An integrated circuit electromagnetic compatibility test method and simulation test system device

By loading multiple electromagnetic field disturbance signals in parallel on the simulation test platform, the method of electromagnetic compatibility test for RF integrated circuits in extreme electromagnetic environments is solved, and the comprehensive electromagnetic compatibility test in high voltage and strong current environments such as smart grids is realized , reduces testing costs and improves reliability.

CN111830355BActive Publication Date: 2024-11-26NORTHWEST UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010817533.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-08-14
Publication Date
2024-11-26
Estimated Expiration
2040-08-14

AI Technical Summary

Technical Problem

The existing technology lacks electromagnetic compatibility test methods and simulation test systems for RF integrated circuits in extreme electromagnetic environments, especially in high voltage and strong current environments such as smart grids. Single electromagnetic field disturbance test cannot simulate multiple practical severe cases. The disturbance causes the test results to be very different from the actual use environment, and it is impossible to ensure the reliability of the integrated circuit in extreme environments.

Method used

An integrated circuit electromagnetic compatibility test method was designed. By loading multiple electromagnetic field disturbance analog signals in parallel on the simulation test platform, it simulates violent disturbances in actual extreme electromagnetic environments, and uses three-phase star-connected electromagnetic field disturbance analog signal output terminal. and corresponding analog loads to ensure parallel loading of high voltage and high current signals and realize comprehensive electromagnetic compatibility tests in extreme electromagnetic environments.

Benefits of technology

It has realized the single electromagnetic compatibility test based on international and domestic standards, simulated the electromagnetic field disturbance in actual extreme electromagnetic environments, conducted comprehensive electromagnetic compatibility tests, reduced the testing cost, and increased the RF integrated circuit and its electronic systems. Reliability in extreme environments is suitable for smart grids, ships, aircraft and other fields.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111830355B_ABST
    Figure CN111830355B_ABST
Patent Text Reader

Abstract

An integrated circuit electromagnetic compatibility test method and a simulation test system device thereof, comprising the following steps: S1, the tested integrated circuit is assembled with a test module and related circuit modules to form a system to be tested; S2, a simulation test platform is set; S3, an electromagnetic field disturbance simulation signal and a simulation load are connected to the simulation test platform; S4, a single electromagnetic field disturbance simulation signal is loaded item by item to perform an electromagnetic compatibility test; S5, multiple electromagnetic field disturbance simulation signals are loaded simultaneously to perform an electromagnetic compatibility comprehensive test in an extreme electromagnetic environment; S6, the test results are analyzed and evaluated. It is possible to perform an electromagnetic compatibility test of a single electromagnetic field disturbance signal, and to load multiple electromagnetic field disturbance simulation signals simultaneously to simulate the severe disturbance of the electromagnetic field in an actual extreme electromagnetic environment, and to perform an electromagnetic compatibility comprehensive test. Therefore, the error between the test result and the actual electromagnetic environment is small. It can be used in various stages such as R&D test, type test, acceptance test, and production test.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the two major technical fields of power technology and microelectronics technology, and relates to a testing method and a testing system, which are suitable for electromagnetic compatibility testing of integrated circuits and their application electronic systems, especially electromagnetic compatibility testing technology of radio frequency integrated circuits and their application electronic systems when working in extreme electromagnetic environments. Background Art

[0002] The electromagnetic compatibility test of integrated circuits, including radio frequency integrated circuits, is usually carried out by assembling the tested integrated circuit samples into test modules and then placing them in an automatic test system for testing. This test includes not only electromagnetic compatibility testing, but more importantly, testing of various functions and performance indicators. For integrated circuits, including radio frequency integrated circuits, used in general electromagnetic environments, this test is sufficient to meet their use requirements. For example, the invention patent application with application number 201710016097.9: "A Bluetooth integrated circuit test system and test method", and the invention patent application with application number 201910153501.6: "A radio frequency mixed signal integrated circuit test system and test method" are such. However, for integrated circuits, especially radio frequency integrated circuits, used in extreme electromagnetic environments, such as extreme electromagnetic environments with high voltages of several kilovolts, tens of kilovolts, hundreds of kilovolts or even thousands of kilovolts, and strong currents of tens of amperes, hundreds of amperes, several kiloamperes or even tens of kiloamperes, it is far from enough to just do such tests. Especially for electromagnetic compatibility testing, a special simulation test environment must be set up to conduct electromagnetic compatibility testing in order to evaluate the various performance indicators of the integrated circuit, especially the electromagnetic compatibility performance indicators.

[0003] The extreme electromagnetic environment generally refers to the complex and special electromagnetic environment of aircraft, spacecraft, ships and vehicles. In recent years, with the continuous development of smart grids, the complexity of this extreme electromagnetic environment has become more severe due to its high voltage and strong current characteristics. The invention patent application with application number 201811159403.5: "A generator electromagnetic compatibility test method" discloses an electromagnetic compatibility test method for electrical equipment used on ships; the invention patent application with application number 201510655755.X: "Test method for verifying electromagnetic compatibility between satellite radio frequency subsystems", the invention patent application with application number 201110262626.6: "Electromagnetic compatibility test method for electric propulsion system and on-board radio frequency equipment radiation", the invention patent application with application number 200910242500.5: "Electromagnetic compatibility test method for electric propulsion system The three invention patents disclosed the electromagnetic compatibility test method for related equipment used on spacecraft; the invention patent application with application number 201110051086.7: "A surface current injection technology for replacing electromagnetic compatibility radiation test" discloses the electromagnetic compatibility test method of electrical equipment mainly used in electromagnetic environments such as aircraft; the invention patent application with application number 201710587037.2: "A new type of new energy vehicle body electronic electromagnetic compatibility test method" discloses the electromagnetic compatibility test method of electronic equipment in an electromagnetic environment such as a vehicle.

[0004] For the extreme electromagnetic environment of high voltage and strong current such as smart grid, the number of its application products is extremely large and the technical field is very broad. Therefore, whether it is the international ISO, IEC, CISPR standard series, or my country's national standards and energy industry standard series, there are extensive and detailed regulations on the electromagnetic compatibility of electronic equipment used in such extreme electromagnetic environments, from limit indicators to test methods. For example, GB / T 17626.XX / IEC 61000-4-XX, CISPR XX-XX, etc. This series of standards has made detailed specifications for various electromagnetic compatibility tests and measurement technologies. At the same time, some product standards used in smart grids have also made more detailed and specific regulations on the limit requirements and test methods of the electromagnetic compatibility of their respective products. For example, Section 6.9 of China's national energy industry standard NB / T 42044-2014 "3.6kV~40.5kV intelligent AC metal-enclosed switchgear and control equipment" requires that the electromagnetic compatibility test of this product be carried out in accordance with the provisions of GB / T11022-2011, and makes the following supplements: the oscillation wave immunity test is carried out in accordance with GB / T 17626.12-2013; the surge immunity test is carried out in accordance with GB / T 17626.5-2008; the pulse magnetic field immunity test is carried out in accordance with GB / T17626.9-2011; the damped oscillation magnetic field immunity test is carried out in accordance with GB / T 17626.10-1998. There are also detailed provisions for electromagnetic compatibility tests in China's national energy industry standard NB / T 42025-2013 "Intelligent gas-insulated metal-enclosed switchgear with rated voltage of 72.5kV and above" and China's national energy industry standard NB / T 10091-2018 "Technical Specifications for Online Temperature Monitoring Devices for High-voltage Switchgear". In addition to the test contents specified in the above four standards, these two product standards also add the following electromagnetic compatibility test contents: radio frequency electromagnetic field radiation immunity test-GB / T17626.3-2016; electrostatic discharge immunity test-GB / T 17626.2-2018; electrical fast transient pulse group immunity test-GB / T 17626.4-2018; power frequency magnetic field immunity test-GB / T 17626.8-2006, etc. These standards not only specify the limits and criteria for various electromagnetic compatibility tests, but also standardize the test methods and technical equipment for various electromagnetic compatibility.

[0005] Looking at the series of standards and known technical documents related to electromagnetic compatibility testing and measurement technology, the following problems are obvious: On the one hand, they are basically electromagnetic compatibility tests for electronic devices or intelligent systems, and there is a lack of electromagnetic compatibility test methods for integrated circuits and their simulation test system devices, especially electromagnetic compatibility test devices for RF integrated circuits when used in smart grids. Because for electronic devices that are not composed of RF integrated circuits, if they are used in extreme electromagnetic environments such as smart grids, they usually need to be placed in an electromagnetic shielding body, and the disturbance of strong external electromagnetic fields has limited impact on the internal integrated circuits. For RF integrated circuits to work, the antenna must be placed outside the shielding body. Any changes in the electromagnetic field outside the shielding body will be directly coupled to the RF integrated circuit through the antenna. Therefore, for RF integrated circuits working in an extreme electromagnetic environment such as a smart grid, it is very necessary to supplement their electromagnetic compatibility evaluation and testing on the basis of the above standards.

[0006] On the other hand, the various tests are all conducted one by one for a single electromagnetic field disturbance signal, which not only requires a large shielded darkroom and high testing costs, but also lacks a test method for loading multiple electromagnetic field disturbance signals into the electromagnetic environment in parallel, and the test results have a large error with the electromagnetic environment during actual use. In this way, even if all the individual tests are qualified, it cannot be ensured that the electronic equipment, especially the radio frequency integrated circuit therein, will not fail during actual use due to the disturbance of some strong electromagnetic field, thereby causing huge operating failures and causing irreparable and significant losses. Because in the actual operation process, whether it is a lightning discharge or a switch action, it may cause the various violent electromagnetic field disturbances to occur simultaneously.

[0007] In recent years, ultra-high voltage direct current transmission technology has developed rapidly. For example, the ±500kV and ±800kV direct current transmission projects put into operation in recent years include a large number of high-power converters. The electromagnetic environment of such converter substations is extremely harsh, and the integrated circuits working therein, especially the radio frequency integrated circuits and their electronic systems, must undergo special electromagnetic compatibility tests to ensure their reliable online operation.

[0008] In view of the above-mentioned problems, it is necessary to provide a simple method and simulation test system device for electromagnetic compatibility testing after the design of integrated circuits, especially radio frequency integrated circuits, is completed and tape-out. At the same time, the method and device should also be able to meet the comprehensive electromagnetic compatibility test requirements of working in a certain extreme electromagnetic environment after the design is finalized and the electronic system is formed, so as to be used by integrated circuits and their electronic system products in various stages such as R&D test, type test, acceptance test, and production test. Summary of the invention

[0009] In order to overcome the deficiencies of the above-mentioned prior art and to meet the testing requirements of integrated circuits, especially radio frequency integrated circuits, for electromagnetic compatibility evaluation and assessment in extreme electromagnetic environments after the design and tape-out are completed to obtain samples, or after the intelligent electronic system is composed of the integrated circuits, the purpose of the present invention is to provide an integrated circuit electromagnetic compatibility test method and a simulation test system device, which can not only perform electromagnetic compatibility tests of various single electromagnetic disturbances in accordance with international and domestic general standards, but also simulate multiple electromagnetic disturbance signals of the electromagnetic field in the actual extreme electromagnetic environment, so as to conduct a comprehensive electromagnetic compatibility test in the extreme electromagnetic environment.

[0010] In order to achieve the above object, the technical solution adopted by the present invention is:

[0011] An integrated circuit electromagnetic compatibility test method comprises the following steps:

[0012] S1. For the IC samples that have completed the general function and performance tests, assemble at least one test module according to their typical applications, and form at least one system to be tested with related circuit modules;

[0013] S2. Assemble an electromagnetic compatibility simulation test platform according to the electromagnetic environment of the tested integrated circuit, in which the tested integrated circuit test module and its tested system and the main equipment working together with the tested integrated circuit are set;

[0014] S3, setting an electromagnetic field disturbance simulation signal and its simulation load, and connecting them to a simulation test platform through a plurality of switches connected in parallel at the output end;

[0015] S4. According to the application product standard requirements of the tested integrated circuit, load each single electromagnetic field disturbance simulation signal to the simulation test platform one by one, and conduct electromagnetic compatibility tests of each single electromagnetic interference;

[0016] S5. Load multiple electromagnetic field disturbance simulation signals to the simulation test platform in parallel to simulate the severe disturbance of the electromagnetic field in the actual extreme electromagnetic environment and conduct comprehensive electromagnetic compatibility tests in extreme electromagnetic environments;

[0017] S6. Compare and analyze the individual test results of S4 with the comprehensive test results of S5 for use in various stages of integrated circuits and their electronic system products such as R&D tests, type tests, acceptance tests, and production tests.

[0018] The technical key of the method is S5 "parallel loading of multiple electromagnetic field disturbance simulation signals to the simulation test platform to simulate the violent disturbance of the electromagnetic field in the actual extreme electromagnetic environment". If this is not achieved, it is impossible to "conduct comprehensive electromagnetic compatibility tests in extreme electromagnetic environments". In order to achieve this goal, it is necessary to solve the technical problem of loading ultra-high voltage voltage signals of several kilovolts, tens of kilovolts, hundreds of kilovolts or even thousands of kilovolts and strong high current signals of tens of amperes, hundreds of amperes, several kiloamperes or even tens of kiloamperes in parallel into the simulation test platform, specifically loading them onto the main equipment in the platform.

[0019] The present invention solves this technical problem in this way:

[0020] The output end of each electromagnetic field disturbance simulation signal and the corresponding simulated load are set to be three-phase star-connected, and the neutral line is connected to the suspended ground and insulated from the chassis and power supply ground. The suspended ground of the electromagnetic field disturbance simulation signal output end is separately connected to the suspended ground of its corresponding simulated load, and is insulated from the suspended ground of other electromagnetic field disturbance simulation signals and corresponding simulated loads. Therefore, when conducting comprehensive electromagnetic compatibility tests in extreme electromagnetic environments, multiple electromagnetic field disturbance simulation signals can be loaded into the simulation test platform in parallel.

[0021] The "integrated circuit electromagnetic compatibility test method and simulation test system device" described in the present invention can not only perform electromagnetic compatibility tests of various single electromagnetic field disturbances in accordance with international and domestic general standards, but also simulate the severe disturbance of the electromagnetic field in the actual extreme electromagnetic environment to conduct comprehensive electromagnetic compatibility tests in extreme electromagnetic environments.

[0022] The "IC electromagnetic compatibility simulation test system device" described in the present invention is composed of a number of electric field disturbance simulation signals and their loads, a number of magnetic field disturbance simulation signals and their loads, a test module containing the tested integrated circuit and a system to be tested composed of related circuit modules, a simulation test platform and a monitoring terminal. The simulation test platform is provided with a main device that works together with the tested integrated circuit, and the monitoring terminal is installed with various electromagnetic compatibility test operating programs and drivers for various related devices.

[0023] Taking the smart grid in an extreme electromagnetic environment as an example, its simulation test platform can be composed of a six-sided detachable metal box, in which the main equipment working with the tested integrated circuit is installed, namely the main power circuit equipment. The main power circuit equipment includes at least one detachable high-voltage switch, at least 3 rows of detachable busbars and at least one detachable cable head.

[0024] After analyzing and synthesizing the existing standards for electromagnetic compatibility testing, it is concluded that the electromagnetic field disturbance simulation signals are basically divided into two categories: one is the electric field disturbance simulation signal, and the other is the magnetic field disturbance simulation signal. The electric field disturbance simulation signal is further divided into two categories: high-voltage AC voltage simulation signal and high-voltage impulse voltage simulation signal, and the corresponding electric field simulation loads are AC voltage load and impulse voltage load, respectively. The magnetic field disturbance simulation signal is further divided into two categories: strong power frequency (including harmonics) current simulation signal and strong impulse current simulation signal, and the corresponding magnetic field simulation loads are power frequency (including harmonics) current load and impulse current load, respectively.

[0025] Therefore, the electric field disturbance simulation signal can be mainly composed of a three-phase step-up transformer. Its input end is connected to the three-phase AC 0.4kV (or 10kV) mains power grid, on which a waveform control unit is connected, and its neutral line is connected to the box and the power ground; its output end is set to different voltage levels according to the test requirements, and is connected in a star connection mode, and is connected to the simulation test platform through the three-phase parallel control switch at the output end, and the neutral line is connected to the floating ground and insulated from the box and the power ground.

[0026] The electric field simulation load sets different levels of loads according to different voltage levels. The AC voltage load and the impulse voltage load are connected in a star connection mode. The neutral line is connected to a suspended ground that is insulated from the chassis and the power supply ground, and is separately connected to the suspended ground of the output end of the high-voltage AC voltage signal or the high-voltage impulse voltage signal in the corresponding electric field simulation interference signal, and is insulated from the suspended grounds of other electromagnetic field disturbance simulation signals and their corresponding simulation loads.

[0027] The magnetic field disturbance simulation signal can be mainly composed of a three-phase step-down transformer. Its input end is connected to a three-phase AC 0.4kV (or 10kV) mains power grid, on which a waveform control unit is connected, and its neutral line is connected to the box and the power ground; its output end is set to different grades of current levels according to the test requirements, and is connected in a star connection mode, and is connected to the simulation test platform through a three-phase parallel control switch at the output end, and the neutral line is connected to a suspended ground and insulated from the box and the power ground.

[0028] The magnetic field simulation load sets different levels of loads according to different levels of current grades. The power frequency (including harmonics) current load and the impact current load are connected in a star connection mode. The neutral line is connected to a suspended ground and is insulated from the chassis and the power supply ground. It is separately connected to the suspended ground of the output end of the strong power frequency (including harmonics) current signal or the strong impact current signal in the corresponding magnetic field simulation interference signal, and is insulated from the suspended ground of other electromagnetic field disturbance simulation signals and their corresponding simulation loads.

[0029] Although the output voltage of the electric field disturbance simulation signal is very high, several kilovolts, tens of kilovolts, hundreds of kilovolts or even thousands of kilovolts, the load impedance (capacitive reactance) of its near-field coupling loop is very high, so the loop current is extremely small; although the load loop current of the magnetic field simulation signal is very large, tens of amperes, hundreds of amperes, several kiloamperes or even tens of kiloamperes, the load impedance (inductive reactance) of its current conduction loop is extremely low, and the output load voltage is also extremely low. Based on this principle, the electromagnetic field disturbance simulation signal and simulated load are designed, which not only solves the technical problem of "parallel loading of multiple electromagnetic field disturbance simulation signals to the simulation test platform", but also ensures that the power of various electromagnetic field disturbance simulation signal sources is not too large to be realized.

[0030] In the "integrated circuit electromagnetic compatibility test method" provided by the present invention, the operation process of S5 "conducting a comprehensive electromagnetic compatibility test of multiple electromagnetic field disturbances" is as follows: 1. Multiple electromagnetic field disturbance simulation signals are loaded in parallel onto a main device that works with the tested integrated circuit in a simulation test platform through corresponding output parallel control switches; 2. The switches on the corresponding simulated loads of each electromagnetic field disturbance simulation signal are operated so that they are loaded onto their respective simulated loads at the same time; 3. Under the monitoring of a monitoring terminal, the main device and each control switch on the simulation test platform are operated to simulate the severe disturbance of the electromagnetic field in an actual extreme electromagnetic environment; 4. Comprehensive electromagnetic compatibility tests are conducted in various extreme electromagnetic environments respectively, and the monitoring terminal records the test result data.

[0031] The electromagnetic compatibility test method and simulation test system device described in the present invention are mainly suitable for electromagnetic compatibility tests in extreme electromagnetic environments. The extreme electromagnetic environment not only refers to smart grids, but also includes other extreme electromagnetic environments such as ships, aircraft, spacecraft and vehicles; the test circuit not only refers to radio frequency integrated circuits, but also includes other integrated circuits, circuit boards, circuit modules and application electronic systems. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 This is a principle block diagram of the "integrated circuit electromagnetic compatibility test method and its simulation test system device" described in the present invention.

[0033] Figure 2 The figure is a schematic diagram of the wiring principle of an embodiment of the present invention.

[0034] Figure 3 Schematic diagram of the wiring principle between the electromagnetic field disturbance simulation signal and the simulation test platform in an embodiment of the present invention.

[0035] Figure 4 This is a schematic diagram of the wiring principle between the electric field disturbance simulation signal and the simulation voltage load.

[0036] Figure 5This is a schematic diagram of the wiring principle between the magnetic field disturbance simulation interference signal and the simulation current load. DETAILED DESCRIPTION

[0037] The following is a further description of the "integrated circuit electromagnetic compatibility test method and simulation test system device thereof" of the present invention in conjunction with the accompanying drawings and embodiments.

[0038] Figure 1 The following is a principle block diagram of the "integrated circuit electromagnetic compatibility test method and simulation test system device thereof" provided by the present invention:

[0039] First, a simulation test platform [1] is set up, and a system under test (hereinafter referred to as "tested integrated circuit system under test") [5, 6, 7] consisting of a test module containing a test integrated circuit and related circuit modules is assembled in the simulation test platform [1]. The "tested integrated circuit system under test" is linked to a monitoring terminal [9] via an uplink channel [8]. A main device that works together with the test integrated circuit is arranged in the simulation test platform [1]. A magnetic field disturbance simulation signal and its simulated load [11, 13, 17, 18], an electric field disturbance simulation interference signal and its simulated load [12, 14, 15, 16] are respectively connected to the simulation test platform [1] to form an integrated circuit electromagnetic compatibility simulation test system device. Then, under the monitoring of the monitoring terminal [9], first operate each control switch to load each single electromagnetic field disturbance simulation signal to the simulation test platform [1] one by one, and perform the electromagnetic compatibility test of each single electromagnetic field disturbance; then operate each control switch to load multiple electromagnetic field disturbance simulation signals to the simulation test platform [1] in parallel, and perform the comprehensive electromagnetic compatibility test of the extreme electromagnetic environment. The test result data is recorded in the monitoring terminal [9].

[0040] Figure 2 The figure shows a wiring schematic diagram of an embodiment of the present invention. This embodiment is suitable for electromagnetic compatibility testing of radio frequency integrated circuits and their application systems, and the electromagnetic environment is a 10kV (or 35kV) smart grid. The tested integrated circuit is a radio frequency integrated circuit used in a smart grid, and the test module is a wireless sensor (including an antenna) [5]; the related circuit module is a signal collector (including an antenna) [7]; and the system to be tested is a radio frequency communication system composed of a wireless sensor (including an antenna) [5] and a signal collector (including an antenna) [7].

[0041] Figure 2In the present invention, a simulation test platform [1] is composed of a six-sided detachable metal box; at least one detachable high-voltage switch [2], at least three rows of detachable busbars [3] and at least one detachable cable head [4] are arranged in the simulation test platform [1], and at least one instrument box [6] is also arranged; at least one test wireless sensor (including antenna) [5] is arranged on the high-voltage switch [2], the busbar [3] and the cable head [4]; at least one signal collector (including antenna) [7] is installed on the instrument box [6], and the signal collector [7] is connected to the monitoring terminal [9] through an uplink channel [8].

[0042] Figure 2 In the embodiment, a strong power frequency (including harmonics) current signal

[11] and a strong impulse current signal

[13] simulating magnetic field disturbance, and a high voltage AC voltage signal

[12] and a high voltage impulse voltage signal

[14] simulating electric field disturbance are respectively connected to the input end of each switch in the control switch cabinet

[10] . The output end of each switch in the switch cabinet

[10] is connected in parallel and connected to the input end of the high voltage switch [2] in the simulation test platform [1]. The output end of the high voltage switch [2] is connected in series with the busbar [3] and the cable head [4]. The cable head [4] is connected in parallel with the input end of the control switch of the impulse voltage load

[15] , the AC voltage load

[16] , the impulse current load

[17] , the power frequency (including harmonics) current load

[18] , etc. through the output cable.

[0043] In this embodiment, the method for performing the electromagnetic compatibility test is:

[0044] S1. After completing the general function and performance test of the IC sample under test, assemble multiple (at least one) test wireless sensors (including antennas) [5] according to their typical applications, and then form a one-to-many (at least one) RF communication system under test with a wireless signal collector (including antennas) [7].

[0045] S2. An electromagnetic compatibility simulation test platform [1] is assembled according to the electromagnetic environment of the IC under test. The system to be tested consists of a wireless sensor (including antenna) [5] and a signal collector (including antenna) [7], and the main power circuit equipment [2, 3, 4] working together with the IC under test is set therein. The signal collector (including antenna) [7] is connected to the monitoring terminal [9] through an uplink channel [8]. The monitoring terminal [9] is installed with various electromagnetic compatibility test operation programs and drivers for various related devices.

[0046] S3. According to the two categories of electric field disturbance simulation signals and magnetic field disturbance simulation signals, electromagnetic field disturbance simulation signals [11, 12, 13, 14] and simulation loads [15, 16, 17, 18] are connected to the simulation test platform [1]. Each electromagnetic field disturbance simulation signal can be loaded into the simulation test platform [1] separately or in parallel.

[0047] S4. According to the application product standard requirements of the tested integrated circuit, load various electromagnetic field disturbance simulation signals to the simulation test platform [1] one by one, and conduct electromagnetic compatibility tests for each single electromagnetic field disturbance.

[0048] S5. Load multiple electromagnetic field disturbance simulation signals in parallel to the simulation test platform [1] to simulate the severe disturbance of the electromagnetic field in the actual extreme electromagnetic environment and conduct a comprehensive electromagnetic compatibility test in the extreme electromagnetic environment.

[0049] S6. Compare and analyze the individual test results of S4 with the comprehensive test results of S5 for use in various stages of integrated circuits and their electronic system products such as R&D tests, type tests, acceptance tests, and production tests.

[0050] The simulation test system device in this embodiment can load various single electromagnetic field disturbance simulation signals to the high-voltage switch [2], busbar [3] and cable head [4] in the simulation test platform [1] according to relevant standards to carry out various single electromagnetic field disturbance electromagnetic compatibility tests, and can also load multiple electromagnetic field disturbance simulation signals in parallel to the high-voltage switch [2], busbar [3] and cable head [4] in the simulation test platform [1] to simulate the severe disturbance of the electromagnetic field in an actual extreme electromagnetic environment and carry out a comprehensive electromagnetic compatibility test in an extreme electromagnetic environment.

[0051] In this embodiment, the detailed operation process of performing the electromagnetic compatibility test is as follows:

[0052] First, according to the product standard requirements of the RF integrated circuit to be tested and its application system, the control switch cabinet

[10] selects the corresponding electromagnetic field disturbance simulation signal in combination with the switches on each simulated load, and loads it to the high-voltage switch [2], busbar [3] and cable head [4] and the corresponding simulated load, and performs electromagnetic compatibility tests of power frequency (including harmonics) electric field and magnetic field, electromagnetic compatibility tests of lightning and high-altitude electromagnetic pulses, electromagnetic compatibility tests of transient pulse trains generated by the switching equipment and control equipment, and electromagnetic compatibility tests of other electromagnetic field disturbance signal sources caused by system faults such as insulation breakdown. Then, the switches on the control switch cabinet

[10] and each simulated load are operated to load multiple electromagnetic field disturbance simulation signals such as strong power frequency (including harmonics) current signal

[11] , strong impulse current signal

[13] , high voltage AC voltage signal

[12] , high voltage impulse voltage signal

[14] in parallel to the high voltage switch [2], busbar [3] and cable head [4] and their respective simulated loads, and under the monitoring of the monitoring terminal [9], a comprehensive electromagnetic compatibility test of the radio frequency integrated circuit and its application system in an extreme electromagnetic environment is carried out. The monitoring terminal [9] records the test data during each test.

[0053] In this embodiment, the operation process of the comprehensive electromagnetic compatibility test in the extreme electromagnetic environment is as follows: 1. The high-voltage switch connected in parallel at the output end of the control switch cabinet

[10] is operated to load multiple electromagnetic field disturbance simulation signals such as a strong power frequency (including harmonics) current signal

[11] , a strong impulse current signal

[13] , a high-voltage AC voltage signal

[12] , and a high-voltage impulse voltage signal

[14] in parallel to the high-voltage switch [2], the busbar [3], and the cable head [4] in the simulation test platform [1]; 2. The corresponding simulation signals of each electromagnetic field disturbance simulation signal are operated. The simulated loads (15, 16, 17, 18) are switched on and off so that multiple electromagnetic field disturbance simulation signals are simultaneously loaded onto the respective simulated loads; 3. Under the monitoring of the monitoring terminal [9], the high-voltage switch [2] in the simulation test platform [1], the switches in the control switch cabinet

[10] , the switches of the simulated loads [15, 16, 17, 18], etc. are operated to simulate the severe disturbance of the electromagnetic field in the actual extreme electromagnetic environment; 4. Comprehensive electromagnetic compatibility tests are carried out in various extreme electromagnetic environments respectively, and the test result data are recorded by the monitoring terminal [9].

[0054] Figure 3 The figure shows a schematic diagram of the wiring principle between the electromagnetic field disturbance simulation signal and the simulation test platform in an embodiment of the present invention. The disturbance simulation signals that generate extreme electromagnetic environments are divided into two categories: one is a strong magnetic field disturbance simulation signal [11, 13], including a strong power frequency (including harmonics) current signal

[11] and a strong impulse current signal

[13] ; the other is a high-voltage electric field disturbance simulation signal [12, 14], including a high-voltage AC voltage signal

[12] and a high-voltage impulse voltage signal

[14] .

[0055] It should be noted again that, although the peak voltage of the electric field disturbance simulation signal is very high, in the electromagnetic space where the tested integrated circuit works, the impedance (capacitive reactance) between its near-field coupling loop, i.e., the high-voltage switch [2], busbar [3], and cable head [4], and the box, power ground, and the system under test is very high, and the energy consumption is extremely small, so a very small simulated load current can be set accordingly. Similarly, although the peak current of the magnetic field disturbance simulation signal is very large, in the electromagnetic space where the tested integrated circuit works, the load impedance (inductive reactance) of its conduction loop, i.e., the high-voltage switch [2], busbar [3], and cable head [4] is extremely small, and the power consumption is extremely low, so a very low simulated load voltage drop can be set accordingly. Therefore, an extremely complex electromagnetic environment can be synthesized by passing the corresponding simulated voltage signal and simulated current signal on the main circuit switch [2], busbar [3], and cable head [4]. Based on this principle, the electric field disturbance simulation signal and the magnetic field disturbance simulation signal can be set separately, and the signal source will not be too powerful to be realized.

[0056] Based on the above principles, Figure 3 The medium-strong magnetic field simulation signal [11, 13] is mainly composed of a three-phase step-down transformer. The input end of the transformer is connected to a 0.4kV (or 10kV) AC power supply, on which a waveform control unit is installed, and its neutral line and the box are connected to the power ground; the output end of the transformer is connected to a high-voltage switch of the control switch cabinet

[10] , and its neutral line is insulated from the box and the power ground as a floating ground.

[0057] Similarly, Figure 3 The medium and high voltage electric field simulation signal [12, 14] is mainly composed of a three-phase step-up transformer. The input end of the transformer is connected to a 0.4kV (or 10kV) AC power supply, on which a waveform control unit is installed, and its neutral line and the box are connected to the power ground; the output end of the transformer is connected to a high voltage switch of the control switch cabinet

[10] , and its neutral line is insulated from the box and the power ground as a floating ground.

[0058] like Figure 3 As shown, the control switch cabinet

[10] is composed of a modified 10kV (or 35kV) high-voltage power distribution cabinet. At least four power distribution switches are installed according to the number of electromagnetic field disturbance simulation signals, and the input end of each power distribution switch is connected to the output end of the corresponding electromagnetic field disturbance simulation signal. The output ends of all the power distribution switches are connected in three phases in parallel and connected to the input end of the high-voltage switch [2] in the simulation test platform [1].

[0059] like Figure 3As shown, the simulation test platform [1] is composed of a modified 10kV (or 35kV) high-voltage switch cabinet. A high-voltage switch [2], a busbar [3] and a cable head [4] are installed inside. The rated voltage of the high-voltage switch [2] is greater than the maximum value of the electric field disturbance simulation signal, and the rated current is greater than the maximum value of the magnetic field disturbance simulation signal. The input end of the high-voltage switch [2] is connected to the output end of each distribution switch in the control switch cabinet

[10] . The output cable connected to the cable head [4] is connected in three phases in parallel with the input end of the high-voltage switch on each electromagnetic field simulation load.

[0060] like Figure 3 As shown, the simulated loads of the electromagnetic field disturbance simulation signal are divided into two categories: one is the simulated voltage load [15, 16] corresponding to the electric field disturbance simulation signal [12, 14], including impulse voltage load

[15] and AC voltage load

[16] ; the other is the simulated current load [17, 18] corresponding to the magnetic field disturbance simulation signal [11, 13], including impulse current load

[17] and power frequency (including harmonic) current load

[18] .

[0061] Figure 4 The diagram shows the wiring principle between the electric field disturbance simulation signal and the simulation voltage load. An AC three-phase high-voltage switch is arranged in the simulation voltage load [15, 16], and its input end is connected in parallel with the output of the cable head [4] in the simulation test platform [1], or directly connected in parallel with the busbar [3] and the high-voltage switch [2]. The loads in the simulation voltage load [15, 16] are all three-phase star-connected, and their neutral lines are connected to the suspended ground insulated from the box and the power supply ground, and are separately connected to the suspended ground in the corresponding electric field disturbance simulation signal [12, 14], and are mutually insulated from the suspended ground of other electromagnetic field disturbance simulation signals and their corresponding simulation loads.

[0062] Figure 5 The figure shows the wiring principle diagram between the magnetic field disturbance simulation signal and the simulation current load. An AC three-phase high-voltage switch is arranged in the simulation current load [17, 18], and its input end is connected in parallel with the output of the cable head [4] of the simulation test platform [1], or directly connected in parallel with the busbar [3] and the high-voltage switch [2]. The loads in the simulation current load [17, 18] are all three-phase star-connected, and their neutral lines are connected to the suspended ground and insulated from the box and the power supply ground, and are separately connected to the suspended ground in the corresponding magnetic field disturbance simulation signal [11, 13], and are insulated from the suspended ground of other electromagnetic field disturbance simulation signals and their corresponding simulation loads.

[0063] In summary, the suspended ground between the strong power frequency (including harmonics) current signal

[11] and the power frequency (including harmonics) current load

[18] , between the high voltage AC voltage signal

[12] and the AC voltage load

[16] , between the strong impulse current signal

[13] and the impulse current load

[17] , and between the high voltage impulse voltage signal

[14] and the impulse voltage load

[15] are directly connected and insulated from each other. Therefore, all switches of the operating control switch cabinet

[10] and all switches of the simulated load are in a closed state, and then the opening and closing of the high voltage switch [2] are controlled, so that various types of electromagnetic field disturbance simulation signals can be loaded into the simulation test platform [1] at the same time, thereby generating an extreme electromagnetic field disturbance simulation environment in the simulation test platform [1], and conducting a comprehensive electromagnetic compatibility test of the extreme electromagnetic environment.

[0064] If the IC under test is other non-RF IC, its test samples can be assembled into a test module according to the application principle and installed in the instrument box [6] in the simulation test platform [1]. If the module under test is other electronic devices or systems, it can be directly installed in the simulation test platform [1]. In this way, the electromagnetic compatibility test under various electromagnetic environments can be carried out, and the electromagnetic compatibility comprehensive test under the extreme electromagnetic field disturbance simulation environment can also be carried out.

[0065] Compared with the prior art, the present invention has obvious technical advantages in the following three aspects:

[0066] 1. It fills the technical gap of the method of conducting electromagnetic compatibility test of integrated circuits, especially radio frequency integrated circuits and its simulation test system device, and is simple to operate and easy to implement, so that it is no longer restricted in the electromagnetic compatibility design and verification of integrated circuits.

[0067] 2. Conducting electromagnetic compatibility tests without using professional electromagnetic compatibility laboratories avoids the need to build electromagnetic compatibility laboratories that cost tens of millions of yuan. The cost of using them is acceptable to general integrated circuit design and application units. For units that develop smart electronic equipment in smart grids, the test costs can be greatly reduced, saving investment.

[0068] 3. It solves the technical problem of simulating extremely complex and violently disturbed electromagnetic environments with extremely small power electromagnetic disturbance signal sources in a limited space. For example, in electromagnetic environments with high voltages of several kilovolts, tens of kilovolts, hundreds of kilovolts or even thousands of kilovolts, and strong currents of tens of amperes, hundreds of amperes, several kiloamperes or even tens of kiloamperes, especially in the ultra-high voltage direct current transmission system that has been rapidly developed in recent years, because the system contains a large number of high-power current conversion equipment, its electromagnetic environment is extremely harsh. The present invention makes it easier to carry out comprehensive electromagnetic compatibility tests of integrated circuits, especially radio frequency integrated circuits and their electronic systems in extreme electromagnetic environments. The experimental environment is truly close to the actual operating environment, and can reflect the electromagnetic compatibility performance of the tested integrated circuits, especially radio frequency integrated circuits and their application systems. The results of the electromagnetic compatibility test are closer to reality, which provides basic test conditions for improving the reliability of the tested products in extreme electromagnetic environments.

[0069] The present invention is not limited to the contents disclosed in the above embodiments and drawings, nor is it limited to the electromagnetic environment of smart grids and the application of integrated circuit design and use units. Various substitutions, deformations and modifications made by technicians in this field within the scope of the claims of the present invention are included in the essential content of the present invention. The scope of protection required by the present invention is defined by the claims and equivalents.

Claims

1. An integrated circuit electromagnetic compatibility test method, characterized in that , including the following steps: S1. For the IC samples that have completed the general function and performance tests, assemble at least one test module according to their typical applications, and form at least one system to be tested with related circuit modules; S2. Assemble an electromagnetic compatibility simulation test platform according to the electromagnetic environment of the tested integrated circuit, in which the tested integrated circuit test module and its tested system and the main equipment working together with the tested integrated circuit are set; S3, setting an electromagnetic field disturbance simulation signal and its simulated load, and connecting them to a simulation test platform through a plurality of switches connected in parallel at the output end; the electromagnetic field disturbance simulation signal and its simulated load include a plurality of electric field disturbance simulation signals and their simulated loads, and a plurality of magnetic field disturbance simulation signals; S4. According to the application product standard requirements of the tested integrated circuit, load each single electromagnetic field disturbance simulation signal to the simulation test platform one by one, and conduct electromagnetic compatibility tests of each single electromagnetic interference; S5. Load multiple electromagnetic field disturbance simulation signals to the simulation test platform in parallel to simulate the severe disturbance of the electromagnetic field in the actual extreme electromagnetic environment and conduct comprehensive electromagnetic compatibility tests in extreme electromagnetic environments; S6. Compare and analyze the individual test results of S4 with the comprehensive test results of S5 for use in the R&D test, type test, acceptance test, and production test of integrated circuits and their electronic system products; The output end of each electromagnetic field disturbance simulation signal and the corresponding simulation load are three-phase star-connected, and the neutral line is connected to form a suspended ground that is insulated from the chassis and the power supply ground. The suspended ground of the electromagnetic field disturbance simulation signal output end is separately connected to the suspended ground of its corresponding simulation load, and is insulated from the suspended grounds of other electromagnetic field disturbance simulation signals and their simulation loads; The steps of the S5 electromagnetic compatibility comprehensive test are as follows: 1) Multiple electromagnetic field disturbance simulation signals are loaded in parallel to the main device working with the tested integrated circuit in the simulation test platform through the corresponding output parallel control switches; 2) Operate the switches on the corresponding simulated load devices of each electromagnetic field disturbance simulated signal so that they are loaded onto their respective simulated loads at the same time; 3) Under the monitoring of the monitoring terminal, operate the main equipment and various control switches on the simulation test platform to simulate the severe disturbance of the electromagnetic field in the actual extreme electromagnetic environment; 4) Conduct comprehensive electromagnetic compatibility tests in various extreme electromagnetic environments, and record the test results data by the monitoring terminal; The electric field simulation interference signals are respectively high-voltage impulse voltage signals and high-voltage AC voltage signals, and the magnetic field simulation interference signals are respectively strong impulse current signals and strong power frequency current signals containing harmonics, which are respectively connected to the high-voltage switches in the simulation test platform through multiple switches connected in parallel at the output end of the control switch cabinet; The impulse voltage load, AC voltage load, impulse current load, and power frequency current load containing harmonics are provided with an input high-voltage switch, the input end of which is connected in parallel to the cable head or busbar or high-voltage switch in the simulation test platform; The several magnetic field disturbance simulation signals, i.e., the strong power frequency current signal and the strong impulse current signal containing harmonics, are respectively mainly composed of a three-phase step-down transformer, the input end of the transformer is connected to a 0.4kV or 10kV AC power supply, wherein a waveform control unit is arranged, and its neutral line is connected to the box and the power ground line; the output end of the transformer is connected to a high-voltage switch in the control switch cabinet, and its neutral line is insulated from the box and the power ground line as a suspended ground, and the suspended ground of each magnetic field disturbance simulation signal output end is separately connected to the suspended ground of its corresponding simulated load, and is insulated from the suspended ground of other electromagnetic field disturbance simulation signals and the corresponding simulated load; The electric field disturbance simulation signals, i.e., the high-voltage AC voltage signal and the high-voltage impulse voltage signal, are respectively mainly composed of a three-phase step-up transformer, the input end of which is connected to a 0.4kV or 10kV AC power supply, wherein a waveform control unit is arranged, and its neutral line is connected to the box and the power ground line; the output end of the transformer is connected to a high-voltage switch in the control switch cabinet, and its neutral line is insulated from the box and the power ground line as a suspended ground; The suspended ground of each electric field simulation interference signal output end is separately connected to the suspended ground of its corresponding simulation load, and is insulated from the suspended ground of other electromagnetic field disturbance simulation signals and the corresponding simulation load.

2. The integrated circuit electromagnetic compatibility test method according to claim 1, characterized in that: It can load various single electromagnetic field disturbance simulation signals to the simulation test platform in accordance with relevant standards to conduct electromagnetic compatibility tests of various single electromagnetic interferences. It can also load multiple electromagnetic field disturbance simulation signals to the simulation test platform in parallel to simulate the severe disturbance of the electromagnetic field in the actual extreme electromagnetic environment and conduct comprehensive electromagnetic compatibility tests in extreme electromagnetic environments.

3. An integrated circuit electromagnetic compatibility simulation test system device, the integrated circuit electromagnetic compatibility simulation test system device is suitable for the integrated circuit electromagnetic compatibility test method according to claim 1, characterized in that: It consists of several electric field disturbance simulation signals and their simulated loads, several magnetic field disturbance simulation signals and their simulated loads, the integrated circuit under test system, a simulation test platform and a monitoring terminal. The simulation test platform is equipped with a main device that works together with the integrated circuit under test.

4. The integrated circuit electromagnetic compatibility simulation test system device according to claim 3, characterized in that: The integrated circuit under test is a radio frequency integrated circuit used in a smart grid. A test module based on the radio frequency integrated circuit and related circuit modules constitute a system to be tested. The test module is a wireless sensor containing an antenna, and the related circuit module is a signal collector containing an antenna. The system to be tested is the radio frequency communication system to be tested, and the main device working with the integrated circuit under test is a main power circuit device.

5. The integrated circuit electromagnetic compatibility simulation test system device according to claim 3, characterized in that: The electric field disturbance simulation signal and the magnetic field disturbance simulation signal are respectively connected to the simulation test platform through a plurality of switches connected in parallel at the output ends.

6. The integrated circuit electromagnetic compatibility simulation test system device according to claim 4, characterized in that: The simulation test platform is composed of a six-sided detachable metal box, in which the main power circuit equipment is provided, namely, at least one detachable high-voltage switch, at least 3 rows of detachable busbars and at least one detachable cable head. The wireless sensors for testing are respectively installed on the high-voltage switch, the busbar and the cable head; at least one instrument box is provided in the simulation test platform, and the signal collector is installed in the instrument box, and the signal collector is linked to the monitoring terminal through an uplink channel.

7. The integrated circuit electromagnetic compatibility simulation test system device according to claim 3, characterized in that: The electric field simulation interference signals are respectively high-voltage impulse voltage signals and high-voltage AC voltage signals, and the magnetic field simulation interference signals are respectively strong impulse current signals and strong power frequency current signals containing harmonics, which are respectively connected to the high-voltage switches in the simulation test platform through a plurality of switches connected in parallel at the output end of the control switch cabinet; The impulse voltage load, AC voltage load, impulse current load, and power frequency current load containing harmonics are provided with an input high-voltage switch, and the input end thereof is connected in parallel to the cable head or bus bar or high-voltage switch in the simulation test platform.

8. The integrated circuit electromagnetic compatibility simulation test system device according to claim 7, characterized in that: The several magnetic field disturbance simulation signals, namely the strong industrial frequency current signal containing harmonics and the strong impulse current signal, are respectively mainly composed of a three-phase step-down transformer. The input end of the transformer is connected to a 0.4kV or 10kV AC power supply, in which a waveform control unit is arranged, and its neutral line is connected to the box and the power ground line; the output end of the transformer is connected to a high-voltage switch in the control switch cabinet, and its neutral line is insulated from the box and the power ground line as a suspended ground, and the suspended ground of each magnetic field disturbance simulation signal output end is separately connected to the suspended ground of its corresponding simulated load, and is insulated from the suspended ground of other electromagnetic field disturbance simulation signals and the corresponding simulated load.

9. The integrated circuit electromagnetic compatibility simulation test system device according to claim 8, characterized in that: The electric field disturbance simulation signals, i.e., the high-voltage AC voltage signal and the high-voltage impulse voltage signal, are respectively mainly composed of a three-phase step-up transformer, the input end of which is connected to a 0.4kV or 10kV AC power supply, wherein a waveform control unit is arranged, and its neutral line is connected to the box and the power ground line; the output end of the transformer is connected to a high-voltage switch in the control switch cabinet, and its neutral line is insulated from the box and the power ground line as a suspended ground; The suspended ground of each electric field simulation interference signal output end is separately connected to the suspended ground of its corresponding simulation load, and is insulated from the suspended ground of other electromagnetic field disturbance simulation signals and the corresponding simulation load.

10. An integrated circuit electromagnetic compatibility simulation test system device according to claim 5 or claim 7, characterized in that: The simulation test platform is composed of a modified 10kV or 35kV switch cabinet; The plurality of switches connected in parallel at the output ends are arranged in a control switch cabinet, and the control switch cabinet is formed by modifying a 10kV or 35kV power distribution cabinet.