An experimental device and test method for temporary blocking and diversion effect considering inter-layer interference

By designing an experimental device to consider the effect of interlayer interference temporary blocking and shunt flow, two sand filling pipes and regulating valves are used to control the simulated interlayer interference, the injection volume of the temporary blocking system is optimized, and the interlayer interference in the existing technology affects the temporary blocking and shunt effect. The problem has improved the transformation effect and safety of the fracturing acidification process.

CN111894572BActive Publication Date: 2024-11-26SOUTHWEST PETROLEUM UNIV
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202010942217.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-09
Publication Date
2024-11-26
Estimated Expiration
2040-09-09

AI Technical Summary

Technical Problem

The existing technology cannot effectively control and optimize the injection amount of interlayer interference to the temporary blocking system, resulting in poor transformation of fracturing acidification process, especially when there are microchannels between high and low permeability layers, the working fluid is prone to return and affect the temporary blocking and shunting effect. .

Method used

An experimental device is designed to consider the effect of temporary blocking and diversion between layers. By controlling the two sand filling pipes with the injection end and the regulating valve, the dosage and radius design of different temporary blocking systems is simulated to optimize the temporary blocking and diversion effect.

Benefits of technology

Overcoming the defect that the single-tube partition plate and single-filled sand pipe model cannot control the position and degree of interference between layers, the injection volume optimization of the temporary blocking system that truly reflects the interference between layers is achieved, and the temporary blocking and diversion effect and the reliability of safe production are improved. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111894572B_ABST
    Figure CN111894572B_ABST
Patent Text Reader

Abstract

The present invention discloses an experimental device for temporary plugging and diversion effect considering interlayer interference and its testing method. The device includes an injection system, a sand filling pipe device, and a metering control system; its testing method is: S1, prepare experimental materials and assemble the experimental device; S2, fill quartz sand and assemble the sand filling pipe; S3, inject base liquid and test the initial permeability of each sand filling pipe; S4, inject temporary plugging system and test the temporary plugging and diversion effect; S5, control the opening and closing of the regulating valve to test the temporary plugging and diversion effect under interlayer interference; S6, use different types of temporary plugging systems and repeat S1 to S5. In the present invention, the sand filling pipes share the injection end, which is closer to the actual situation of the working fluid injected into the formation; by controlling the regulating valve between the sand filling pipes, the temporary plugging and diversion effect of the temporary plugging system when there is interlayer interference at different positions of two layers can be evaluated and the temporary plugging radius can be optimized, and the device structure is simple and reliable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of oil and gas field reservoir transformation, and in particular to an experimental device for temporary plugging and diversion effect considering interlayer interference and a testing method thereof. Background Art

[0002] Fracturing and acidizing technology is a widely used production-increasing measure in oil and gas field reservoir transformation. Due to the serious heterogeneity of the reservoir and the large coefficient of variation of interlayer permeability, according to the principle of minimum flow resistance, the fracturing fluid or acid will preferentially enter the high permeability reservoir, which can only improve the physical properties of the high permeability layer, while the physical properties of the low permeability reservoir are still poor. The key to solving the problem is to control the diversion and diversion of working fluids such as fracturing fluid and acid. Temporary plugging and diversion technology is a technology that injects temporary plugging agents into the formation to form a dense temporary plugging layer, increase the seepage resistance in the high permeability area, and realize the diversion of fracturing fluid or acid to transform the low permeability layer. However, if there are microchannels between the high and low permeability layers outside the temporary plugging radius, interlayer interference will occur, causing the working fluid to "turn" and flow back into the high permeability layer, affecting the temporary plugging and diversion effect. From the above, it can be seen that the design of the temporary plugging radius of the temporary plugging system directly affects the success of the fracturing and acidizing process transformation. How to optimize the injection volume of the temporary plugging system considering interlayer interference through indoor experimental evaluation, select the temporary plugging system, and optimize the temporary plugging radius is crucial to the temporary plugging diversion effect and subsequent safe production.

[0003] At present, the conventional temporary plugging and diversion experimental device is a heterogeneous parallel double-tube device with a simple structure and convenient measurement; however, the fluid injected by the device is diverted at the inlet pipeline, which cannot truly reflect the characteristics of the injected fluid contacting adjacent formations at the same time. Patent CN201510617167.7 discloses a heterogeneous single sand-filled tube core model, which separates high and low permeability areas through a cylindrical copper mesh inside the tube, and truly reflects the interlayer flow characteristics; Patent CN202010117355.4 discloses a single-tube baffle heterogeneous model device, which separates high and low permeability areas through a baffle inside the tube, and can intuitively observe the plugging status of the simulated interlayer cementation difference channel; However, both heterogeneous sand-filled tube models cannot control the position and degree of interlayer interference, and cannot optimize the injection volume of the temporary plugging system considering interlayer interference. Summary of the invention

[0004] The purpose of the present invention is to provide a testing device and a testing method for temporary plugging and diversion effects taking into account interlayer interference. Two sand-filled pipes share an injection end, and the diversion effect evaluation experiment of different temporary plugging system dosages can be carried out by controlling the regulating valve between the sand-filled pipes, so as to solve the problem of temporary plugging system design and dosage optimization when there is interlayer interference at different positions of two adjacent layers in the above-mentioned background technology.

[0005] The technical solution adopted by the present invention is:

[0006] An experimental device for temporary plugging and diversion effect considering interlayer interference includes an injection system, a sand filling pipe device, and a metering control system. Specifically:

[0007] The injection system comprises a clean water tank, an injection pump, an injection pipeline, a vent valve, a control valve, a base liquid tank, and a working liquid tank; the clean water tank is connected to the injection pump through a threaded pipeline; the base liquid tank and the working liquid tank are connected to the injection pump through a pipeline; a vent valve is arranged on the injection pipeline; the base liquid tank and the working liquid tank both comprise a liquid tank cover, a liquid tank body, a liquid tank piston, and a liquid tank base; a liquid tank piston is arranged in the liquid tank body, the liquid tank piston can move up and down inside the liquid tank body, and the liquid tank body is connected to the liquid tank cover through a threaded connection; after clean water is injected into the base liquid tank or the working liquid tank through the injection pump, the displacement liquid tank piston moves upward, so that the base liquid or the temporary plugging system flows out;

[0008] The sand filling pipe device comprises a fixed support, an inlet cap, an inlet joint, an inlet sealing gasket, an inlet screen plug, a sand filling pipe, a constant temperature heating sleeve, a regulating valve, a screen pipe, an outlet screen plug, an outlet sealing gasket, an outlet cap, and an outlet joint; the inlet cap is connected to the inlet joint by threads, and the inlet cap is connected to the injection pipeline by threads; there is a groove on the inner side of the inlet joint, and the cylindrical inlet screen plug is placed in the cylindrical groove space on the inner side of the inlet joint; the inlet sealing gasket is installed in the inlet cap, and the inner side of the inlet cap is sealed and connected to the inlet joint through the inlet sealing gasket; the sand filling pipes are connected to the inlet joint, and the two The sand-filled pipes are connected through multiple pipes in the middle, and each pipe is provided with a regulating valve; the fixed support is placed under the two sand-filled pipes, and the two sand-filled pipes are placed in the semicircular groove on the fixed support; the screen pipe is installed in the sand-filled pipe through the inlet joint; the constant temperature heating sleeve is coated on the outer wall of the sand-filled pipe; the outlet cap is connected to the outlet joint through threads, and the outlet cap is connected to the outflow pipeline through threads; there is a groove on the inner side of the outlet joint, and the cylindrical outlet screen plug is placed in the groove on the inner side of the outlet joint; the outlet sealing gasket is installed in the outlet cap, and the inner side of the outlet cap is sealed and connected to the outlet joint through the outlet sealing gasket;

[0009] The metering control system includes a pressure gauge, a temperature sensor, an outflow pipeline and a measuring cylinder; the pressure gauge is installed at the inlet of the sand filling pipe device; the temperature sensor is installed in the constant temperature heating jacket; a valve is arranged on the outflow pipeline, and the fluid in the outflow pipeline flows into the measuring cylinder for metering.

[0010] Preferably, the base liquid tank is connected to the working liquid tank via an injection pipeline, and control valves are provided at both the inlet and outlet, and a plurality of parallel working liquid tanks are provided according to experimental requirements.

[0011] Preferably, three cylindrical protrusions are provided on the inlet cap for tightening the threaded connection between the inlet cap and the inlet joint.

[0012] A method for testing the temporary blocking and diversion effect considering inter-layer interference comprises the following steps:

[0013] S1. Prepare experimental materials and assemble experimental equipment. Use sieves with different mesh sizes to prepare two kinds of quartz sand with different particle sizes. The quartz sand with a lower mesh size is named quartz sand A, and the quartz sand with a higher mesh size is named quartz sand B. Configure the temporary plugging system and base liquid, inject the configured temporary plugging system into the working liquid tank, and inject the configured base liquid into the base liquid tank. When assembling the device, first close all the regulating valves between the two sand filling pipes, install the outlet end of the sand filling pipe device, put the outlet screen plug into the internal groove of the outlet joint, place the outlet sealing gasket on the outlet screen plug, tighten the outlet joint with the outlet cap, and then place the sand filling pipe vertically with the assembled end at the bottom and the inlet end at the top, and place the cylindrical screen inside the sand filling pipe body.

[0014] S2. Fill with quartz sand and assemble the sand filling tube. Fill the screened quartz sand A and quartz sand B into the sand filling tube A and sand filling tube B respectively, and tap the sand filling tube gently continuously to make the quartz sand evenly and densely filled in the sand filling tube body until the quartz sand fills the two adjacent grooves at the inlet end of the sand filling tube. After the quartz sand filling is completed, assemble the inlet end of the sand filling tube, put the inlet screen plug into the internal groove of the inlet joint, fully contact the filled quartz sand, place the inlet sealing gasket on the inlet screen plug, and tighten the inlet cap to the inlet joint; place the assembled sand filling tube on the fixed support, cover the two constant temperature heating sleeves on the outer walls of the two sand filling tubes, and complete the connection of the injection pipeline and the outflow pipeline.

[0015] S3. Inject base liquid to test the initial permeability of each sand-filled tube. Open the outflow pipeline valve A and valve B, turn on the constant temperature heating jacket switch, and heat to the temperature required for the experiment; close control valve A and control valve B, open control valve C and control valve D, and start the injection pump. The base liquid is displaced into the two sand-filled tubes; when the outflow pipeline corresponding to sand-filled tube A and sand-filled tube B is stable, record the fluid increment in each measuring cylinder per unit time, calculate the initial permeability of sand-filled tube A and sand-filled tube B, and end the injection of base liquid.

[0016] S4. Inject the temporary plugging system to test the temporary plugging and diversion effect. Close control valve C and control valve D, open control valve A and control valve B, start the injection pump, and the temporary plugging system is driven into the sand filling pipe. After the temporary plugging system is injected, the base liquid is injected again to test the permeability of each sand filling pipe after the experiment.

[0017] S5. Control the opening and closing of the regulating valve to test the temporary plugging and diversion effect under interlayer interference. Repeat S1 to S3, open regulating valve A, close regulating valves B, C, D, E and F, and repeat S4 to obtain the temporary plugging and diversion effect under the condition of interlayer interference at the position of regulating valve A. Increase the dosage of the temporary plugging system, repeat S1 to S3, open regulating valve B, close regulating valves A, C, D, E and F, and repeat S4 to obtain the temporary plugging and diversion effect under the condition of interlayer interference at the position of regulating valve B, open and close regulating valves at different positions to obtain the temporary plugging and diversion effect when interlayer interference exists at different positions.

[0018] S6. Use different types of temporary plugging systems, repeat S1 to S5, and obtain multiple sets of experimental data after treatment with different types of temporary plugging systems.

[0019] The beneficial effects of the present invention are as follows: the present invention controls the position of interlayer interference by controlling the opening and closing states of the regulating valves between the sand filling pipes, thereby overcoming the defects that the single-tube partition heterogeneous device and the single-tube copper mesh partition heterogeneous device cannot control the position and degree of interlayer interference; the two sand filling pipes in the present invention share the injection end, thereby overcoming the defect that the heterogeneous parallel double-tube device cannot truly reflect the fact that the injected liquid can contact adjacent formations at the same time; the present invention has a simple structure and is easy to assemble. In the experimental device, quartz sand of different particle sizes can be filled in the sand filling pipe to match adjacent formations with different permeability differences. The present invention has strong practicality and can be repeatedly filled and used. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The present invention will be further described below in conjunction with the accompanying drawings:

[0021] Figure 1 It is a schematic diagram of the overall structure of an experimental device for temporary blocking and diversion effect considering interlayer interference in the present invention;

[0022] Figure 2 It is an exploded view of the sand filling tube device;

[0023] Figure 3 It is a cross-sectional view of the structure of the sand filling pipe device;

[0024] Figure 4 It is a cross-sectional view of a liquid tank.

[0025] Numbers in the figure: 1, clean water tank; 2, injection pump; 3, base liquid tank; 4, working liquid tank; 5-1, control valve A; 5-2, control valve B; 5-3, control valve C; 5-4, control valve D; 6, injection pipeline; 7, pressure gauge; 8, vent valve; 9, inlet cap; 10, convex rod; 11-1, constant temperature heating jacket A; 11-2, constant temperature heating jacket B; 12-1, temperature sensor A; 12-2, temperature sensor B; 13-1, sand filling pipe A; 13-2, sand filling pipe B; 14-1, regulating valve A; 14-2, regulating valve B; 14-3, regulating valve C; 14-4, regulating valve D; 14-5, regulating valve E; 14-6, regulating valve F; 15-1, Outlet cap A; 15-2, outlet cap B; 16-1, outflow pipeline A; 16-2 outflow pipeline B; 17-1, valve A; 17-2, valve B; 18-1, measuring cylinder A; 18-2, measuring cylinder B; 19, fixed support; 20, inlet sealing gasket; 21, inlet screen plug; 22, inlet joint; 23-1, outlet joint A; 23-2, outlet joint B; 24-1, screen A; 24-2, screen B; 25-1, outlet screen plug A; 25-2, outlet screen plug B; 26-1, outlet sealing gasket A; 26-2, outlet sealing gasket B; 27, liquid tank cover; 28, liquid tank body; 29, liquid tank piston; 30, liquid tank base. DETAILED DESCRIPTION

[0026] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. The preferred embodiments described herein are only used to explain the present invention but are not used to limit the scope of the present invention.

[0027] The present invention discloses an experimental device for temporary blocking and diversion effect considering interlayer interference, such as Figure 1-4 As shown, it includes an injection system, a sand filling pipe device, and a metering control system. The injection system is connected to the sand filling pipe device through an injection pipeline 6, and the sand filling pipe device is connected to the metering control system through the injection pipeline 6 and the outflow pipeline 5.

[0028] like Figure 1 and Figure 4As shown, the injection system includes a clean water tank 1, an injection pump 2, an injection pipeline 6, a vent valve 8, a control valve A5-1, a control valve B5-2, a control valve C5-3, a control valve D5-4, a base liquid tank 3, and a working liquid tank 4; the clean water tank 1 is connected to the injection pump 2 through a threaded pipeline; the base liquid tank 3 and the working liquid tank 4 are connected to the injection pump 2 through a pipeline; a vent valve 8 is arranged on the injection pipeline 6; the base liquid tank 3 and the working liquid tank 4 both include a liquid tank cover 27, a liquid tank body 28, a liquid tank piston 29 and a liquid tank base 30; a liquid tank piston 29 is arranged in the liquid tank body 28, and the liquid tank piston 29 can move up and down inside the liquid tank body 28, and the liquid tank body 28 is connected to the liquid tank cover 27 through a threaded connection; after clean water is injected into the base liquid tank 3 or the working liquid tank 4 through the injection pump 2, the liquid tank piston 29 is displaced and moves upward, so that the base liquid or the temporary plugging system flows out;

[0029] like Figure 1-3As shown, the sand filling pipe device includes a fixed support 19, an inlet cap 9, an inlet joint 22, an inlet sealing gasket 20, an inlet screen plug 21, a sand filling pipe A13-1, a sand filling pipe B13-2, a constant temperature heating sleeve A11-1, a constant temperature heating sleeve B11-2, a regulating valve A14-1, a regulating valve B14-2, a regulating valve C14-3, a regulating valve D14-4, a regulating valve E14-5, a regulating valve F14-6, a screen pipe A24-1, a screen pipe B24-2, an outlet screen plug A25-1, an outlet screen plug B25-2, an outlet sealing gasket A26-1, an outlet sealing gasket B26-2, an outlet cap A15-1, an outlet cap B15-2, an outlet The inlet cap 9 is connected to the inlet joint 22 by threads, and the inlet cap 9 is connected to the injection pipeline 6 by threads; there is a groove on the inner side of the inlet joint 22, and the cylindrical inlet screen plug 21 is placed in the cylindrical groove space inside the inlet joint 22; the inlet sealing gasket 20 is installed in the inlet cap 9, and the inner side of the inlet cap 9 is sealed and connected to the inlet joint 22 through the inlet sealing gasket 20; the sand filling pipe A13-1 and the sand filling pipe B13-2 are both connected to the inlet joint 22, and the sand filling pipe A13-1 and the sand filling pipe B13-2 are connected through multiple pipes in the middle, and the pipes are respectively provided with regulating valves A14-1 and regulating valves B14-2, regulating valve C14-3, regulating valve D14-4, regulating valve E14-5, regulating valve F14-6; the fixed support 19 is placed under the sand filling pipe A13-1 and the sand filling pipe B13-2, and the sand filling pipe A13-1 and the sand filling pipe B13-2 are placed in the semicircular groove on the fixed support 19; the screen pipe A24-1 and the screen pipe B24-2 are respectively installed in the sand filling pipe A13-1 and the sand filling pipe B13-2 through the inlet joint 22; the constant temperature heating sleeve A11-1 and the constant temperature heating sleeve B11-2 are respectively coated on the outer wall of the sand filling pipe A13-1 and the sand filling pipe B13-2; the outlet cap A15-1 and the outlet cap B15-2 are respectively connected to the outlet The connector A23-1 and the outlet connector B23-2 are connected by threads, and the outlet caps A15-1 and the outlet caps B15-2 are connected to the outflow pipeline A16-1 and the outflow pipeline B16-2 respectively by threads; there are grooves on the inner sides of the outlet connector A23-1 and the outlet connector B23-2, and the cylindrical outlet screen plugs A25-1 and the outlet screen plugs B25-2 are respectively placed in the inner grooves of the outlet connector A23-1 and the outlet connector B23-2; the outlet sealing gaskets A26-1 and the outlet sealing gaskets B26-2 are respectively installed in the outlet caps A15-1 and the outlet caps B15-2, and the inner sides of the outlet caps are sealed and connected to the outlet connector through the outlet sealing gaskets;

[0030] The metering control system includes a pressure gauge 7, a temperature sensor A12-1, a temperature sensor B12-2, an outflow pipeline A16-1, an outflow pipeline B16-2, a measuring cylinder A18-1, and a measuring cylinder B18-2; the pressure gauge 7 is installed at the inlet of the sand filling pipe device; the temperature sensor A12-1 and the temperature sensor B12-2 are respectively installed in the constant temperature heating jacket A11-1 and the constant temperature heating jacket B11-2; the outflow pipeline A16-1 and the outflow pipeline B16-2 are correspondingly provided with valves A17-1 and valve B17-2, and the fluids in the outflow pipeline A16-1 and the outflow pipeline B16-2 flow into the measuring cylinder A18-1 and the measuring cylinder B18-2 for metering.

[0031] Preferably, the base liquid tank 3 is connected to the working liquid tank 4 via an injection pipeline 6, and control valves are provided at both the inlet and outlet, and a plurality of parallel working liquid tanks are provided according to experimental requirements.

[0032] Preferably, three cylindrical protruding rods 10 are provided on the inlet cap 9 for tightening the threaded connection between the inlet cap 9 and the inlet joint 22 .

[0033] A method for testing the temporary blocking and diversion effect considering inter-layer interference comprises the following steps:

[0034] S1. Prepare experimental materials and assemble experimental equipment. Use sieves of different mesh sizes to prepare two kinds of quartz sand with different particle sizes. The quartz sand with a lower mesh size is named quartz sand A, and the quartz sand with a higher mesh size is named quartz sand B. Configure the temporary plugging system and base liquid, inject the configured temporary plugging system into the working liquid tank 4, and inject the configured base liquid into the base liquid tank 3. When assembling the device, first close the regulating valves A14-1, B14-2, C14-3, D14-4, E14-5, and F14-6 between the sand filling pipe A13-1 and the sand filling pipe B13-2, install the outlet end of the sand filling pipe device, and plug the outlet sieve A25- 1 and outlet screen plug B25-2 are placed into the inner grooves of outlet joint A23-1 and outlet joint B23-2 respectively, outlet sealing gasket A26-1 and outlet sealing gasket B26-2 are placed on outlet screen plug A25-1 and outlet screen plug B25-2, outlet cap A15-1 and outlet cap B15-2 are tightened on outlet joint A23-1 and outlet joint B23-2 respectively, and then the sand filling pipe is placed vertically with the assembled end at the bottom and the inlet end at the top, and the cylindrical screen A24-1 and screen B24-2 are placed in the sand filling pipe A13-1 and sand filling pipe B13-2 respectively.

[0035] S2. Filling with quartz sand and assembling the sand filling tube. Fill the selected quartz sand A and quartz sand B into the sand filling tube A13-1 and the sand filling tube B13-2 respectively, and tap the sand filling tube gently continuously to make the quartz sand evenly and densely filled in the sand filling tube body until the quartz sand fills up the two adjacent grooves at the entrance end of the sand filling tube. After the quartz sand filling is completed, assemble the inlet end of the sand filling pipe, put the inlet screen plug 21 into the internal groove of the inlet joint 22 to fully contact the filled quartz sand, place the inlet sealing gasket 20 on the inlet screen plug 21, and tighten the inlet cap 9 to the inlet joint 22; place the assembled sand filling pipe on the fixed support 19, and cover the constant temperature heating jacket A11-1 and the constant temperature heating jacket B11-2 on the outer walls of the sand filling pipe A13-1 and the sand filling pipe B13-2 respectively to complete the connection of the injection pipeline 6, the outflow pipeline A16-1 and the outflow pipeline B16-2.

[0036] S3. Inject base liquid and test the initial permeability of each sand-filled tube. Open the outflow pipeline valve A17-1 and valve B17-2, turn on the constant temperature heating jacket A11-1 and constant temperature heating jacket B11-2 switches, and heat to the required temperature for the experiment; close the control valve A5-1 and control valve B5-2, open the control valve C5-3 and control valve D5-4, and start the injection pump 2, and the base liquid is displaced into the sand-filled tube A13-1 and sand-filled tube B13-2; when the liquid output of the outflow pipeline A16-1 and the outflow pipeline B16-2 corresponding to the sand-filled tube A13-1 and sand-filled tube B13-2 is stable, record the fluid increment in each measuring cylinder per unit time, calculate the initial permeability of the sand-filled tube A13-1 and sand-filled tube B13-2, and end the injection of base liquid.

[0037] S4. Inject the temporary plugging system to test the temporary plugging and diversion effect. Close the control valve C5-3 and the control valve D5-4, open the control valve A5-1 and the control valve B5-2, and start the injection pump 2. The temporary plugging system is driven into the sand filling pipe A13-1 and the sand filling pipe B13-2. After the temporary plugging system is injected, the base liquid is injected again. After the experiment, the permeability of the sand filling pipe A13-1 and the sand filling pipe B13-2 is tested.

[0038] S5. Control the opening and closing of the regulating valve to test the temporary plugging and diversion effect under interlayer interference. Repeat S1 to S3, open the regulating valve A14-1, close the regulating valve B14-2, regulating valve C14-3, regulating valve D14-4, regulating valve E14-5 and regulating valve F14-6, repeat S4, and obtain the temporary plugging and diversion effect under the condition of interlayer interference at the position of regulating valve A14-1. Increase the dosage of the temporary plugging system, repeat S1 to S3, open the regulating valve B14-2, close the regulating valve A14-1, regulating valve C14-3, regulating valve D14-4, regulating valve E14-5 and regulating valve F14-6, repeat S4, and obtain the temporary plugging and diversion effect under the condition of interlayer interference at the position of regulating valve B14-2. Open and close the regulating valves at different positions to obtain the temporary plugging and diversion effect when interlayer interference exists at different positions.

[0039] S6. Use different types of temporary plugging systems, repeat S1 to S5, and obtain multiple sets of experimental data after treatment with different types of temporary plugging systems.

[0040] The above description is only for the purpose of facilitating those skilled in the art to understand the preferred embodiments of the present invention and is not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An experimental device for temporary blocking and diversion effect considering inter-layer interference, characterized in that: Including injection system, sand filling pipe device, metering control system, specifically: The injection system comprises a clean water tank, an injection pump, an injection pipeline, a vent valve, a control valve, a base liquid tank, and a working liquid tank; the clean water tank is connected to the injection pump through a threaded pipeline; the base liquid tank and the working liquid tank are connected to the injection pump through a pipeline; a vent valve is arranged on the injection pipeline; the base liquid tank and the working liquid tank both comprise a liquid tank cover, a liquid tank body, a liquid tank piston, and a liquid tank base; a liquid tank piston is arranged in the liquid tank body, the liquid tank piston can move up and down inside the liquid tank body, and the liquid tank body and the liquid tank cover are connected through threads; after clean water is injected into the base liquid tank or the working liquid tank through the injection pump, the displacement liquid tank piston moves upward, so that the base liquid or the temporary plugging system flows out of the base liquid tank or the working liquid tank; The sand filling pipe device comprises a fixed support, an inlet cap, an inlet joint, an inlet sealing gasket, an inlet screen plug, a sand filling pipe, a constant temperature heating sleeve, a regulating valve, a screen pipe, an outlet screen plug, an outlet sealing gasket, an outlet cap, and an outlet joint; the inlet cap is connected to the inlet joint by threads, and the inlet cap is connected to the injection pipeline by threads; there is a groove on the inner side of the inlet joint, and the cylindrical inlet screen plug is placed in the cylindrical groove space on the inner side of the inlet joint; the inlet sealing gasket is installed in the inlet cap, and the inner side of the inlet cap is sealed and connected to the inlet joint through the inlet sealing gasket; the sand filling pipes are connected to the inlet joint, and the two The sand-filled pipes are connected through multiple pipes in the middle, and each pipe is provided with a regulating valve; the fixed support is placed under the two sand-filled pipes, and the two sand-filled pipes are placed in the semicircular groove on the fixed support; the screen pipe is installed in the sand-filled pipe through the inlet joint; the constant temperature heating sleeve is coated on the outer wall of the sand-filled pipe; the outlet cap is connected to the outlet joint through threads, and the outlet cap is connected to the outflow pipeline through threads; there is a groove on the inner side of the outlet joint, and the cylindrical outlet screen plug is placed in the groove on the inner side of the outlet joint; the outlet sealing gasket is installed in the outlet cap, and the inner side of the outlet cap is sealed and connected to the outlet joint through the outlet sealing gasket; The metering control system includes a pressure gauge, a temperature sensor, an outflow pipeline and a measuring cylinder; the pressure gauge is installed at the inlet of the sand filling pipe device; the temperature sensor is installed in the constant temperature heating jacket; a valve is arranged on the outflow pipeline, and the fluid in the outflow pipeline flows into the measuring cylinder for metering.

2. According to claim 1, a temporary blocking and diversion effect experimental device considering interlayer interference is characterized in that: The base liquid tank is connected to the working liquid tank through an injection pipeline, and control valves are provided at the inlet and outlet, and a plurality of parallel working liquid tanks are provided according to experimental requirements.

3. According to claim 1, a temporary blocking and diversion effect experimental device considering interlayer interference is characterized in that: The inlet cap is provided with three cylindrical protruding rods for tightening the threaded connection between the inlet cap and the inlet joint.

4. A testing method for the temporary blocking and diversion effect experimental device considering interlayer interference as claimed in claim 1, characterized in that: The following steps are involved: S1. Prepare experimental materials and assemble experimental equipment; S2. Fill with quartz sand and assemble the sand filling tubes; S3. Inject base fluid and test the initial permeability of each sand filling tube; S4. Inject the temporary plugging system to test the temporary plugging and diversion effect; S5. Control the opening and closing of the regulating valve to test the temporary plugging and diversion effect under interlayer interference; S6. Use different types of temporary plugging systems, repeat S1 to S5, and obtain multiple sets of experimental data after processing with different types of temporary plugging systems.

Citation Information

Cited By

  • Chemical diverting acidification grading method for multi-layer medium-high permeability sandstone reservoir

    CN115992684A

  • Chemical diversion acidizing staged method for multilayer medium-high permeability sandstone reservoir

    CN115992684B

  • Experimental device for quantitative profile control and displacement of strong interlayer heterogeneity low-permeability reservoir and use method of experimental device

    CN116498309A