A method for evaluating the discharge capacity of multi-stage discharge dams
By setting up multi-level venting dams in reservoirs, counting and calculating key indicators, and evaluating venting capabilities, the problem of lack of specifications in venting design in water conservancy and hydropower projects has been solved, more serious and detailed design evaluations have been achieved, and project difficulty and investment have been reduced.
Patent Information
- Application Number
- CN202010652026.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-08
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2040-07-08
AI Technical Summary
In water conservancy and hydropower projects, vent design lacks clear specifications and unified design standards, resulting in low vent scale and capacity design levels that need to be improved urgently.
Provide a method for evaluating the venting capacity of multi-stage venting dams. By setting up multi-stage venting dams in the reservoir, the water inflow is counted, the status is divided into years and periods, and key indicators such as initial storage capacity, maximum water retaining head, venting depth, duration, and storage capacity rate are calculated. etc., draw the discharge curve, evaluate the venting capacity, and adjust the venting plan according to different working conditions and flow requirements.
It effectively improves the rationality and detail of vent design, provides standardized calculation methods, reduces engineering difficulty and investment, and promotes the improvement and guidance of vent design.
Smart Images

Figure BDA0002575328780000071 
Figure BDA0002575328780000081
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of water conservancy and hydropower engineering, and in particular relates to a method for evaluating the discharge capacity of a multi-stage discharge dam. Background Art
[0002] During the engineering design process, there are no clear venting specifications for reference, and there are no unified standards for the design and statistical methods of venting scale and venting capacity. As a result, the venting design of the project is still at a low design level and needs to be improved urgently. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a method for evaluating the discharge capacity of a multi-stage discharge dam.
[0004] The present invention is achieved through the following technical solutions.
[0005] The present invention provides a method for evaluating the discharge capacity of a multi-stage discharge dam, comprising:
[0006] Multiple drain holes are dug along the water discharge path, each drain hole is connected to the reservoir, and a multi-level drain dam is set above the drain hole to statistically record the water inflow of the reservoir, and the corresponding natural year is divided into three annual states of normal water year, flood year and dry year according to the numerical value of the recorded result. At the same time, according to the numerical value of the recorded result, a plurality of consecutive natural days within each natural year are divided into two period states of flood season and dry season. The drain capacity evaluation method of the multi-level drain dam includes the following steps:
[0007] According to the difference in water supply guarantee rate, the flood control method and discharge depth are selected by preliminary estimation or detailed calculation, and the discharge curve is drawn according to the discharge situation of multi-stage discharge dams. The following index parameters are obtained according to preliminary estimation or detailed calculation;
[0008] The reservoir opening water level corresponding to the initial storage capacity;
[0009] The maximum water retaining head of the multi-stage emptying dam, that is, the highest water level of the reservoir when the multi-stage emptying dam is in operation, H max1 The lowest bottom plate elevation H of the reservoir when the multi-stage dam is in operation min1 difference;
[0010] Drain and balance the water level;
[0011] Drain depth: the difference between the opening water level and the drain balance water level;
[0012] Empty duration;
[0013] The time taken to empty to the dead water level;
[0014] Empty the storage capacity;
[0015] Emptying rate: the ratio of empty storage capacity to total storage capacity;
[0016] Water level drop; that is, the ratio of draining depth to draining duration;
[0017] Remaining storage capacity: the difference between total storage capacity and emptied storage capacity;
[0018] The remaining reservoir water level corresponding to the remaining storage capacity: that is, the difference between the discharge equilibrium water level and the dam bottom elevation;
[0019] Thickness of water retaining wall on dam surface at equilibrium water level;
[0020] Time to store water to dead water level;
[0021] The discharge capacity of the multi-stage discharge dam is evaluated based on the above-mentioned index parameters.
[0022] The current reservoir capacity is taken as the initial capacity, and the reservoir capacity after drainage from multi-stage discharge dams is taken as the final capacity. The flow safety threshold is preset according to user needs. When the preliminary estimation method is adopted, the monthly average daily flow with a guarantee rate of 50% can be used for flood control; when the detailed calculation method is adopted, different water inflow guarantee rates can be used to respond to the flood process lines of each month for flood control.
[0023] The following factors need to be considered when drawing the leakage curve:
[0024] The statistical range of the unit's power generation flow is generally between the normal water storage level and the dead water level; the downstream flow involving different numbers of generating units should be counted separately; downstream control water level; downstream flood control flow requirements; downstream ecological flow requirements; different gate openings during the discharge process; the combined impact of different discharge channels at different times, etc.
[0025] The discharge starting point is determined by preliminary estimation or detailed calculation. The preliminary estimation can be based on the normal water storage level of the project. The detailed calculation can be based on the average monthly operating water level of the project provided by the reservoir operation as the starting water level for flood control.
[0026] The siltation elevation of the project in 50 to 100 years is estimated based on the reservoir-to-sand ratio, and then the relationship between the emptying elevation and the siltation elevation is compared. If the siltation elevation is greater than the emptying elevation, there is no need to make emptying requirements below the siltation elevation.
[0027] The storage capacity to be emptied should minimize the impact on the storage capacity for project benefits, and should be higher than the water intake elevation for irrigation, production and life, and industrial water supply, while meeting the requirements for navigation water volume. The storage capacity to be emptied under extraordinary conditions may not take the above factors into consideration, with reducing accident losses as the first element.
[0028] The method for evaluating the discharge capacity of a multi-stage discharge dam also includes calculating the discharge water level drop at each elevation of the reservoir through the storage capacity curve and the discharge flow curve during the discharge process. At the same time, the requirements for the sudden drop in water level can be calculated based on the dam, slope, and accumulation stability. The discharge flow curve can be adjusted by adjusting the discharge plan to meet the requirements for the discharge water level drop.
[0029] The method for evaluating the discharge capacity of the multi-stage discharge dam also includes: during the flood season, according to the discharge requirements during the flood season, the discharge capacity of each discharge and spillway structure should be greater than the average monthly flow rate of each month in the flood season.
[0030] The method for evaluating the discharge capacity of a multi-stage discharge dam also includes statistically analyzing the discharge capacity based on the monthly discharge capacity and the cumulative discharge capacity. The monthly discharge capacity only counts the water level and time when the discharge system reaches discharge balance within the month. When the discharge system cannot reach discharge balance within the month, it is necessary to continue to count the water level and time when continuous discharge lasts for more than one month to reach discharge balance.
[0031] The method for evaluating the discharge capacity of a multi-stage discharge dam also includes combining various operating conditions during project operation, and separately counting the discharge capacity under continuous or discontinuous discharge, frequency of normal flood and dry seasons, dry season, flood season, and average monthly flow. The operating condition factors include discharge control, the number of operating generators, and the number of gates opened. Among them, when discharge control is performed, all generators are operated and all gates are opened at the same time, it is the slowest operating condition; when discharge control is performed, all generators are operated and some gates are opened at the same time, it is the conventional fastest operating condition; when discharge control is performed, all generators are operated and some gates are opened at the same time, it is an extreme operating condition.
[0032] The beneficial effects of the present invention are as follows: the technical solution of the present invention is adopted to effectively summarize the specific problems faced in the venting design, and to formulate design principles in a targeted manner, and to classify and refine the venting operation conditions according to the impact on the venting capacity statistics, and to define the various indicators of the comprehensive statistics of the venting performance and standardize the calculation method thereof. Not only can the rationality of the venting design scheme be judged more seriously, but also a more detailed reference can be provided for the venting scheme design of water conservancy and hydropower projects, and the venting design scheme can be improved, making it more instructive for the venting scheme design of similar projects, and it is also conducive to reducing the difficulty of the project and the investment in the project. DETAILED DESCRIPTION
[0033] The technical solution of the present invention is further described below, but the scope of protection claimed is not limited to the description.
[0034] The present invention provides a method for evaluating the discharge capacity of a multi-stage discharge dam, comprising:
[0035] Multiple drain holes are dug along the water discharge path, each drain hole is connected to the reservoir, and multiple drain dams are set above the drain holes to statistically record the water inflow of the reservoir, and the corresponding natural year is divided into three annual states: normal water year, flood year and dry year according to the numerical value of the recorded results. At the same time, according to the numerical value of the recorded results, multiple consecutive natural days within each natural year are divided into two period states: flood season and dry season. The discharge capacity evaluation method of the multi-level drain dam includes the following steps:
[0036] According to the difference in water supply guarantee rate, the flood control method and discharge depth are selected by preliminary estimation or detailed calculation, and the discharge curve is drawn according to the discharge situation of multi-stage discharge dams. The following index parameters are obtained according to preliminary estimation or detailed calculation;
[0037] The reservoir opening water level corresponding to the initial storage capacity;
[0038] The maximum water retaining head of the multi-stage emptying dam, that is, the highest water level of the reservoir when the multi-stage emptying dam is in operation, H max1 The lowest bottom plate elevation H of the reservoir when the multi-stage dam is in operation min1 difference;
[0039] Drain and balance the water level;
[0040] Drain depth: the difference between the opening water level and the drain balance water level;
[0041] Empty duration;
[0042] The time taken to empty to the dead water level;
[0043] Empty the storage capacity;
[0044] Emptying rate: the ratio of empty storage capacity to total storage capacity;
[0045] Water level drop; that is, the ratio of draining depth to draining duration;
[0046] Remaining storage capacity: the difference between total storage capacity and emptied storage capacity;
[0047] The remaining reservoir water level corresponding to the remaining storage capacity: that is, the difference between the discharge equilibrium water level and the dam bottom elevation;
[0048] Thickness of water retaining wall on dam surface at equilibrium water level;
[0049] Time to store water to dead water level;
[0050] The discharge capacity of the multi-stage discharge dam is evaluated based on the above-mentioned index parameters.
[0051] Furthermore, the current reservoir capacity is taken as the initial capacity, and the reservoir capacity after multi-stage venting dam drainage is taken as the final capacity. The flow safety threshold is preset according to user needs. When the preliminary estimation method is adopted, the daily average flow with a monthly guarantee rate of 50% can be used for flood control; when the detailed calculation method is adopted, different water inflow guarantee rates can be used to deal with the monthly flood process lines for flood control. The following factors need to be considered when drawing the discharge curve:
[0052] The statistical range of the unit's power generation flow is generally between the normal water storage level and the dead water level; the downstream flow involving different numbers of generating units should be counted separately; downstream control water level; downstream flood control flow requirements; downstream ecological flow requirements; different gate openings during the discharge process; the combined impact of different discharge channels at different times, etc.
[0053] In addition, preliminary estimation or detailed calculation can be used to determine the starting point of discharge. The preliminary estimation can be based on the normal water storage level of the project, and the detailed calculation can be based on the average monthly operating water level of the project provided by the reservoir operation as the starting water level for flood control.
[0054] Furthermore, the siltation elevation of the project in 50 to 100 years is calculated based on the reservoir-to-sand ratio, and then the relationship between the emptying elevation and the siltation elevation is compared. If the siltation elevation is greater than the emptying elevation, there is no need to make emptying requirements below the siltation elevation.
[0055] In addition, the emptying of storage capacity should minimize the impact on the beneficial storage capacity of the project, and should be higher than the water intake elevation for irrigation, production and life, and industrial water supply, while meeting the requirements of navigation water volume. The emptying of storage capacity under extraordinary conditions may not take the above factors into consideration, with reducing accident losses as the first element.
[0056] The discharge capacity assessment method of a multi-stage discharge dam also includes calculating the discharge water level drop at each elevation of the reservoir through the storage capacity curve and the discharge flow curve during the discharge process. At the same time, the requirements for the sudden drop in water level can be calculated based on the stability of the dam, slope, and accumulation. The discharge flow curve can be adjusted by adjusting the discharge plan to meet the requirements for the discharge water level drop.
[0057] The discharge capacity assessment method of multi-stage discharge dams also includes: during the flood season, according to the discharge requirements of the flood season, the discharge capacity of each discharge and discharge structure should be greater than the average monthly flow of each month in the flood season. The discharge capacity assessment method of multi-stage discharge dams also includes statistical discharge capacity based on the monthly discharge capacity and cumulative discharge capacity. The monthly discharge capacity only counts the water level and time when the discharge system reaches the discharge balance within the month. When the discharge system cannot reach the discharge balance within the month, it is necessary to continue to count the water level and time when the discharge is continuously discharged for more than one month to reach the discharge balance.
[0058] Furthermore, the discharge capacity assessment method of the multi-stage discharge dam also includes combining various operating conditions in the operation of the project, and separately calculating its discharge capacity under continuous discharge or discontinuous discharge, frequency of normal flood and dry season, dry season, flood season, and average flow of each month. The operating condition factors include discharge control, the number of operating generators, and the number of gates opened. Among them, when discharge control is carried out, all generators are running and all gates are opened at the same time, it is the slowest operating condition; when discharge control is carried out, all generators are running and some gates are opened at the same time, it is the normal fastest operating condition; when discharge control is carried out, all generators are running and some gates are opened at the same time, it is an extreme operating condition.
[0059] The method for evaluating the discharge capacity of multi-stage discharge dams also includes: statistics on the discharge time under various working conditions, among which the discharge time in dry years, normal years and flood years gradually increase in sequence. The discharge flow curve should be as smooth and uniform as possible, and the minimum discharge at the relay discharge position of the two-layer discharge building should be greater than the maximum flow during the discharge period. If the requirements are not met, the requirements can be met by adjusting the height difference of the two-layer discharge building or the gate head.
[0060] The method for evaluating the discharge capacity of multi-stage discharge dams also includes comprehensive comparisons to obtain various statistical indicators of discharge capacity based on discharge depth H, discharge duration T, water level drop, discharge to dead water level duration T, discharge storage capacity V, discharge rate, discharge residual storage capacity, residual reservoir water height, dam surface water retaining thickness B at equilibrium water level, dam body length M, and backfill to dead water level duration T. The water supply guarantee rate is 50% in normal water years, 25% in flood years, and 75% in dry years.
[0061] The technical solution of the present invention effectively summarizes the specific problems faced in the venting design, formulates the design principles in a targeted manner, classifies and refines the venting operation conditions according to the impact on the venting capacity statistics, clarifies the various indicators of the venting performance comprehensive statistics and standardizes the calculation method thereof. Not only can the rationality of the venting design scheme be judged more seriously, but also a more detailed reference can be provided for the venting scheme design of water conservancy and hydropower projects, promoting the improvement of the venting design scheme, making it more instructive for the venting scheme design of similar projects, and also helping to reduce the difficulty of the project and the investment in the project.
[0062] Taking the Rumei Hydropower Station on the Lancang River as an example, in normal water year, flood year or dry water year, the Rumei Hydropower Station is operated in the slowest working condition, the conventional fastest working condition or the extreme working condition, and the multi-stage venting dam venting capacity evaluation method provided by the present invention is adopted. The final venting characteristic comprehensive statistical analysis table is as follows:
[0063] Table 1 Comprehensive statistical analysis of venting characteristics
[0064]
[0065]
[0066] Among them, a certain month is selected as a typical month during the flood season / dry season, with an average monthly flow of Xm3 / s; the dam foundation elevation is Ym; the single-unit full-discharge flow is Zm3 / s; the 100-year silt elevation is Hsilt m; and the discharge control standard is PN%=Qm3 / s.
Claims
1. A method for evaluating the discharge capacity of a multi-stage discharge dam. Features: Multiple drain holes are dug along the water discharge path, each drain hole is connected to the reservoir, and a multi-level drain dam is set above the drain hole to statistically record the water inflow of the reservoir, and the corresponding natural year is divided into three annual states of normal water year, flood year and dry year according to the numerical value of the recorded result. At the same time, according to the numerical value of the recorded result, a plurality of consecutive natural days within each natural year are divided into two period states of flood season and dry season. The drain capacity evaluation method of the multi-level drain dam includes the following steps: According to the difference in water supply guarantee rate, the flood control method and discharge depth are selected by preliminary estimation or detailed calculation, and the discharge curve is drawn according to the discharge situation of multi-stage discharge dams. The following index parameters are obtained according to preliminary estimation or detailed calculation; The reservoir opening water level corresponding to the initial storage capacity; The maximum water retaining head of the multi-stage discharge dam, that is, the highest water level of the reservoir when the multi-stage discharge dam is in operation The lowest bottom plate elevation of the reservoir when the multi-stage dam is in operation difference; Drain and balance the water level; Drain depth: the difference between the opening water level and the drain balance water level; Empty duration; The time taken to empty to the dead water level; Empty the storage capacity; Emptying rate: the ratio of empty storage capacity to total storage capacity; Water level drop; that is, the ratio of draining depth to draining duration; Remaining storage capacity: the difference between total storage capacity and emptied storage capacity; The remaining reservoir water level corresponding to the remaining storage capacity: that is, the difference between the discharge equilibrium water level and the dam bottom elevation; Thickness of water retaining wall on dam surface at equilibrium water level; Time to store water to dead water level; Evaluate the discharge capacity of the multi-stage discharge dam based on the above index parameters; The discharge starting position is determined by preliminary estimation or detailed calculation. The preliminary estimation is based on the normal water storage level of the project. The detailed calculation is based on the average monthly operating water level of the project provided by the reservoir operation as the flood control starting water level. The siltation elevation of the project in 50 to 100 years is estimated based on the reservoir sediment ratio. Then, the relationship between the discharge elevation and the siltation elevation is compared. If the siltation elevation is greater than the discharge elevation, no discharge requirement is required below the siltation elevation. The method for evaluating the discharge capacity of the multi-stage discharge dam further includes calculating the discharge water level drop at each elevation of the reservoir through the storage capacity curve and the discharge flow curve during the discharge process, and at the same time, adjusting the discharge flow curve by adjusting the discharge plan to meet the discharge water level drop requirements according to the requirements of the dam, slope, and accumulation stability calculation on the water level drop; The multi-stage venting dam discharge capacity assessment method also includes: during the flood season, according to the flood season discharge requirements, the discharge capacity of each discharge and discharge structure should be greater than the average monthly flow rate of each month in the flood season, and the multi-stage venting dam discharge capacity assessment method also includes statistical discharge capacity based on the single-month discharge capacity and the cumulative discharge capacity, and the single-month discharge capacity only counts the water level and time when the discharge system reaches the discharge balance within the month. When the discharge system cannot reach the discharge balance within the month, it is necessary to continue to count the water level and time when the discharge is continuously discharged for more than one month to reach the discharge balance. The method for evaluating the discharge capacity of a multi-stage discharge dam also includes combining various operating conditions during project operation, and separately counting the discharge capacity under continuous or discontinuous discharge, frequency of normal flood and dry seasons, dry season, flood season, and average monthly flow. The operating condition factors include discharge control, the number of operating generators, and the number of gates opened. Among them, when discharge control is performed, all generators are operated and all gates are opened at the same time, it is the slowest operating condition; when discharge control is performed, all generators are operated and some gates are opened at the same time, it is the conventional fastest operating condition; when discharge control is performed, all generators are operated and some gates are opened at the same time, it is an extreme operating condition.
2. The method for evaluating the discharge capacity of a multi-stage discharge dam according to claim 1, Features: The current reservoir capacity is taken as the initial capacity, and the reservoir capacity after drainage from multi-stage discharge dams is taken as the final capacity. The flow safety threshold is preset according to user needs. When the preliminary estimation method is adopted, the monthly average daily flow with a guaranteed rate of 50% is used for flood control. When the detailed calculation method is adopted, different water inflow guarantee rates are used to respond to the flood process lines of each month for flood control.
3. The method for evaluating the discharge capacity of a multi-stage discharge dam according to claim 1, Features: The following factors need to be considered when drawing the leakage curve: The statistical range of the unit's power generation flow is between the normal water storage level and the dead water level; the downstream flow involving different numbers of generating units should be counted separately; downstream control water level; downstream flood control flow requirements; downstream ecological flow requirements; different gate openings during the discharge process; and the combined impact of the input of different discharge channels at different times.
Citation Information
Patent Citations
Multi-year regulating storage reservoir optimal scheduling method considering runoff uncertainty
CN105243438A
Measuring and calculating method of water level control improved efficiency of cascade hydropower stations and system
CN107016496A
Method for determining criteria and quantity value for adding abnormal flood discharge facilities to special-grade dam
CN107169246A
Reservoir group outlet structure failure assessment method based on Bayesian network
CN107330621A
High dam construction middle-stage flood control scheme decision-making method under stair construction condition
CN107761654A