A method, device, equipment and medium for allocating production tasks of articles

By obtaining task information and selecting suitable workstations according to classification rules to allocate item production tasks, the problem of poor information base and high randomness caused by manual allocation in the existing technology is solved, and the production efficiency and task processing accuracy are improved.

CN111815092BActive Publication Date: 2024-10-22BEIJING JINGDONG QIANSHITECHNOLOGY CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN201910293250.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-04-12
Publication Date
2024-10-22
Estimated Expiration
2039-04-12

AI Technical Summary

Technical Problem

In the existing task allocation of item production, task allocation relies on manual business level, resulting in poor informatization foundation and strong randomness, which affects the processing timeliness.

Method used

By obtaining task information, the production type and demand are determined according to the preset task classification rules, and workstations that meet the needs are selected for allocation to achieve more reasonable task allocation.

Benefits of technology

It improves the production efficiency of item production tasks, ensures that tasks are completed on time and in quantity, and reduces the randomness of manual intervention.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111815092B_ABST
    Figure CN111815092B_ABST
Patent Text Reader

Abstract

The embodiment of the present invention discloses a method, device, equipment and medium for allocating item production tasks, the method comprising: obtaining task information contained in the current item production task; determining the production type of the item production task according to the task information and a pre-set task classification rule, and using the workstation corresponding to the production type as the candidate workstation of the item production task; determining the production demand of the item production task according to the task information, selecting the candidate workstation whose production capacity meets the production demand as the production workstation of the item production task according to the production demand and the production capacity of the candidate workstation, and allocating the item production task to the production workstation. The method provided by the embodiment of the present invention determines the candidate workstation according to the production type of the item production task, selects the production workstation that meets the production demand of the item production task from the candidate workstation, so that the allocation method of the item production task is more reasonable, thereby improving the production efficiency of the item production task.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present invention relate to the field of information technology, and in particular, to a method, device, equipment and medium for performing an item production task. Background Art

[0002] In the existing production warehouse, there are different production areas, such as automatic production area and manual production area. When receiving a production task, the production area to which the production task belongs is generally determined manually, and the production task is assigned to the corresponding production workstation.

[0003] In the process of realizing the present invention, the inventors found that there are at least the following technical problems in the prior art: in the current allocation of item production tasks, the production area to which the task is assigned is mainly determined by the business level of the assignor, the information technology foundation is poor, and there is a strong sense of arbitrariness. If the business level of the assignor is weak, it will affect the processing time of the entire item production task. Summary of the invention

[0004] The embodiments of the present invention provide a method, device, equipment and medium for allocating item production tasks, so as to make the allocation method of item production tasks more reasonable, thereby improving the production efficiency of item production tasks.

[0005] In a first aspect, an embodiment of the present invention provides a method for allocating item production tasks, comprising:

[0006] Get the task information contained in the current item production task;

[0007] Determine the production type of the item production task according to the task information and a preset task classification rule, and use the workstation corresponding to the production type as a candidate workstation for the item production task;

[0008] The production requirement of the item production task is determined according to the task information, and according to the production requirement and the production capacity of the candidate workstation, the candidate workstation whose production capacity meets the production requirement is selected as the production workstation of the item production task, and the item production task is allocated to the production workstation.

[0009] In a second aspect, an embodiment of the present invention further provides a device for allocating item production tasks, including:

[0010] The task information acquisition module is used to obtain the task information contained in the current item production task;

[0011] A candidate workstation determination module, used to determine the production type of the item production task according to the task information and a preset task classification rule, and use the workstation corresponding to the production type as a candidate workstation for the item production task;

[0012] A production task allocation module is used to determine the production requirements of the item production task based on the task information, select the candidate workstation whose production capacity meets the production requirements as the production workstation of the item production task based on the production requirements and the production capacity of the candidate workstation, and allocate the item production task to the production workstation.

[0013] In a third aspect, an embodiment of the present invention further provides a computer device, the device comprising:

[0014] one or more processors;

[0015] A storage device for storing one or more programs;

[0016] When the one or more programs are executed by the one or more processors, the one or more processors implement the method for allocating item production tasks as provided in any embodiment of the present invention.

[0017] In a fourth aspect, an embodiment of the present invention further provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements a method for allocating item production tasks as provided in any embodiment of the present invention.

[0018] The embodiment of the present invention obtains task information contained in the current item production task; determines the production type of the item production task according to the task information and a preset task classification rule, and uses the workstation corresponding to the production type as the candidate workstation of the item production task; determines the production demand of the item production task according to the task information, selects the candidate workstation whose production capacity meets the production demand according to the production demand and the production capacity of the candidate workstation as the production workstation of the item production task, and allocates the item production task to the production workstation. By determining the candidate workstation according to the production type of the item production task and selecting the production workstation that meets the production demand of the item production task from the candidate workstation, the allocation method of the item production task is made more reasonable, thereby improving the production efficiency of the item production task. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a flow chart of a method for allocating item production tasks provided by Embodiment 1 of the present invention;

[0020] Figure 2 is a flow chart of a method for allocating item production tasks provided by Embodiment 2 of the present invention;

[0021] Figure 3 is a flow chart of a method for allocating item production tasks provided by Embodiment 3 of the present invention;

[0022] Figure 4a is a flow chart of a method for allocating item production tasks provided by Embodiment 4 of the present invention;

[0023] Figure 4b This is a flow chart of determining the production capacity of a workstation in a method for allocating item production tasks provided in Embodiment 4 of the present invention;

[0024] Figure 5 It is a structural schematic diagram of a device for allocating item production tasks provided by Embodiment 5 of the present invention;

[0025] Figure 6 It is a structural diagram of a computer device provided in Embodiment 6 of the present invention. DETAILED DESCRIPTION

[0026] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0027] Embodiment 1

[0028] Figure 1 1 is a flowchart of a method for allocating item production tasks provided by the first embodiment of the present invention. This embodiment is applicable to the case where item information is cached. The method can be executed by an item production task allocation device, which can be implemented in software and / or hardware. For example, the item production task allocation device can be configured in a computer device. Figure 1 As shown, the method includes:

[0029] S110. Obtain task information included in the current item production task.

[0030] In order to solve the technical problems in the prior art of poor information technology foundation and strong arbitrariness of task allocation caused by manual allocation of item production tasks, in this embodiment, for the current item production task to be assigned, the production type and production requirements of the current item production task are determined according to the task information contained in the current item production task, and a workstation that meets the production requirements of the current item production task is selected from the workstations corresponding to the production type as the production workstation of the current item production task.

[0031] In this embodiment, the current item production task may be any item production task to be assigned. The task information of the item production task may be information such as the task completion time of the item production task or the task production volume of the item production task. Optionally, the task information contained in the current item production task may be matched from the task data of the current item production task by keyword matching, or the task information of the current item production task may be extracted from the task data of the current item production task according to the correspondence between each task information and the information in the task data of the current item production task.

[0032] For example, if the task data of the current item production task is "task deadline: March 29, 2019 16:00; task quantity: 1000; item to be produced: item A", then the task deadline can be matched from the task data of the current item production task through keyword matching to find out that the task deadline is January 14, 2019 16:00 and the task production quantity is 1000 pieces.

[0033] S120: Determine the production type of the item production task according to the task information and a preset task classification rule, and use the workstation corresponding to the production type as a candidate workstation for the item production task.

[0034] Generally, different items may correspond to different production types, and a fixed workstation can produce items of one or more production types. In one embodiment of the present invention, a correspondence between an item identifier and a production type, and a correspondence between a production type and a workstation may be pre-established. When allocating item production tasks, the item identifier of the item to be produced is determined based on the task information contained in the item production task, and the production type of the item to be produced is determined based on the pre-established correspondence between the item identifier and the production type, and the workstation corresponding to the production type is used as a candidate workstation for executing the item production task.

[0035] For example, if the item identifier of the item to be produced is determined to be "item A" based on the task information of the current item production task, and after searching the correspondence between the pre-set item identifier and the production type, it is determined that the production type of the item to be produced "item A" is "Type A", then "Type A" is used as the production type of the current item production task, and workstation 1 and workstation 2 corresponding to "Type A" are used as candidate workstations for the current item production task.

[0036] In another embodiment of the present invention, a correspondence between an item identifier and a workstation can be directly established. After determining the item identifier of the item to be produced according to the task information contained in the current item production task, the candidate workstation for the current item production task can be directly determined according to the correspondence between the item identifier and the workstation. Whether to directly establish a correspondence between the item identifier and the workstation can be determined according to the total number of item identifiers that each workstation can produce. Exemplarily, when the total number of item identifiers that each workstation can produce is a large amount of data, it is preferred to consider establishing a correspondence between the item identifier and the production type, and a correspondence between the production type and the workstation, respectively. Otherwise, it is preferred to consider directly establishing a correspondence between the item identifier and the workstation. Optionally, a data volume threshold can be set, and whether the total number of item identifiers that each workload can produce is a large amount of data can be determined according to the set data volume threshold.

[0037] S130, determining the production demand of the item production task according to the task information, selecting the candidate workstation whose production capacity meets the production demand as the production workstation of the item production task according to the production demand and the production capacity of the candidate workstation, and assigning the item production task to the production workstation.

[0038] In this embodiment, by selecting a workstation with a production capacity higher than the production requirement of the current item production task as the workstation of the item production task, it is ensured that the item production task can be smoothly executed. It can be understood that the production requirement of the item production task may include task completion time and production volume.

[0039] In one embodiment of the present invention, the production demand includes the task completion time. According to the production demand and the production capacity of the candidate workstation, the candidate workstation whose production capacity meets the production demand is selected as the production workstation of the item production task, including: determining the production wave of the item production task according to the task completion time, the production wave is used to represent the execution time of the item production task; obtaining the production capacity of the candidate workstation in the production wave, and selecting the candidate workstation whose production capacity is higher than the production demand as the production workstation.

[0040] Generally, the workstation performs the production task of the item in waves, and each wave corresponds to a corresponding time period. In this embodiment, the production wave of the item production task can be determined according to the task completion time of the item production task, and each candidate workstation is screened according to the production capacity of each candidate workstation in the production wave, and the candidate workstation whose production capacity in the production wave is higher than the production demand of the item production task is used as the production workstation of the item production task. The production wave of the item production task is determined by the task completion time, and each candidate workstation is screened according to the production wave, taking into account the tasks that exceed the cut-off time and the production capacity of each workstation in the future wave, so that the determination of the production workstation is more reasonable, and the smooth execution of the item production task is further guaranteed.

[0041] In one embodiment of the present invention, the production wave of the item production task is determined according to the task completion time, including: if the task completion time is earlier than the current time, determining the generation wave of the item production task as the current wave; if the task completion time is not earlier than the current time, determining the production wave of the item production task according to the task completion time and the production time corresponding to each wave.

[0042] In this embodiment, the production wave of the item production task may be one or more. Considering that the current item production task may be an item production task that exceeds the cut-off time, or may be an item production task that has sufficient time before the task completion time, the production wave of the item production task can be determined according to the task completion time of the item production task. When the task completion time of the current item production task is earlier than the current time, it means that the current item production task is an item production task that exceeds the cut-off time, and the production wave of the current item task is determined as the current wave; when the task completion time of the current item production task is later than the current time, the wave where the task completion time is located can be used as the production wave of the item production task, or the wave where the task completion time is located and at least one wave before the wave can be used as the production wave of the item production task.

[0043] For example, assuming that the current time is 7:55 on March 29, 2019, and the task completion time of the item production task is 7:00 on March 29, 2019, the task completion time of the item production task is earlier than the current time, and the current wave is used as the production wave of the item production task. Assuming that the current time is 7:55 on March 29, 2019, and the task completion time of the item production task is 20:00 on March 29, 2019, the task completion time of the item production task is later than the current time. If the wave corresponding to 20:00 on March 29, 2019 is wave 7, wave 7 can be directly used as the production wave of the item production task, or at least one wave from wave 1 to wave 7 can be used as the production wave of the item production task.

[0044] The embodiment of the present invention obtains task information contained in the current item production task; determines the production type of the item production task according to the task information and a preset task classification rule, and uses the workstation corresponding to the production type as the candidate workstation of the item production task; determines the production demand of the item production task according to the task information, selects the candidate workstation whose production capacity meets the production demand according to the production demand and the production capacity of the candidate workstation as the production workstation of the item production task, and allocates the item production task to the production workstation. By determining the candidate workstation according to the production type of the item production task and selecting the production workstation that meets the production demand of the item production task from the candidate workstation, the allocation method of the item production task is made more reasonable, thereby improving the production efficiency of the item production task.

[0045] On the basis of the above scheme, after the item production task is assigned to the production workstation, it further includes: updating the production capacity of the production workstation according to the production demand. In this embodiment, in order to make the assignment of item production tasks more accurate and reasonable, it is necessary to update the production capacity of each workstation in a timely manner. After the item production task is assigned to the production workstation, the production capacity corresponding to the production demand of the item production task can be subtracted from the original production capacity of the production workstation to obtain the updated production capacity of the production workstation. Subsequent item production tasks are assigned based on the updated production capacity of the production workstation, so that the assignment of item production tasks is more accurate.

[0046] Embodiment 2

[0047] Figure 2 1 is a flow chart of a method for allocating production tasks of articles provided in the second embodiment of the present invention. This embodiment is further optimized on the basis of the above embodiment. Figure 2 As shown, the method includes:

[0048] S210: Obtain task information included in the current item production task.

[0049] S220: Determine the production type of the item production task according to the task information and a preset task classification rule, and use the workstation corresponding to the production type as a candidate workstation for the item production task.

[0050] S230: Obtain the task completion time and the number of items to be produced contained in the item production task.

[0051] Generally, the execution process of an item production task includes the process of item picking and the process of boxing. The process of item picking can be understood as picking items to be produced from the item production line, and the process of boxing can be understood as packing the picked items to be produced into boxes. In this embodiment, the production demand of the item production task is concretized as the number of items to be produced and the number of boxes to be boxed, the production capacity of the candidate workstation is concretized as the item picking capacity and the boxing capacity, and the production demand of the item production task is determined and the item production task is allocated according to the production demand of the item production task.

[0052] Optionally, the task completion time and the number of items to be produced of the item production task can be directly obtained from the task data of the item production task. The specific method of obtaining the task completion time and the number of items to be produced can be referred to the above embodiment, which will not be repeated here.

[0053] S240. Determine the production wave of the item production task according to the task completion time.

[0054] S250: Obtain the number of items picked per box at the candidate workstation, where the number of items picked per box is the number of items contained in a single box.

[0055] S260: Determine the number of boxes to be produced according to the number of items to be produced and the number of pieces to be picked in a single box.

[0056] After obtaining the number of items to be produced for the item production task, the number of boxes shipped for the item production task can be estimated based on the number of pieces picked per box at the candidate workstation. Optionally, the average number of pieces picked per box for workstations that can produce the same type can be calculated in advance. When estimating the number of boxes shipped for the item production task, the number of boxes shipped for the item production task is calculated based on the number of items to be produced for the item production task and the average number of pieces picked per box at the candidate workstation. Exemplarily, if the number of items to be produced for the item production task is A and the average number of pieces picked per box at the candidate workstation is B, then the number of boxes shipped for the item production task is C = A / B.

[0057] S270: Obtain the item picking capacity and box delivery capacity of the candidate workstation in the production wave, and select the candidate workstation whose item picking capacity is greater than the number of items to be produced and whose box delivery capacity is greater than the number of boxes delivered as the production workstation.

[0058] In this embodiment, after determining the number of items to be produced and the number of boxes shipped of the item production task, the item picking capacity and box shipping capacity of the candidate workstation in the production wave are obtained, and the candidate workstation whose item picking capacity in the production wave is greater than the number of items to be produced and whose box shipping capacity in the production wave is greater than the number of boxes shipped is used as the production workstation of the item production task.

[0059] The technical solution of the embodiment of the present invention, on the basis of the above embodiment, concretizes the production demand of the item production task into the number of items to be produced and the number of boxes shipped, and concretizes the production capacity of the candidate workstation into the item picking capacity and the box shipping capacity. By selecting the candidate workstation whose item picking capacity in the production wave is greater than the number of items to be produced and whose box shipping capacity in the production wave is greater than the number of boxes shipped as the production workstation of the item production task, the multiple production demands of the item production task are combined in the allocation of the item production task, so that the allocation of the item production task is more reasonable.

[0060] Embodiment 3

[0061] Figure 3 1 is a flow chart of a method for allocating item production tasks provided by Embodiment 3 of the present invention. This embodiment is further optimized on the basis of the above embodiment. Figure 3 As shown, the method includes:

[0062] S310, obtaining task information included in the current item production task.

[0063] S320: Determine the production type of the item production task according to the task information and a preset task classification rule, and use the workstation corresponding to the production type as a candidate workstation for the item production task.

[0064] S330. For each workstation, obtain production data of at least one historical production wave.

[0065] In this embodiment, the working parameters of each workstation are determined by the production data of each workstation in the historical production waves to evaluate the working capacity of each workstation. In one embodiment of the present invention, the production data of multiple historical peak waves (busy waves) and the production data of the most recent busy wave from the current time can be obtained respectively, and the working parameters of each workstation are determined according to the obtained production data. The production data of multiple historical peak waves can represent the maximum production capacity of the workstation, and the production data of the most recent busy wave can represent the recent production capacity of the workstation.

[0066] S340. Determine multiple production parameters of the workstation according to the production data of historical waves.

[0067] In this embodiment, the production parameters are used to evaluate the production capacity of the workstation. Optionally, for each workstation, the production parameters of the workstation can be the picking quantity per unit time of the workstation and the number of boxes per unit time of the workstation, wherein the picking quantity per unit time is the number of items that the workstation can pick per unit time, and the number of boxes per unit time is the number of boxes that flow out of the workstation per unit time. The unit time can be per hour. In addition, since the number of boxes out of a workstation on a certain floor is a combination of the number of boxes out of each workstation on the floor, the production parameters of the workstation can also be determined by the production data of the workstations on the same floor. For example, the number of pieces picked per box at each workstation on the same floor can be determined based on the number of pieces picked from a single outbound material box at each workstation on the same floor.

[0068] Optionally, for each workstation, the first picking quantity per unit time of the workstation can be calculated based on the production data of multiple historical peak waves, and the second picking quantity per unit time of the workstation can be calculated based on the production data of the most recent busy wave from the current time, and the larger value between the first picking quantity per unit time and the second picking quantity per unit time is taken as the picking quantity per unit time of the workstation.

[0069] S350, evaluating the production capacity of at least one wave of the workstation according to multiple production parameters and pre-set evaluation rules.

[0070] In this embodiment, after the production parameters of the workstation are determined, the production capacity of the workstation at each wave is calculated according to a preset evaluation rule.

[0071] In one embodiment of the present invention, the production capacity of at least one wave of a workstation is evaluated according to a plurality of production parameters and a preset evaluation rule, including:

[0072] pass Determine the item picking capacity of the workstation, where: represents the item picking capacity of workstation j in the i-th wave, α j represents the picking capacity control parameter of workstation j, N j represents the number of workstations at workstation j, Q j represents the picking quantity per unit time of workstation j, T i represents the end time of the ith wave, T i-1 Indicates the end time of the i-1th wave;

[0073] pass Determine the outbound capacity of the workstation, where: represents the outgoing capacity of workstation j in the i-th wave, β j represents the outbound capacity control parameter of workstation j, B jrepresents the number of pieces picked per box at workstation j, T i represents the end time of the ith wave, T i-1 Indicates the end time of the i-1th wave.

[0074] In this embodiment, different control parameters and evaluation rules are set for the item picking capacity and out-of-box capacity of the workstation. Considering that each workstation may include multiple workstations, the item picking capacity and out-of-box capacity of each workstation in each wave can be calculated according to the number of workstations included in each workstation, the control parameters and the evaluation rules. j And the out-of-box capacity control parameter β j The value of can be determined according to the actual needs of workstation j. Optionally, the default values ​​of the picking capacity control parameter and the outbound capacity control parameter can be 1.

[0075] It should be noted that the current wave's item picking capacity includes the item picking volume that has been executed in the current wave, and the current wave's box delivery capacity includes the box delivery volume that has been executed in the current wave. In other words, the current wave's item picking capacity at the current moment needs to be subtracted from the item picking volume that has been executed up to the current moment, and the current wave's box delivery capacity at the current moment needs to be subtracted from the box delivery volume that has been executed up to the current moment.

[0076] S360. Determine the production wave of the item production task according to the task completion time.

[0077] S370, obtaining the production capacity of the candidate workstations in the production wave, and using the candidate workstations whose production capacity is higher than the production demand as production workstations.

[0078] The technical solution of the embodiment of the present invention adds, on the basis of the above embodiment, an operation of determining the working parameters of each workstation according to the production data of each workstation in historical production waves, and evaluating the working capacity of each workstation according to the working parameters, by obtaining the production data of at least one historical production wave for each workstation; determining multiple production parameters of the workstation according to the production data of the historical waves, and the production parameters are used to evaluate the production capacity of the workstation; and evaluating the production capacity of at least one wave of the workstation according to the multiple production parameters and pre-set evaluation rules, so that the evaluation of the production capacity of each workstation is more accurate, and thus the allocation of item production tasks based on the production capacity of each workstation is more reasonable.

[0079] Embodiment 4

[0080] Figure 4aIt is a flow chart of a method for allocating item production tasks provided in the fourth embodiment of the present invention. This embodiment provides a preferred embodiment based on the above embodiment. This embodiment provides a preferred embodiment based on the above embodiment. In this embodiment, the warehouse where each workstation is located is specifically an unmanned warehouse. The unmanned warehouse is divided into a shuttle area and a manual area. The shuttle area includes the workstations on the first floor and the workstations on the second floor. The workstations on the first floor include single-piece workstations on the first floor and mixed workstations on the first floor. The workstation corresponding to the order (i.e., the item production task) is determined by the method provided in this embodiment. Figure 4a As shown, the method includes:

[0081] S410, start.

[0082] S420, obtaining the number of items picked for the order, the estimated number of boxes shipped, and the corresponding waves.

[0083] In this embodiment, after obtaining an order, the number of pieces to be picked for the order is determined based on the order information, the production floor of the order is determined based on the type of items to be produced in the order, and the number of boxes shipped for the order is estimated. For example, if the number of pieces to be picked for the order is Q0, and the average number of pieces to be picked per box on the production floor corresponding to the order is φ, then the number of boxes shipped for the order is E0 = Q0 / φ, and the wave i corresponding to the task deadline of the order is used as the corresponding wave of the order.

[0084] S430, determine the floor where the order is produced in the Shuttle area.

[0085] The production floor of the order is determined according to the type of the item to be produced in the order, and whether the production capacity of each floor is sufficient is determined one by one. In this embodiment, the production tasks that can be performed by the single-piece workstation on the first floor can also be performed by the mixed workstation on the first floor and the workstation on the second floor, and the production tasks that can be performed by the mixed workstation on the first floor can also be performed by the workstation on the second floor. Therefore, if the production floor of the item to be produced in the order is the single-piece workstation on the first floor, then the single-piece workstation on the first floor, the mixed workstation on the first floor, and the workstation on the second floor are determined in sequence. If the production floor of the item to be produced in the order is the mixed workstation on the first floor, then the mixed workstation on the first floor and the workstation on the second floor are determined in sequence. If the production floor of the item to be produced in the order is the workstation on the second floor, then only the workstation on the second floor needs to be determined.

[0086] S440. Consider each wave one by one and determine whether the picking and unpacking capacity of the single-piece workstation on the first floor is sufficient.

[0087] If the production floor of the item to be produced in the order is the single-piece workstation on the first floor, then determine whether the single-piece workstation on the first floor, the mixed workstation on the first floor, and the workstation on the second floor have sufficient production capacity. If the single-piece workstation on the first floor has sufficient production capacity, then return sufficient production capacity and use the single-piece workstation on the first floor as the production workstation for the order. If the single-piece workstation on the first floor has insufficient production capacity, then determine whether the mixed workstation on the first floor has sufficient production capacity.

[0088] In this embodiment, when judging whether the single-piece workstation on the first floor has sufficient production capacity, it is necessary to consider each wave one by one to judge whether the picking capacity and box delivery capacity corresponding to the wave meet the number of picked pieces and the estimated number of boxes delivered of the order. For example, if the order corresponds to wave i, then it is judged one by one whether the capacity of wave j = i, i-1, i-2, ..., 1 is sufficient. For wave j, if and If it is determined that the single-piece workstation on the first floor has sufficient capacity in wave j, the order will be allocated to the single-piece workstation on the first floor, and the picking capacity and outbound capacity of the single-piece workstation on the first floor will be deducted according to the order demand to update the picking capacity and outbound capacity of the single-piece workstation on the first floor. is the picking capacity of the single-piece workstation on the first floor at wave j, Q0 is the number of pieces picked for the order, is the outgoing capacity of the workstation on the first floor at wave j, and E0 is the estimated number of outgoing boxes of the order. For example, the updating of the picking capacity and outgoing capacity of the single-piece workstation on the first floor can be: in, is the updated picking capacity of wave j of the single-piece workstation on the first floor, The updated out-of-box capacity of wave J for the first floor workstation.

[0089] S450. Consider each wave one by one to determine whether the picking capacity and box-out capacity of the mixed workstation on the first floor are sufficient.

[0090] If the production floor of the item to be produced in the order is the mixed workstation on the first floor, then determine whether the mixed workstation on the first floor and the workstation on the second floor have sufficient production capacity. If the mixed workstation on the first floor has sufficient production capacity, then return sufficient production capacity and use the mixed workstation on the first floor as the production workstation for the order. If the mixed workstation on the first floor has insufficient production capacity, then determine whether the workstation on the second floor has sufficient production capacity.

[0091] In this embodiment, when judging whether the capacity of the mixed workstation on the first floor is sufficient, it is necessary to consider each wave one by one to judge whether the picking capacity and box delivery capacity corresponding to the wave meet the number of picked items and the estimated number of boxes delivered of the order. For example, if the order corresponds to wave i, then it is judged one by one whether the capacity of wave j = i, i-1, i-2, ..., 1 is sufficient. For wave j, if and If it is determined that the mixed workstation on the first floor has sufficient capacity in wave j, the order will be allocated to the mixed workstation on the first floor, and the picking capacity and outbound capacity of the mixed workstation on the first floor will be deducted according to the order demand to update the picking capacity and outbound capacity of the mixed workstation on the first floor. is the picking capacity of the mixed workstation on the first floor at wave j, Q0 is the number of items picked for the order, is the outgoing capacity of the workstation on the first floor at wave j, and E0 is the estimated number of outgoing boxes of the order. Exemplarily, the picking capacity and outgoing capacity of the mixed workstation on the first floor can be updated as follows: in, The updated picking capacity of wave j for the mixed workstation on the first floor. The updated out-of-box capacity of wave J for the first floor workstation.

[0092] S460. Consider each wave one by one and determine whether the picking and unpacking capacity of the second-floor workstation is sufficient.

[0093] If the production floor of the item to be produced in the order is the second-floor workstation, then determine whether the second-floor workstation has sufficient production capacity. If the second-floor workstation has sufficient production capacity, then return sufficient production capacity and use the second-floor workstation as the production workstation for the order. If the second-floor workstation has insufficient production capacity, then assign the order to the manual area.

[0094] In this embodiment, when judging whether the second-floor workstation has sufficient capacity, it is necessary to consider each wave one by one to judge whether the picking capacity and box delivery capacity corresponding to the wave meet the number of picked items and the estimated number of boxes delivered of the order. For example, if the order corresponds to wave i, then it is judged one by one whether the capacity of wave j = i, i-1, i-2, ..., 1 is sufficient. For wave j, if and If it is determined that the workstation on the second floor has sufficient capacity in wave j, the order will be allocated to the workstation on the second floor, and the picking capacity and outbound capacity of the workstation on the second floor will be deducted according to the order requirements to update the picking capacity and outbound capacity of the workstation on the second floor. is the picking capacity of the workstation on the second floor at wave j, Q0 is the number of items picked for the order, is the outgoing capacity of the workstation on the second floor at wave j, and E0 is the estimated number of outgoing boxes of the order. Exemplarily, the updating of the picking capacity and outgoing capacity of the workstation on the second floor can be: in, The updated picking capacity of wave j for the workstation on the second floor, Updated the out-of-box capabilities of wave J for the second floor workstation.

[0095] S470, production capacity is sufficient, and orders are produced in the Shuttle area.

[0096] If any workstation returns that it has sufficient capacity, the order will be assigned to the workstation with sufficient capacity and the order will be produced in the Shuttle area.

[0097] S480, due to insufficient production capacity, orders are produced in the manual area.

[0098] If the production capacity of each workstation is insufficient, the order will be allocated to the manual area for production.

[0099] S490, end.

[0100] In this embodiment, before allocating the order, the production parameter configuration of the workstation and the operation of determining the working capacity of each workstation according to the production parameters are also included. Figure 4b : is a flow chart of determining the production capacity of a workstation in a method for allocating item production tasks provided in Embodiment 4 of the present invention, such as Figure 4b As shown, the method includes:

[0101] S510, start.

[0102] S520. Regularly calculate the picking capacity of the single-piece workstation on the first floor, the mixed workstation on the first floor, and the workstation on the second floor in each wave, and regularly calculate the loop capacity of the workstation on the first floor and the workstation on the second floor in each wave.

[0103] In this embodiment, before calculating the working capacity of each workstation in each wave at a regular interval, it is necessary to determine the relevant working parameters of each workstation. Optionally, the configuration method of the relevant working parameters and the method of calculating the working capacity of each workstation in each wave are as follows:

[0104] (1) Analyze historical peak period (busy period) data and calculate the average picking volume per unit time Q of single-piece workstations on the first floor over multiple time periods 1d , the average picking quantity per unit time Q of the mixed workstation on the first floor 1h and the average picking quantity per unit time Q of the second floor workstation 2 . Count the number of outflow boxes per unit time of the first floor workstation in multiple time periods B 1 and the number of boxes B flowing out of the workstation on the second floor per unit time 2 . Count the average number of pieces picked from a single outbound bin at the workstation on the first floor φ1 (i.e., the average number of pieces picked from a single bin) and the average number of pieces picked from a single outbound bin at the workstation on the second floor φ2. Among them, a time period can be a time period corresponding to a wave. Set the remaining picking capacity control parameter α of the single-piece workstation on the first floor 1d , the remaining picking capacity control parameter α of the mixed workstation on the first floor 1h and the remaining picking capacity control parameter α of the second floor workstation 2 The value of α 1d , α 1h , α 2∈[0,1]. Optional, α 1d , α 1h and α 2 The default value can be 1.

[0105] (2) Timing of production capacity (picking capacity and loop capacity) of each workstation and each wave.

[0106] First, calculate the average picking volume per unit time at the single-piece workstation on the first floor during the recent busy period. Average picking volume per unit time at mixed workstations on the first floor and the average picking volume per unit time of the second floor workstation Then, count the number of workstations N of the currently opened single-piece workstations on the first floor 1d , the number of workstations N on the first floor of the mixed workstation 1h and the number of workstations on the second floor N 2 .

[0107] ① Initialize the picking capacity of each wave of workstations.

[0108] Initialize the remaining picking capacity of each workstation in the current wave. The remaining picking capacity of the single-piece workstation on the first floor in the current wave is: The remaining picking capacity of the current wave of the mixed workstation on the first floor is: The remaining picking capacity of the current wave of the workstation on the second floor is: in, is the remaining picking capacity of the current wave of the single-piece workstation on the first floor, is the remaining picking capacity of the current wave of the mixed workstation on the first floor, is the remaining picking capacity of the current wave of the workstation on the second floor, is the number of items picked in the current wave at the single-piece workstation on the first floor. The number of items picked in the current wave of the mixed workstation on the first floor. is the number of items picked in the current wave of the workstation on the second floor, T1 is the end time of the current wave, T c is the current time, and the meanings of other parameters can refer to the above embodiment.

[0109] Initialize the picking capacity of each workstation for subsequent wave i. The picking capacity of the single-piece workstation on the first floor for subsequent wave i is: The picking capacity of subsequent wave i of the mixed workstation on the first floor is: The picking capacity of subsequent wave i of the workstation on the second floor is: in, is the picking capacity of wave i of the single-piece workstation on the first floor, is the picking capacity of wave i of the mixed workstation on the first floor, is the picking capacity of wave i of the workstation on the second floor, T iis the end production time of wave i, T i-1 It is the end production time of wave i-1. The meanings of other parameters can refer to the above embodiment.

[0110] ② Regularly calculate the loop capacity (i.e., box-out capacity) of the first-floor workstation and the second-floor workstation for each wave.

[0111] Count the number of boxes that flow out per unit time at the workstation on the first floor during the recent busy period and the number of boxes flowing out per unit time at the workstation on the second floor

[0112] Initialize the remaining loop capacity of each workstation in the current wave. The remaining loop capacity of the first floor workstation in the current wave is: The remaining loop capacity of the current wave of the second-floor workstation is: in, is the remaining loop capacity of the current wave of the workstation on the first floor, is the remaining loop capacity of the current wave of workstations on the second floor, is the number of boxes shipped out of the current wave of the single-piece workstation on the first floor. is the number of boxes shipped out of the current wave of the workstation on the second floor, T1 is the end time of the current wave of production, T c is the current time, and the meanings of other parameters can refer to the above embodiment.

[0113] Initialize the loop capacity of each workstation for subsequent wave i.

[0114] The loop capacity of subsequent wave i of the first floor workstation is: The loop capacity of subsequent wave i of the second floor workstation is: in, is the loop capacity of wave i of the workstation on the first floor, is the loop capacity of wave i of the second floor workstation, T i is the end production time of wave i, T i-1 It is the end production time of wave i-1. The meanings of other parameters can refer to the above embodiment.

[0115] S530: Store the calculation results in Redis.

[0116] The remaining picking capacity and remaining loop capacity of the current wave of each workstation and the picking capacity and loop capacity of the subsequent waves of each workstation are stored in Redis for subsequent use.

[0117] S540, end.

[0118] The method for allocating item production tasks provided in this embodiment determines the storage area (such as the shuttle area or the manual area) to which the order belongs based on the production capacity of each work area, deducts the production capacity of different types of workstations based on different types of orders, and takes into account orders that exceed the cut-off time and the production capacity of future waves, so that the allocation of item production tasks is more reasonable.

[0119] Embodiment 5

[0120] Figure 5 1 is a schematic diagram of the structure of a device for allocating item production tasks provided in Embodiment 5 of the present invention. The device for allocating item production tasks may be implemented in software and / or hardware, for example, the device for allocating item production tasks may be configured in a computer device. Figure 5 As shown, the device includes a task information acquisition module 510, a candidate workstation determination module 520 and a production task allocation module 530, wherein:

[0121] Task information acquisition module 510, used to acquire task information included in the current item production task;

[0122] A candidate workstation determination module 520 is used to determine the production type of the item production task according to the task information and a preset task classification rule, and use the workstation corresponding to the production type as a candidate workstation for the item production task;

[0123] The production task allocation module 530 is used to determine the production requirements of the item production task according to the task information, select the candidate workstation whose production capacity meets the production requirements as the production workstation of the item production task according to the production requirements and the production capacity of the candidate workstation, and allocate the item production task to the production workstation.

[0124] The embodiment of the present invention obtains the task information contained in the current item production task through the task information acquisition module; the candidate workstation determination module determines the production type of the item production task according to the task information and a preset task classification rule, and uses the workstation corresponding to the production type as the candidate workstation of the item production task; the production task allocation module determines the production demand of the item production task according to the task information, selects the candidate workstation whose production capacity meets the production demand according to the production demand and the production capacity of the candidate workstation as the production workstation of the item production task, and allocates the item production task to the production workstation, by determining the candidate workstation according to the production type of the item production task, and selecting the production workstation that meets the production demand of the item production task from the candidate workstation, so that the allocation method of the item production task is more reasonable, thereby improving the production efficiency of the item production task.

[0125] Based on the above solution, the production demand includes the task completion time, and the production task allocation module 530 includes:

[0126] A production wave determining unit, used to determine the production wave of the item production task according to the task completion time, wherein the production wave is used to indicate the execution time of the item production task;

[0127] The production workstation determination unit is used to obtain the production capacity of the candidate workstation in the production wave, and use the candidate workstation whose production capacity is higher than the production demand as the production workstation.

[0128] On the basis of the above scheme, the production demand also includes the number of items to be produced and the number of boxes shipped, and the production capacity includes the item picking capacity and the box shipping capacity; the production workstation determination unit is specifically used for:

[0129] The item picking capacity and box delivery capacity of the candidate workstation in the production wave are obtained, and the candidate workstation whose item picking capacity is greater than the number of items to be produced and whose box delivery capacity is greater than the number of boxes delivered is selected as the production workstation.

[0130] Based on the above solution, the production task allocation module 530 includes:

[0131] A production information acquisition unit, used to acquire the task completion time and the number of items to be produced contained in the item production task;

[0132] The outbound parameter acquisition unit is used to acquire the number of items picked in a single box at the candidate workstation, where the number of items picked in a single box is the number of items contained in a single box;

[0133] The box output number determination unit is used to determine the box output number of the item production task according to the number of items to be produced and the number of items picked in a single box.

[0134] Based on the above solution, the device further includes a production capacity determination module, which is used to:

[0135] Before selecting a candidate workstation with a production capacity higher than the production demand as a production workstation for the item production task according to the production demand and the production capacity of the candidate workstation, obtaining production data of at least one historical production wave for each workstation;

[0136] Determine a plurality of production parameters of the workstation according to the production data of the historical waves, wherein the production parameters are used to evaluate the production capacity of the workstation;

[0137] The production capacity of at least one wave of the workstation is evaluated according to the multiple production parameters and preset evaluation rules.

[0138] Based on the above solution, the production capacity determination module is specifically used to:

[0139] pass Determine the item picking capacity of the workstation, wherein: represents the item picking capacity of workstation j in the i-th wave, α j represents the picking capacity control parameter of workstation j, N j represents the number of workstations at workstation j, Q j represents the picking quantity per unit time of workstation j, T i represents the end time of the ith wave, T i-1 Indicates the end time of the i-1th wave;

[0140] pass Determine the outbound capacity of the workstation, wherein: represents the outgoing capacity of workstation j in the i-th wave, β j represents the outbound capacity control parameter of workstation j, B j represents the number of pieces picked per box at workstation j, T i represents the end time of the ith wave, T i-1 Indicates the end time of the i-1th wave.

[0141] Based on the above solution, the production wave determination unit is specifically used to:

[0142] If the task completion time is earlier than the current time, the generation wave of the item production task is determined to be the current wave;

[0143] If the task completion time is not earlier than the current time, the production wave of the item production task is determined according to the task completion time and the production time corresponding to each wave.

[0144] Based on the above solution, the device further includes a production capacity updating module, which is used to:

[0145] After the item production task is assigned to the production workstation, the production capacity of the production workstation is updated according to the production demand.

[0146] The device for allocating item production tasks provided in the embodiment of the present invention can execute the method for allocating item production tasks provided in any embodiment, and has the corresponding functional modules and beneficial effects of the execution method.

[0147] Embodiment 6

[0148] Figure 6 It is a structural diagram of a computer device provided in Embodiment 6 of the present invention. Figure 6A block diagram of an exemplary computer device 612 suitable for use in implementing embodiments of the present invention is shown. Figure 6 The computer device 612 shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.

[0149] like Figure 6 As shown, the computer device 612 is in the form of a general-purpose computing device. The components of the computer device 612 may include, but are not limited to: one or more processors 616, a system memory 628, and a bus 618 that connects different system components (including the system memory 628 and the processor 616).

[0150] Bus 618 represents one or more of several types of bus structures, including a memory bus or memory controller, a peripheral bus, an accelerated graphics port, a local bus to processor 616, or a bus structure using any of a variety of bus architectures. Examples of these architectures include, but are not limited to, an Industry Standard Architecture (ISA) bus, a Micro Channel Architecture (MAC) bus, an Enhanced ISA bus, a Video Electronics Standards Association (VESA) local bus, and a Peripheral Component Interconnect (PCI) bus.

[0151] The computer device 612 typically includes a variety of computer system readable media. These media can be any available media that can be accessed by the computer device 612, including volatile and non-volatile media, removable and non-removable media.

[0152] The system memory 628 may include computer system readable media in the form of volatile memory, such as random access memory (RAM) 630 and / or cache memory 632. The computer device 612 may further include other removable / non-removable, volatile / non-volatile computer system storage media. By way of example only, the storage device 634 may be used to read and write non-removable, non-volatile magnetic media ( Figure 6 not shown, usually called a "hard drive"). Although Figure 6 Not shown, a disk drive for reading and writing to a removable non-volatile disk (e.g., a "floppy disk"), and an optical disk drive for reading and writing to a removable non-volatile optical disk (e.g., a CD-ROM, a DVD-ROM, or other optical media) may be provided. In these cases, each drive may be connected to bus 618 via one or more data medium interfaces. Memory 628 may include at least one program product having a set (e.g., at least one) of program modules that are configured to perform the functions of various embodiments of the present invention.

[0153] A program / utility 640 having a set (at least one) of program modules 642 may be stored, for example, in the memory 628, such program modules 642 including, but not limited to, an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment. The program modules 642 generally perform the functions and / or methods of the embodiments described herein.

[0154] The computer device 612 may also communicate with one or more external devices 614 (e.g., keyboard, pointing device, display 624, etc.), may also communicate with one or more devices that enable a user to interact with the computer device 612, and / or communicate with any device that enables the computer device 612 to communicate with one or more other computing devices (e.g., network card, modem, etc.). Such communication may be performed via an input / output (I / O) interface 622. In addition, the computer device 612 may also communicate with one or more networks (e.g., local area network (LAN), wide area network (WAN) and / or public network, such as the Internet) via a network adapter 620. As shown, the network adapter 620 communicates with other modules of the computer device 612 via a bus 618. It should be understood that, although not shown in the figure, other hardware and / or software modules may be used in conjunction with the computer device 612, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems.

[0155] The processor 616 executes various functional applications and data processing by running the program stored in the system memory 628, for example, implementing the method for allocating item production tasks provided in an embodiment of the present invention, the method comprising:

[0156] Get the task information contained in the current item production task;

[0157] Determine the production type of the item production task according to the task information and a preset task classification rule, and use the workstation corresponding to the production type as a candidate workstation for the item production task;

[0158] The production requirement of the item production task is determined according to the task information, and according to the production requirement and the production capacity of the candidate workstation, the candidate workstation whose production capacity meets the production requirement is selected as the production workstation of the item production task, and the item production task is allocated to the production workstation.

[0159] Of course, those skilled in the art can understand that the processor can also implement the technical solution of the method for allocating item production tasks provided in any embodiment of the present invention.

[0160] Embodiment 7

[0161] Embodiment 7 of the present invention further provides a computer-readable storage medium, on which a computer program is stored. When the program is executed by a processor, the method for allocating item production tasks provided in the embodiment of the present invention is implemented. The method includes:

[0162] Get the task information contained in the current item production task;

[0163] Determine the production type of the item production task according to the task information and a preset task classification rule, and use the workstation corresponding to the production type as a candidate workstation for the item production task;

[0164] The production requirement of the item production task is determined according to the task information, and according to the production requirement and the production capacity of the candidate workstation, the candidate workstation whose production capacity meets the production requirement is selected as the production workstation of the item production task, and the item production task is allocated to the production workstation.

[0165] Of course, the computer-readable storage medium provided by an embodiment of the present invention stores a computer program which is not limited to the method operations described above, but can also execute related operations in the method for allocating item production tasks provided by any embodiment of the present invention.

[0166] The computer storage medium of the embodiment of the present invention can adopt any combination of one or more computer-readable media. The computer-readable medium can be a computer-readable signal medium or a computer-readable storage medium. The computer-readable storage medium can be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples (non-exhaustive list) of computer-readable storage media include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this document, a computer-readable storage medium can be any tangible medium containing or storing a program, which can be used by an instruction execution system, device or device or used in combination with it.

[0167] Computer-readable signal media may include data signals propagated in baseband or as part of a carrier wave, which carry computer-readable program code. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than a computer-readable storage medium, which may send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, apparatus, or device.

[0168] Program code embodied on a computer readable medium may be transmitted using any appropriate medium, including but not limited to wireless, wireline, optical fiber cable, RF, etc., or any suitable combination of the foregoing.

[0169] Computer program code for performing the operations of the present invention may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0170] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims

1. A method for allocating item production tasks, It is characterized in that include: Get the task information contained in the current item production task; Determine the production type of the item production task according to the task information and a preset task classification rule, and use the workstation corresponding to the production type as a candidate workstation for the item production task; Determine the production demand of the item production task according to the task information, select the candidate workstation whose production capacity meets the production demand as the production workstation of the item production task according to the production demand and the production capacity of the candidate workstation, and assign the item production task to the production workstation; The production requirement includes a task completion time, and selecting a candidate workstation whose production capacity meets the production requirement as a production workstation for the item production task according to the production requirement and the production capacity of the candidate workstation includes: Determining a production wave of the item production task according to the task completion time, wherein the production wave is used to indicate the execution time of the item production task; Acquire the production capacity of the candidate workstation in the production wave, and use the candidate workstation whose production capacity is higher than the production demand as the production workstation; Before selecting a candidate workstation whose production capacity meets the production demand as a production workstation for the item production task according to the production demand and the production capacity of the candidate workstation, the method further includes: For each workstation, obtain production data of at least one historical production wave; Determine a plurality of production parameters of the workstation according to the production data of historical waves, wherein the production parameters are used to evaluate the production capacity of the workstation; According to the multiple production parameters and pre-set evaluation rules, evaluate the production capacity of at least one wave of the workstation; The step of evaluating the production capacity of at least one wave of the workstation according to the multiple production parameters and pre-set evaluation rules includes: pass Determine the item picking capacity of the workstation, where R i j represents the item picking capacity of workstation j in the i-th wave, α j represents the picking capacity control parameter of workstation j, N j represents the number of workstations in workstation j, Q j represents the picking quantity per unit time of workstation j, T i represents the end time of the ith wave, T i-1 Indicates the end time of the i-1th wave; By E i j =β j B j (T i -T i-1 ) determines the outbound capacity of the workstation, where E i j represents the outgoing capacity of workstation j in the i-th wave, β j represents the outbound capacity control parameter of workstation j, B j represents the number of pieces picked per box at workstation j, T i represents the end time of the ith wave, T i-1 Indicates the end time of the i-1th wave.

2. The method according to claim 1, It is characterized in that The production demand also includes the number of items to be produced and the number of boxes shipped, and the production capacity includes the item picking capacity and the box shipping capacity; The step of obtaining the production capacity of the candidate workstation in the production wave and using the candidate workstation with a production capacity higher than the production demand as the production workstation includes: The item picking capacity and box delivery capacity of the candidate workstation in the production wave are obtained, and the candidate workstation whose item picking capacity is greater than the number of items to be produced and whose box delivery capacity is greater than the number of boxes delivered is selected as the production workstation.

3. The method according to claim 2, It is characterized in that The determining the production requirement of the item production task according to the task information includes: Obtaining the task completion time and the number of items to be produced contained in the item production task; Obtaining the number of items picked per box at the candidate workstation, where the number of items picked per box is the number of items contained in a single box; The number of boxes output for the item production task is determined according to the number of items to be produced and the number of pieces picked in a single box.

4. The method according to claim 1, It is characterized in that The determining the production wave of the item production task according to the task completion time includes: If the task completion time is earlier than the current time, the generation wave of the item production task is determined to be the current wave; If the task completion time is not earlier than the current time, the production wave of the item production task is determined according to the task completion time and the production time corresponding to each wave.

5. The method according to any one of claims 1 to 4, It is characterized in that After allocating the item production task to the production workstation, the method further includes: The production capacity of the production workstation is updated according to the production demand.

6. A device for allocating production tasks of goods, It is characterized in that include: The task information acquisition module is used to obtain the task information contained in the current item production task; A candidate workstation determination module, used to determine the production type of the item production task according to the task information and a preset task classification rule, and use the workstation corresponding to the production type as a candidate workstation for the item production task; A production task allocation module, used to determine the production demand of the item production task according to the task information, select a candidate workstation whose production capacity meets the production demand as the production workstation of the item production task according to the production demand and the production capacity of the candidate workstation, and allocate the item production task to the production workstation; Wherein, the production demand includes the task completion time, and the production task allocation module includes: A production wave determining unit, used to determine the production wave of the item production task according to the task completion time, wherein the production wave is used to indicate the execution time of the item production task; A production workstation determination unit, configured to obtain the production capacity of the candidate workstation in the production wave, and select the candidate workstation whose production capacity is higher than the production demand as the production workstation; The device also includes a production capacity determination module, which is used to: Before selecting a candidate workstation whose production capacity meets the production demand as a production workstation for the item production task according to the production demand and the production capacity of the candidate workstation, obtaining production data of at least one historical production wave for each workstation; Determine a plurality of production parameters of the workstation according to the production data of historical waves, wherein the production parameters are used to evaluate the production capacity of the workstation; According to the multiple production parameters and pre-set evaluation rules, evaluate the production capacity of at least one wave of the workstation; The production capacity determination module is specifically used for: By R i j =α j N j Q j (T i -T i-1 ) determines the item picking capacity of the workstation, where R i j represents the item picking capacity of workstation j in the i-th wave, α j represents the picking capacity control parameter of workstation j, N j represents the number of workstations in workstation j, Q j represents the picking quantity per unit time of workstation j, T i represents the end time of the ith wave, T i-1 Indicates the end time of the i-1th wave; By E i j =β j B j (T i -T i-1 ) determines the outbound capacity of the workstation, where E i j represents the outgoing capacity of workstation j in the i-th wave, β j represents the outbound capacity control parameter of workstation j, B j represents the number of pieces picked per box at workstation j, T i represents the end time of the ith wave, T i-1 Indicates the end time of the i-1th wave.

7. A computer device, It is characterized in that The device comprises: one or more processors; A storage device for storing one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement the method for allocating item production tasks as described in any one of claims 1-5.

8. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the program is executed by a processor, the method for allocating item production tasks as described in any one of claims 1 to 5 is implemented.

Citation Information

Patent Citations

  • Method and device for automatically distributing production line task

    CN101655715A

  • Order-sorting out-of-warehouse task processing method and apparatus

    CN104881768A

  • Assembly line production scheduling method and system

    CN105045236A

  • Intelligent clothes production scheduling method

    CN105427021A

  • Production planning system and production planning method

    JP2010170353A