural diagram of a drainage system according to a preferred embodiment of the present invention.

[0047] The reference numerals in the drawings are as follows:

[0048] 1 is the municipal combined pipe; 2 is the diversion facility; 3 is the access branch pipe; 4 is the regulation and storage facility; 5 is the sewage treatment facility; 6 is the natural water body. DETAILED DESCRIPTION

[0049] The preparation method of the present invention will be described in further detail below in conjunction with specific examples. It should be understood that the following examples are only exemplary illustrations and explanations of the present invention and should not be construed as limiting the scope of protection of the present invention. All technologies implemented based on the above content of the present invention are included in the scope that the present invention is intended to protect.

[0050] Unless otherwise specified, the experimental methods used in the following examples are all conventional methods; the reagents, materials, etc. used in the following examples, unless otherwise specified, can be obtained from commercial channels.

[0051] In the description of the present invention, it should be noted that the terms "first", "second", "third", etc. are only used for descriptive purposes, and do not indicate or imply relative importance.

[0052] In the description of the present invention, it should be noted that the "upstream" and "downstream" are relative, and are defined according to the direction of water flow in the municipal combined pipe, that is, the water flows from the upstream end to the downstream end.

[0053] In the description of the present invention, it should be noted that the “several” mentioned refers to at least one.

[0054] Example 1

[0055] like Figure 1 As shown, the present invention provides a sewage interception, storage and drainage system, the drainage system includes a municipal combined pipe 1, a plurality of access branch pipes 3, n diversion facilities 2, n storage facilities 4 and sewage treatment facilities 5,

[0056] n diversion facilities are arranged along the municipal combined pipe, wherein the n diversion facilities are sequentially named the first diversion facility, the second diversion facility, ..., the nth diversion facility from the upstream of the municipal combined pipe; the n regulating and storage facilities are respectively connected to the first diversion facility, the second diversion facility, ..., the nth diversion facility;

[0057] The access branch pipes are respectively connected to the municipal confluence pipes;

[0058] The diversion facility includes a water inlet, a first water outlet, and a second water outlet, wherein:

[0059] The diversion facility near the sewage treatment facility, i.e., the nth diversion facility, further includes a third water outlet, whose water inlet is connected to the end of the municipal combined pipe, whose first water outlet is connected to the regulating and storage facility, whose second water outlet is connected to the sewage treatment facility, and whose third water outlet is connected to the natural water body 6;

[0060] In each diversion facility upstream of the nth diversion facility, its water inlet is connected to the municipal confluence pipe upstream thereof, its first water outlet is connected to the regulating and storage facility, and its second water outlet is connected to the municipal confluence pipe downstream thereof;

[0061] The number of diversion facilities is set according to the total catchment area of ​​the municipal combined pipe connected, and the catchment area corresponding to each diversion facility is 0.01-1 square kilometers, wherein the catchment area corresponding to the diversion facility refers to the catchment area of ​​the municipal combined pipe connected between a diversion facility near the upstream end of the municipal combined pipe and the upstream end of the municipal combined pipe, or the catchment area of ​​the municipal combined pipe connected between two diversion facilities;

[0062] The access branch pipe is a combined branch pipe, a split-flow rainwater branch pipe or a split-flow sewage branch pipe;

[0063] A first hydraulic switch is arranged near the first water outlet to control the opening and closing of the first water outlet; a second hydraulic switch is arranged near the second water outlet to control the flow of the second water outlet; a third hydraulic switch is arranged near the third water outlet to control the opening and closing of the third water outlet. The first hydraulic switch, the second hydraulic switch and the third hydraulic switch can be devices of the type of lower opening weir gate, flow control gate, pneumatic pipe clamp valve or rotary weir gate. Taking the lower opening weir gate as an example, the lower opening weir gate is opened when the door plate of the lower opening weir gate moves downward, and the water flow of the outlet where the lower opening weir gate is located is the largest; the lower opening weir gate is closed when the door plate of the lower opening weir gate moves upward, and the water flow of the outlet where the lower opening weir gate is located is 0; the flow control of the lower opening weir gate means that the lower opening weir gate moves upward or downward to ensure that the flow through the outlet where the lower opening weir gate is located does not exceed the specified flow range.

[0064] In a preferred embodiment of the present invention, the drainage system further comprises a control system, which comprises a controller, a device for monitoring rainfall, a device for monitoring time, a plurality of devices for monitoring flow, and a plurality of devices for monitoring liquid level; the device for monitoring rainfall and the device for monitoring time are arranged at any position in the drainage system, the plurality of devices for monitoring flow are respectively arranged at the second water outlet close to each diversion facility, and the plurality of devices for monitoring liquid level are arranged in each diversion facility;

[0065] The controller is respectively connected to the device for monitoring rainfall, the device for monitoring time, a plurality of devices for monitoring flow, a plurality of devices for monitoring liquid level, a first water switch, a second water switch and a third water switch;

[0066] The controller is used to control the operation of the first hydraulic switch, the second hydraulic switch and the third hydraulic switch according to the rainfall monitored by the rainfall monitoring device, the time monitored by the time monitoring device, the liquid level height in the diversion facility monitored by the liquid level monitoring device, and the flow rate through the second water outlet monitored by the flow monitoring device.

[0067] In a preferred embodiment of the present invention, several flow monitoring devices are respectively arranged near the second water outlet of each diversion facility. The flow control through the second water outlet is achieved by cooperating with the flow monitoring device and the second hydraulic switch arranged at the second water outlet. The control method is known in the art, and specifically, refer to the Chinese patent application number 201811279055.5 or 201711034953.X or 201620328751.0, which are hereby introduced in their entirety into this application as the content disclosed in this application.

[0068] Exemplarily, the maximum allowable flow value downstream of the water switch is first defined, and then the maximum allowable flow value is input into the control program; the ultrasonic level sensor is used to monitor the water level on both sides of the water switch, and the signal is transmitted to the PLC controller in the control unit; the PLC controller calculates the water flow through the water switch according to the water level difference and the hole size; when the flow through the water switch is less than the maximum allowable flow value, the PLC controls the water switch to increase the opening degree until the flow through the water switch is equal to the maximum allowable flow value; when the flow through it is greater than the maximum allowable flow value, the PLC controls the water switch to reduce the opening degree until the flow through the water switch is equal to the maximum allowable flow value, and then stops the action; at this time, the flow through the water switch is a constant value. The present invention can ensure that the pipeline flow downstream of the water switch does not exceed the set allowable value, and ensure stable drainage.

[0069] Example 2

[0070] Assuming that the total catchment area of ​​the municipal combined pipe is 3 square kilometers, then according to the principle that the catchment area corresponding to each diversion facility is 0.3 square kilometers, the number of the diversion facilities is 10, and the 10 diversion facilities are arranged along the municipal combined pipe. The 10 diversion facilities are sequentially named the first diversion facility, the second diversion facility, ..., the tenth diversion facility from the upstream of the municipal combined pipe; the 10 regulating and storage facilities are respectively connected to the first diversion facility, the second diversion facility, ..., the tenth diversion facility;

[0071] The access branch pipes are each connected to the municipal confluence pipe;

[0072] The diversion facility includes a water inlet, a first water outlet, and a second water outlet, wherein:

[0073] The tenth diversion facility also includes a third water outlet, whose water inlet is connected to the end of the municipal combined pipe, whose first water outlet is connected to the regulating and storage facility, whose second water outlet is connected to the sewage treatment facility, and whose third water outlet is connected to the natural water body;

[0074] The water inlets of the 9 diversion facilities upstream of the 10th diversion facility are connected to the municipal combined pipe upstream thereof, the first water outlets thereof are connected to the regulating and storage facility, and the second water outlets thereof are connected to the municipal combined pipe downstream thereof.

[0075] Either multiple diversion facilities are connected to one regulating and storage facility, or one diversion facility is connected to multiple regulating and storage facilities.

[0076] Example 3

[0077] This embodiment provides a control method for the sewage interception, storage and drainage system described in the above embodiment 1, and the method comprises the following steps:

[0078] Set the rainfall threshold L0, the rainfall intensity threshold I0, the flow threshold Q of the second outlet of each diversion facility 0i , and the liquid level threshold H in each diversion facility 0i ;

[0079] The rainfall L continuously monitored by the device for monitoring rainfall, the rainfall intensity value I jointly and continuously monitored by the device for monitoring rainfall and the device for monitoring time, the flow value Q continuously monitored by the device for monitoring the flow of each diversion facility i , and the liquid level value H continuously monitored by the device for monitoring the liquid level of each diversion facility i , 1 ≤ i ≤ n;

[0080] The first judgment condition is that when I > I0 and L > L0, it is determined that the water in the municipal combined sewer pipe is clean water at this time. Then, the first water conservancy switch, the second water conservancy switch of the nth diversion facility are closed, and the third water conservancy switch is opened to convey the water in the municipal combined sewer pipe to the natural water body. The first water conservancy switches of other diversion facilities are closed, and the second water conservancy switches are opened to divert the water in the diversion facilities to the downstream municipal combined sewer pipe, and then conveyed to the natural water body together;

[0081] The second judgment condition is that when I > I0 and L ≤ L0 or when I ≤ I0, it is determined that the water in the municipal combined sewer pipe is dirty water at this time. The control methods of each diversion facility are as follows,

[0082] If Q i ≤ Q 0i , at this time, neither the municipal combined sewer pipe nor the sewage treatment facility has reached the upper limit. When i = n, control the first water conservancy switch of the nth diversion facility to close, the second water conservancy switch to open, and the third water conservancy switch to close, and convey the water of the nth diversion facility to the sewage treatment facility for treatment; when 1 ≤ i < n, control the first water conservancy switch of the ith diversion facility to close, the second water conservancy switch to open, and convey the water in the municipal combined sewer pipe to the municipal combined sewer pipe downstream of the ith diversion facility,

[0083] If Q i > Q 0i , the steps are as follows:

[0084] S1, at this time, the municipal combined sewer pipe or the sewage treatment facility has reached the upper limit. When i = n, control the first water conservancy switch of the nth diversion facility to close, the second water conservancy switch to perform flow limiting treatment, and the third water conservancy switch to close, and convey the water of the nth diversion facility to the sewage treatment facility for treatment; when 1 ≤ i < n, control the second water conservancy switch of the ith diversion facility to perform flow limiting treatment, and convey the water in the municipal combined sewer pipe to the municipal combined sewer pipe downstream of the ith diversion facility at a certain flow rate;

[0085] S2, because the flow limiting treatment is carried out at this time, the water in each diversion facility cannot be completely discharged, so it is necessary to monitor the water level height in each diversion facility. When the water level height H in the i-th diversion facility i ≥H 0i , then the first hydraulic switch at the first water outlet in the i-th diversion facility is turned on to transport part of the water in the municipal combined pipe to the regulating and storage facility connected to the i-th diversion facility.

[0086] Furthermore, a threshold value T0 of the interval between two rains is set, and the device for monitoring time monitors the interval T between two rains in real time. Then, the first judgment condition is when I>I0 and L>L0 or I>I0 and L≤L0 and T≤T0, at this time, the water body under the current conditions is considered to be a clean water body, and the program of the first judgment condition is executed; the second judgment condition is when I>I0 and L≤L0 and T>T0 or when I≤I0, at this time, the water body under the current conditions is considered to be a clean water body, and the program of the second judgment condition is executed;

[0087] In addition, the current limiting process may adopt the following method:

[0088] When the maximum flow that the sewage treatment facility can handle is Q, assuming that the catchment area of ​​the municipal combined pipe is S, the catchment area corresponding to the i-th diversion facility is S i , i=1,2,...,n, the flow threshold Q of the i-th diversion facility 0i =(S1+…+S i ) / S×Q.

[0089] Specifically,

[0090] Q 01 =S1 / S×Q,

[0091] Q 02 =(S1+S2) / S×Q,

[0092] Q 02 =(S1+S2+S3) / S×Q,

[0093] ...,

[0094] Q 0i =(S1+…+S i ) / S×Q,

[0095] ...,

[0096] Q 0n =(S1+S2+S3+…+S n ) / S×Q.

[0097] The above is an explanation of the embodiments of the present invention. However, the present invention is not limited to the above embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A sewage interception, storage and drainage system, in, The drainage system includes a municipal combined pipe, a number of access branches, a number of diversion facilities, a number of regulation and storage facilities, and sewage treatment facilities. Several diversion facilities are set up along the municipal combined pipe. Assuming that n diversion facilities are set up, the first diversion facility, the second diversion facility, ..., the nth diversion facility are recorded from the upstream of the municipal combined pipe. The plurality of access branch pipes are respectively connected to the municipal confluence pipe; The diversion facility includes a water inlet, a first water outlet, and a second water outlet, wherein: The diversion facility near the sewage treatment facility, i.e., the nth diversion facility, further includes a third water outlet, a water inlet of which is connected to the end of the municipal combined pipe, a first water outlet of which is connected to the regulating and storage facility, a second water outlet of which is connected to the sewage treatment facility, and a third water outlet of which is connected to a natural water body; In each diversion facility upstream of the nth diversion facility, its water inlet is connected to the municipal confluence pipe upstream thereof, its first water outlet is connected to the regulating and storage facility, and its second water outlet is connected to the municipal confluence pipe downstream thereof; The number of diversion facilities is set according to the total catchment area of ​​the municipal combined pipe connected, and the catchment area corresponding to each diversion facility is 0.01-1 square kilometers, wherein the catchment area corresponding to the diversion facility refers to the catchment area of ​​the municipal combined pipe connected between a diversion facility near the upstream end of the municipal combined pipe and the upstream end of the municipal combined pipe, or the catchment area of ​​the municipal combined pipe connected between two diversion facilities; Wherein, a number of regulating and storing facilities are set up, one diversion facility is connected to one regulating and storing facility, or, multiple diversion facilities are connected to one regulating and storing facility, or, one diversion facility is connected to multiple regulating and storing facilities; The access branch pipe is a combined branch pipe, a separate rainwater branch pipe or a separate sewage branch pipe.

2. According to the system of claim 1, the catchment area corresponding to each diversion facility is 0.02-0.8 square kilometers.

3. According to the system of claim 2, each diversion facility corresponds to a catchment area of ​​0.03-0.6 square kilometers.

4. A system according to any one of claims 1 to 3, in, The diversion facility is selected from a diversion well, a discarding well or an intercepting well; the storage facility is selected from a storage tank, a box culvert or a pipe culvert; the sewage treatment facility is selected from a sewage treatment plant or an integrated treatment facility.

5. A system according to any one of claims 1 to 3, in, A first hydraulic switch is arranged near the first water outlet to control the opening and closing of the first water outlet; a second hydraulic switch is arranged near the second water outlet to control the flow rate of the second water outlet; A third hydraulic switch is arranged near the third water outlet to control the opening and closing of the third water outlet.

6. The system according to claim 5, in, The drainage system also includes a control system, which includes a controller and several monitoring devices. The monitoring devices are used to monitor various parameters required for the operation of the drainage system: rainfall, rainfall time, rainfall intensity, flow in the pipeline, and liquid level in the diversion facility; the controller is respectively connected to the monitoring device, the first hydraulic switch, the second hydraulic switch and the third hydraulic switch, and the controller is used to control the operation of the first hydraulic switch, the second hydraulic switch and the third hydraulic switch according to the parameters monitored by the monitoring device.

7. The system according to claim 6, in, The monitoring device includes a device for monitoring rainfall, and the device for monitoring rainfall is set at any position in the drainage system. The controller is respectively connected to the device for monitoring rainfall, the first water switch, the second water switch and the third water switch. The controller is used to control the operation of the first water switch, the second water switch and the third water switch according to the rainfall monitored by the device for monitoring rainfall.

8. The system according to claim 7, in, The monitoring device also includes several devices for monitoring flow, and the devices for monitoring flow are respectively arranged at the second water outlet near each diversion facility. The controller is respectively connected to the devices for monitoring flow near the second water outlet of each diversion facility and the second hydraulic switch in each diversion facility. The controller is used to control the action of the second hydraulic switch at the second water outlet of the corresponding diversion facility according to the flow value monitored by the devices for monitoring flow, so as to realize flow control through the second water outlet, wherein the device for monitoring flow is a flow meter or a liquid level meter.

9. The system according to claim 8, in, The monitoring device also includes a device for monitoring time, and the device for monitoring time is arranged at any position in the drainage system; The purpose of setting the device for monitoring time is to monitor the rainfall time; and together with the device for monitoring rainfall amount, it can realize the monitoring of rainfall intensity.

10. The system according to claim 9, in, The controller is respectively connected to the device for monitoring rainfall, the device for monitoring time, the first water switch, the second water switch and the third water switch. The controller is used to obtain the monitored rainfall intensity according to the monitored rainfall and the monitored time, and control the operation of the first water switch, the second water switch and the third water switch.

11. The system according to claim 10, in, The monitoring device also includes a plurality of devices for monitoring liquid levels, and the plurality of devices for monitoring liquid levels are arranged in each diversion facility. The purpose of arranging the plurality of devices for monitoring liquid levels is to monitor the liquid levels in the corresponding diversion facilities.

12. According to the system of claim 11, the controller is respectively connected to the device for monitoring the liquid level of each diversion facility and the first hydraulic switch in each diversion facility, and the controller is used to control the action of the first hydraulic switch at the first water outlet of the corresponding diversion facility according to the liquid level value monitored by the device for monitoring the liquid level, so as to realize the opening or closing control of the regulation and storage facilities.

13. The control method of the sewage interception, storage and drainage system according to claim 12, the method comprising the following steps: Set the rainfall threshold L 0 , rainfall intensity threshold I 0 , the flow threshold Q of the second outlet of each diversion facility 0i , the liquid level threshold H in each diversion facility 0i ; The rainfall L monitored in real time by the rainfall monitoring device, the rainfall intensity value I monitored in real time by the rainfall monitoring device and the time monitoring device, and the flow value Q monitored in real time by the flow monitoring device of each diversion facility i , the liquid level value H monitored in real time by the liquid level monitoring device of each diversion facility i , 1≤i≤n; The first judgment condition is when I>I 0 And L>L 0 , the first water switch of the nth diversion facility is closed, the second water switch is closed, and the third water switch is opened, so that the water in the municipal combined pipe is transported to the natural water body, and the first water switch of other diversion facilities is closed, and the second water switch is opened, so that the water in the diversion facility is diverted to the downstream municipal combined pipe; The second judgment condition is when I>I 0 And L≤L 0 Or when I≤I 0 , the control methods of each diversion facility are as follows, If Q i ≤Q 0i , when i = n, control the first water conservancy switch of the nth diversion facility to close, the second water conservancy switch to open, and the third water conservancy switch to close, and convey the water of the nth diversion facility to the sewage treatment facility for treatment; when 1 ≤ i < n, control the first water conservancy switch of the ith diversion facility to close and the second water conservancy switch to open, and convey the water in the municipal combined sewer to the municipal combined sewer downstream of the ith diversion facility, If Q i >Q 0i , the steps are as follows: S1. When \(i = n\), control the first water conservancy switch of the \(n\)th flow diversion facility to close, the second water conservancy switch to perform flow-limiting treatment, the third water conservancy switch to close, and convey the water of the \(n\)th flow diversion facility to the sewage treatment facility for treatment; when \(1\leq i < n\), control the second water conservancy switch of the \(i\)th flow diversion facility to perform flow-limiting treatment, and convey the water in the municipal combined sewer pipe to the municipal combined sewer pipe downstream of the \(i\)th flow diversion facility at a certain flow rate. S2, when the water level height H in the i-th diversion facility i ≥H 0i , then the first hydraulic switch at the first water outlet in the i-th diversion facility is turned on to transport part of the water in the municipal combined pipe to the regulating and storage facility connected to the i-th diversion facility.

14. The control method according to claim 13, wherein, the method further comprises the following steps: Set the interval time threshold T between two rain events 0 , the device for monitoring time monitors the interval time T between two rains in real time, then the first judgment condition is when I>I 0 And L>L 0 or I>I 0 And L≤L 0 And T≤T 0 The second judgment condition is when I>I 0 And L≤L 0 And T>T 0 Or when I≤I 0 .

15. The control method according to claim 13 or 14, wherein, In the above steps, the maximum flow that the sewage treatment facility can handle is Q. Assuming that the catchment area of ​​the municipal combined pipe is S, the catchment area corresponding to the i-th diversion facility is S. i , i=1,2,…,n, the flow threshold Q of the i-th diversion facility 0i =(S 1 +…+S i ) / S×Q.