Rack in-situ vertical winding method and vertical winding robot used therein

Through the in-situ vertical winding method of the rack and the vertical winding robot, the problems of welding deformation and difficult turning operations of large racks are solved, efficient and safe steel wire winding is achieved, and construction costs are reduced.

CN111844058BActive Publication Date: 2024-10-29KUNSHAN YONGNIAN ADVANCED MFG TECH
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202010465980.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-28
Publication Date
2024-10-29
Estimated Expiration
2040-05-28

AI Technical Summary

Technical Problem

The frame of a large hydraulic press is difficult to form in one piece during the manufacturing process. Traditional welding methods lead to weld deformation and low safety, and it is difficult to turn the frame over during the steel wire winding assembly process.

Method used

The in-situ vertical winding method of the rack and the vertical winding robot are used to form a temporary rack by fixing the rack base on the foundation, and the vertical winding robot is used to perform frictional motion on the side steps of the rack to achieve vertical winding of the steel wire. , avoid turning over and moving as a whole.

Benefits of technology

The vertical winding of the frame in situ is realized, which avoids vibration and jitter during the steel wire winding process, improves operational safety and winding efficiency, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111844058B_ABST
    Figure CN111844058B_ABST
Patent Text Reader

Abstract

The invention discloses an in-situ vertical winding method for a frame and a vertical winding robot used therein. The winding method comprises the following steps: assembling a temporary frame on a final working foundation, the vertical winding robot being driven to move by contacting with the surface of the frame through a friction pair, the vertical winding robot communicating with a ground control center through a wireless signal, and the vertical winding robot being dismantled after the wire winding is completed. The vertical winding robot comprises a wire arranging device for arranging the wires, a wire drum for providing the wires, a tension device for providing tension to the wires, a load-bearing trolley group for loading the wire winding equipment, a driving trolley for providing power to each load-bearing trolley group, the trolleys being articulated in sequence by connecting rods, and the driving trolley being driven by a motor driving a friction wheel to rotate. The invention realizes the vertical winding construction of the frame in the final working state, and has the advantages of convenient and safe operation, high control accuracy, convenient transportation, high winding efficiency, and greatly saving winding construction costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a large-scale frame manufacturing method, in particular to an in-situ vertical winding method for the frame and a vertical winding robot used therefor. Background Art

[0002] It is difficult to form a large hydraulic press frame in one piece during the manufacturing process. The traditional forming method is to use multiple sub-components to form a complete frame after they are processed and fixed by welding. This method often leads to weld deformation, weld cracking after long-term use, etc., and has low safety. In view of the defects of the above scheme, the applicant has proposed to use wire winding to achieve sub-component fixed assembly. This method can avoid welding and ensure the safe use of the frame. At present, when the frame sub-components are assembled by wire winding, the frame is first placed on the ground in an inverted state, and then a winding robot is used to move in a horizontal annular space to achieve wire winding of the frame. After the frame wire winding assembly is completed, it needs to be turned over and fixed to the ground upright. Since the entire volume and mass of the frame after assembly are very large, this brings great difficulties to the frame turning operation. Summary of the invention

[0003] In order to make up for the above shortcomings, the present invention provides a frame in-situ vertical winding method and a vertical winding robot used therefor. The frame in-situ vertical winding method and the vertical winding robot used therefor can enable the frame to perform vertical wire winding in-situ, and after the frame winding is completed, there is no need to turn over, rotate, translate and lift the frame as a whole.

[0004] The technical solution adopted by the present invention to solve the technical problem is: a frame in-situ vertical winding method, comprising the following steps:

[0005] Step 1: Fix the rack base to the final working foundation;

[0006] Step 2: vertically assemble several rack sub-components through connectors on the rack base according to the working state to form a temporary rack preliminarily installed in situ;

[0007] Step 3: Install the vertical winding robot on the temporary rack. The vertical winding robot uses the side steps of the rack as the positioning basis. The walking body on the vertical winding robot is in close contact with the surface of the temporary rack through the friction kinematic pair.

[0008] Step 4: Start the vertical winding robot, and control the vertical winding robot to realize wire winding through the Internet wireless signal at the ground control center;

[0009] Step 5: After the wire winding is completed to form the final frame, the vertical winding robot is removed from the final frame.

[0010] As a further improvement of the present invention, in the step 2, the rack sub-components are first preliminarily positioned and connected by keys, and then the pre-welded connecting earrings on each rack sub-component are fixed together by bolts and nuts to form a temporary rack, and the connecting earrings on the rack sub-components are cut off after the winding is completed.

[0011] As a further improvement of the present invention, in the step 2, during the assembly of the temporary rack, a conductive track is laid on the temporary rack along the winding direction of the rack, the conductive track is connected to the temporary rack by an insulating material, a conductive block of a conductive material is arranged on the vertical winding robot, the conductive block is electrically connected to the electric control box of the vertical winding robot for power supply, the conductive block on the vertical winding robot slides along the conductive track on the temporary rack, and the conductive track on the temporary rack is passed with 380V three-phase four-wire strong electricity. After the steel wire winding is completed, the conductive track is removed synchronously when the vertical winding robot is removed from the final rack.

[0012] A vertical winding robot used in a frame in-situ vertical winding method comprises a wire arrangement device, a wire drum, a tension device, a driving trolley, a load-bearing trolley group, a connecting rod and a control system. A plurality of the driving trolleys and the load-bearing trolley groups are staggered along the outer circumference of a temporary frame. Adjacent driving trolleys and load-bearing trolley groups are hingedly connected to both ends of the connecting rod to form an annular structure matching the outer circumference of the temporary frame. Each group of load-bearing trolley groups is provided with at least one load-bearing trolley. Two or more load-bearing trolleys are arranged at intervals along the wire winding direction. Adjacent load-bearing trolleys are hingedly connected to both ends of the connecting rod to form a load-bearing trolley group. The driving trolley and the load-bearing trolley are respectively rotatably provided with a plurality of support members along the outer circumference of the temporary frame. The driving trolley is provided with a traveling wheel that rolls on the surface, and a friction wheel that is in close contact with the axial side wall of the temporary frame can also be rotated on the driving trolley. The driving trolley is also provided with a driving motor, and the power of the driving motor is output to the friction wheel on the driving trolley. The wire drum, the tension device and the wire arrangement device are sequentially installed on each carrying trolley along the winding direction of the wire. The wire drum is wound with steel wire for winding the frame wire. One end of the steel wire is led out from the wire drum and sequentially enters the tension device and the wire arrangement device. The tension device can provide a set pre-tension to the steel wire, and the wire arrangement device can arrange one end of the wound steel wire with a set pre-tension neatly and evenly on the outer circumferential surface of the temporary frame. The control system controls the operation of the driving motor, the tension device and the wire arrangement device.

[0013] As a further improvement of the present invention, the control system includes an electric control box, a wire winding detection system, a wireless signal transceiver and a ground controller. The electric control box is fixedly installed on the carrying trolley. The electric control box can control the operation of the drive motor, the tension device and the wire arrangement device. The wire winding detection system can detect the wire winding data and transmit it to the ground controller through the wireless signal transceiver. The ground controller has wire winding standard data. The ground controller can analyze and calculate the wire winding data and transmit it to the electric control box through the wireless signal transceiver.

[0014] As a further improvement of the present invention, the tension device includes a resistance increaser, an active tension wheel, a passive tension wheel, a tension maintaining device and a tension closed-loop control device. The steel wire led out from the wire reel passes through the resistance increaser, the active tension wheel, the passive tension wheel, the tension maintaining device and the tension closed-loop control device in sequence. The resistance increaser includes a pressure plate, an elastic member and a roller. The two pressure plates are arranged in parallel and at intervals. The elastic member provides an elastic retaining force to keep the two pressure plates close to each other. The rollers are rotatably arranged on the side walls of the two pressure plates close to each other, and the rollers on the two pressure plates are arranged in parallel and staggered and their circumferential surfaces are close to each other. Wire grooves are provided on the circumferential surfaces of the rollers, and the wound steel wire can interactively pass through the wire grooves on the rollers. The active tension wheel and the passive tension wheel are rotatably installed on the carrying trolley, and the active tension wheel and the passive tension wheel are respectively arranged on the circumferential outer walls. A number of corresponding steel wire grooves are provided, and the wound steel wire is wound in the shape of an "8" in each steel wire groove of the active tension wheel and the passive tension wheel. The tension holding device can provide the active tension wheel with a holding force in the opposite direction of the steel wire sliding. The tension closed-loop control device includes a pulley, a tension detection sensor, a preamplifier, an A / D converter and a terminal actuator. The three groups of pulleys are rotatably installed on the carrying trolley in a symmetrical triangle manner. The wound steel wire is alternately passed around the circumferential surface of each pulley in an inside-outside state in turn. The tension detection sensor can sense the pressure value caused by the steel wire and convert the pressure value into a voltage analog output. The voltage analog is transmitted to the electric control box through the preamplifier and the A / D converter. The processor in the electric control box controls the torque provided to the active tension wheel in the opposite direction of the steel wire movement by the tension holding device through calculation and control of the terminal actuator.

[0015] As a further improvement of the present invention, the wire arranging device includes a wire arranging motor, a ball screw, a linear guide and a wire arranging beam. The wire arranging motor and the linear guide are fixedly positioned on the carrying trolley. The wire arranging motor drives the ball screw to rotate. The wire arranging beam is axially slidable and circumferentially stopped on the linear guide. The wire arranging beam is screwed to the ball screw. A wire guide pulley with grooves on the outer circumferential surface is provided on the wire arranging beam. The wound steel wire can slide through the grooves on the surface of the wire guide pulley on the wire arranging beam.

[0016] As a further improvement of the present invention, a group of running wheels are respectively provided at both ends of the driving trolley and the carrying trolley along the wire winding direction, and the two ends of the connecting rod are respectively hinged to the running wheel shafts close to each other on two adjacent carrying trolleys or adjacent carrying trolleys and the driving trolley.

[0017] As a further improvement of the present invention, the outer circumferential wall of the temporary frame is respectively provided with step structures protruding in the axial direction and radial direction at both ends along the axial direction, the winding wire is wound between the two step structures of the outer circumferential wall of the temporary frame, the driving trolley and the load-bearing trolley are also provided with a connecting piece extending radially along the temporary frame, and a balancing wheel is rotatably provided on the connecting piece, and a U-shaped structure is formed between the walking wheel, the connecting piece and the balancing wheel, and the U-shaped structure is tightly covered on the outer side of the step structure on the temporary frame, and the walking wheel and the balancing wheel respectively walk along the two opposite circumferential side walls of the step structure.

[0018] As a further improvement of the present invention, each driving trolley is provided with at least one friction wheel on both sides of the axial direction of the temporary frame, and each driving trolley is provided with two driving motors. The two driving motors respectively drive the friction wheels located on the driving trolley along the axial direction of the temporary frame to rotate synchronously, and the friction wheels are tightly against the axial side walls of the step structure of the temporary frame.

[0019] The beneficial technical effect of the present invention is as follows: the present invention forms a temporary frame by preliminarily assembling the frame sub-components in situ according to the final working state, and then adopts a vertical winding robot to perform vertical winding on the temporary frame. The vertical winding robot realizes vertical winding walking on the temporary frame through a friction motion pair, thereby avoiding the jumping of the vertical winding robot during operation. During the process of wire winding and contraction of the frame, the vertical winding robot always maintains stable operation. Moreover, the vertical winding robot further realizes the stability of the vertical robot operation through distributed drive, thereby avoiding the vibration and jitter of the pre-tightened frame during the wire winding process, and ensuring the cable arrangement quality during vertical winding. The present invention fundamentally solves the winding technical problems of heavy structures that need to be wound, and can perform in-situ winding construction. When vertical winding is adopted, there is no need to flip or move after winding. At the same time, it has the advantages of easy and safe operation, high control precision, convenient transportation, high winding efficiency, and greatly saves winding construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A three-dimensional diagram of the winding robot of the present invention in winding state;

[0021] Figure 2 for Figure 1 Enlarged view of part A in the middle;

[0022] Figure 3 for Figure 1 Enlarged view of middle part B;

[0023] Figure 4 for Figure 1 Enlarged view of middle C;

[0024] Figure 5 It is a front view of a temporary rack of the present invention;

[0025] Figure 6 It is a schematic diagram of the anti-shear positioning principle between the frame components of the present invention;

[0026] Figure 7 It is a front view of the earring connection structure between the frame components of the present invention;

[0027] Figure 8 for Figure 7 Middle DD section view;

[0028] Fig. 9 The vertical winding robot of the present invention is a schematic diagram of random balance on a temporary frame;

[0029] Fig.10 It is the principle diagram of the motion section of the vertical winding robot of the present invention;

[0030] Fig.11 This is the schematic diagram of the horizontal winding robot motion segment;

[0031] Fig.12 This is a schematic diagram of the distributed drive principle of the present invention;

[0032] Fig.13 This is the driving principle diagram of the horizontal winding machine. DETAILED DESCRIPTION

[0033] Embodiment: A rack in-situ vertical winding method comprises the following steps:

[0034] Step 1: Fix the rack base to the final working foundation;

[0035] Step 2: vertically assemble a plurality of rack sub-components 28 through connectors on the rack base according to the working state to form a temporary rack 1 preliminarily installed in situ;

[0036] Step 3: Install the vertical winding robot 2 on the temporary rack 1. The vertical winding robot 2 uses the side steps of the rack as the positioning basis. The walking body on the vertical winding robot 2 is in close contact with the surface of the temporary rack 1 through the friction kinematic pair.

[0037] Step 4: Start the vertical winding robot 2, and control the vertical winding robot 2 to run and realize wire winding through the Internet wireless signal at the ground control center;

[0038] Step 5: After the wire winding is completed to form a final frame, the vertical winding robot 2 is removed from the final frame.

[0039] The temporary frame 1 is wound vertically in situ by the vertical winding robot 2, that is, the heavy structure is vertically assembled according to the working state on the actual basis of its final work. The temporary frame is the basic structure for the installation of the vertical winding robot 2, and should be able to withstand the static load on it and the dynamic load generated by the movement of the vertical winding robot 2. After the winding is completed, the vertical winding robot 2 is removed, and the frame is firmly fixed on the original position of the press. From the beginning to the end of the winding, the frame has no overall turning, rotation, translation and lifting.

[0040] In the step 2, the rack sub-components 28 are first preliminarily positioned and connected by the key 3, and then the pre-welded connecting earrings 6 on each rack sub-component 28 are fixedly connected together by the bolts 4 and nuts 5 to form a temporary rack 1. After the winding is completed, the connecting earrings 6 on the rack sub-components 28 are cut off. The rack sub-components 28 are positioned by the key 3 to achieve structural positioning and anti-shear force, so as to ensure that the rack sub-components 28 are not misaligned and accurately positioned after the winding is pre-tightened. The rack sub-components 28 are connected by bolts 4 through the earrings to form a temporary rack. During the winding process, the rack is continuously compressed, and the nuts 5 can be adjusted to maintain the locking state.

[0041] In the second step, during the assembly of the temporary rack 1, a conductive track is laid on the temporary rack 1 along the rack winding direction, and the conductive track is connected to the temporary rack 1 through insulating materials. A conductive block made of conductive material is set on the vertical winding robot 2, and the conductive block is electrically connected to the electric control box 15 of the vertical winding robot 2 for power supply. The conductive block on the vertical winding robot 2 slides along the conductive track on the temporary rack 1, and the conductive track on the temporary rack 1 is connected with 380V three-phase four-wire strong electricity. After the steel wire winding is completed, the vertical winding robot 2 is removed from the final rack and the conductive track is removed synchronously. Power supply is achieved by contact between the conductive track and the conductive block, which avoids the pulling of power cables and provides stable power supply.

[0042] A vertical winding robot used in a frame in-situ vertical winding method includes a wire arrangement device 7, a wire drum 8, a tension device 9, a driving trolley 10, a group of carrying trolleys 12, a connecting rod 11 and a control system. A plurality of the driving trolleys 10 and the group of carrying trolleys 12 are staggered along the outer circumference of a temporary frame 1, and adjacent driving trolleys 10 and the group of carrying trolleys 12 are connected by hinges at both ends of the connecting rod 11 to form an annular structure matching the outer circumference of the temporary frame 1. Each group of carrying trolleys is provided with at least one carrying trolley 12, and two or more carrying trolleys 12 are arranged at intervals along the wire winding direction. Adjacent carrying trolleys 12 are connected by hinges at both ends of the connecting rod 11 to form a group of carrying trolleys 12. The driving trolleys 10 and the carrying trolleys 12 are respectively rotatable and provided with a plurality of rotatable trolleys 12 that can rotate along the circumference of the temporary frame 1. A traveling wheel 13 rolls on the outer side of the circumference, and a friction wheel that is in close contact with the axial side wall of the temporary frame 1 can also be rotated on the driving trolley 10. The driving trolley 10 is also provided with a driving motor 14, and the driving motor 14 outputs power to the friction wheel on the driving trolley 10. The wire drum 8, the tension device 9 and the wire arrangement device 7 are sequentially installed on each carrying trolley 12 along the wire winding direction. The wire drum 8 is wound with steel wire for frame wire winding. One end of the steel wire is led out from the wire drum 8 and sequentially enters the tension device 9 and the wire arrangement device 7. The tension device 9 can provide a set pre-tension to the steel wire, and the wire arrangement device 7 can arrange one end of the wound steel wire with a set pre-tension neatly and evenly on the outer circumferential surface of the temporary frame 1. The control system controls the operation of the driving motor 14, the tension device 9 and the wire arrangement device 7.

[0043] When winding the winding steel wire, a plurality of driving trolleys 10 distribute and drive the corresponding supporting trolleys 12 groups, which run on the outer side of the circumference of the temporary frame 1 through the friction kinematic pair. After the winding steel wire is drawn out from the wire drum 8, it passes through the tension device 9 to make the winding steel wire have a set tension. Then, the winding steel wire with tension is tightly and orderly wound on the outer surface of the circumference of the temporary frame 1 by the wire arrangement device 7 in sequence, so as to realize the pre-tightening and fixing of the steel wire winding of the temporary frame 1.

[0044] The vertical winding robot 2 uses a plurality of driving trolleys 10 distributed at various positions of the temporary frame 1 to drive different groups of carrying trolleys 12. The motion segment mechanism of the vertical winding robot 2 adopts distributed drive. The horizontal winding robot is centrally driven to reduce the cost of the winding robot. However, the centralized drive will be unstable due to the influence of gravity during the vertical winding process. The vertical winding robot 2 adopts the drive of the distributed motion segment, that is, each motion segment (or 2 to 3 motion segments) is equipped with a set of machine drive devices to ensure smooth operation;

[0045] The vertical winding robot 2 adopts a friction kinematic pair drive to replace the horizontal winding tooth meshing kinematic pair. Both chain meshing and tooth meshing have transmission sides. There are precision problems in the meshing of the sprocket and gear on the motion section with the chain and rack on the frame. The chain and rack are installed on the frame to be wound. As the winding pre-tightening is carried out, the body of the frame continues to shrink, causing the contraction of the chain and rack, thereby destroying the meshing conditions of excellent meshing and causing the robot to move unsteadily. During the vertical winding movement of the vertical winding robot 2, the stability of the movement is very high, otherwise it will cause vibration and jitter of the pre-tightened frame, affecting the quality of the wiring, and even breaking the wire. The vertical winding robot 2 adopts a non-meshing friction kinematic pair to move smoothly, and the robot drive has nothing to do with the contraction of the frame.

[0046] The driving motor 14 of the driving trolley 10 is a frequency-modulated AC motor, which can realize the function of stepless speed change during the operation of the vertical winding robot 2, has a large starting torque, does not require additional starting equipment, has a wide constant torque speed regulation range, and is conducive to the robot starting with tension. The driving motor 14 is also provided with a brake device, which is used to maintain the tension rate on the winding wire after power failure.

[0047] The control system includes an electric control box 15, a wire winding detection system, a wireless signal transceiver and a ground controller. The electric control box 15 is fixedly installed on the carrier trolley 12. The electric control box 15 can control the operation of the drive motor 14, the tension device 9 and the cable arrangement device 7. The wire winding detection system can detect the wire winding data and transmit it to the ground controller through the wireless signal transceiver. The ground controller has wire winding standard data. The ground controller can analyze and calculate the wire winding data and transmit it to the electric control box 15 through the wireless signal transceiver. The vertical winding robot 2 moves in space, and the Internet communication method is used to transmit the winding status parameters of the vertical winding robot 2 to the ground controller in real time. This method has good communication effect, less interference, and avoids the pulling and winding of cables.

[0048] The tension device 9 includes a resistance increaser 16, an active tension wheel 17, a passive tension wheel 18, a tension holding device 19 and a tension closed-loop control device 20. The steel wire led out from the wire reel 8 passes through the resistance increaser 16, the active tension wheel 17, the passive tension wheel 18, the tension holding device 19 and the tension closed-loop control device 20 in sequence. The resistance increaser 16 includes a pressure plate, an elastic member and a roller. The two pressure plates are arranged in parallel and spaced apart. The elastic member provides an elastic holding force for the two pressure plates to keep them close to each other. The rollers are rotatably arranged on the side walls of the two pressure plates close to each other, and the rollers on the two pressure plates are arranged in parallel and staggered and their circumferential surfaces are close to each other. Steel wire grooves are provided on the circumferential surfaces of the rollers, and the wound steel wire can interactively pass through the steel wire grooves on the rollers. The active tension wheel 17 and the passive tension wheel 18 are rotatably installed on the carrying trolley 12 respectively. The active tension wheel 17 and the passive tension wheel 18 are divided on the outer circumferential walls. A plurality of corresponding steel wire grooves are provided, and the wound steel wire is wound in the shape of an "8" in each steel wire groove of the active tension wheel 17 and the passive tension wheel 18. The tension holding device 19 can provide the active tension wheel 17 with a holding force in the opposite direction of the steel wire sliding. The tension closed-loop control device 20 includes a pulley, a tension detection sensor, a preamplifier, an A / D converter and a terminal actuator. The three sets of pulleys are rotatably installed on the carrying trolley 12 in a symmetrical triangle manner. The wound steel wire is alternately passed around the circumferential surface of each pulley in an inside-outside state in turn. The tension detection sensor can sense the pressure value caused by the steel wire and convert the pressure value into a voltage analog output. The voltage analog is transmitted to the electric control box 15 through the preamplifier and the A / D converter. The processor in the electric control box 15 controls the torque provided to the active tension wheel 17 in the opposite direction of the steel wire movement by the tension holding device 19 through calculation and control of the terminal actuator.

[0049] The wound steel wire is bent repeatedly and passes through the steel wire groove of the roller on the resistance increasing device 16, so that the steel wire obtains initial tension;

[0050] The winding steel wires are interlaced in an "8" shape and wound in the steel wire grooves on the upper surfaces of the master and slave tension wheels. The active tension wheel 17 has a tendency to rotate in the opposite direction of the sliding direction of the winding steel wire. After the winding steel wire passes through the "8" shape, the tension increases under the action of friction to reach the set value. The tension holding device 19 can be a DC motor, which is as follows:

[0051] Assume that the winding steel wire is wound around the main and driven tension wheels for n turns, the wrap angle from the second turn to the n-1th turn is α0, and the initial tension of the winding steel wire before entering the main and driven tension wheels is T0. Then, after passing through the main and driven tension wheels, the tension of the winding steel wire reaches the set value. When the winding robot is in the winding state, the winding steel wire is continuously pulled out after being wound in an "8" shape, so the main and driven tension wheels both rotate in the sliding direction of the winding steel wire. At this time, the DC motor connected to the active tension wheel 17 is in the power generation state, generating a resistance torque to ensure that the tension of the winding steel wire is TR When the winding robot is in the braking state, the master and driven wheels are in the stopped state, and the DC motor works in the driving state to tighten the wire. The output torque of the two states is in the same direction. It is only because the feeding direction of the winding wire is different that the two states of power generation and driving are generated. When generating electricity, the electric energy can be fed back to the power grid through the modulator, fundamentally solving the heating problem. When parking and reversing, the winding wire can be actively reeled in to ensure the continuity of the tension of the winding wire during the winding process.

[0052] When replacing the wire reel 8, the tension-free butt joint of the new and old wound wire joints must be completed before the resistance increasing device 16, and the tension-free butt joint of the new and old wound wire joints is completed by resistance welding.

[0053] The wire arranging device 7 includes a wire arranging motor 21, a ball screw 22, a linear guide 23 and a wire arranging beam 24. The wire arranging motor 21 and the linear guide 23 are fixedly positioned on the carrying trolley 12. The wire arranging motor 21 drives the ball screw 22 to rotate. The wire arranging beam 24 is sleeved on the linear guide 23 so as to be axially slidable and circumferentially fixed. The wire arranging beam 24 is screwed to the ball screw 22. A steel wire guide pulley with a groove on the outer circumferential surface is provided on the wire arranging beam 24. The wound steel wire can slide through the groove on the surface of the steel wire guide pulley on the wire arranging beam 24. The ball screw 22 is driven to rotate by the wire-laying motor 21, and the wire-laying beam 24 moves linearly along the linear guide rail 23 under the drive of the ball screw 22. In this way, the speed and direction of the wire-laying beam 24 can be controlled by only controlling the speed and rotation direction of the wire-laying motor 21, which can effectively ensure the arrangement spacing and winding direction of the winding steel wires, and prevent the winding steel wires from being too large or overlapping. The wire guide pulleys are respectively distributed on the side of the wire-laying beam 24 facing the tension device 9 and the side away from the tension device 9. The wire guide pulley on the side facing the tension device 9 guides the winding steel wire coming out of the tension device 9, and the wire guide pulley on the side away from the tension device 9 is used for wire laying, so as to achieve uniform and close arrangement of the steel wires on the circumferential outer surface of the temporary frame 1.

[0054] The driving trolley 10 and the carrying trolley 12 are respectively provided with a group of running wheels 13 at both ends along the wire winding direction, and the two ends of the connecting rod 11 are respectively hinged with the rotating shafts of the running wheels 13 close to each other on the two adjacent carrying trolleys 12 or the adjacent carrying trolleys 12 and the driving trolley 10. Compared with the assembly frame horizontally installed on the horizontal support plane, the assembly frame vertically installed on the foundation with limited area has a high center of gravity and poor support conditions, and is more susceptible to shaking and vibration, so it is very sensitive to the instability of movement, which is the reason for many differences between vertical winding and horizontal winding. The motion section of this vertical winding robot 2 is different from that of the horizontal winding robot. This vertical winding robot 2 is vertically suspended on the wound structure and needs to walk without jumping at all. The hinge axis 30 of the motion section 29 of the vertical winding robot 2 is designed on the axis of the running wheel 13, instead of being hinged between the motion sections. This can fully ensure that the walking wheel 13 does not bounce, so that the moving joint remains stable during vertical up and down movement. This structure realizes the random balance of the vertically wound moving parts. During distributed drive, it can ensure that the driving torque at the hinge connecting each moving part is equal, so as to achieve a high degree of movement stability.

[0055] The outer circumferential wall of the temporary frame 1 is provided with a step structure 25 protruding outward in the axial direction and radial direction at both ends in the axial direction, and the winding wire is wound between the two step structures of the outer circumferential wall of the temporary frame 1. The driving trolley 10 and the carrying trolley 12 are also provided with a connecting piece 26 extending radially along the temporary frame 1, and a balancing wheel 27 is rotatably provided on the connecting piece 26. A U-shaped structure is formed between the running wheel 13, the connecting piece 26 and the balancing wheel 27, and the U-shaped structure is tightly covered on the outer side of the step structure 25 on the temporary frame 1, and the running wheel 13 and the balancing wheel 27 respectively run along the two opposite circumferential side walls of the step structure 25. The balancing wheel 27 and the running wheel 13 are preferably arranged in a one-to-one correspondence, and the balancing wheel 27, the running wheel 13 and the connecting piece 26 are tightly covered on the outer side of the step structure 25 at both ends in the axial direction of the outer circumferential wall of the temporary frame 1. This structure ensures the stable connection and positioning of the vertical winding robot 2 and the temporary frame 1, and at the same time ensures the close contact between the friction wheel and the temporary frame 1 to provide friction power.

[0056] Each driving trolley 10 is provided with at least one friction wheel on both sides of the axial direction of the temporary frame 1, and each driving trolley 10 is provided with two driving motors 14, which respectively drive the friction wheels located along the axial direction of the temporary frame 1 of the driving trolley 10 to rotate synchronously, and the friction wheels are tightly against the axial side wall of the step structure 25 of the temporary frame 1. This structure ensures that the driving trolley 10 on the vertical winding robot 2 runs smoothly along the temporary frame 1 to avoid jamming.

Claims

1. A frame in-situ vertical winding method, characterized by: The following steps are involved: Step 1: Fix the rack base to the final working foundation; Step 2: Preliminarily position and connect a plurality of rack sub-components (28) on the rack base according to the working state by means of keys (3), and then fix and connect the pre-welded connection earrings (6) on the rack sub-components together by means of bolts (4) and nuts (5) to form a temporary rack (1) preliminarily installed in situ; Step 3: Install the vertical winding robot (2) on the temporary frame, with the vertical winding robot using the side steps of the frame as a positioning basis, and the walking body on the vertical winding robot in close contact with the surface of the temporary frame through a friction kinematic pair; Step 4: Start the vertical winding robot, and control the vertical winding robot to realize wire winding through the Internet wireless signal at the ground control center; Step 5: After the wire winding is completed to form the final frame, the vertical winding robot is removed from the final frame and the connecting earrings on the frame sub-components are cut off.

2. A frame in-situ vertical winding method as claimed in claim 1, characterized in that: In the second step, during the temporary rack assembly process, a conductive track is laid on the temporary rack along the winding direction of the rack, the conductive track is connected to the temporary rack by insulating material, a conductive block of conductive material is set on the vertical winding robot, the conductive block is electrically connected to the vertical winding robot control box for power supply, the conductive block on the vertical winding robot slides along the conductive track on the temporary rack, and the conductive track on the temporary rack is passed with 380V three-phase four-wire strong electricity. After the steel wire winding is completed, the conductive track will be removed synchronously when the vertical winding robot is removed from the final rack.

3. The vertical winding robot used in the frame in-situ vertical winding method according to claim 1 is characterized by: The invention comprises a wire arrangement device (7), a wire drum (8), a tension device (9), a driving trolley (10), a load-bearing trolley group, a connecting rod (11) and a control system. A plurality of the driving trolleys and the load-bearing trolley groups are arranged alternately along the outer side of the circumference of a temporary frame. Adjacent driving trolleys and load-bearing trolley groups are connected by hinges at both ends of the connecting rod to form an annular structure matching the outer side of the circumference of the temporary frame. Each group of load-bearing trolley groups is provided with at least one load-bearing trolley (12). Two or more load-bearing trolleys are arranged at intervals along the winding direction of the wire. Adjacent load-bearing trolleys are connected by hinges at both ends of the connecting rod to form a load-bearing trolley group. The driving trolleys and the load-bearing trolleys are respectively provided with a walking device that can rotate along the outer side of the circumference of the temporary frame. The driving trolley is provided with a friction wheel (13) which is rotatable and in close contact with the axial side wall of the temporary frame. The driving trolley is also provided with a driving motor (14). The driving motor outputs power to the friction wheel on the driving trolley. The wire drum, the tension device and the wire arrangement device are sequentially installed on each carrying trolley along the wire winding direction. The wire drum is wound with a steel wire for winding the frame steel wire. One end of the steel wire is led out from the wire drum and sequentially enters the tension device and the wire arrangement device. The tension device can provide a set pre-tension to the steel wire. The wire arrangement device can arrange one end of the wound steel wire with the set pre-tension neatly and evenly on the outer circumferential surface of the temporary frame. The control system controls the operation of the driving motor, the tension device and the wire arrangement device.

4. The vertical winding robot according to claim 3, characterized in that: The control system comprises an electric control box (15), a wire winding detection system, a wireless signal transceiver and a ground controller. The electric control box is fixedly mounted on the carrying trolley and can control the operation of the drive motor, the tension device and the cable arrangement device. The wire winding detection system can detect wire winding data and transmit the data to the ground controller via the wireless signal transceiver. The ground controller has wire winding standard data. The ground controller can analyze and calculate the wire winding data and transmit the data to the electric control box via the wireless signal transceiver.

5. The vertical winding robot according to claim 4, characterized in that: The tension device comprises a resistance increasing device (16), an active tension wheel (17), a passive tension wheel (18), a tension holding device (19) and a tension closed-loop control device (20). The steel wire drawn from the steel wire drum passes through the resistance increasing device, the active tension wheel, the passive tension wheel, the tension holding device and the tension closed-loop control device in sequence. The resistance increasing device comprises a pressure plate, an elastic member and a roller. The two pressure plates are arranged in parallel and spaced apart. The elastic member provides an elastic holding force for the two pressure plates to keep them close to each other. The rollers are rotatably arranged on the side walls of the two pressure plates close to each other, and the rollers on the two pressure plates are arranged in parallel and staggered and their circumferential surfaces are close to each other. Steel wire grooves are arranged on the circumferential surfaces of the rollers. The wound steel wire can be interactively wound around the steel wire grooves on the rollers. The active tension wheel and the passive tension wheel are rotatably installed on the carrying trolley. The outer circumferences of the active tension wheel and the passive tension wheel are A number of corresponding steel wire grooves are respectively arranged on the wall. The wound steel wire is wound in the shape of "8" in each steel wire groove of the active tension wheel and the passive tension wheel. The tension holding device can provide the active tension wheel with a holding force in the opposite direction of the steel wire sliding. The tension closed-loop control device includes a pulley, a tension detection sensor, a preamplifier, an A / D converter and a terminal actuator. The three groups of pulleys are rotatably installed on the carrying trolley in a symmetrical triangle manner. The wound steel wire is alternately passed around the circumferential surface of each pulley in an inside-outside state in turn. The tension detection sensor can sense the pressure value caused by the steel wire and convert the pressure value into a voltage analog output. The voltage analog is transmitted to the electric control box through the preamplifier and the A / D converter. The processor in the electric control box controls the torque provided to the active tension wheel in the opposite direction of the steel wire movement by the tension holding device through calculation and control of the terminal actuator.

6. The vertical winding robot according to claim 3, characterized in that: The wire arrangement device comprises a wire arrangement motor (21), a ball screw (22), a linear guide rail (23) and a wire arrangement beam (24). The wire arrangement motor and the linear guide rail are fixedly positioned on the carrying trolley. The wire arrangement motor drives the ball screw to rotate. The wire arrangement beam is sleeved on the linear guide rail so as to be able to slide axially and stop in the circumferential direction. The wire arrangement beam is screwed to the ball screw. A steel wire guide pulley with a groove on the outer circumferential surface is provided on the wire arrangement beam. The wound steel wire can slide through the groove on the surface of the steel wire guide pulley on the wire arrangement beam.

7. The vertical winding robot according to claim 3, characterized in that: The driving trolley and the carrying trolley are respectively provided with a group of running wheels at both ends along the wire winding direction, and the two ends of the connecting rod are respectively hinged to the running wheel rotating shafts close to each other on two adjacent carrying trolleys or adjacent carrying trolleys and the driving trolley.

8. The vertical winding robot according to claim 7, characterized in that: The temporary frame outer circumferential wall is provided with axially and radially outwardly protruding step structures (25) at both ends along the axial direction, and the winding wire is wound between the two step structures on the temporary frame outer circumferential wall. The driving trolley and the carrying trolley are also provided with a connecting piece (26) extending radially along the temporary frame, and a balancing wheel (27) is rotatably provided on the connecting piece. A U-shaped structure is formed between the running wheel, the connecting piece and the balancing wheel, and the U-shaped structure is tightly covered on the outer side of the step structure on the temporary frame, and the running wheel and the balancing wheel respectively run along the two opposite circumferential side walls of the step structure.

9. The vertical winding robot according to claim 7, characterized in that: Each driving trolley is provided with at least one friction wheel on both sides along the axis of the temporary frame, and each driving trolley is provided with two driving motors. The two driving motors respectively drive the friction wheels located on the driving trolley along the axis of the temporary frame to rotate synchronously, and the friction wheels are tightly against the axial side walls of the step structure of the temporary frame.

Citation Information

Patent Citations

  • Pre-tightening and winding robot with prestressed structure

    CN102126642A

  • Method for assembling rack for oversize multifunctional presses

    CN102909553A

  • Non-engaged-transmission steel wire winding robot

    CN109850701A

  • Prestress press with double winding structures

    CN111086265A

  • Vertical winding robot

    CN212471513U