A UHPC-NC hybrid box girder, a large-span rigid frame bridge and a construction method thereof
By adopting a UHPC-NC hybrid box girder structure in a long-span PC rigid frame bridge, the low creep and high compressive strength of UHPC, combined with prestressed steel bar connections, solved the problems of deflection and cracking in long-span PC rigid frame bridges, improving the bridge's durability and construction efficiency.
Patent Information
- Application Number
- CN202010905969.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-01
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2040-09-01
AI Technical Summary
Long-span PC rigid frame bridges commonly suffer from severe concrete cracking in the box girder and excessive deflection at mid-span of the main span during construction and operation. In particular, the long-term deflection problem caused by concrete creep cannot be effectively solved.
The UHPC-NC hybrid box girder structure is adopted, including a UHPC ribbed bottom plate, an NC web plate, and an NC top plate. By optimizing the bottom plate material to UHPC to reduce creep effect, and combining the connection method of prestressed steel bars and fasteners, the box girder structure is optimized to reduce deflection and cracking.
It significantly reduces the risk of long-term deflection and cracking in long-span rigid frame bridges, improves the compressive strength and durability of bridges, shortens the construction period, controls costs, and reduces the self-weight of box girders.
Smart Images

Figure CN112012091B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of bridges, and in particular relates to a box girder, a rigid frame bridge and a construction method thereof. Background Art
[0002] Large-span prestressed concrete (PC) rigid frame bridge is a commonly used bridge type with strong spanning capacity, good structural integrity, simple construction, good economy and smooth driving. It has become the main bridge type in the world with a span range of 100-250m.
[0003] However, during the construction and later operation of large-span PC rigid frame bridges, serious cracking of box girder concrete and excessive deflection in the main span are common problems. These problems make it impossible to effectively guarantee the applicability, safety and durability of the bridge structure. In severe cases, they may affect the normal use of the bridge and have not been effectively solved so far. The cracking and deflection problems of large-span PC rigid frame bridges have become a recognized global problem. Current studies have shown that there are many factors that affect the long-term deflection of rigid frame bridges, such as prestress loss, cross-sectional size, bridge span, concrete deadweight, etc. Among them, the concrete creep effect is the main reason for the long-term continuous deflection in the span of large-span PC rigid frame bridges, and a considerable part of the prestress loss is also caused by concrete creep. However, concrete creep is an inherent characteristic of concrete and is inevitable. Large-span PC rigid frame bridges made of concrete inevitably have cracking and deflection problems.
[0004] Therefore, how to solve the problem of continuous deflection and cracking in the mid-span of large-span PC rigid frame bridges is a technical problem that needs to be solved urgently for large-span PC rigid frame bridges. Summary of the invention
[0005] The technical problem to be solved by the present invention is to overcome the deficiencies and defects mentioned in the above background technology, and to provide a UHPC-NC hybrid box girder, a long-span rigid frame bridge and a construction method thereof that can reduce the deflection and cracking of the main beam of a long-span rigid frame bridge. In order to solve the above technical problems, the technical solution proposed by the present invention is:
[0006] A UHPC-NC hybrid box girder for a long-span rigid frame bridge comprises a UHPC ribbed bottom plate, an NC web plate and an NC top plate, wherein the UHPC ribbed bottom plate is fixedly connected to the NC top plate as a whole via the NC web plate. The main starting point of the present invention is to solve the difficult problem of long-term deflection and cracking of long-span rigid frame bridges. The main reason for the deflection and cracking is the creep effect of the ordinary concrete bottom plate, which leads to a reduction in stiffness. The present invention optimizes the bottom plate of the UHPC-NC hybrid box girder and adopts a UHPC ribbed bottom plate, which is matched with the NC web plate and the NC top plate. Since UHPC has no creep and has stronger compressive resistance, the occurrence of long-term deflection and cracking of long-span rigid frame bridges can be greatly reduced.
[0007] In the above-mentioned UHPC-NC hybrid box girder, preferably, the UHPC ribbed bottom plate is provided with a plurality of longitudinal ribs and two transverse ribs, the plurality of longitudinal ribs are evenly arranged on the UHPC ribbed bottom plate along the longitudinal bridge direction, and the two transverse ribs are respectively arranged on both sides of the longitudinal bridge direction of the UHPC ribbed bottom plate along the transverse bridge direction. In the present invention, the height of the longitudinal ribs needs to meet the change requirements, because the closer to the pier top beam section, the greater the compressive stress, so the required cross-sectional area is also larger, so it needs to be increased. The commonly used change method is generally to transition according to a parabola, and then lower it in turn. The transverse ribs can be the same height as the longitudinal ribs. The above-mentioned transverse ribs are used to anchor the first prestressed steel rods; because the UHPC bottom plate is relatively thin, the longitudinal ribs mainly play the role of strengthening the out-of-plane stability of the UHPC, and also play the role of bearing compressive stress.
[0008] In the above-mentioned UHPC-NC hybrid box girder, preferably, the UHPC ribbed bottom plate is provided with anchor steel bars on both sides of the transverse bridge, one end of the anchor steel bar is provided in the UHPC ribbed bottom plate, and the other end extends upward into the NC web plate. The anchor steel bar facilitates the connection between the UHPC ribbed bottom plate and the NC web plate, and improves the connection strength between the UHPC ribbed bottom plate and the NC web plate.
[0009] As a general technical concept, the present invention also provides a long-span rigid frame bridge, including a pier top beam section, a first beam section and a second beam section, wherein the first beam section is located on both sides of the pier top beam section and is symmetrically arranged along the pier top beam section, the second beam section is located on the outside of the first beam section and is symmetrically arranged along the pier top beam section, the first beam section and the second beam section both include a plurality of box beams connected to each other, the box beam of the first beam section is the above-mentioned UHPC-NC hybrid box beam, and the box beam of the second beam section is an NC box beam. The above-mentioned first beam section is a high-pressure stress section, and the section within the range of 1 / 4 of the span close to the pier top beam section belongs to the high-pressure stress section, and the closer to the pier top beam section, the greater the compressive stress, the second beam section is a low-pressure stress section, and through the reasonable selection of the high-pressure stress section and the low-pressure stress section for the box beam, and through the structural optimization of the UHPC-NC hybrid box beam, the occurrence of the deflection and cracking of the main beam of the long-span rigid frame bridge can be reduced.
[0010] In the above-mentioned long-span rigid frame bridge, preferably, adjacent UHPC-NC hybrid box girders are connected by a first anchoring assembly, wherein the first anchoring assembly includes a first prestressed steel rod and a first fastener for matching with the first prestressed steel rod. When adjacent UHPC-NC hybrid box girders are connected, a tensioning method at both ends is adopted.
[0011] In the above-mentioned large-span rigid frame bridge, preferably, through holes are provided on the transverse ribs between the adjacent longitudinal ribs, and the first prestressed steel rod passes through the through holes on the adjacent transverse ribs of the adjacent UHPC-NC hybrid box girders and fixes the adjacent UHPC-NC hybrid box girders by applying prestressing stress through the first fasteners. Considering the convenience of installation and force transmission, the present invention opens through holes on the transverse ribs, optimizes the opening positions of the through holes, and then fixes the adjacent UHPC-NC hybrid box girders through the first prestressed steel rods. The entire fixing structure is cleverly designed, simple in structure, convenient in construction, and has a clear force transmission path. It can ensure the fixing strength and reliability between adjacent UHPC-NC hybrid box girders, which is conducive to ensuring the overall mechanical properties of the bridge.
[0012] In the above-mentioned long-span rigid frame bridge, preferably, the UHPC-NC hybrid box girder is connected to the NC box girder through a second anchor assembly, and the second anchor assembly includes a second prestressed steel rod and a second fastener for matching with the second prestressed steel rod. When the adjacent UHPC-NC hybrid box girder is connected to the NC box girder, a one-end tensioning method is adopted, the bottom plate of the NC box girder is the buried anchor end, and the UHPC ribbed bottom plate of the UHPC-NC hybrid box girder is the tensioning end.
[0013] In the above-mentioned large-span rigid frame bridge, preferably, a through hole is opened on the transverse ribs between the adjacent longitudinal ribs, one end of the second prestressed steel rod is anchored on the bottom plate of the NC box girder, and the other end passes through the through hole and fixes the adjacent UHPC-NC hybrid box girder and the NC box girder through the second fastener. Since the mechanical properties of the bottom plates of adjacent UHPC-NC hybrid box girders and NC box girders are quite different, it is necessary to reasonably optimize the connection method between the two to ensure the reliability and stability of the connection between adjacent UHPC-NC hybrid box girders and NC box girders. The present invention adopts a second prestressed steel rod, one end of which is anchored on the bottom plate of the NC box girder, and the other end is fixed on the transverse ribs of the UHPC ribbed bottom plate, so as to ensure the fixing strength and reliability of the UHPC-NC hybrid box girder and the NC box girder, which is beneficial to ensure the overall mechanical properties of the bridge.
[0014] In the above-mentioned long-span rigid frame bridge, preferably, the second prestressed steel bars are arranged in a staggered manner in long and short forms. Considering the poor mechanical properties of NC, when connecting the UHPC-NC hybrid box girder and the NC box girder, the second prestressed steel bars are arranged in a staggered manner in long and short forms, so as to achieve a high connection strength between the two.
[0015] As a general technical concept, the present invention also provides a construction method of the above-mentioned long-span rigid frame bridge, comprising the following steps:
[0016] S1: Prefabricate the UHPC ribbed bottom plate of the UHPC-NC hybrid box girder, and simultaneously embed the anchor steel bars when prefabricating the UHPC ribbed bottom plate;
[0017] S2: Cast-in-place construction of the pier top beam section, and synchronously embedding the second prestressed steel rod during the construction of the pier top beam section;
[0018] S3: adopt the hanging basket cantilever construction method, symmetrically assemble the bottom formwork-free hanging basket on both sides of the pier top beam section, place the UHPC ribbed bottom plate under the support of the hanging basket, connect the UHPC ribbed bottom plate with the pier top beam section by tensioning the second prestressed steel rod between the UHPC ribbed bottom plate and the pier top beam section; cast the NC web plate and NC top plate of the UHPC-NC hybrid box beam in situ; install the tensioning negative bending moment pre-steel bundle;
[0019] S4: Move the hanging basket to both sides, place the UHPC ribbed bottom plate under the support of the hanging basket, connect the adjacent UHPC ribbed bottom plates by tensioning the first prestressed steel bars between the adjacent UHPC ribbed bottom plates; cast the NC web plate and NC top plate of the UHPC-NC hybrid box girder in situ; install the tensioning negative bending moment pre-steel bundle; repeat this step until all the UHPC-NC hybrid box girders are completed;
[0020] S5: moving the hanging basket to both sides, casting the NC box girder in situ, pre-embedding the second prestressed steel rod when constructing the NC box girder, and connecting the UHPC ribbed bottom plate with the NC box girder by tensioning the second prestressed steel rod between the UHPC ribbed bottom plate and the NC box girder;
[0021] S6: Continue to use the hanging basket cantilever construction method to construct the remaining NC box girders and tension the later prestressed steel strands, thus completing the construction of the large-span rigid frame bridge.
[0022] In the present invention, prestressed steel strands can also be used to achieve the fixed connection between the UHPC-NC hybrid box girder and the NC box girder at the mid-span side. In this case, S5-S6 are adjusted to:
[0023] S5: Move the hanging basket to both sides, cast the NC box girder in situ, and close the long-span rigid frame bridge;
[0024] S6: tensioning the later prestressed steel strands of the mid-span bottom plate, connecting the UHPC ribbed bottom plate with the NC box girder, tensioning other later prestressed steel strands, and completing the construction of the long-span rigid frame bridge.
[0025] Ultra-high performance concrete (UHPC) is a cement-based composite material with high flexural strength, high toughness and high durability, which is formed by mixing cement, mineral admixtures, fine aggregates, steel fibers and water reducing agents or dry mixes made of the above materials with water, and then solidifying and hardening to form a cement-based composite material with high flexural strength, high toughness and high durability. Compared with ordinary concrete (NC), UHPC materials have ultra-high compressive strength, flexural strength and toughness, and have extremely small creep and almost no shrinkage after high-temperature steam curing. The present invention introduces high-strength and high-performance concrete materials into long-span PC rigid frame bridges, starting from solving the fundamental problem of deflection of long-span PC rigid frame bridges (concrete shrinkage creep), greatly reducing the concrete creep effect of the bottom plate in the high-pressure stress area of the structure, reducing the late creep deformation, and thus solving the problem of continuous deflection in the mid-span of long-span PC rigid frame bridges.
[0026] Compared with the prior art, the advantages of the present invention are:
[0027] 1. The bottom plate of the large-span rigid frame bridge of the present invention in the high-pressure stress zone is a UHPC ribbed plate. After high-temperature steam curing, the UHPC prefabricated plate has extremely small creep, almost no shrinkage and ultra-high compressive strength, which increases the compressive resistance of the bottom plate, significantly reduces the creep effect, and greatly reduces the risk of later deflection and cracking of large-span continuous rigid frame bridges.
[0028] 2. The UHPC ribbed slab of the present invention can be prefabricated in sections according to the box girder segments, and adjacent prefabricated UHPC bottom plates can be connected by prestressed steel rods, eliminating the need for conventional cast-in-place concrete bottom formwork in high pressure stress areas, making construction convenient and shortening the construction period.
[0029] 3. In the large-span rigid frame bridge of the present invention, by reasonably selecting the box girder and adopting the combination of UHPC-NC hybrid box girder and NC box girder, the bridge has better durability, can control the cost, reduce the dead weight of the box girder to a certain extent, and increase the span of the rigid frame bridge. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0031] Figure 1 It is a structural schematic diagram of the general position of the long-span rigid frame bridge in the embodiment.
[0032] Figure 2 Schematic diagram of the cross section of the UHPC-NC hybrid box girder in the embodiment.
[0033] Figure 3It is a schematic diagram of the longitudinal end section of the UHPC-NC hybrid box girder in the embodiment (the first prestressed steel rod is arranged).
[0034] Figure 4 Schematic diagram of the structure of adjacent UHPC ribbed bottom plates connected in the embodiment.
[0035] Figure 5 It is a schematic structural diagram of the connection between the bottom plates of adjacent UHPC ribbed bottom plates and NC box girders in the embodiment.
[0036] Figure 6 It is another structural schematic diagram of the connection between the adjacent UHPC ribbed bottom plates and the bottom plates of the NC box beam in the embodiment.
[0037] Figure 7 It is a schematic elevation diagram of the cantilever hanging basket construction in the embodiment.
[0038] Figure 8 It is a schematic side view of the cantilever hanging basket construction in the embodiment.
[0039] Legend:
[0040] 1. UHPC ribbed bottom plate; 2. NC web plate; 3. NC top plate; 4. Longitudinal ribs; 5. Transverse ribs; 6. Anchor steel bars; 7. Pier top beam section; 8. First beam section; 9. Second beam section; 10. First prestressed steel rod; 11. First fastener; 12. Second prestressed steel rod; 13. Second fastener; 14. Hanging basket. DETAILED DESCRIPTION
[0041] In order to facilitate the understanding of the present invention, the present invention will be described more comprehensively and meticulously below in conjunction with the accompanying drawings and preferred embodiments of the present invention, but the protection scope of the present invention is not limited to the following specific embodiments.
[0042] Unless otherwise defined, all the professional terms used below have the same meanings as those generally understood by those skilled in the art. The professional terms used herein are only for the purpose of describing specific embodiments and are not intended to limit the scope of protection of the present invention.
[0043] Example:
[0044] like Figure 2-Figure 3 As shown, the UHPC-NC hybrid box girder for a long-span rigid frame bridge of this embodiment includes a UHPC ribbed bottom plate 1, an NC web plate 2 and an NC top plate 3. The UHPC ribbed bottom plate 1 is fixedly connected to the NC top plate 3 through the NC web plate 2 to form a whole.
[0045] In this embodiment, a plurality of longitudinal ribs 4 and two transverse ribs 5 are provided on the UHPC ribbed bottom plate 1. The plurality of longitudinal ribs 4 are evenly arranged on the UHPC ribbed bottom plate 1 along the longitudinal bridge direction, and the two transverse ribs 5 are respectively arranged on both sides of the longitudinal bridge direction of the UHPC ribbed bottom plate 1 along the transverse bridge direction. In this embodiment, the UHPC ribbed bottom plate 1 has a transverse bridge width of 6m and a thickness of 30cm. The longitudinal ribs 4 are arranged thereon. The transverse bridge width of the longitudinal ribs 4 is 25cm, and they are arranged at a spacing of 37.5cm. The height thereof transitions from 90cm to 30cm along a parabola from beam sections 1#-13# and 1#'-13'#. The transverse ribs 5 are of the same height as the longitudinal ribs 4, and have a longitudinal bridge width of 30cm.
[0046] In this embodiment, anchor steel bars 6 are provided on both sides of the transverse bridge of the UHPC ribbed bottom plate 1 , one end of the anchor steel bar 6 is provided in the UHPC ribbed bottom plate 1 , and the other end extends upward into the NC web 2 .
[0047] like Figure 1 As shown, the long-span rigid frame bridge of this embodiment includes a pier top beam section 7, a first beam section 8 and a second beam section 9. The first beam section 8 is located on both sides of the pier top beam section 7 and is symmetrically arranged along the pier top beam section 7. The second beam section 9 is located on the outside of the first beam section 8 and is symmetrically arranged along the pier top beam section 7. The first beam section 8 and the second beam section 9 both include a plurality of interconnected box girders. The box girder of the first beam section 8 is the above-mentioned UHPC-NC hybrid box girder, and the box girder of the second beam section 9 is an NC box girder.
[0048] In this embodiment, the span of the above-mentioned large-span rigid frame bridge is arranged as 115+220+115m, the bridge width is 12m, the pier top beam section 7 is a 0# beam section, and the beam section length is 3-4.5m. The beam sections (first beam section 8) 1#-13# and 1#'-13'# that bear greater compressive stress adopt UHPC-NC hybrid box beams, and the application range of UHPC-NC hybrid box beams is 45m on both sides of the pier top beam section 7. In addition, the remaining low-pressure stress beam sections (second beam section 9) all adopt NC box beams. The joint surface between the UHPC-NC hybrid box beam and the NC box beam is set at the end faces of the 13# and 13'# beam sections.
[0049] like Figure 4 As shown, in this embodiment, adjacent UHPC-NC hybrid box girders are connected by a first anchoring assembly, and the first anchoring assembly includes a first prestressed steel rod 10 and a first fastener 11 for matching with the first prestressed steel rod 10. Through holes are provided on the transverse ribs 5 between adjacent longitudinal ribs 4, and the first prestressed steel rod 10 passes through the through holes on the adjacent transverse ribs 5 of the adjacent UHPC-NC hybrid box girders and is fixedly connected by applying precompressive stress to the adjacent UHPC-NC hybrid box girders through the first fastener 11. In this embodiment, the first prestressed steel rod 10 uses 8 φ50 high-strength prestressed threaded steel rods.
[0050] like Figure 5As shown, in this embodiment, the UHPC-NC hybrid box girder is connected to the NC box girder through a second anchoring assembly, and the second anchoring assembly includes a second prestressed steel rod 12 and a second fastener 13 for matching with the second prestressed steel rod 12. A through hole is provided on the transverse rib 5 between adjacent longitudinal ribs 4, one end of the second prestressed steel rod 12 is anchored on the bottom plate of the NC box girder, and the other end passes through the through hole and fixes the adjacent UHPC-NC hybrid box girder and the NC box girder through the second fastener 13. In this embodiment, the second prestressed steel rod 12 uses 8 φ50 high-strength prestressed threaded steel rods.
[0051] In this embodiment, in order to strengthen the connection between the prefabricated UHPC ribbed floor 1 and the 0#, 14#, 14' cast-in-place NC floor to avoid tensile stress, 8 high-strength prestressed threaded steel bars are also provided, arranged between the longitudinal ribs 4, one end of which is embedded in the NC floor, and the other end is anchored on the transverse rib 5 of the prefabricated UHPC ribbed floor beam section, and tension is performed only at the transverse rib 5. Considering the poor mechanical properties of NC, the high-strength prestressed threaded steel bars are arranged in long and short forms on the NC side, with a staggered length of 2-3m.
[0052] like Figure 7 , Figure 8 As shown, this embodiment also provides a construction method for the above-mentioned large-span rigid frame bridge, comprising the following steps:
[0053] S1: UHPC ribbed bottom plate 1 of prefabricated UHPC-NC hybrid box girder, anchor steel bars 6 are pre-embedded synchronously when prefabricating the UHPC ribbed bottom plate 1;
[0054] S2: Cast-in-place construction of pier top beam section 7 (0#), while simultaneously pre-burying the second prestressed steel rod 12 during the construction of pier top beam section 7; that is, the construction of section 0# is completed;
[0055] S3: adopt the hanging basket cantilever construction method, symmetrically assemble the bottom formwork-free hanging basket 14 on both sides of the pier top beam section 7, place the UHPC ribbed bottom plate 1 under the support of the hanging basket 14, and connect the UHPC ribbed bottom plate 1 with the pier top beam section 7 by tensioning the second prestressed steel rod 12 between the UHPC ribbed bottom plate 1 and the pier top beam section 7; cast the NC web 2 and NC top plate 3 of the UHPC-NC hybrid box girder in situ; install the tensioning negative bending moment pre-steel bundle when the strength of the ordinary concrete of the cast NC top plate 3 and NC web 2 reaches more than 90% of the design strength; that is, complete the construction of 1# and 1'# sections;
[0056] S4: Move the hanging basket 14 to both sides, place the UHPC ribbed bottom plate 1 under the support of the hanging basket 14, connect the adjacent UHPC ribbed bottom plates 1 by tensioning the first prestressed steel rods 10 between the adjacent UHPC ribbed bottom plates 1; cast the NC web 2 and NC top plate 3 of the UHPC-NC hybrid box girder; install the tensioning negative bending moment pre-steel bundle; repeat this step until all the UHPC-NC hybrid box girders are completed; that is, the construction of 2#-13#, 2#'-13'# is completed;
[0057] S5: Move the hanging basket 14 to both sides, cast the NC box girder in situ, and simultaneously pre-embed the second prestressed steel rod 12 when constructing the NC box girder. Connect the UHPC ribbed bottom plate 1 with the NC box girder by tensioning the second prestressed steel rod 12 between the UHPC ribbed bottom plate 1 and the NC box girder; that is, complete the construction of the 14# and 14'# sections;
[0058] S6: Continue to use the hanging basket 14 cantilever construction method to construct the remaining NC box girders, thus completing the construction of the large-span rigid frame bridge.
[0059] like Figure 6 As shown, in this embodiment, the connection between the UHPC ribbed bottom plate 1 and the 14#, 14' cast-in-place NC bottom plates can also be achieved by extending the later prestressed steel strands of the mid-span bottom plate to the transverse ribs 5 of the beam section of the UHPC ribbed bottom plate 1, and tensioning is performed at the transverse ribs 5.
[0060] In this embodiment, 1#-13#, 1'-13'# adopt the prefabricated UHPC ribbed bottom plate 1, which can avoid the bottom mold required by the conventional hanging basket 14. After the prefabricated UHPC ribbed bottom plate 1 is connected with the high-strength prestressed threaded steel rods, it is supported on the hanging basket 14, that is, it can bear the steel bars and NC wet weight of the cast-in-place NC top plate 3 and NC web 2.
Claims
1. A long-span rigid frame bridge, characterized in that: The invention comprises a pier top beam section (7), a first beam section (8) and a second beam section (9), wherein the first beam section (8) is located on both sides of the pier top beam section (7) and is symmetrically arranged along the pier top beam section (7), and the second beam section (9) is located on the outside of the first beam section (8) and is symmetrically arranged along the pier top beam section (7), and the first beam section (8) and the second beam section (9) each comprise a plurality of box beams connected to each other, the box beam of the first beam section (8) is a UHPC-NC hybrid box beam, and the box beam of the second beam section (9) is an NC box beam; The UHPC-NC hybrid box girder comprises a UHPC ribbed bottom plate (1), an NC web plate (2) and an NC top plate (3), wherein the UHPC ribbed bottom plate (1) is fixedly connected to the NC top plate (3) via the NC web plate (2) to form a whole; a plurality of longitudinal ribs (4) and two transverse ribs (5) are provided on the UHPC ribbed bottom plate (1), wherein the plurality of longitudinal ribs (4) are evenly arranged on the UHPC ribbed bottom plate (1) along the longitudinal bridge direction, and the two transverse ribs (5) are respectively arranged on both sides of the UHPC ribbed bottom plate (1) in the longitudinal bridge direction along the transverse bridge direction; The height of the longitudinal ribs increases as they are closer to the pier top, and the transverse ribs are equal in height to the longitudinal ribs. Adjacent UHPC-NC hybrid box girders are connected via a first anchoring assembly, wherein the first anchoring assembly comprises a first prestressed steel rod (10) and a first fastener (11) for cooperating with the first prestressed steel rod (10); A through hole is formed on the transverse rib (5) between adjacent longitudinal ribs (4); the first prestressed steel rod (10) passes through the through hole on the adjacent transverse rib (5) of the adjacent UHPC-NC hybrid box beam and the adjacent UHPC-NC hybrid box beams are fixedly connected by applying pre-compressive stress through the first fastener (11); The UHPC-NC hybrid box girder is connected to the NC box girder via a second anchoring assembly, wherein the second anchoring assembly comprises a second prestressed steel rod (12) and a second fastener (13) for matching with the second prestressed steel rod (12); A through hole is provided on the transverse rib (5) between adjacent longitudinal ribs (4); one end of the second prestressed steel rod (12) is anchored on the bottom plate of the NC box girder, and the other end passes through the through hole and fixes the adjacent UHPC-NC hybrid box girder and the NC box girder via the second fastener (13); The second prestressed steel bars (12) are arranged in a staggered manner in long and short forms.
2. The long-span rigid frame bridge according to claim 1, characterized in that: Anchor steel bars (6) are provided on both sides of the transverse bridge of the UHPC ribbed bottom plate (1); one end of the anchor steel bar (6) is provided in the UHPC ribbed bottom plate (1), and the other end extends upward into the NC web plate (2).
3. A construction method for a long-span rigid frame bridge as claimed in claim 1 or 2, characterized in that: The following steps are involved: S1: A UHPC ribbed bottom plate (1) of a prefabricated UHPC-NC hybrid box girder, wherein anchor steel bars (6) are embedded synchronously when the UHPC ribbed bottom plate (1) is prefabricated; S2: Cast-in-place construction of the pier top beam section (7), and synchronously pre-embedding the second prestressed steel rod (12) during the construction of the pier top beam section (7); S3: adopting a hanging basket cantilever construction method, symmetrically assembling a bottom formwork-free hanging basket (14) on both sides of the pier top beam section (7), placing the UHPC ribbed bottom plate (1) under the support of the hanging basket (14), and connecting the UHPC ribbed bottom plate (1) and the pier top beam section (7) by tensioning a second prestressed steel rod (12) between the UHPC ribbed bottom plate (1) and the pier top beam section (7); casting the NC web plate (2) and the NC top plate (3) of the UHPC-NC hybrid box beam; S4: Move the hanging basket (14) to both sides, place the UHPC ribbed bottom plate (1) under the support of the hanging basket (14), connect adjacent UHPC ribbed bottom plates (1) by tensioning the first prestressed steel bars (10) between adjacent UHPC ribbed bottom plates (1); cast the NC web plate (2) and NC top plate (3) of the UHPC-NC hybrid box beam in situ; repeat this step until all the UHPC-NC hybrid box beams are constructed; S5: moving the hanging basket (14) to both sides, casting the NC box girder in situ, pre-embedding the second prestressed steel rod (12) when constructing the NC box girder, and connecting the UHPC ribbed bottom plate (1) with the NC box girder by tensioning the second prestressed steel rod (12) between the UHPC ribbed bottom plate (1) and the NC box girder; S6: Continue to use the hanging basket (14) cantilever construction method to construct the remaining NC box girders, that is, complete the construction of the large-span rigid frame bridge.
Citation Information
Patent Citations
Wide box girder bridge main beam bottom board structure and construction method thereof
CN105887653A
UHPC composite box beam
CN106835932A
UHPC-NC hybrid box girder and large-span rigid frame bridge
CN212404773U
Pre-stressed concrete floor slab and construction method for floor slab using pre-stressed concrete floor slab
JP2020125675A