Host computer monitoring system for waste heat recovery and reuse in cold areas
By adopting a combination of heat pump units, sewage tanks and distributed sewage recovery pipes in the sewage waste heat recovery system in the cold area, combined with PLC control and monitoring system, the corrosion, scaling and low efficiency of the sewage waste heat recovery system is solved, and high efficiency is achieved , stable heat recovery and automated management reduce energy consumption and maintenance needs.
Patent Information
- Application Number
- CN202010836452.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-19
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2040-08-19
AI Technical Summary
Due to the corrosion, scaling and low heat exchange efficiency of sewage in cold areas, sewage waste heat recovery systems have frequent maintenance and short lifespan. The dispersed management method leads to large workload and low efficiency in operation and management, and the sewage waste heat recovery effect is poor.
A high-level monitoring system for waste heat recovery and reuse in cold areas was designed, using a combination of heat pump units, sewage tanks and distributed sewage recovery pipes, and automated management is achieved through PLC control cabinets and monitoring systems, and the heat exchange is optimized using temperature gradients and flow rates. Combining immersive sewage waste heat exchanger and diversion partition plate ensures effective heat recovery and stable operation of the system.
It realizes efficient recycling and stable operation of waste heat in waste water, reduces energy consumption, simplifies maintenance, extends equipment life, and improves management efficiency through automated management, ensuring the safe and comfortable use of equipment.
Smart Images

Figure CN111930066B_ABST
Abstract
Description
Technical field:
[0001] The invention relates to a host computer monitoring system for recycling waste heat from sewage in cold areas. Background technology:
[0002] Using sewage as a heat source is very energy-saving, but the biggest technical difficulty in sewage source heat recovery is: because it uses sewage, sewage waste heat recovery in cold areas is bound to cause blockage, corrosion, scaling of the heat exchanger, resulting in frequent maintenance, short life, low heat exchange efficiency and other problems, and poor use effect. At the same time, the bath sewage waste heat recovery system contains multiple subsystems, such as heat pump unit system, heat source indirect heat exchange system, fan coil unit, hot water supply system, etc. The number of electromechanical equipment is large and scattered. At the same time, it is necessary to measure the temperature, flow and liquid level of multiple measuring points in the hot water loop, refrigerant loop and sewage loop. If the decentralized management on-site control measurement method is adopted, it will lead to a large workload and low efficiency in operation and management, and the sewage waste heat recovery effect is not good. Summary of the invention:
[0003] The purpose of the present invention is to provide a host computer monitoring system for recycling waste heat from sewage in cold regions, which reduces primary energy consumption and promotes the recycling of energy resources.
[0004] The above purpose is achieved through the following technical solutions:
[0005] A host computer monitoring system for waste heat recovery and reuse in cold areas, comprising: a heat pump unit, the heat pump unit is connected to a first temperature sensor through a pipeline, the first temperature sensor is connected to a water inlet pipe through a pipeline, the water inlet pipe is connected to a sewage waste heat exchanger in a box body in a sewage tank, the sewage waste heat exchanger is connected to a water outlet pipe through a pipeline, the water outlet pipe is connected to a refrigerant expansion water tank, the refrigerant expansion water tank is connected to a liquid level sensor, the refrigerant expansion water tank is connected to a second temperature sensor through a pipeline, the second temperature sensor is connected to the heat pump unit through a pipeline, the pipeline is filled with refrigerant, the bath drain pipe is connected to the sewage inlet pipe, the sewage inlet pipe is provided with a sixth temperature sensor, the sewage inlet pipe is connected to the sewage in the box body in the sewage tank Distribution pipe, distributed sewage recovery pipe is provided with a seventh temperature sensor, the heat pump unit is connected to the third temperature sensor through a pipeline, the third temperature sensor is connected to the insulated water tank through a pipeline, the insulated water tank is connected to the hot water output pipeline to the shower, the hot water output pipeline is provided with an ultrasonic heat meter, the tap water inlet pipe is connected to the fan coil unit, the tap water inlet pipe is provided with a fourth temperature sensor, the fan coil unit is connected to the electric heater through a pipeline, the electric heater is connected to the heat pump unit through the electric heater pipeline, the fifth temperature sensor is provided on the electric heater pipeline, the first temperature sensor, the second temperature sensor, the third temperature sensor, the fourth temperature sensor, the fifth temperature sensor, the sixth temperature sensor, the seventh temperature sensor, and the liquid level sensor are all connected to the PLC control cabinet.
[0006] A group of guide partition plates are installed in the inner box of the sewage tank, and the guide partition plates are arranged in parallel longitudinally. A group of sewage waste heat exchangers are installed in the inner box of the sewage tank, and the sewage waste heat exchangers are parallel to each other laterally. The top of the sewage waste heat exchanger is provided with a sewage distribution pipe, and the sewage distribution pipe is connected to the sewage inlet pipe. The sewage waste heat exchanger is connected to the sewage waste heat connecting pipe. The lower part of the sewage waste heat connecting pipe is connected to the inlet pipe, and the inlet pipe is connected to the heat pump unit. The upper part of the sewage waste heat connecting pipe is connected to the outlet pipe, and the outlet pipe is connected to the heat pump unit. A distributed sewage recovery pipe is installed at the bottom of the inner box of the sewage tank. The inner box of the sewage tank is installed in the outer box of the sewage tank. Sewage tank insulation material is installed between the inner box of the sewage tank and the outer box of the sewage tank.
[0007] The sewage waste heat exchanger is assembled from a group of heat exchange tubes installed in parallel, each group of heat exchange tubes is composed of multiple pipes installed in parallel from top to bottom, and multiple groups of heat exchange tubes are installed in parallel to ensure that the sewage waste heat exchanger is fully distributed in the insulated sewage tank; a sewage distribution pipe is arranged above the box body of the sewage tank, so that the high-temperature sewage enters the sewage tank in a jet manner, and the sewage distribution pipe is evenly distributed above the sewage waste heat exchanger to generate vibration and enhance the heat exchange effect; when the sewage is at high temperature, heat is exchanged with the refrigerant in the sewage waste heat exchanger installed in the middle and upper layers of the sewage tank. As the heat of the sewage is absorbed, the temperature gradually decreases, the specific gravity of the sewage increases, and it falls into the bottom layer of the sewage tank, generating a temperature gradient; the low-temperature sewage that has absorbed heat sinks to the lower layer, and under the action of the new high-temperature sewage pressure, it is discharged in the form of overflow through the distributed sewage recovery pipe, thereby preventing heat loss;
[0008] The low-temperature refrigerant in the sewage waste heat exchanger enters from the bottom inlet of the water inlet pipe at a certain flow rate, and exchanges heat with the sewage with a temperature gradient in the sewage tank in the form of multiple tube layers. The higher the flow rate, the more significant the heat transfer effect. The high-temperature refrigerant flows out from the outlet of the upper water outlet pipe of the sewage waste heat exchanger and enters the evaporator of the unit. The heat in the refrigerant is absorbed by the refrigerant in the unit through conversion, and the low-temperature refrigerant returns to the bottom inlet of the water inlet pipe, circulates and absorbs heat to ensure the progress of the heat transfer process.
[0009] The sewage waste heat exchanger adopts an immersion structure, which immerses the sewage waste heat exchanger in sewage to facilitate cleaning of dirt; the sewage distribution pipe causes lateral scouring and temperature gradient when the high-temperature sewage enters the sewage tank, ensuring that the high-temperature sewage is evenly and fully exchanged with heat. The low-temperature sewage that absorbs heat sinks to the lower layer and is discharged in the form of overflow through the recovery device, i.e. the distributed sewage recovery pipe, under the action of the new high-temperature sewage pressure, to prevent heat loss;
[0010] The guide partitions are designed to be staggered in the sewage tank. The guide partitions increase the flow speed of sewage, extend the flow time, and fully exchange heat to ensure that the sewage with the lowest temperature is discharged evenly and quickly; distributed sewage recovery pipes are arranged at the bottom of the sewage waste heat exchanger to quickly discharge the low-temperature sewage; at the same time, the refrigerant with a certain flow rate enters at the bottom inlet of the sewage waste heat exchanger, flows through the entire sewage waste heat exchanger from bottom to top, and fully exchanges heat with the sewage passing in the opposite direction, so that the refrigerant obtains the maximum amount of heat and the heat recovery efficiency is maximized.
[0011] The upper computer monitoring system for waste heat recovery and reuse of sewage in cold areas, the PLC control cabinet is respectively connected to temperature sensors, liquid level sensors, ultrasonic heat meters, smart water meters, multi-function power meters, electric heaters, regulating valves, domestic water pumps, sewage pumps, heat pump units, monitoring system hardware equipment, monitoring system application software, large-screen displays, and network communications; the temperature sensor measures the temperature of each measuring point, the ultrasonic heat meter measures the heat and flow, and the multi-function power meter measures the electricity; the monitoring system hardware equipment includes an industrial computer, the industrial computer is connected to a network switch, the PLC control cabinet, the smart meter, the configuration software Ukey, and the network server Ukey; the temperature sensors include a first temperature sensor, a second temperature sensor, a third temperature sensor, a fourth temperature sensor, a fifth temperature sensor, a sixth temperature sensor, and a seventh temperature sensor.
[0012] The monitoring system software has the functions of start and stop control and operation status display of a single unit. It can operate each unit locally and remotely respectively, and remotely monitor the operation status of the heat pump hot water unit through the mobile phone APP software to realize the start and stop control of the hot water unit; the monitoring system software controls the number of running units and configures the start and stop programs to realize automatic continuous operation of the system; during the peak bathing period, the system unit and the backup unit are started at the same time. When the peak period is over, the number of bathers gradually decreases, the recovered heat also decreases, and the system COP value gradually decreases. At this time, the monitoring system automatically reduces the number of running units and reduces the system power consumption until the insulated hot water tank is full, or hot water is produced according to demand. At this time, the unit automatically stops running and the entire system no longer works.
[0013] The monitoring system software realizes the monitoring and display of the average temperature of the heat source, the adjustment of hot water flow and temperature, the instantaneous hot water production of a single unit, the heat recovery and percentage display of the refrigerant in the sewage waste heat exchanger of a single unit, the water tank level control, the fan coil unit intercooler or hot water valve switch control, and the motor start and stop and speed control.
[0014] The monitoring system application software adopts ForceControl V7.0 configuration software of ForceControl Technology. The core of the functional architecture of ForceControl monitoring configuration software is the distributed regional real-time database. Other application programs or functional modules realize their functions and expansions by interacting with the regional real-time database. The functional modules of the software include HMI screen, real-time database, equipment communication service program, network communication program, interface SDK, Web application service, relational data dump, data forwarding, and expansion components.
[0015] The operation process is sewage side stroke, coolant side stroke, bath hot water side stroke;
[0016] The sewage side process, (1) the temperature of the hot water in the bathtub shower is 38℃-41℃,
[0017] (2) After showering, the sewage enters the insulation sump through the water channel, and the sewage is pumped into the insulation sewage tank using a sewage lift pump. At this time, the sewage temperature is around 25℃-35℃.
[0018] (3) Through the sewage distribution device, the high-temperature sewage enters the sewage tank in the form of a jet and is evenly distributed on the sewage waste heat exchanger, generating vibrations and enhancing the heat exchange effect. When the sewage is at a high temperature, it exchanges heat with the refrigerant installed in the sewage waste heat exchanger in the middle and upper layers of the sewage tank. As the heat of the sewage is absorbed, the temperature gradually decreases, the specific gravity of the sewage increases, and it falls to the bottom of the sewage tank, generating a temperature gradient; the low-temperature sewage that has absorbed heat sinks to the lower layer, and under the action of the new high-temperature sewage pressure, it is discharged in the form of overflow through the recovery device; the guide baffle installed in the sewage tank lengthens the sewage flow, and its purpose is to discharge the sewage with the lowest temperature in the sewage tank and reduce heat discharge;
[0019] (4) When the temperature of the discharged sewage is higher than 10.5°C, the system units and the backup units are started at the same time. When the sewage temperature is lower than 9°C, the backup units stop running. When the sewage temperature is lower than 7°C, the system units are stopped in turn. When the sewage temperature is lower than 4°C, the system generates a "low temperature alarm", all units stop running, and the system is no longer working. This starts and stops repeatedly, and the control system runs automatically.
[0020] The coolant side process is as follows: (1) the sewage waste heat exchanger is immersed in the sewage tank, and the coolant in the sewage waste heat exchanger is pumped from the outlet of the unit into the sewage waste heat exchanger through a circulating water pump. The coolant enters from the bottom of the sewage waste heat exchanger and is heated by the sewage with a temperature gradient in the sewage tank in a multi-tube layer form. The high-temperature coolant flows out from the upper layer of the sewage waste heat exchanger;
[0021] (2) The coolant enters the evaporator of the unit from the outlet of the wastewater heat exchanger. The heat in the coolant is absorbed by the refrigerant in the unit through the plate exchanger. The low-temperature coolant returns to the bottom inlet of the wastewater heat exchanger and circulates to absorb heat.
[0022] (3) In summer, the low-temperature refrigerant bypasses the plate-type sewage waste heat exchanger and exchanges heat with the hot air in the dormitory, absorbing heat from the air, lowering the temperature in the dormitory and achieving the cooling effect; the refrigerant takes away the heat and directly returns to the unit evaporator, releases heat through the unit, and then circulates.
[0023] The bathing hot water side stroke,
[0024] (1) Under the pressure of the pipe network, tap water with an average temperature of 10.7°C first enters the fan disk to recover the heat released by the condensation of bathing steam in the bathroom, raising the tap water temperature by 2-4°C, while reducing the humidity in the bathroom, and recovering the condensed water for bathing;
[0025] (2) The preheated tap water enters the inlet of the unit, and the heat source in the sewage in the energy storage sewage tank is brought into the unit by the unit's refrigerant to evaporate. Through the work of the refrigeration compressor, the tap water is cooled and released under high pressure in the condenser to raise the temperature of the tap water to the set value, producing hot water for bathing;
[0026] Generally, the water temperature setting value does not exceed 60℃ and is not lower than 40℃. When the water temperature exceeds the "over-temperature value", the monitoring system generates a "hot water over-temperature" alarm and the unit shuts down. When the water temperature returns to the "set value", the monitoring system cancels the "hot water over-temperature" alarm and the unit returns to normal working state.
[0027] The heat pump unit heats the water to 40-60℃ and places it in the insulated hot water tank. The temperature drop is generally less than 2-5℃ per day. The working time of the machine is arranged according to the water consumption, the amount of water used per day, and the amount of water produced;
[0028] When the water temperature and water volume in the insulated hot water tank reaches the set upper limit, the main unit stops working. When the water temperature is lower than the set lower limit, the main unit starts working in this cycle, so that the hot water in the insulated hot water tank remains constant for 24 hours. (3) The high-temperature water in the insulated hot water tank is mixed with a certain proportion of tap water through a water mixing device to form low-temperature water of about 40°C, which is then injected into the insulated mixing water tank. After the insulated mixing water tank is full, the mixing water pump automatically stops running, and the hot water at this time is directly used for bathing.
[0029] Beneficial effects:
[0030] 1. The present invention adopts a sewage tank indirect heat exchange heat pump system, which has stable operation, high heat exchange efficiency, simple maintenance, and can be unattended; it does not burn or emit during operation, and is completely driven by a small amount of electric energy. It is an efficient, environmentally friendly, and energy-saving hot water production technology.
[0031] 2. The bathhouse sewage waste heat recovery monitoring system of the present invention is a product of the combination of heat pump technology, automatic control technology and computer network technology. The use of this monitoring system can rationally utilize equipment, save energy, save manpower, ensure the safe operation of equipment, extend the life of equipment, strengthen the modern management of apartment bathhouse electromechanical equipment, and create a safe, comfortable and convenient working environment, and improve the management level.
[0032] 3. The sewage waste heat exchanger of the present invention is assembled by a group of heat exchange tubes installed in parallel, each group of heat exchange tubes is composed of a plurality of pipes installed in parallel from top to bottom, and a plurality of groups of heat exchange tubes are installed in parallel to ensure that the sewage waste heat exchanger is fully distributed in the insulated sewage tank; a sewage distribution pipe is arranged above the box body of the sewage tank, so that the high-temperature sewage enters the sewage tank in a jet manner, and the sewage distribution pipe is evenly distributed above the sewage waste heat exchanger to generate vibration and enhance the heat exchange effect; when the sewage is at a high temperature, heat is exchanged with the refrigerant in the sewage waste heat exchanger installed in the middle and upper layers of the sewage tank. As the heat of the sewage is absorbed, the temperature gradually decreases, the specific gravity of the sewage increases, and the sewage falls into the bottom layer of the sewage tank, generating a temperature gradient; the low-temperature sewage that has absorbed heat sinks to the lower layer, and is discharged in the form of overflow through the distributed sewage recovery pipe under the pressure of the new high-temperature sewage, thereby preventing the loss of heat;
[0033] 4. The low-temperature refrigerant in the sewage waste heat exchanger of the present invention enters from the bottom inlet of the water inlet pipe at a certain flow rate, and exchanges heat with the sewage with a temperature gradient in the sewage tank in the form of multiple tube layers. The higher the flow rate, the more significant the heat transfer effect. The high-temperature refrigerant flows out from the outlet of the upper water outlet pipe of the sewage waste heat exchanger and enters the evaporator of the unit. The heat in the refrigerant is absorbed by the refrigerant in the unit through conversion, and the low-temperature refrigerant returns to the bottom inlet of the water inlet pipe, circulates and absorbs heat to ensure the progress of the heat transfer process.
[0034] 5. The sewage waste heat exchanger of the present invention adopts an immersion structure, and the sewage waste heat exchanger is immersed in sewage, which is convenient for cleaning dirt; the sewage distribution pipe causes lateral flushing and temperature gradient when the high-temperature sewage enters the sewage tank, ensuring that the high-temperature sewage is evenly and fully exchanged with heat, and the low-temperature sewage that absorbs heat sinks to the lower layer, and is discharged in the form of overflow through the recovery device, i.e., the distributed sewage recovery pipe, under the action of the new high-temperature sewage pressure, thereby preventing heat loss;
[0035] 6. The guide partition plates of the present invention are designed to be staggered in the sewage tank, which increases the flow rate of sewage, prolongs the flow time, and fully exchanges heat to ensure that the sewage with the lowest temperature is discharged evenly and quickly; a distributed sewage recovery pipe is arranged at the lower part of the sewage waste heat exchanger to quickly discharge the low-temperature sewage; at the same time, a refrigerant with a certain flow rate enters at the bottom inlet of the sewage waste heat exchanger, flows through the entire sewage waste heat exchanger from bottom to top, and fully exchanges heat with the sewage passing in the reverse direction, so that the refrigerant obtains the maximum amount of heat and the heat recovery efficiency reaches the highest. Description of the drawings:
[0036] Attached Figure 1 This is the measurement point location diagram of this product.
[0037] Attached Figure 2 This is the energy flow diagram of the bath sewage waste heat recovery system of this product.
[0038] Attached Figure 3 This is the system working condition of this product. Figure 1 .
[0039] Attached Figure 4 This is a schematic diagram of the single machine working condition of this product Figure 2 .
[0040] Attached Figure 5 This is a schematic diagram of the mobile phone APP operation interface of this product.
[0041] Attached Figure 6 This is the monitoring system architecture diagram of this product.
[0042] Attached Figure 7 This is the data logic flow chart of the monitoring system of this product.
[0043] Attached Figure 8 This is the operating principle diagram of the bath sewage waste heat recovery system of this product.
[0044] Attached Fig. 9 This is a comparison chart of standard coal consumption for this product.
[0045] Attached Fig.10 This is a comparison chart of the standard coal energy saving of this product.
[0046] Attached Fig.11 This is a comparison chart of the standard coal energy saving rate of this product.
[0047] Attached Fig.12 This is a graph showing changes in CO2 emissions reduction for this product.
[0048] Attached Fig.13 This is the hourly change chart of the COP of the heat pump unit of this product on November 3.
[0049] Attached Fig.14 This is the hourly change chart of the COP of the heat pump unit of this product on November 4.
[0050] Attached Fig.15 This is the hourly change chart of the COP of the heat pump unit of this product on November 5.
[0051] Attached Fig.16 This is the three-dimensional structure diagram of the sewage tank of this product.
[0052] Attached Fig.17 This is the main view of the sewage tank of this product.
[0053] Attached Fig.18 This is a top view of the sewage tank of this product.
[0054] Attached Fig.19 This is the side view of the sewage tank of this product.
[0055] Attached Fig. 20This is a schematic diagram of the distributed sewage recovery pipe structure of this product. Specific implementation method:
[0056] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention.
[0057] Embodiment 1:
[0058] A host computer monitoring system for waste heat recovery and reuse in cold areas, comprising: a heat pump unit 1, the heat pump unit 1 is connected to a first temperature sensor 51 through a pipeline, the first temperature sensor 51 is connected to an inlet pipe 3-7 through a pipeline, the inlet pipe 3-7 is connected to a waste heat exchanger 3-2 in a sewage tank body 3-1, the waste heat exchanger 3-2 is connected to an outlet pipe 3-11 through a pipeline, the outlet pipe 3-11 is connected to a refrigerant expansion water tank 60, the refrigerant expansion water tank 60 is connected to a liquid level sensor 58, the refrigerant expansion water tank is connected to a second temperature sensor 52 through a pipeline, the second temperature sensor 52 is connected to the heat pump unit 1 through a pipeline, the pipeline is filled with refrigerant, the bath drain pipe is connected to a sewage inlet pipe 3-4, the sewage inlet pipe 3-4 is provided with a sixth temperature sensor 56, the sewage inlet pipe 3-4 is connected to the sewage tank body 3-1 The sewage distribution pipe 3-3 and the distributed sewage recovery pipe 3-6 are provided with a seventh temperature sensor 57, the heat pump unit 1 is connected to the third temperature sensor 53 through a pipeline, the third temperature sensor 53 is connected to the insulated water tank 18 through a pipeline, the insulated water tank 18 is connected to the hot water output pipeline to the shower, the hot water output pipeline is provided with an ultrasonic heat meter 61, the tap water inlet pipe is connected to the fan coil unit 15, the tap water inlet pipe is provided with a fourth temperature sensor 54, the fan coil unit 15 is connected to the electric heater 16 through a pipeline, the electric heater 16 is connected to the heat pump unit 1 through the electric heater pipeline, and the fifth temperature sensor 55 is provided on the electric heater pipeline. The first temperature sensor 51, the second temperature sensor 52, the third temperature sensor, the fourth temperature sensor 54, the fifth temperature sensor 55, the sixth temperature sensor 56, the seventh temperature sensor 57, and the liquid level sensor 58 are all connected to the PLC control cabinet.
[0059] Embodiment 2:
[0060] In the host computer monitoring system for waste heat recovery and reuse in cold areas described in Example 1, a group of guide partition plates 3-10 are installed in the box body 3-1 of the sewage tank, and the guide partition plates 3-10 are arranged in parallel in the longitudinal direction. A group of sewage waste heat exchangers 3-2 are installed in the box body of the sewage tank, and the sewage waste heat exchangers are parallel to each other in the transverse direction. The top of the sewage waste heat exchanger is provided with a sewage distribution pipe 3-3, and the sewage distribution pipe 3-3 is connected to the sewage inlet pipe 3-4. The sewage waste heat exchanger 3-2 Connect the sewage waste heat connecting pipe 3-5, the lower part of the sewage waste heat connecting pipe 3-5 is connected to the water inlet pipe 3-7, the water inlet pipe 3-7 is connected to the heat pump unit 1, the upper part of the sewage waste heat connecting pipe 3-5 is connected to the outlet pipe 3-11, the outlet pipe 3-11 is connected to the heat pump unit 1, and a distributed sewage recovery pipe 3-6 is installed at the bottom of the sewage tank inner box body, the sewage tank inner box body 3-1 is installed in the sewage tank outer box body 3-8, and a sewage tank insulation material 3-9 is installed between the sewage tank inner box body and the sewage tank outer box body.
[0061] The wastewater heat exchanger 3-2 is assembled from a group of heat exchange tubes installed in parallel, each group of heat exchange tubes is composed of multiple pipes installed in parallel from top to bottom, each group of heat exchange tubes has a certain height, and multiple groups of heat exchange tubes are installed in parallel to ensure that the wastewater heat exchanger is fully distributed in the insulated sewage tank;
[0062] As a preferred embodiment, the sewage waste heat exchanger 2 is designed to adopt a multi-pass fin zigzag structure, and the number of passes can be determined by numerical analysis and optimization design combined with model experiments, with the maximum heat transfer area as a constraint;
[0063] A sewage distribution pipe 3-3 is arranged above the box body 3-1 in the sewage tank, so that the high-temperature sewage enters the sewage tank in a jet manner. The sewage distribution pipe 3-3 is evenly distributed above the sewage waste heat exchanger 3-2, generating vibrations and enhancing the heat exchange effect. When the sewage is at a high temperature, it exchanges heat with the refrigerant installed in the sewage waste heat exchanger 3-2 in the middle and upper layers of the sewage tank. As the heat of the sewage is absorbed, the temperature gradually decreases, the specific gravity of the sewage increases, and it falls to the bottom of the sewage tank, generating a temperature gradient. The low-temperature sewage that has absorbed heat sinks to the lower layer, and under the action of the new high-temperature sewage pressure, it is discharged in the form of overflow through the distributed sewage recovery pipe 3-6, eliminating the loss of heat.
[0064] The low-temperature refrigerant in the sewage waste heat exchanger 3-2 enters from the bottom inlet of the water inlet pipe 3-7 at a certain flow rate, and exchanges heat with the sewage with a temperature gradient in the sewage tank in the form of multiple tube layers. The higher the flow rate, the more significant the heat transfer effect. The high-temperature refrigerant flows out from the outlet of the upper water outlet pipe 3-11 of the sewage waste heat exchanger and enters the evaporator of the unit. The heat in the refrigerant is absorbed by the refrigerant in the unit through conversion, and the low-temperature refrigerant returns to the bottom inlet of the water inlet pipe 3-7, circulates and absorbs heat to ensure the progress of the heat transfer process.
[0065] The sewage waste heat exchanger 3-2 can be a non-metallic sewage waste heat exchanger as a preferred solution, with heat-conducting elements added inside, good thermal conductivity, high strength; no corrosion, no scaling, easy to clean and easy to install.
[0066] The sewage waste heat exchanger 3-2 adopts an immersion structure, and the sewage waste heat exchanger is immersed in sewage to facilitate cleaning of dirt;
[0067] As a preferred solution, an antifreeze heat exchange medium can be injected into the sewage waste heat exchanger 3-2, and non-contact heat exchange can be performed with the sewage through the sewage waste heat exchanger to ensure the safety of the hot water unit.
[0068] It is assembled from several sewage waste heat exchangers and is easy to install and maintain.
[0069] The sewage tank is designed with a distributed sewage distribution and recovery device, specifically: the sewage distribution pipe 3-3 causes lateral scouring and temperature gradient when the high-temperature sewage enters the sewage tank, ensuring that the high-temperature sewage is evenly and fully heat-exchanged, and the low-temperature sewage that has absorbed heat sinks to the lower layer. Under the pressure of the new high-temperature sewage, it is discharged in the form of overflow through the recovery device, i.e., the distributed sewage recovery pipe 3-6, thus preventing heat loss;
[0070] By designing and installing sewage distribution pipe 3-3 and distributed sewage recovery pipe 3-6 in the sewage tank, a distributed sewage distribution and recovery device is formed, which does not destroy the temperature drop layer in the sewage tank and maintains a good temperature layer change caused by water temperature.
[0071] The design and installation of distributed sewage recovery pipes 3-6 aims to concentrate the low-temperature sewage in the lower layer of the water tank and discharge it at the lowest temperature, thereby reducing the energy loss of sewage discharge.
[0072] The guide partition plates 3-10 are designed to be staggered in the sewage tank. The guide partition plates 3-10 increase the flow speed of the sewage, extend the flow time, fully exchange heat, and ensure that the sewage with the lowest temperature is discharged evenly and quickly.
[0073] Distributed sewage recovery pipes 3-6 are arranged at the bottom of the sewage waste heat exchanger to quickly discharge low-temperature sewage. At the same time, a refrigerant with a certain flow rate enters the bottom inlet of the sewage waste heat exchanger, flows through the entire sewage waste heat exchanger from bottom to top, and fully exchanges heat with the sewage passing in the opposite direction, so that the refrigerant obtains the maximum amount of heat and the heat recovery efficiency is the highest.
[0074] Embodiment 3:
[0075] The host computer monitoring system for waste heat recovery and reuse of sewage in cold areas described in Example 1, the PLC control cabinet is respectively connected to temperature sensors, liquid level sensors, ultrasonic heat meters, smart water meters, multi-function power meters, electric heaters, regulating valves, domestic water pumps, sewage pumps, heat pump units, monitoring system hardware equipment, monitoring system application software, large-screen displays, and network communications; the temperature sensor measures the temperature of each measuring point, the ultrasonic heat meter measures the heat and flow, and the multi-function power meter measures the electricity; the monitoring system hardware equipment includes an industrial computer, the industrial computer is connected to a network switch, the PLC control cabinet, the smart meter, the configuration software Ukey, and the network server Ukey. The temperature sensors include a first temperature sensor 51, a second temperature sensor 52, a third temperature sensor, a fourth temperature sensor 54, a fifth temperature sensor 55, a sixth temperature sensor 56, and a seventh temperature sensor 57; the monitoring system software (monitoring system) has the functions of start-stop control and operation status display of a single unit, and can perform local and remote operation on each unit respectively. The operation status of the heat pump water heater unit can also be monitored through the mobile phone software to realize the start-stop control of the water heater unit.
[0076] The monitoring system controls the number of units in operation and configures the start and stop programs to achieve automatic and continuous operation of the system. During the peak period of bathing, the system units and backup units are started at the same time, which basically solves the problem of wastewater heat source loss. When the peak period is over, the number of bathers gradually decreases, the amount of heat that can be recovered also decreases, and the system COP value gradually decreases. At this time, the monitoring system automatically reduces the number of units in operation, reduces the power consumption of the system, and improves the heat recovery efficiency until the insulated hot water tank is full, or a certain amount of hot water is produced according to demand. At this time, the unit automatically stops running and the entire system no longer works, ensuring that the system heat recovery efficiency reaches 100%.
[0077] The monitoring system realizes monitoring and display of average temperature of heat source, hot water flow and temperature regulation, instantaneous hot water production display of single unit, heat recovery and percentage display of refrigerant in sewage waste heat exchanger of single unit, water tank level control, switch control of cold (hot) water valve in fan coil unit, motor start and stop and speed control, etc.
[0078] The monitoring system has the functions of fault self-diagnosis, alarm, automatic protection, etc. The alarm function is perfect, with alarm contents such as over-temperature alarm, under-temperature alarm, power phase sequence error alarm, phase loss alarm, motor overload alarm, water flow fault alarm, water pressure fault alarm, over-pressure alarm, under-pressure alarm, hot water tank full water alarm, etc.
[0079] The monitoring system has the functions of data curve display, printing, and historical data export. At the same time, the data is analyzed, energy consumption is accumulated, and energy saving, emission reduction, production cost, and cost saving are calculated. It can also display basic information such as indoor and outdoor temperature and humidity, number of online nozzles, total number of bathers, weather forecast, etc. You can check the current bathroom usage online through the mobile phone APP and arrange bathing time reasonably.
[0080] The monitoring system can provide multi-user and multi-account management functions, provide managers with a hierarchical management method for online data monitoring and supervision, provide real-time data display functions, and rich historical data analysis methods. It can select historical data of 1 hour, 24 hours, 15 days, 1 month, half a year, and the whole year, and has data curve display, printing, and historical data export functions.
[0081] The system does not require manual care when running, is unattended, and can be monitored remotely.
[0082] While optimizing the original software and hardware, the system uses the latest monitoring software, which responds to hardware information collection more promptly and has higher operating efficiency. It also has the conditions for uninterrupted operation. The computer used in the hardware is an i7 processor and is equipped with a large-screen TV as a split screen, allowing people entering the bath to clearly see the system working screen. At the same time, the data is displayed dynamically with obvious color distinctions. You can click on equipment such as units or water tanks to view detailed information.
[0083] Embodiment 4:
[0084] The host computer monitoring system for waste heat recovery and reuse in cold areas described in Example 3 is composed of temperature sensors, liquid level sensors, ultrasonic heat meters, intelligent water meters, multifunctional power meters, electric heaters, regulating valves, domestic water pumps, sewage pumps, heat pump units, PLC control cabinets, monitoring system hardware equipment, monitoring system application software, large-screen displays, network communications, etc. The temperature of each measuring point is measured by a temperature sensor, the heat and flow are measured by an ultrasonic heat meter, and the power is measured by a multifunctional power meter.
[0085] The hardware of the monitoring system includes an industrial computer, a network switch, a PLC, multiple intelligent instruments, a configuration software Ukey, and a network server Ukey. The same model of intelligent instruments share a PLC communication module and occupy the same port, i.e., the communication bus. This solves the communication problems that may be caused by different communication parameters such as baud rate, data bit, and check bit of different instruments.
[0086] Embodiment 5:
[0087] The host computer monitoring system for waste heat recovery and reuse in cold areas described in Example 3, the monitoring system application software adopts ForceControl V7.0 configuration software of ForceControl Technology. The core of the functional architecture of ForceControl monitoring configuration software is the distributed regional real-time database. Other application programs or functional modules realize their functions and extensions by interacting with the regional real-time database. The functional modules of the software include HMI screen, real-time database, equipment communication service program, network communication program, interface SDK, Web application service, relational data dump, data forwarding, and extension components.
[0088] Embodiment 6:
[0089] The host computer monitoring system for waste heat recovery and reuse in cold regions described in Example 4, the measurement point location, taking Apartment A11 as an example, the name, instrument model and location of each measurement point in the monitoring system are as shown in the attached Figure 8 As shown in Table 4-1, measuring point names and instrument models (taking A11 Apartment as an example).
[0090] Table 4-1
[0091]
[0092]
[0093] Embodiment 7:
[0094] The host computer monitoring system for waste heat recovery and reuse of sewage in cold areas described in the above embodiment reads the flow rate of device No. 1 in the Modbus-RTU protocol RTU mode, that is, reads registers 5 and 6, a total of 2 registers, and the command is as follows:
[0095] 01 03 00 04 00 02 85 CA Device Number Function Start register Number of registers Validation and
[0096] 85 CA is a hexadecimal value obtained by CRC-16 (BISYNCH, polynomial is x16+x15+x2+1, mask word is 0A001H) cyclic redundancy algorithm. The returned data should be (set state to simulation operation state, flow rate = 1.2345678m / s):
[0097] 01 03 04 06 51 3F 9E 3B 32 Device Number Function Number of data bytes Data = 1.234567 Validation and
[0098] The four bytes 3F 9E 06 51 are the IEEE754 format single-precision floating point number 1.2345678.
[0099] For another example, to read the net cumulative flow, the commands for registers REG25 and REG26 are as follows:
[0100] 01 03 00 18 00 02 44 0C (hexadecimal number), the returned data should be (assuming net accumulator = 802609, its 4-byte hexadecimal representation is 00 0C 3F 31), 01 03 04 3F 31 00 0C A7 ED (hexadecimal number, A7 ED is the checksum), when the net accumulation = 0, the returned data is 01 03 04 00 00 00 00 FA 33, where FA33 is the checksum.
[0101] Please note the order of data storage in the above example. When interpreting values using C language, you can use pointers to directly put the required data into the corresponding variable address. The commonly used storage order is low byte first. For example, in the above 1.23456m / s example, the storage order of 3F 9E 06 51 data is 51 06 9E 3F.
[0102] In MODBUS-RTU state, a maximum of 125 registers can be read each time.
[0103] The register addresses in the protocol are as follows:
[0104] Table 5-1 MODBUS protocol register address table, Table 5-1
[0105]
[0106]
[0107]
[0108] The internal accumulation uses a combination of long integers and decimals. In general use, only the integer part can be read, and the decimal part can be ignored. The size of the accumulation is related to the accumulation unit and the multiplication factor. The exact relationship between them is that the accumulated integer part is N (for positive accumulation, it is the value in registers 0009 and 0010, a 32-bit signed long integer), the accumulated decimal part is Nf (for positive accumulation, it is the content in registers 0011 and 0012, a 4-byte floating point number), and the accumulated flow multiplication factor is n (register 1439).
[0109] Embodiment 8:
[0110] The host computer monitoring system for waste heat recovery and reuse of sewage in cold areas described in the above embodiment is in accordance with the DLT645-1997 standard.
[0111] ⑴ Reference standards
[0112] GB / T3454-1994 Basic control regulations for data communication
[0113] GB / T9387-1995 Basic reference model for open systems interconnection of information processing systems
[0114] DL / T614-1997 Multifunctional Electric Energy Meter
[0115] IEC1107-1996 Data exchange for meter reading, tariff and load control --- Direct local data exchange
[0116] IEC1142-1993 Data exchange for meter reading, tariff and load control---Local bus data exchange
[0117] ITU-TV.24—1993 Point characteristics of unbalanced dual-current interface circuits
[0118] ITU-TV.28—1993 Interface circuit definition table between data terminal equipment (DTE) and data circuit-terminating equipment (DCE)
[0119] ⑵RS-485 standard serial electrical interface
[0120] This protocol uses the RS-485 standard serial electrical interface, which makes point-of-use connection possible. The general performance of the RS-485 interface should meet the following requirements.
[0121] Driving and receiving ends, electrostatic discharge (ESD) ±15kV (human body model).
[0122] Common mode input voltage: -7V~+12V.
[0123] Differential input voltage: greater than 0.2V
[0124] Drive output voltage: When the load impedance is 54 ohms, the maximum is 5V and the minimum is 1.5V
[0125] Three-state output
[0126] Half-duplex communication mode.
[0127] The driving capability is no less than 32 similar interfaces.
[0128] When the transmission rate is no more than 100kbps, the effective transmission distance is no less than 1200m
[0129] The bus is passive and isolated power is provided by the tariff device or data terminal.
[0130] ⑶Byte format
[0131] Each byte contains 8 bits of binary code, plus a start bit (0), an even parity bit and a stop bit (1) for a total of 11 bits. The transmission sequence is as follows: Figure 1D0 is the least significant bit of the byte, and D7 is the most significant bit of the byte. The low bit is transmitted first, and the high bit is transmitted later.
[0132] (4) Frame format
[0133] Frame is the basic unit of information transmission.
[0134]
[0135] The user decides. When the length of the address code used is less than 6 bytes, use hexadecimal AAH to make up 6 bytes. The low address bit comes first and the high address bit comes later. When the address is 999999999999H, it is a broadcast address.
[0136] ⑸Transmission
[0137] Before sending the frame information, 1-4 bytes FEH are sent to wake up the receiver. All data items are transmitted with low-order bytes first and high-order bytes later. Each communication starts with the master station sending a request command frame from the slave station selected by the information frame address field, and the requested slave station responds according to the control code in the command frame. Response delay after receiving the command frame Td: 20ms≤Td≤500ms. Pause time between bytes Tb: Tb≤500ms. Byte check is even check, frame check is longitudinal information checksum, and the receiver will discard the information frame and not respond regardless of whether it detects an even check error or a longitudinal information checksum error. Initial rate: 1200bpd Standard rate: 300, 600, 1200, 2400, 4800, 9600bps Special rate: specified by the manufacturer. See Appendix B4 for the characteristic word Z of the transmission rate. The bits of the characteristic word are not allowed to be used in combination. When the transmission rate is 1200bps, Z = 0. When modifying the rate, the characteristic word Z is valid only when one binary bit is 1. To change the transmission rate, the master station first sends a rate change request to the slave station at the initial rate, and the slave station sends a confirmation response frame or a negative response frame at the initial rate. After receiving the confirmation frame from the slave station, both parties will communicate at the confirmed new rate and restore to the initial rate after the communication ends; if the communication link is not established within 500ms, both parties will restore to the initial rate. Only one change in the communication rate is allowed in each communication.
[0138] The script compilation environment adopts object-oriented design, "what you see is what you get", and supports online script debugging; the "Basic" language environment provides object-oriented programming methods to realize functions from simple digital calculations to algorithms for advanced control; the script types and triggering methods are diverse, supporting conditional actions, data change actions, window actions, loop actions and other variables to support indirect addressing functions, and the system has built-in indirect variables, intermediate variables, database variables and other variable methods. With an independent Web server, the Likong Web Server achieves a high degree of synchronization between the server and client screens, and the Web page automatically adapts to the server engineering resolution. The real-time data transmission between the Web client and the network server adopts an event-driven mechanism and a variable transmission method. The monitoring data displayed by the IE "thin" client has better real-time performance. The load balancing of Web communication enables the system to have high-capacity data throughput and good robustness, ensuring concurrent access by hundreds of Web clients.
[0139] Embodiment 9:
[0140] The host computer monitoring system for waste heat recovery and reuse in cold areas described in the above embodiment, calculation and verification of various indicators
[0141] ⑴Calculation of each indicator
[0142] The temperature sensor at each measuring point can directly read the temperature, the ultrasonic heat meter can directly read the flow and heat, and the accuracy of the heat can be verified by the flow, temperature difference and specific heat. The electric meter of each device can directly read the power consumption, and the power of the equipment is calculated by the following formula:
[0143]
[0144] COP is calculated by dividing the heat increment of the heat meter by the power increment of the electric meter in the same time interval. The heat recovered by the fan is calculated by flow rate, temperature rise and specific heat. The liquid level of the refrigerant expansion tank is read by the pressure transmitter. When the liquid level drops to the specified value, the system alarms and the staff uses an explosion-proof oil pump to replenish the refrigerant.
[0145] ① The heat output of the unit is directly read from the heat meter on the unit’s user side;
[0146] ② The power consumption of the unit is directly read from the unit's electric meter;
[0147] ③ The power consumption of the refrigerant circulation pump is calculated according to the nameplate power of the circulation pump;
[0148] ④ Heat recovery from fan coil = (unit inlet water temperature - tap water temperature) × specific heat × flow rate;
[0149] ⑤The power consumption of the fan disk is directly read from the fan disk meter;
[0150] ⑥The power consumption of the thermal protection system is directly read from the thermal protection system meter;
[0151] ⑦ The heat absorbed by the refrigerant is directly read from the ultrasonic heat meter of the unit's heat source;
[0152] ⑧The amount of heat supplement is calculated through the power consumption of the heat guarantee system;
[0153] ⑨ COP can be calculated through power consumption and heat generation;
[0154] ⑩ The computer software system centrally monitors multiple independently running heat pump units through network interconnection, monitors the operating conditions of various equipment in the system, and displays them intuitively on the large screen. It can also display basic information such as indoor and outdoor temperature and humidity, number of online nozzles, number of bathers, weather forecast, etc. Bathers can check the current bathroom conditions online through the APP and arrange bathing time reasonably.
[0155] ⑵ Positive balance verification
[0156] The power consumption of the unit, the heat production of the unit, and the power consumption of the refrigerant circulation pump are measured, and the heating performance coefficient of the compressor (compressor COP) and the heating performance coefficient of the unit (unit COP) are calculated.
[0157] Measure the system power consumption (including the power consumption of the bathing area steam heat recovery system and hot water pump and other equipment), measure the system heat generation (including the heat recovered by the bathing area steam heat recovery system), and calculate the system's heating performance coefficient (system COP).
[0158]
[0159]
[0160]
[0161] ⑶ Counter-balance calculation
[0162] Measure the temperature and flow rate of the refrigerant entering and leaving the unit, and calculate the heat absorption of the refrigerant; measure the power consumption of the heat pump unit and calculate the power consumption of the compressor; measure the water temperature of the inlet and outlet air discs and the flow rate through the air discs, and calculate the heat recovered by the air discs; measure the power consumption of the thermal security system and calculate the heat supplement.
[0163] Unit heat generation = refrigerant heat absorption + compressor power consumption
[0164] System heat generation = heat absorbed by refrigerant + power consumption of compressor + heat recovery from fan + heat supplement
[0165] (4) Data acquisition and elimination principles
[0166] ① Carry out error analysis on temperature measurement and calibrate each temperature measuring point with a mercury-in-glass thermometer.
[0167] ② It takes some time for the unit to start, debug and finally run normally. This process will generate abnormal data, which will be automatically eliminated by the computer and will not be involved in the calculation.
[0168] ③ During the operation phase, the data obtained is compared with the normal data. If the deviation is large, an alarm is issued and the average value of the normal state is taken for calculation.
[0169] ④ Since the density and specific heat of refrigerants with different concentrations are different, in order to ensure the accuracy of the calculation results, the density of the 5% concentration refrigerant is taken as 0.991g / cm3=0.991kg / L, and the specific heat of the 5% concentration refrigerant is taken as 1cal / (g·℃)=4.1859kJ / (kg·℃) in the calculation process.
[0170] ⑤Although the abnormal data automatically eliminated by the above system does not participate in the calculation, the original data will be retained in the computer.
[0171] Embodiment 10:
[0172] The host computer monitoring system for waste heat recovery and reuse in cold areas of sewage described in the above embodiment, the energy saving analysis and calculation of the system,
[0173] ⑴ Standard coal coefficient
[0174] The heat content of standard coal is 7000kcal / kg (29302kJ / kg);
[0175] Natural gas contains 8500 kcal / m3 (35581 kJ / m3);
[0176] The efficiency of thermal power plants is generally 30% to 40%, so the equivalence coefficient fluctuates between 3.1 and 4.1. The data from the National Bureau of Statistics in 2006 was 3.66tce / 10,000kwh. However, in fact, as the efficiency of power plants increases, this value decreases year by year.
[0177] The heat content of electricity is 3600kJ / kWh, and the efficiency of thermal power plants is calculated as 40%, taking into account the conversion efficiency of coal to electricity;
[0178] Natural gas to standard coal conversion coefficient:
[0179] Electricity standard coal conversion coefficient:
[0180] ⑵ Calculation coefficients for CO2 and nitrogen oxide emissions
[0181] CO2 emissions from burning standard coal: 2.6kg CO2 / kg ce
[0182] Nitrogen oxide emissions from burning standard coal: 0.0074kg nitrogen oxides / kg ce
[0183] ⑶Energy saving analysis
[0184]
[0185] The analysis data of the energy-saving effect of the bath wastewater waste heat recovery monitoring system in Apartment A11 from November 3, 2018 to November 5, 2018 is shown in Table 10-1 Energy-saving Effect Analysis Table, where the calorific value of natural gas is calculated as 35581kJ / m3, and considering the boiler efficiency and pipe network heat loss, the total efficiency of the gas boiler system is calculated as 75%, and the total efficiency of the electric boiler system is calculated as 95%.
[0186] Table 10-1
[0187] November 3 November 4 November 5 Water supply (t / d) 107.76 108.00 97.39 Heating capacity (kWh / d) 3295.76 3345.32 3058.37 Heat pump unit power consumption (kWh / d) 634.90 607.42 652.95 <![CDATA[Gas consumption of gas boiler (m 3 / d)]]> 444.61 451.30 412.58 Electric boiler power consumption (kWh / d) 3469.22 3521.39 3219.33 Heat pump unit power consumption equivalent to standard coal (kgce / d) 222.85 213.20 229.19 Gas consumption of gas boilers converted into standard coal (kgce / d) 539.89 548.01 501.00 Electric boiler power consumption equivalent to standard coal (kgce / d) 1217.70 1236.01 1129.99 Energy saving of heat pump unit relative to gas boiler equivalent to standard coal (kgce / d) 317.04 334.80 271.82 Energy saving rate of heat pump unit relative to gas boiler (%) 58.72 61.09 54.25 Energy saving of heat pump unit relative to electric boiler equivalent to standard coal (kgce / d) 994.85 1022.80 900.80 Energy saving rate of heat pump unit relative to electric boiler (%) 81.70 82.75 79.72 <![CDATA[CO emissions reduction of heat pump unit compared with gas boiler (kg / d)]]> 2 > 824.30 870.49 706.72 <![CDATA[CO reduction amount (kg / d) of heat pump unit relative to electric boiler 2 > 2586.60 2659.29 2342.08 Heat pump unit power consumption per ton of hot water (kWh / t) 5.89 5.62 6.70 Electric boiler power consumption per ton of hot water (kWh / t) 32.19 32.61 33.06
[0188] Core Technology
[0189] On the one hand, the monitoring system controls the number of units in operation and configures the equipment start-stop program to achieve automatic continuous operation of the system and produce hot water. On the other hand, the real-time data collected is analyzed online, and the heat recovery efficiency of the computer unit and the system is calculated through changes in sewage temperature, flow rate, and heat, hot water temperature, flow rate, and heat, refrigerant temperature, flow rate, and heat, and changes in the power consumption of each part. Based on the calculation results, the start-stop, operation, and various medium flow rates of the system equipment are adaptively controlled to make the system work in the best state, and the heat recovery efficiency index can reach or meet the design requirements, ensuring that the system heat recovery process is carried out smoothly.
[0190] Based on the results of the heat recovery calculation, the system can analyze whether there is heat loss in the entire heat recovery process, where the loss is, how much is lost, and the reason for the difference, which will provide guidance for the structural design and operation methods of subsequent projects.
[0191] During the operation of the system, by calculating the energy saving and emission reduction indicators, it is possible to analyze whether the bath sewage waste heat recovery technology is energy-saving, how much conventional energy is saved, how much CO2 emission reduction is achieved, how much the results after completion and operation differ from the design goals, etc., and the original data can be provided to the user unit as a basis for the system energy saving and emission reduction assessment.
[0192] Operation process
[0193] During the operation of the system, according to the different media and the different roles played in the heat exchange process, it is mainly divided into three operation processes, namely the sewage side process, the refrigerant side process, and the bathing hot water side process. The whole system operates automatically to realize the recovery and reuse of sewage waste heat.
[0194] 1. Sewage side travel
[0195] (1) The temperature of hot water in a bathtub is generally between 38℃ and 41℃.
[0196] (2) After showering, the sewage enters the insulated sump through the water channel, and the sewage is pumped into the insulated sewage tank using a sewage lift pump. At this time, the sewage temperature is around 25℃-35℃.
[0197] (3) Through the sewage distribution device, the high-temperature sewage enters the sewage tank in the form of a jet and is evenly distributed on the sewage waste heat exchanger, generating vibrations and enhancing the heat exchange effect. When the sewage is at a high temperature, it exchanges heat with the refrigerant installed in the sewage waste heat exchanger in the middle and upper layers of the sewage tank. As the heat of the sewage is absorbed, the temperature gradually decreases, the specific gravity of the sewage increases, and it falls to the bottom of the sewage tank, generating a temperature gradient. The heat-absorbed low-temperature sewage sinks to the lower layer, and under the pressure of the new high-temperature sewage, it is discharged in the form of overflow through the recovery device; the guide baffle installed in the sewage tank lengthens the sewage flow, with the purpose of discharging the sewage with the lowest temperature in the sewage tank and reducing the discharge of heat.
[0198] (4) When the temperature of the discharged sewage is higher than 10.5℃, the system unit and the backup unit start at the same time. When the sewage temperature is lower than 9℃, the backup unit stops running. When the sewage temperature is lower than 7℃, the number of system units stops running in turn. When the sewage temperature is lower than 4℃, the system generates a "low temperature alarm", all units stop running, and the system is not working. This starts and stops repeatedly, and the control system runs automatically. (Under normal circumstances, the heat source temperature cannot be lower than 2℃ to avoid freezing the evaporator.)
[0199] 2. Coolant side stroke
[0200] (1) The sewage waste heat exchanger 3-2 is immersed in the sewage tank. The low-temperature refrigerant in the sewage waste heat exchanger 3-2 is pumped into the sewage waste heat exchanger 3-2 from the outlet of the unit through a circulating water pump, and enters from the bottom of the sewage waste heat exchanger. It is heated by the sewage with a temperature gradient in the sewage tank in the form of multiple tube layers, and the high-temperature refrigerant flows out from the upper layer of the sewage waste heat exchanger.
[0201] (2) The refrigerant enters the evaporator of the unit from the outlet of the wastewater heat exchanger. The heat in the refrigerant is absorbed by the refrigerant in the unit through the plate exchanger. The low-temperature refrigerant returns to the bottom inlet of the wastewater heat exchanger, circulates and absorbs heat to ensure the heat transfer process.
[0202] (3) In summer, the low-temperature refrigerant bypasses the plate-type wastewater heat exchanger and exchanges heat with the hot air in the dormitory, absorbing the heat in the air, lowering the temperature in the dormitory, and achieving the cooling effect. The refrigerant takes away the heat and directly returns to the unit evaporator. After the unit releases heat, it is recycled.
[0203] 3. Bathing hot water side stroke
[0204] (1) Under the action of pipe network pressure, tap water with an average temperature of 10.7°C first enters the fan disk to recover the heat released by the condensation of bathing steam in the bathroom, raising the tap water temperature by 2-4°C, while reducing the humidity in the bathroom and recovering the condensed water for bathing.
[0205] (2) The preheated tap water enters the inlet of the unit. The heat source in the sewage in the energy storage sewage tank is brought into the unit by the unit's refrigerant to evaporate. Through the work of the refrigeration compressor, the tap water is cooled and released under the high pressure of the condenser to increase the temperature of the tap water to the set value, producing hot water for bathing.
[0206] Generally, the water temperature setting value does not exceed 60℃ and is not lower than 40℃. When the water temperature exceeds the "over-temperature value", the monitoring system generates a "hot water over-temperature" alarm and the unit shuts down. When the water temperature returns to the "set value", the monitoring system cancels the "hot water over-temperature" alarm and the unit returns to normal working condition.
[0207] During the peak period of students bathing, the system unit and the backup unit are started at the same time, which basically solves the problem of wastewater heat source loss. When the peak period is over, the number of bathers gradually decreases, the heat that can be recovered also decreases, and the system COP value gradually decreases. At this time, the monitoring system automatically reduces the number of units in operation, reduces system power consumption, and improves heat recovery efficiency until the insulated hot water tank is full, or a certain amount of hot water is produced according to demand. At this time, the unit automatically stops running and the entire system no longer works. Basically, the system can get one ton of bathing water at the same temperature for every ton of water used by students for bathing.
[0208] The heat pump unit heats the water to 40-60℃ once and places it in an insulated hot water tank. For a well-insulated water tank, the daily temperature drop is generally less than 2-5℃. As long as you make a good plan and arrange the working time of the machine according to the water usage every day, the amount of water produced will be based on the daily water usage. In this way, the energy loss in insulation will be very low.
[0209] When the water temperature and water volume in the insulated hot water tank reaches the set upper limit, the main unit stops working. When the water temperature is lower than the set lower limit, the main unit starts working in this cycle, so that the hot water in the insulated hot water tank remains constant for 24 hours, thereby meeting the daily hot water demand of the bath. (3) The high-temperature water in the insulated hot water tank is mixed with a certain proportion of tap water through a water mixing device to form low-temperature water of about 40°C, which is then injected into the insulated mixing water tank. After the insulated mixing water tank is full, the mixing water pump automatically stops running, and the hot water at this time can be directly used for bathing.
[0210] Since the first system was put into use in the A02 Apartment Bathing Center of Harbin Institute of Technology in 2016, the system has been continuously upgraded and optimized, with stable operation and significant energy-saving effects.
[0211]
Claims
1. A host computer monitoring system for waste heat recovery and reuse in cold areas, comprising: a heat pump unit, characterized in that : The heat pump unit is connected to the first temperature sensor through a pipeline, the first temperature sensor is connected to the water inlet pipe through a pipeline, the water inlet pipe is connected to the sewage waste heat exchanger in the box body of the sewage tank, the sewage waste heat exchanger is connected to the water outlet pipe through a pipeline, the water outlet pipe is connected to the refrigerant expansion water tank, the refrigerant expansion water tank is connected to the liquid level sensor, the refrigerant expansion water tank is connected to the second temperature sensor through a pipeline, the second temperature sensor is connected to the heat pump unit through a pipeline, the pipeline is filled with refrigerant, the bathtub drain pipe is connected to the sewage inlet pipe, the sewage inlet pipe is provided with a sixth temperature sensor, the sewage inlet pipe is connected to the sewage distribution pipe in the box body of the sewage tank, the distributed sewage recovery pipe is provided with a seventh temperature sensor, the heat pump unit is connected to the third temperature sensor, the third temperature sensor is connected to the insulated water tank through a pipeline, the insulated water tank is connected to the hot water output pipeline to the shower, the hot water output pipeline is provided with an ultrasonic heat meter, the tap water inlet pipe is connected to the fan coil unit, the tap water inlet pipe is provided with a fourth temperature sensor, the fan coil unit is connected to the electric heater through a pipeline, the electric heater is connected to the heat pump unit through the electric heater pipeline, the fifth temperature sensor is provided on the electric heater pipeline, the first temperature sensor, the second temperature sensor, the third temperature sensor, the fourth temperature sensor, the fifth temperature sensor, the sixth temperature sensor, the seventh temperature sensor, and the liquid level sensor are all connected to the PLC control cabinet; a group of guide partition plates are installed in the box body of the sewage tank, and the guide partition plates are arranged in parallel longitudinally. A group of sewage waste heat exchangers are installed in the inner box of the sewage tank, and the sewage waste heat exchangers are parallel to each other horizontally. The top of the sewage waste heat exchanger is provided with a sewage distribution pipe, and the sewage distribution pipe is connected to the sewage inlet pipe. The sewage waste heat exchanger is connected to the sewage waste heat connecting pipe. The lower part of the sewage waste heat connecting pipe is connected to the inlet pipe, and the inlet pipe is connected to the heat pump unit. The upper part of the sewage waste heat connecting pipe is connected to the outlet pipe, and the outlet pipe is connected to the heat pump unit. A distributed sewage recovery pipe is installed at the bottom of the inner box of the sewage tank. The inner box of the sewage tank is installed in the outer box of the sewage tank. Sewage tank insulation material is installed between the inner box of the sewage tank and the outer box of the sewage tank. The sewage waste heat exchanger is assembled by a group of heat exchange tubes installed in parallel, and each group The heat exchange tube is composed of multiple pipes installed in parallel from top to bottom. Multiple groups of heat exchange tubes are installed in parallel to ensure that the sewage waste heat exchanger is fully distributed in the insulated sewage tank; sewage distribution pipes are arranged above the box body of the sewage tank, so that high-temperature sewage enters the sewage tank in a jet manner. The sewage distribution pipes are evenly distributed above the sewage waste heat exchanger to generate vibrations and enhance the heat exchange effect; when the sewage is at high temperature, it exchanges heat with the refrigerant installed in the sewage waste heat exchanger in the middle and upper layers of the sewage tank. As the heat of the sewage is absorbed, the temperature gradually decreases, the specific gravity of the sewage increases, and it falls to the bottom of the sewage tank, generating a temperature gradient; the low-temperature sewage that has absorbed heat sinks to the lower layer, and under the action of the new high-temperature sewage pressure, it is discharged in the form of overflow through the distributed sewage recovery pipe, eliminating the loss of heat;The low-temperature refrigerant in the sewage waste heat exchanger enters from the bottom inlet of the water inlet pipe at a certain flow rate, and exchanges heat with the sewage with a temperature gradient in the sewage tank in the form of multiple tube layers. The higher the flow rate, the more significant the heat transfer effect. The high-temperature refrigerant flows out from the outlet of the upper water outlet pipe of the sewage waste heat exchanger and enters the evaporator of the unit. The heat in the refrigerant is absorbed by the refrigerant in the unit through conversion, and the low-temperature refrigerant returns to the bottom inlet of the water inlet pipe, circulates and absorbs heat to ensure the progress of the heat transfer process. The sewage waste heat exchanger adopts an immersion structure to transfer the sewage waste heat to the evaporator. The heat exchanger is immersed in sewage, which is convenient for cleaning dirt; the sewage distribution pipe causes lateral flushing and temperature gradient when the high-temperature sewage enters the sewage tank, ensuring that the high-temperature sewage is evenly and fully exchanged with heat. The low-temperature sewage that absorbs heat sinks to the lower layer and is discharged in the form of overflow through the recovery device, i.e., the distributed sewage recovery pipe, under the action of the new high-temperature sewage pressure, to prevent heat loss; the diversion partition plate is designed to be staggered in the sewage tank, which increases the sewage flow speed, prolongs the flow time, fully exchanges heat, and ensures that the lowest temperature sewage is evenly and quickly discharged; A distributed sewage recovery pipe is arranged at the bottom of the sewage waste heat exchanger to quickly discharge low-temperature sewage. At the same time, a coolant with a certain flow rate enters the bottom inlet of the sewage waste heat exchanger, flows through the entire sewage waste heat exchanger from bottom to top, and fully exchanges heat with the sewage passing in the opposite direction, so that the coolant obtains the maximum amount of heat and the heat recovery efficiency is maximized. The PLC control cabinet is respectively connected to temperature sensors, liquid level sensors, ultrasonic heat meters, smart water meters, multifunctional power meters, electric heaters, regulating valves, sewage pumps, heat pump units, monitoring system hardware equipment, monitoring system application software, large-screen displays, and network communications; the temperature sensor measures the temperature of each measuring point, the ultrasonic heat meter measures the heat and flow, and the multifunctional power meter measures the electricity; the monitoring system hardware equipment includes an industrial computer, which is connected to a network switch, the PLC control cabinet, smart meters, configuration software Ukey, and a network server Ukey; the temperature sensors include a first temperature sensor, a second temperature sensor, a third temperature sensor, a fourth temperature sensor, a fifth temperature sensor, a sixth temperature sensor, and a seventh temperature sensor; the monitoring system software has the functions of starting and stopping control of a single unit and displaying the operating status, and can perform local and remote operations on each unit, and can be controlled through a mobile phone terminal The APP software remotely monitors the operating status of the heat pump hot water unit and realizes the start and stop control of the hot water unit; the monitoring system software controls the number of running units and configures the start and stop programs to realize automatic and continuous operation of the system; during the peak bathing period, the system unit and the backup unit are started at the same time. When the peak period is over, the number of bathers gradually decreases, the recovered heat also decreases, and the system COP value gradually decreases. At this time, the monitoring system automatically reduces the number of running units and reduces the power consumption of the system until the insulated hot water tank is full, or hot water is produced according to demand. At this time, the unit automatically stops running and the entire system no longer works; the monitoring system software realizes the monitoring and display of the average temperature of the heat source, the hot water flow and temperature adjustment, the instantaneous hot water production of a single unit, the heat recovery and percentage display of the refrigerant in the sewage waste heat exchanger of a single unit, the water tank level control, the fan coil unit intercooler or hot water valve switch control, the motor start and stop and speed control; save manpower, ensure the safe operation of the equipment, and extend the life of the equipment.
2. The host computer monitoring system for waste heat recovery and reuse in cold areas of sewage according to claim 1 is characterized by: :The monitoring system application software adopts ForceControl V7.0 configuration software of ForceControl Technology. The core of the functional architecture of ForceControl monitoring configuration software is the distributed regional real-time database. Other application programs or functional modules realize their functions and extensions by interacting with the regional real-time database. The functional modules of the software include HMI screen, real-time database, equipment communication service program, network communication program, interface SDK, Web application service, relational data dump, data forwarding, and extension components.
3. The host computer monitoring system for waste heat recovery and reuse in cold areas according to claim 2 is characterized by: : The operation process is sewage side stroke, coolant side stroke, bath hot water side stroke; The sewage side process, (1) the temperature of hot water in the bathtub shower is 38℃-41℃, (2) After showering, the sewage enters the insulation sump through the water channel, and the sewage is pumped into the insulation sewage tank using a sewage lift pump. At this time, the sewage temperature is around 25℃-35℃. (3) Through the sewage distribution device, the high-temperature sewage enters the sewage tank in the form of a jet and is evenly distributed on the sewage waste heat exchanger, generating vibrations and enhancing the heat exchange effect. When the sewage is at a high temperature, it exchanges heat with the refrigerant installed in the sewage waste heat exchanger in the middle and upper layers of the sewage tank. As the heat of the sewage is absorbed, the temperature gradually decreases, the specific gravity of the sewage increases, and it falls to the bottom of the sewage tank, generating a temperature gradient; the low-temperature sewage that has absorbed heat sinks to the lower layer and is discharged in the form of overflow through the recovery device under the pressure of the new high-temperature sewage; the guide baffle installed in the sewage tank lengthens the sewage flow process, with the purpose of discharging the sewage with the lowest temperature in the sewage tank and reducing heat discharge; (4) When the temperature of the discharged sewage is higher than 10.5°C, the system units and the backup units are started at the same time. When the sewage temperature is lower than 9°C, the backup units stop running. When the sewage temperature is lower than 7°C, the system units are stopped in turn. When the sewage temperature is lower than 4°C, the system generates a "low temperature alarm", all units stop running, and the system is no longer working. This starts and stops repeatedly, and the control system runs automatically.
4. The host computer monitoring system for waste heat recovery and reuse in cold regions according to claim 3 is characterized by: : The coolant side process, (1) the sewage waste heat exchanger is immersed in the sewage tank, and the coolant in the sewage waste heat exchanger is pumped into the sewage waste heat exchanger from the outlet of the unit through a circulating water pump. The coolant enters from the bottom of the sewage waste heat exchanger and is heated by the sewage with a temperature gradient in the sewage tank in the form of multiple tube layers. The high-temperature coolant flows out from the upper layer of the sewage waste heat exchanger; (2) The refrigerant enters the evaporator of the unit from the outlet of the wastewater heat exchanger. The heat in the refrigerant is absorbed by the refrigerant in the unit through the plate exchanger. The low-temperature refrigerant returns to the bottom inlet of the wastewater heat exchanger and circulates to absorb heat. (3) In summer, the low-temperature refrigerant bypasses the plate-type sewage waste heat exchanger and exchanges heat with the hot air in the dormitory, absorbing heat from the air, lowering the temperature in the dormitory and achieving the cooling effect; the refrigerant takes away the heat and directly returns to the unit evaporator, releases heat through the unit, and then circulates again.
5. The host computer monitoring system for waste heat recovery and reuse in cold regions according to claim 3 is characterized by: : The bathing hot water side stroke, (1) Under the action of the pipe network pressure, tap water with an average temperature of 10.7°C first enters the fan disk to recover the heat released by the condensation of bathing steam in the bathroom, raising the tap water temperature by 2-4°C, while reducing the humidity in the bathroom, and recovering the condensed water for bathing; (2) The preheated tap water enters the inlet of the unit. The heat source in the sewage in the energy storage sewage tank is brought into the unit by the unit's refrigerant to evaporate. Through the work of the refrigeration compressor, the tap water is cooled and released under the high pressure of the condenser to increase the temperature of the tap water to the set value, producing hot water for bathing; Generally, the water temperature setting value does not exceed 60℃ and is not lower than 40℃. When the water temperature exceeds the "over-temperature value", the monitoring system generates a "hot water over-temperature" alarm and the unit shuts down. When the water temperature returns to the "set value", the monitoring system cancels the "hot water over-temperature" alarm and the unit returns to normal working state. The heat pump unit heats the water to 40-60℃ and places it in the insulated hot water tank. The temperature drop is generally less than 2-5℃ per day. The working time of the machine is arranged according to the water consumption, the amount of water used per day, and the amount of water produced; When the water temperature and water volume in the thermal insulation hot water tank reaches the set upper limit, the host stops working. When the water temperature is lower than the set lower limit, the host starts working in this cycle, so that the hot water in the thermal insulation hot water tank remains constant for 24 hours. (3) The high-temperature water in the insulated hot water tank is mixed with a certain proportion of tap water through a water mixing device to become low-temperature water of about 40°C, and then injected into the insulated mixing water tank. After the insulated mixing water tank is full, the mixing water pump automatically stops running, and the hot water at this time is directly used for bathing.