A bridge erecting machine
By designing a bridge erecting machine with a truss-type main frame and outrigger moving cylinders, the safety hazards and inconvenience of applying adhesive in windy environments have been solved, achieving improvements in safety and ease of operation, and adapting to construction in complex terrain.
Patent Information
- Application Number
- CN202010810018.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-13
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2040-08-13
AI Technical Summary
Existing bridge erecting machines pose safety hazards when used in strong winds, and the application of adhesive by workers is inconvenient. Cranes occupy a lot of space and are costly, and there are also issues with terrain restrictions preventing cranes from entering the area.
A bridge erecting machine was designed, comprising a main frame, outriggers, and an adhesive application platform. The main frame adopts a truss structure, and the outriggers are equipped with movable hydraulic cylinders to adapt to windy conditions. The adhesive application platform facilitates worker operation.
It improves the safety and ease of operation of bridge erecting machines in windy environments, simplifies the glue application process for workers, reduces costs, and adapts to construction in complex terrain.
Smart Images

Figure CN111945570B_ABST
Abstract
Description
Technical field:
[0002] The invention relates to the field of bridge erection, in particular to a bridge erection machine. Background technology:
[0004] Bridge erection machines are used in the construction of many bridge superstructures. Beam bridges are a widely used structural form, which consists of foundations, piers, precast beams and bridge decks from bottom to top. Bridge erection machines are key equipment in the construction process. Their function is to lift the cast precast beams to the designated installation positions on the piers. In addition, since bridges are usually composed of multiple spans, and the lifting of precast beams can only be done span by span, bridge erection machines not only have the function of lifting precast beams, but also have the ability to move forward.
[0005] The existing crossbeams of bridge erectors are mostly made of steel plates, which swing greatly when used in windy working conditions such as by the river or the sea, posing a safety hazard. When the bridge erector passes through a hole, it is supported by the first and second legs, and the third and fourth legs assist in passing through the hole. Due to uneven force, a counterweight is required to increase the overall weight.
[0006] In addition, the gluing of the joints of the segmental beams is done by workers standing in the crane's basket. The use of a crane takes up a lot of space and is costly. In addition, some sites cannot be accessed by cranes due to terrain conditions. Summary of the invention:
[0008] The technical problem to be solved by the present invention is to provide a bridge erecting machine which is suitable for use in strong wind conditions and can facilitate workers to apply glue to the joint surfaces of segment beams.
[0009] The above object is achieved in this way: it comprises a main frame, a first leg, a second leg, a third leg, a fourth leg, a glue coating construction work platform, a main overhead crane, and an auxiliary overhead crane;
[0010] The main frame includes two left and right truss main beams with the same structure, and the front and rear ends of the two truss main beams are respectively connected with connecting beams. Each truss main beam includes an upper chord beam and a left lower chord beam and a right lower chord beam arranged side by side on the left and right. A left web member system is connected between the upper chord beam and the left lower chord beam, and a right web member system is connected between the upper chord beam and the right lower chord beam; a connecting longitudinal beam is connected between the left lower chord beam and the right lower chord beam, that is, the two ends of the connecting longitudinal beam are respectively connected to the left lower chord beam and the right lower chord beam by bolts.
[0011] The left web system is composed of a plurality of first left webs and second left webs, the upper ends of the first left webs are respectively connected to the upper chord beam by bolts, the first left webs are gradually tilted forward from top to bottom, the lower ends of the first left webs are respectively connected to the left lower chord beam by bolts, and the first left webs are arranged in parallel with each other; the upper ends of the second left webs are respectively connected to the upper chord beam by bolts, the second left webs are gradually tilted backward from top to bottom, the lower ends of the second left webs are respectively connected to the left lower chord beam by bolts, and the second left webs are arranged in parallel with each other. Each first left web crosses the middle part of the second left web on one side, a left connecting plate is arranged at the intersection of each first left web and the second left web, the left connecting plate is connected to the first left web and the second left web by bolts, a left upright column extending downward is also connected to the left connecting plate by bolts, the lower end of the left upright column is connected to the left lower chord beam by bolts, a left tie rod is arranged between two adjacent left connecting plates, and the left tie rod is connected to the left connecting plates on both sides by bolts.
[0012] The right web member system has the same structure as the left web member system, and is composed of a plurality of first right web members and second right web members, the upper ends of the first right web members are respectively connected to the upper chord beam by bolts, the first right web members gradually tilt forward from top to bottom, the lower ends of the first right web members are respectively connected to the right lower chord beam by bolts, and the first right web members are arranged parallel to each other; the upper ends of the second right web members are respectively connected to the upper chord beam by bolts, the second right web members gradually tilt backward from top to bottom, the lower ends of the second right web members are respectively connected to the right lower chord beam by bolts, and the second right web members are arranged parallel to each other. Each first right web crosses with the middle part of the second right web on one side thereof, and a right connecting plate is arranged at the intersection of each first right web and the second right web, and the right connecting plate is connected to the first right web and the second right web by bolts, and a right column extending downward is also connected to the right connecting plate by bolts, and the lower end of the right column is connected to the right lower chord beam by bolts, and a right pull rod is arranged between two adjacent right connecting plates, and the right pull rod is connected to the right connecting plates on both sides thereof by bolts.
[0013] The tops of the two upper chord beams are provided with overhead crane rails, and the wheels of the main overhead crane and the auxiliary overhead crane are placed on the overhead crane rails. An axial slide rail is fixed to the left end face of the left lower chord beam of the truss-type main beam on the left, and an axial slide rail is also fixed to the right end face of the right lower chord beam of the truss-type main beam on the right. The suspension is installed on the left and right lower chord beams.
[0014] The first leg comprises two first upright posts, a plurality of first lower cross braces and first upper cross braces are arranged between the two first upright posts from bottom to top, the first lower cross braces and the first upper cross braces are arranged at intervals, both ends of the first lower cross braces and the first upper cross braces are respectively connected to the two first upright posts by bolts, a first support rod is connected between each first lower cross brace and the first upper cross brace above it; a first movable sleeve is fixed on the top of the two first upright posts, a pin hole is arranged on the upper part of the first movable sleeve, and a first cross beam is connected between the two first movable sleeves; and two A first movable inner sleeve, two first movable inner sleeves are provided with pin holes arranged up and down, the first upper trusses are fixed to the upper ends of the two first movable inner sleeves, and the two ends of the first upper trusses are connected to the upper chord beams of the two truss-type main beams through hinge seats and pin shafts respectively; the lower parts of the two first movable inner sleeves are respectively placed in the two first movable outer sleeves, and the connection and fixation are achieved by installing pin shafts in the pin holes of the first movable inner sleeves and the first movable outer sleeves; the cylinder bodies of the two first leg oil cylinders are fixed on the first upper truss, and the cylinder rods of the two first leg oil cylinders are connected to the first crossbeam.
[0015] The second leg comprises two second columns, a second leg lower beam is fixed to the bottom of the second column, a second leg supporting beam is fixed to the top of the second column, a cylinder body of the second leg lifting cylinder is fixed to the second leg supporting beam, a second leg upper beam is arranged above the second leg supporting beam, a cylinder rod of the second leg lifting cylinder is connected to the second leg upper beam, a plurality of holes are provided correspondingly on the second leg upper beam and the second leg supporting beam, threaded steel bars are arranged in the corresponding holes of the second leg upper beam and the second leg supporting beam, and when the second leg lifting cylinder is working, the height of the second leg upper beam can be adjusted by loosening the nut on the threaded steel bar. The upper surface of the second leg upper crossbeam is fixed with two left and right second leg slide rails, the wheels of the two second leg trolleys are respectively placed in the two left and right second leg slide rails, the two second leg trolleys are fixed with second leg trays, the left lower chord beam and the right lower chord beam of a truss main beam are fixed on the tray of one second leg trolley, and the left lower chord beam and the right lower chord beam of another truss main beam are fixed on the tray of another second leg trolley. The cylinder bodies of the two second leg longitudinal moving cylinders are respectively fixed on the two second leg trolleys, and the cylinder rods of the two second leg longitudinal moving cylinders are respectively connected to the connecting longitudinal beams between the left lower chord beam and the right lower chord beam of the two truss main beams through pin shafts. The connecting longitudinal beam is provided with a plurality of pin shaft mounting holes arranged in a front-to-back manner. When the bridge erecting machine passes through the hole, the second leg longitudinal moving cylinder works. After the cylinder rod reaches the set stroke, the cylinder rod and the pin shaft connecting the longitudinal beam are removed, the cylinder rod retracts, and the pin shaft at the end of the cylinder rod is installed in a corresponding pin shaft mounting hole at the back, and this process is repeated. It also includes two second leg transverse moving cylinders arranged on the left and right. The cylinder bodies of the two second leg transverse moving cylinders are fixed between the two second leg slide rails, wherein the cylinder rod of the second leg transverse moving cylinder on the left is connected to the second leg trolley on the left, and the cylinder rod of the second leg transverse moving cylinder on the right is connected to the second leg trolley on the right. When the two second leg transverse moving cylinders are working, the two truss-type main beams can be slightly adjusted laterally.
[0016] The third leg comprises two third leg lifting cylinders, the cylinder rods of the two third leg lifting cylinders are connected to the third leg upper cross beam, the upper surface of the third leg upper cross beam is fixed with left and right third leg slide rails, the wheels of the two third leg moving trolleys are respectively placed in the left and right third leg slide rails, the two third leg trolleys are fixed with third leg trays, the left lower chord beam and the right lower chord beam of a truss main beam are fixed to the third leg tray of one third leg trolley, and the left lower chord beam and the right lower chord beam of another truss main beam are fixed to the third leg tray of another third leg trolley. The cylinder bodies of the two third leg longitudinal moving cylinders are respectively fixed to the two third leg trolleys, and the cylinder rods of the two third leg longitudinal moving cylinders are respectively connected to the connecting longitudinal beams between the left lower chord beam and the right lower chord beam of the two truss main beams through pin shafts. The connecting longitudinal beam is provided with a plurality of pin shaft mounting holes arranged front and back. When the bridge erecting machine passes through the hole, the longitudinal moving cylinder of the third leg works. After the cylinder rod reaches the set stroke, the cylinder rod and the pin shaft connecting the longitudinal beam are removed, the cylinder rod retracts, and the pin shaft at the end of the cylinder rod is installed in a corresponding pin shaft mounting hole at the back. It also includes two third leg transverse moving cylinders arranged on the left and right. The cylinder bodies of the two third leg transverse moving cylinders are fixed between the two third leg slide rails. The cylinder rod of the third leg transverse moving cylinder on the left is connected to the third leg trolley on the left, and the cylinder rod of the third leg transverse moving cylinder on the right is connected to the third leg trolley on the right.
[0017] The fourth leg includes a support, a fourth leg cross beam fixed on the top of the support, the lower ends of the two left inner sleeves are fixed on the left side of the fourth leg cross beam, the two left inner sleeves are provided with a plurality of pin shaft mounting holes arranged up and down, the upper parts of the two left inner sleeves are respectively sleeved with left outer sleeves, the two left outer sleeves are respectively provided with pin shaft mounting holes, the left outer sleeve and the left inner sleeve are connected by pins installed in the pin shaft mounting holes, the lower parts of the two left outer sleeves are connected to the left lower connecting beam of the fourth leg, the upper parts of the two left outer sleeves are connected to the left upper connecting beam of the fourth leg, the tops of the two left outer sleeves are respectively connected to left hinge seats, the cylinder rod of the left lifting cylinder is fixed on the fourth leg cross beam, and the cylinder body of the left lifting cylinder is fixed on the left lower connecting beam of the fourth leg. The lower ends of the two right inner sleeves are fixed to the right side of the fourth leg cross beam, the two right inner sleeves are provided with a plurality of pin shaft mounting holes arranged up and down, the upper parts of the two right inner sleeves are respectively provided with right outer sleeves, the two right outer sleeves are respectively provided with pin shaft mounting holes, the right outer sleeves and the right inner sleeves are connected by pin shafts installed in the pin shaft mounting holes, the lower parts of the two right outer sleeves are connected to the right lower connecting beam of the fourth leg, the upper parts of the two right outer sleeves are connected to the right upper connecting beam of the fourth leg, the tops of the two right outer sleeves are respectively connected to right hinge seats, the cylinder rod of the right jacking oil cylinder is fixed to the cross beam, and the cylinder body of the right jacking oil cylinder is fixed to the right lower connecting beam of the fourth leg. The left lower chord beam and the right lower chord beam of one truss main beam are fixed to the two left hinge seats, and the left lower chord beam and the right lower chord beam of another truss main beam are fixed to the two right hinge seats.
[0018] The glue coating construction work platform includes a left ladder cage and a right ladder cage, and electric walking trolleys are installed on the top of the left ladder cage and the right ladder cage, and the wheels of the two electric walking trolleys are respectively placed on the slide rails of the left lower chord beam of the truss-type main beam on the left and the slide rails of the right lower chord beam of the truss-type main beam on the right; the left end of the left working platform is connected to the lower end of the left ladder cage through a pin shaft, and the right end of the right working platform is connected to the lower end of the right ladder cage through a pin shaft; the right end of the left working platform is provided with a connecting piece extending to the right, and the left end of the right working platform is provided with a connecting piece extending to the left, and the two connecting pieces are provided with pin shaft holes, and the pin shaft is inserted into the pin shaft hole to realize the connection between the left working platform and the right working platform.
[0019] A left middle working platform is arranged above the left working platform, the left end of which is fixed on the left ladder cage, a left upper working platform is arranged above the left middle working platform, the left end of which is also fixed on the left ladder cage, and guardrails extending upward are fixed on the edges of the left working platform, the left middle working platform and the upper left working platform; the left middle working platform and the upper left working platform are located on the left side of the beam body;
[0020] A right middle working platform is arranged above the right working platform, the right end of which is fixed on the right ladder cage, a right upper working platform is arranged above the right middle working platform, the right end of which is also fixed on the right ladder cage, and guardrails extending upward are fixed on the edges of the right working platform, the right middle working platform and the right upper working platform; the right middle working platform and the right upper working platform are located on the right side of the beam body;
[0021] Hand hoists are installed on the left middle working platform and the right middle working platform, and the hooks of the two hand hoists are hung on the guardrail of the left working platform and the guardrail of the right working platform respectively.
[0022] The lower end of the left pull rod is bolted to the left working platform, and the upper end of the left pull rod is inserted into the connecting sleeve at the right end of the left middle working platform and then tightened with bolts; the lower end of the right pull rod is bolted to the right working platform, and the upper end of the right pull rod is inserted into the connecting sleeve at the left end of the right middle working platform and then tightened with bolts; when the bridge erection machine passes through the hole, the left and right pull rods are removed, the pin shaft connecting the left working platform and the right working platform is removed, and the two hand hoists work to rotate the left working platform and the right working platform downward.
[0023] When passing through the hole, anchor the second leg to the beam surface of the segmental beam and the pre-embedded threaded steel bars on the pier top, the overhead crane and the auxiliary overhead crane move to the top of the third leg, the second leg and the third leg support, the first leg and the fourth leg are emptied, and the longitudinal movement cylinders of the second leg and the third leg are used to push the main frame forward, and the first leg reaches the front pier top position for support. At this time, the first, second and fourth legs support, and the main overhead crane is used to lift the third leg to the front bridge deck position, and the anchoring of the second leg to the beam surface and the pier top is released. The first leg, the third leg and the fourth leg support, and the main overhead crane is used to lift the second leg to the front pier top pad stone for support, and the second leg is anchored to the pre-embedded threaded steel bars on the pier top. The main overhead crane and the auxiliary overhead crane move to the position above the second leg to counterweight, emptying the first leg and the fourth leg, the main frame moves longitudinally, the first leg reaches the front pier top and supports, the bridge erecting machine moves longitudinally to the position to pass through the hole, and the second leg and the third leg are anchored to the main frame.
[0024] The advantages of the present invention are as follows: since the second and third legs are provided with lateral movement oil cylinders, the whole machine can be moved horizontally to realize the construction of multiple bridges. The whole machine has a simple and compact structure. The main frame adopts a truss structure, which has high rigidity and strong wind resistance, and is convenient for disassembly, assembly and transportation. The second and third legs are provided with lifting oil cylinders to meet the requirements of small-range elevation adjustment during the installation of the beam body. Since a glue coating construction work platform is provided, it is convenient for workers to paint the waterproof material on the joint surface of the segmental beam. Description of the drawings:
[0026] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0027] Figure 2 It is a schematic diagram of the top view of the main frame in the present invention;
[0028] Figure 3 It is a side view structural schematic diagram of the truss type main beam in the present invention;
[0029] Figure 4 It is a schematic diagram of the main structure of the left abdominal rod system in the present invention;
[0030] Figure 5 It is a schematic diagram of the main structure of the right abdominal rod system in the present invention;
[0031] Figure 6 is a side structural schematic diagram of the first leg in the present invention;
[0032] Figure 7 is a side structural schematic diagram of the second leg in the present invention;
[0033] Figure 8 is a side structural schematic diagram of the third leg in the present invention;
[0034] Fig. 9 is a schematic side view of the structure of the fourth leg in the present invention;
[0035] Fig.10 It is a side structural schematic diagram of the glue coating construction work platform in the present invention. Specific implementation method:
[0037] Reference Figure 1 It includes a main frame 1, a first leg 2, a second leg 3, a third leg 4, a fourth leg 5, a gluing construction platform 6, a main overhead crane 7, and an auxiliary overhead crane 8;
[0038] Reference Figure 2-3 The main frame includes two left and right truss main beams 1-1 with the same structure, and the front and rear ends of the two truss main beams are respectively connected with a connecting beam 1-2. Each truss main beam includes an upper chord beam 1-1-1 and a left lower chord beam 1-1-2 and a right lower chord beam 1-1-3 arranged side by side on the left and right. A left web member system 1-1-4 is connected between the upper chord beam and the left lower chord beam, and a right web member system 1-1-5 is connected between the upper chord beam and the right lower chord beam; a connecting longitudinal beam 1-1-6 is connected between the left lower chord beam and the right lower chord beam, that is, the two ends of the connecting longitudinal beam are respectively connected to the left lower chord beam and the right lower chord beam by bolts.
[0039] Reference Figure 4The left web member system 1-1-4 is composed of a plurality of first left web members 1-1-4-1 and second left web members 1-1-4-2, the upper ends of the first left web members are respectively connected to the upper chord beam by bolts, the first left web members gradually tilt forward from top to bottom, the lower ends of the first left web members are respectively connected to the left lower chord beam by bolts, and the first left web members are arranged parallel to each other; the upper ends of the second left web members are respectively connected to the upper chord beam by bolts, the second left web members gradually tilt backward from top to bottom, the lower ends of the second left web members are respectively connected to the left lower chord beam by bolts, and the second left web members are arranged parallel to each other. Each first left web crosses with the middle part of the second left web on one side thereof, and a left connecting plate 1-1-4-3 is arranged at the intersection of each first left web and the second left web, and the left connecting plate is connected to the first left web and the second left web by bolts, and a left column 1-1-4-4 extending downward is also connected to the left connecting plate by bolts, and the lower end of the left column is connected to the left lower chord beam by bolts, and a left pull rod 1-1-4-5 is arranged between two adjacent left connecting plates, and the left pull rod is connected to the left connecting plates on both sides thereof by bolts.
[0040] Reference Figure 5 The right web member system 1-1-5 has the same structure as the left web member system, and is composed of a plurality of first right web members 1-1-5-1 and second right web members 1-1-5-2. The upper ends of the first right web members are respectively connected to the upper chord beam by bolts, and the first right web members gradually tilt forward from top to bottom, and the lower ends of the first right web members are respectively connected to the right lower chord beam by bolts, and the first right web members are arranged parallel to each other; the upper ends of the second right web members are respectively connected to the upper chord beam by bolts, and the second right web members gradually tilt backward from top to bottom, and the lower ends of the second right web members are respectively connected to the right lower chord beam by bolts, and the second right web members are arranged parallel to each other. Each first right web crosses with the middle part of the second right web on one side thereof, and a right connecting plate 1-1-5-3 is arranged at the intersection of each first right web and the second right web, and the right connecting plate is connected to the first right web and the second right web by bolts, and a right column 1-1-5-4 extending downward is also connected to the right connecting plate by bolts, and the lower end of the right column is connected to the right lower chord beam by bolts, and a right pull rod 1-1-5-5 is arranged between two adjacent right connecting plates, and the right pull rod is connected to the right connecting plates on both sides thereof by bolts.
[0041] The tops of the two upper chord beams are provided with overhead crane guide rails 1-1-1-1, and the wheels of the main overhead crane and the auxiliary overhead crane are placed on the overhead crane guide rails. The left end face of the left lower chord beam of the truss-type main beam located on the left side is fixed with an axial slide rail 1-1-2-1, and the right end face of the right lower chord beam of the truss-type main beam located on the right side is also fixed with an axial slide rail. The suspension 9 is installed on the left and right lower chord beams.
[0042] Reference Figure 6The first leg 2 comprises two first columns 2-1, a plurality of first lower cross braces 2-2 and first upper cross braces 2-3 are arranged between the two first columns from bottom to top, the first lower cross braces and the first upper cross braces are arranged at intervals, both ends of the first lower cross braces and the first upper cross braces are respectively connected to the two first columns by bolts, and a first support rod 2-4 is connected between each first lower cross brace and the first upper cross brace above it; a first movable jacket 2-5 is fixed on the top of the two first columns, a pin hole is arranged on the upper part of the first movable jacket, and a first beam 2- 6; it also includes two first movable inner sleeves 2-7, both of which are provided with pin holes arranged up and down, and the first upper trusses 2-8 are fixed to the upper ends of the two first movable inner sleeves, and the two ends of the first upper trusses are respectively connected to the upper chord beams of the two truss-type main beams through hinge seats and pin shafts; the lower parts of the two first movable inner sleeves are respectively placed in the two first movable outer sleeves, and the connection and fixation are achieved by installing pin shafts in the pin holes of the first movable inner sleeves and the first movable outer sleeves; the cylinder bodies of the two first leg cylinders 2-9 are fixed on the first upper trusses, and the cylinder rods of the two first leg cylinders are connected to the first crossbeam.
[0043] Reference Figure 7The second leg 3 includes two second columns 3-1, a second leg lower beam 3-2 is fixed to the bottom of the second column, a second leg supporting beam 3-3 is fixed to the top of the second column, a cylinder body of a second leg lifting cylinder 3-4 is fixed on the second leg supporting beam, a second leg upper beam 3-5 is arranged above the second leg supporting beam, a cylinder rod of the second leg lifting cylinder is connected to the second leg upper beam, a plurality of holes are provided correspondingly on the second leg upper beam and the second leg supporting beam, threaded steel bars 3-6 are arranged in the corresponding holes of the second leg upper beam and the second leg supporting beam, and when the second leg lifting cylinder is working, the height of the second leg upper beam can be adjusted by loosening the nut on the threaded steel bar. The upper surface of the second leg upper crossbeam is fixed with two left and right second leg slide rails 3-7, the wheels of two second leg trolleys 3-8 are respectively placed in the two left and right second leg slide rails, and the two second leg trolleys are fixed with second leg trays 3-9, the left lower chord beam and the right lower chord beam of a truss main beam are fixed on the tray of one second leg trolley, and the left lower chord beam and the right lower chord beam of another truss main beam are fixed on the tray of another second leg trolley. The cylinder bodies of the two second leg longitudinal moving cylinders 3-10 are respectively fixed on the two second leg trolleys, and the cylinder rods of the two second leg longitudinal moving cylinders are respectively connected to the connecting longitudinal beams 1-1-6 between the left lower chord beams 1-1-2 and the right lower chord beams 1-1-3 of the two truss main beams through pin shafts. It also includes two second leg lateral movement cylinders 3-11 arranged on the left and right, the cylinder bodies of the two second leg lateral movement cylinders are fixed between the two second leg slide rails, wherein the cylinder rod of the second leg lateral movement cylinder on the left is connected to the second leg trolley on the left, and the cylinder rod of the second leg lateral movement cylinder on the right is connected to the second leg trolley on the right. When the two second leg lateral movement cylinders are working, the two truss-type main beams can be slightly adjusted laterally.
[0044] Reference Figure 8The third leg 4 includes two third leg lifting cylinders 4-1, the cylinder rods of the two third leg lifting cylinders are connected to the third leg upper cross beam 4-2, the upper surface of the third leg upper cross beam is fixed with left and right third leg slide rails 4-3, the wheels of two third leg moving trolleys 4-4 are respectively placed in the left and right third leg slide rails, and the two third leg trolleys are fixed with third leg trays 4-5, the left lower chord beam and the right lower chord beam of a truss main beam are fixed to the third leg tray of one third leg trolley, and the left lower chord beam and the right lower chord beam of another truss main beam are fixed to the third leg tray of another third leg trolley. The cylinder bodies of the two third leg longitudinal moving cylinders 4-6 are respectively fixed to the two third leg trolleys, and the cylinder rods of the two third leg longitudinal moving cylinders are respectively connected to the connecting longitudinal beams between the left lower chord beam and the right lower chord beam of the two truss main beams through pin shafts. It also includes two third leg lateral movement cylinders 4-7 arranged on the left and right, and the cylinder bodies of the two third leg lateral movement cylinders are fixed between the two third leg slide rails, wherein the cylinder rod of the third leg lateral movement cylinder on the left is connected to the third leg trolley on the left, and the cylinder rod of the third leg lateral movement cylinder on the right is connected to the third leg trolley on the right.
[0045] Reference Fig. 9The fourth leg 5 includes a support 5-1, a fourth leg cross beam 5-2 fixed on the top of the support, the lower ends of the two left inner sleeves 5-3 are fixed on the left side of the fourth leg cross beam, the two left inner sleeves are provided with a plurality of pin mounting holes arranged up and down, the upper parts of the two left inner sleeves are respectively sleeved with left outer sleeves 5-4, the two left outer sleeves are respectively provided with pin mounting holes, the left outer sleeves and the left inner sleeves are connected by pins installed in the pin mounting holes, the lower parts of the two left outer sleeves are connected with the fourth leg left lower connecting beam 5-5, the upper parts of the two left outer sleeves are connected with the fourth leg left upper connecting beam 5-6, the tops of the two left outer sleeves are respectively connected with left hinge seats 5-7, the cylinder rod of the left lifting cylinder 5-8 is fixed on the fourth leg cross beam, and the cylinder body of the left lifting cylinder is fixed on the fourth leg left lower connecting beam. The lower ends of the two right inner sleeves 5-9 are fixed to the right side of the fourth leg cross beam, and the two right inner sleeves are provided with a plurality of pin shaft mounting holes arranged up and down, and the upper parts of the two right inner sleeves are respectively provided with right outer sleeves 5-10, and the two right outer sleeves are respectively provided with pin shaft mounting holes, and the right outer sleeves and the right inner sleeves are connected by pin shafts installed in the pin shaft mounting holes, and the lower parts of the two right outer sleeves are connected to the fourth leg right lower connecting beam 5-11, and the upper parts of the two right outer sleeves are connected to the fourth leg right upper connecting beam 5-12, and the tops of the two right outer sleeves are respectively connected to the right hinge seats 5-13, and the cylinder rod of the right jacking oil cylinder 5-14 is fixed to the cross beam, and the cylinder body of the right jacking oil cylinder is fixed to the fourth leg right lower connecting beam. The left lower chord beam and the right lower chord beam of one truss main beam are fixed to the two left hinge seats, and the left lower chord beam and the right lower chord beam of another truss main beam are fixed to the two right hinge seats.
[0046] Reference Fig.10 The glue coating construction work platform 6 includes a left ladder cage 6-1 and a right ladder cage 6-2. Electric walking trolleys 6-3 are installed on the top of the left ladder cage and the right ladder cage. The wheels of the two electric walking trolleys are respectively placed on the slide rails of the left lower chord beam of the truss-type main beam on the left and the slide rails of the right lower chord beam of the truss-type main beam on the right; the left end of the left working platform 6-4 is connected to the lower end of the left ladder cage through a pin shaft, and the right end of the right working platform 6-5 is connected to the lower end of the right ladder cage through a pin shaft; the right end of the left working platform is provided with a connecting piece 6-6 extending to the right, and the left end of the right working platform is provided with a connecting piece extending to the left, and the two connecting pieces are provided with pin shaft holes, and the pin shaft 6-7 is inserted into the pin shaft hole to realize the connection between the left working platform and the right working platform.
[0047] A left middle working platform 6-8 is provided above the left working platform, the left end of the left middle working platform is fixed on the left ladder cage, a left upper working platform 6-9 is provided above the left middle working platform, the left end of the left upper working platform is also fixed on the left ladder cage, and the edges of the left working platform, the left middle working platform and the left upper working platform are all fixed with guardrails extending upward; the left middle working platform and the left upper working platform are located on the left side of the beam body;
[0048] A right middle working platform 6-10 is arranged above the right working platform, the right end of which is fixed on the right ladder cage, a right upper working platform 6-11 is arranged above the right middle working platform, the right end of which is also fixed on the right ladder cage, and guardrails extending upward are fixed on the edges of the right working platform, the right middle working platform and the right upper working platform; the right middle working platform and the right upper working platform are located on the right side of the beam body;
[0049] Hand chain hoists 6-12 are installed on the left middle working platform and the right middle working platform, and the hooks of the two hand chain hoists are hung on the guardrail of the left working platform and the guardrail of the right working platform respectively.
[0050] The lower end bolt of the left tie rod 6-13 is connected to the left working platform, and the upper end of the left tie rod is inserted into the connecting sleeve at the right end of the left middle working platform and tightened with bolts; the lower end bolt of the right tie rod 6-14 is connected to the right working platform, and the upper end of the right tie rod is inserted into the connecting sleeve at the left end of the right middle working platform and tightened with bolts.
Claims
1. A bridge erecting machine, characterized in that: It comprises a main frame (1), a first leg (2), a second leg (3), a third leg (4), a fourth leg (5), a gluing construction platform (6), a main overhead crane (7), and an auxiliary overhead crane (8); The main frame comprises two left and right truss-type main beams (1-1) of identical structure, the front ends and rear ends of the two truss-type main beams are respectively connected with connecting beams (1-2), each truss-type main beam comprises an upper chord beam (1-1-1) and a left lower chord beam (1-1-2) and a right lower chord beam (1-1-3) arranged side by side on the left and right, a left web member system (1-1-4) is connected between the upper chord beam and the left lower chord beam, and a right web member system (1-1-5) is connected between the upper chord beam and the right lower chord beam; a connecting longitudinal beam (1-1-6) is connected between the left lower chord beam and the right lower chord beam, that is, two ends of the connecting longitudinal beam are respectively connected to the left lower chord beam and the right lower chord beam by bolts; The left web member system (1-1-4) is composed of a plurality of first left web members (1-1-4-1) and second left web members (1-1-4-2), the upper ends of the first left web members are respectively connected to the upper chord beam by bolts, the first left web members gradually tilt forward from top to bottom, the lower ends of the first left web members are respectively connected to the left lower chord beam by bolts, and the first left web members are arranged parallel to each other; the upper ends of the second left web members are respectively connected to the upper chord beam by bolts, the second left web members gradually tilt backward from top to bottom, the lower ends of the second left web members are respectively connected to the left lower chord beam by bolts, and the second The left webs are arranged parallel to each other; each first left web crosses the middle part of the second left web on one side thereof; a left connecting plate (1-1-4-3) is arranged at the intersection of each first left web and the second left web; the left connecting plate is connected to the first left web and the second left web by bolts; a left upright column (1-1-4-4) extending downward is also connected to the left connecting plate by bolts; the lower end of the left upright column is connected to the left lower chord beam by bolts; a first left pull rod (1-1-4-5) is arranged between two adjacent left connecting plates; the first left pull rod is connected to the left connecting plates on both sides thereof by bolts; The right web member system (1-1-5) has the same structure as the left web member system, and is composed of a plurality of first right web members (1-1-5-1) and second right web members (1-1-5-2). The upper ends of the first right web members are respectively connected to the upper chord beam by bolts, the first right web members gradually tilt forward from top to bottom, and the lower ends of the first right web members are respectively connected to the right lower chord beam by bolts. The first right web members are arranged parallel to each other; the upper ends of the second right web members are respectively connected to the upper chord beam by bolts, the second right web members gradually tilt backward from top to bottom, and the lower ends of the second right web members are respectively connected to the right lower chord beam by bolts. , the second right web members are arranged parallel to each other; each first right web member intersects with the middle part of the second right web member on one side thereof, a right connecting plate (1-1-5-3) is arranged at the intersection of each first right web member and the second right web member, the right connecting plate is connected to the first right web member and the second right web member by bolts, the right connecting plate is also connected to a right column (1-1-5-4) extending downward by bolts, the lower end of the right column is connected to the right lower chord beam by bolts, a first right pull rod (1-1-5-5) is arranged between two adjacent right connecting plates, and the first right pull rod is connected to the right connecting plates on both sides thereof by bolts; A crane guide rail (1-1-1-1) is provided on the top of the two upper chord beams, and the wheels of the main crane and the auxiliary crane are placed on the crane guide rail; an axial slide rail (1-1-2-1) is fixed to the left end face of the left lower chord beam of the truss-type main beam located on the left, and an axial slide rail is also fixed to the right end face of the right lower chord beam of the truss-type main beam located on the right; The first support leg (2) comprises two first upright columns (2-1), a plurality of first lower cross braces (2-2) and first upper cross braces (2-3) are arranged between the two first upright columns from bottom to top, the first lower cross braces and the first upper cross braces are arranged at intervals, both ends of the first lower cross braces and the first upper cross braces are respectively connected to the two first upright columns by bolts, and a first support rod (2-4) is connected between each first lower cross brace and the first upper cross brace above it; a first movable sleeve (2-5) is fixed on the top of the two first upright columns, a pin hole is provided on the upper part of the first movable sleeve, and a first cross beam (2-5) is connected between the two first movable sleeves. 2-6); also includes two first movable inner sleeves (2-7), both of which are provided with pin holes arranged up and down, the upper ends of the two first movable inner sleeves are fixed with first upper trusses (2-8), and the two ends of the first upper trusses are respectively connected to the upper chord beams of the two truss-type main beams through hinge seats and pin shafts; the lower parts of the two first movable inner sleeves are respectively placed in the two first movable outer sleeves, and the connection and fixation are achieved by installing pin shafts in the pin holes of the first movable inner sleeves and the first movable outer sleeves; the cylinder bodies of the two first outrigger oil cylinders (2-9) are fixed on the first upper trusses, and the cylinder rods of the two first outrigger oil cylinders are connected to the first crossbeam; The second leg (3) comprises two second columns (3-1), a second leg lower beam (3-2) fixed to the bottom of the second column, a second leg supporting beam (3-3) fixed to the top of the second column, a cylinder body of a second leg lifting cylinder (3-4) fixed to the second leg supporting beam, a second leg upper beam (3-5) is provided above the second leg supporting beam, a cylinder rod of the second leg lifting cylinder is connected to the second leg upper beam, a plurality of holes are provided correspondingly on the second leg upper beam and the second leg supporting beam, threaded steel bars (3-6) are provided in the corresponding holes of the second leg upper beam and the second leg supporting beam, two left and right second leg slide rails (3-7) are fixed to the upper surface of the second leg upper beam, wheels of two second leg trolleys (3-8) are respectively placed in the two left and right second leg slide rails, and second leg trays (3-9) are fixed to the two second leg trolleys, one The left lower chord beam and the right lower chord beam of a truss-type main beam are fixed on the tray of a second leg trolley, and the left lower chord beam and the right lower chord beam of another truss-type main beam are fixed on the tray of another second leg trolley; the cylinder bodies of the two second leg longitudinal movement cylinders (3-10) are respectively fixed on the two second leg trolleys, and the cylinder rods of the two second leg longitudinal movement cylinders are respectively connected to the connecting longitudinal beams (1-1-6) between the left lower chord beam (1-1-2) and the right lower chord beam (1-1-3) of the two truss-type main beams through pin shafts; and also include two second leg transverse movement cylinders (3-11) arranged on the left and right, the cylinder bodies of the two second leg transverse movement cylinders are fixed between the two second leg slide rails, wherein the cylinder rod of the second leg transverse movement cylinder on the left is connected to the second leg trolley on the left, and the cylinder rod of the second leg transverse movement cylinder on the right is connected to the second leg trolley on the right; The third leg (4) comprises two third leg lifting cylinders (4-1), the cylinder rods of the two third leg lifting cylinders are connected to the third leg upper cross beam (4-2), the upper surface of the third leg upper cross beam is fixed with left and right third leg slide rails (4-3), the wheels of two third leg moving trolleys (4-4) are respectively placed in the left and right third leg slide rails, and the two third leg trolleys are fixed with third leg trays (4-5), the left lower chord beam and the right lower chord beam of a truss main beam are fixed to the third leg tray of one third leg trolley, and the left lower chord beam and the right lower chord beam of another truss main beam are fixed to the other third leg trolley The third leg tray is provided with two third leg longitudinal movement cylinders (4-6); the cylinder bodies of the two third leg longitudinal movement cylinders (4-6) are respectively fixed on the two third leg trolleys, and the cylinder rods of the two third leg longitudinal movement cylinders are respectively connected to the connecting longitudinal beams between the left lower chord beam and the right lower chord beam of the two truss-type main beams through pin shafts; and also includes two third leg transverse movement cylinders (4-7) arranged on the left and right, the cylinder bodies of the two third leg transverse movement cylinders are fixed between the two third leg slide rails, wherein the cylinder rod of the third leg transverse movement cylinder located on the left is connected to the third leg trolley on the left, and the cylinder rod of the third leg transverse movement cylinder located on the right is connected to the third leg trolley on the right; The fourth leg (5) comprises a support (5-1), a fourth leg cross beam (5-2) fixed on the top of the support, the lower ends of the two left inner sleeves (5-3) fixed on the left side of the fourth leg cross beam, the two left inner sleeves are provided with a plurality of pin shaft mounting holes arranged up and down, the upper parts of the two left inner sleeves are respectively sleeved with left outer sleeves (5-4), the two left outer sleeves are respectively provided with pin shaft mounting holes, the left outer sleeves and the left inner sleeves are connected by pin shafts installed in the pin shaft mounting holes, the lower parts of the two left outer sleeves are connected with the fourth leg left lower connecting beam (5-5), the upper parts of the two left outer sleeves are connected with the fourth leg left upper connecting beam (5-6), the tops of the two left outer sleeves are respectively connected with left hinge seats (5-7), the cylinder rod of the left lifting cylinder (5-8) is fixed on the fourth leg cross beam, and the cylinder body of the left lifting cylinder is fixed on the fourth leg left lower connecting beam; the two right inner sleeves (5 -9) is fixed on the right side of the fourth leg crossbeam, the two right inner sleeves are provided with a plurality of pin shaft mounting holes arranged up and down, the upper parts of the two right inner sleeves are respectively provided with right outer sleeves (5-10), the two right outer sleeves are respectively provided with pin shaft mounting holes, the right outer sleeve and the right inner sleeve are connected by pin shafts installed in the pin shaft mounting holes, the lower parts of the two right outer sleeves are connected with the fourth leg right lower connecting beam (5-11), the upper parts of the two right outer sleeves are connected with the fourth leg right upper connecting beam (5-12), the tops of the two right outer sleeves are respectively connected with right hinge seats (5-13), the cylinder rod of the right jacking cylinder (5-14) is fixed on the crossbeam, and the cylinder body of the right jacking cylinder is fixed on the fourth leg right lower connecting beam; the left lower chord beam and the right lower chord beam of one truss main beam are connected to the two left hinge seats, and the left lower chord beam and the right lower chord beam of the other truss main beam are connected to the two right hinge seats; The glue coating construction work platform (6) comprises a left ladder cage (6-1) and a right ladder cage (6-2), the tops of the left ladder cage and the right ladder cage are both equipped with electric walking trolleys (6-3), the wheels of the two electric walking trolleys are respectively placed on the slide rails of the left lower chord beam of the truss-type main beam located on the left side and the slide rails of the right lower chord beam of the truss-type main beam located on the right side; the left end of the left working platform (6-4) is connected to the lower end of the left ladder cage through a pin shaft, and the right end of the right working platform (6-5) is connected to the lower end of the right ladder cage through a pin shaft; the right end of the left working platform is provided with a connecting piece (6-6) extending to the right, and the left end of the right working platform is provided with a connecting piece extending to the left, and the two connecting pieces are provided with pin shaft holes, and the pin shaft (6-7) is inserted into the pin shaft hole to realize the connection between the left working platform and the right working platform; A left middle working platform (6-8) is arranged above the left working platform, the left end of the left middle working platform is fixed on the left ladder cage, a left upper working platform (6-9) is arranged above the left middle working platform, the left end of the left upper working platform is also fixed on the left ladder cage, and guardrails extending upward are fixed to the edges of the left working platform, the left middle working platform and the left upper working platform; the left middle working platform and the left upper working platform are located on the left side of the beam body; A right middle working platform (6-10) is arranged above the right working platform, the right end of the right middle working platform is fixed on the right ladder cage, a right upper working platform (6-11) is arranged above the right middle working platform, the right end of the upper working platform is also fixed on the right ladder cage, and guardrails extending upward are fixed to the edges of the right working platform, the right middle working platform and the upper working platform; the right middle working platform and the upper working platform are located on the right side of the beam body; Hand chain hoists (6-12) are installed on the left middle working platform and the right middle working platform, and the hooks of the two hand chain hoists are respectively hung on the guardrail of the left working platform and the guardrail of the right working platform; The lower end of the second left tie rod (6-13) is bolted to the left working platform, and the upper end of the second left tie rod is inserted into the connecting sleeve at the right end of the left middle working platform and then tightened with bolts; the lower end of the second right tie rod (6-14) is bolted to the right working platform, and the upper end of the second right tie rod is inserted into the connecting sleeve at the left end of the right middle working platform and then tightened with bolts.