Underground engineering system with reserved interface and construction method thereof

Through the underground engineering system with reserved interfaces, the connection between precast concrete slabs and outer frame beams and water stops are used to solve the problem of large-area chisel removal and leakage at the interface, and the precise connection and waterproofing effect are achieved.

CN112177044BActive Publication Date: 2024-12-06CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202011023239.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-25
Publication Date
2024-12-06
Estimated Expiration
2040-09-25

AI Technical Summary

Technical Problem

The existing underground engineering technology needs to be drilled out on a large area at the interface, resulting in the impact on underground space and later leakage problems.

Method used

An underground engineering system with reserved interfaces includes precast concrete slabs, interface frame beams and outsourcing frame beams. Through the connection between precast concrete slabs and outsourcing frame beams, an embedded groove structure is formed, and a water stop is installed at the interface to avoid leakage.

Benefits of technology

It reduces the impact of interface chiseling on the existing structure, reduces the difficulty of later cleaning and transportation, and effectively prevents leakage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112177044B_ABST
    Figure CN112177044B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of underground engineering technology, and provides an underground engineering system with a reserved interface, including a current underground structure, the current underground structure having a reserved interface for docking with a future underground structure, the reserved interface including a precast concrete slab, an interface frame beam, and an outsourced frame beam, the outsourced frame beam being arranged on the side of the interface frame beam facing the future underground structure, and the interface frame beam and the outsourced frame beam enclose a groove for the precast concrete slab to be embedded, and the precast concrete slab is connected to the outsourced frame beam. A construction method for an underground engineering system with a reserved interface is also provided. When the present invention needs to dock with a future underground structure, it only needs to take out the precast concrete slab, which causes little disturbance and will not affect the existing passage or underground space, thereby reducing the risk of chiseling the interface and the use of the existing underground structure, and also avoiding the difficulty of cleaning and transportation caused by large-scale chiseling in the later stage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underground engineering, and in particular to an underground engineering system with a reserved interface and a construction method thereof. Background Art

[0002] For underground structures with pedestrian functions such as underground spaces and underground passages, there are often situations where they are connected to surrounding underground structures or reserved for future interfaces. The conventional practice is to directly chisel out the interface walls within the interface range and connect them to the reserved beams and columns. This connection method is relatively conventional, but there are also obvious problems:

[0003] 1) The interface requires large-scale chiseling of the existing structural side wall, which has a certain degree of impact on the use of existing passages or underground spaces;

[0004] 2) After the interface is broken, it is directly connected to the existing beams and columns, and this part will often become the main leakage point in the later stage. Summary of the invention

[0005] The purpose of the present invention is to provide an underground engineering system with a reserved interface and a construction method thereof, which can at least solve some of the defects in the prior art.

[0006] To achieve the above-mentioned purpose, an embodiment of the present invention provides the following technical solution: an underground engineering system with a reserved interface, including a current underground structure, the current underground structure having a reserved interface for docking with a future underground structure, the reserved interface including a precast concrete slab, an interface frame beam and an outsourced frame beam, the outsourced frame beam being arranged on the side of the interface frame beam facing the future underground structure, and the interface frame beam and the outsourced frame beam enclose a groove for embedding the precast concrete slab, and the precast concrete slab is connected to the outsourced frame beam.

[0007] Furthermore, the reserved interface also includes interface frame columns, the outsourced frame beam is sandwiched between the interface frame columns, and the outsourced frame beam is arranged on the interface frame columns.

[0008] Furthermore, water stoppers are provided between the precast concrete slab and the interface frame beam, between the precast concrete slab and the interface frame column, and between the interface frame beam and the interface frame column.

[0009] Furthermore, the water stop member includes a water stop strip and a water stop glue.

[0010] Furthermore, the precast concrete slab is a framed precast slab.

[0011] Furthermore, the partitioned prefabricated panel includes a plurality of panel bodies, and each of the panel bodies is arranged side by side between the interface frame columns.

[0012] Furthermore, a caulking joint is provided between two adjacent plate bodies, the caulking joint is connected to a grouting pipe, and one end of the grouting pipe away from the caulking joint extends out of the precast concrete plate.

[0013] Furthermore, the middle section of the caulking is provided with elastic rubber.

[0014] Furthermore, the opening caulked outside the prefabricated blocking plate is blocked with a steel plate.

[0015] The embodiment of the present invention provides another technical solution: a construction method of an underground engineering system with a reserved interface, comprising the following steps:

[0016] S1, construct the main body of the current underground structure, and set precast concrete slabs, interface frame beams and interface frame columns on the main body at the position for docking with the future underground structure;

[0017] S2, reserving steel bars around the precast concrete slab, anchoring them into the outer frame beam, and casting them simultaneously with the main body, the precast concrete slab is connected to the outer frame beam, so that the precast concrete slab is embedded in the groove formed by the interface frame beam and the outer frame beam.

[0018] Compared with the prior art, the present invention has the following beneficial effects:

[0019] 1. When it is necessary to connect to the future underground structure, only the precast concrete slab needs to be taken out, which causes little disturbance and will not affect the existing passages or underground space. It reduces the risk of interface chiseling and the use of the existing underground structure, and also avoids the difficulty of cleaning and transportation caused by large-scale chiseling in the later stage.

[0020] 2. The waterproof parts applied can avoid leakage in the later stage. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A plan view of an underground engineering system with a reserved interface provided by an embodiment of the present invention;

[0022] Figure 2 for Figure 1 AA cross-section diagram;

[0023] Figure 3 for Figure 2 The cross-section of BB;

[0024] Figure 4 A schematic diagram of the internal structure of a precast concrete slab of an underground engineering system with a reserved interface provided by an embodiment of the present invention;

[0025] In the accompanying drawings: 1-future underground structure; 2-side wall of future underground structure; 3-external frame beam; 4-precast concrete slab; 41-first section precast slab; 42-second section precast slab; 43-third section precast slab; 5-interface frame beam; 6-interface frame column; 7-main body of current underground structure; 8-side wall of current underground structure; 9-top plate of future underground structure; 10-bottom plate of future underground structure; a-grouting pipe; b-elastic rubber; c-steel plate; d-caulking. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Embodiment 1

[0027] See also Figure 1 and Figure 2 The embodiment of the present invention provides an underground engineering system with a reserved interface, including a current underground structure, the current underground structure having a reserved interface for docking with a future underground structure 1, the reserved interface including a precast concrete slab 4, an interface frame beam 5 and an external frame beam 3, the external frame beam 3 is arranged on the side of the interface frame beam 5 facing the future underground structure 1, and the interface frame beam 5 and the external frame beam 3 enclose a groove for the precast concrete slab 4 to be embedded, and the precast concrete slab 4 is connected to the external frame beam 3. In the prior art, the reserved interface is usually prepared by using a beam-column wall. When docking with the future underground structure 1 is required, the beam-column wall needs to be chiseled out as a whole. However, this method has a large chiseling area, which will bring a series of problems. In the present embodiment, a reserved interface is provided at the docking point between the current underground structure and the future underground structure 1, and the precast concrete slab 4 is only connected to the external frame beam 3, and is not connected to the interface frame beam 5, so that when it is subsequently broken, it is convenient to remove the precast concrete slab 4 and then dock with the future underground structure 1. In this structure, the interface frame beam 5 and the outer frame beam 3 enclose a groove, and the precast concrete slab 4 can be embedded in it. This spliced ​​structure is conducive to subsequent precise chiseling, and no large-scale chiseling is required. On the one hand, the disturbance is small and will not affect the existing passage or underground space, reducing the risk of interface chiseling and the use of the existing underground structure. On the other hand, it also avoids the difficulty of cleaning and transportation caused by large-scale chiseling in the later stage. The current underground structure is equipped with the current underground structure side wall 8.

[0028] As an optimization solution of the embodiment of the present invention, please refer to Figure 1 and Figure 2, the reserved interface also includes an interface frame column 6, the outsourced frame beam 3 is sandwiched between the interface frame columns 6, and the outsourced frame beam 3 is arranged on the interface frame column 6. In this embodiment, the interface frame column 6 is provided to improve the stability of the structure, and it sandwiches the interface frame beam 5 therebetween. Preferably, water stoppers are provided between the precast concrete slab 4 and the interface frame beam 5, between the precast concrete slab 4 and the interface frame column 6, and between the interface frame beam 5 and the interface frame column 6. In this embodiment, the provision of this water stopper can avoid leakage in the later stage.

[0029] As an optimization solution of the embodiment of the present invention, the water stop member includes a water stop strip and a water stop glue. In this embodiment, the water stop method can be a water stop strip and a water stop glue. Or other existing water stop forms, which will not be listed here.

[0030] As an optimization solution of the embodiment of the present invention, please refer to Figure 1 , Figure 2 and Figure 3 , the precast concrete slab 4 is a framed precast slab. Preferably, the framed precast slab includes a plurality of slabs, each of which is arranged side by side between the interface frame columns 6. In this embodiment, the framed precast slab is convenient for the manufacturer to process and prefabricate on the one hand, and also convenient for subsequent dismantling on the other hand. Preferably, there are three framed precast slabs, namely, a first framed precast slab 41, a second framed precast slab 42, and a third framed precast slab 43.

[0031] As an optimization solution of the embodiment of the present invention, please refer to Figure 1 , Figure 2 , Figure 3 and Figure 4 There is a caulking d between two adjacent plates, and the caulking is connected to a grouting pipe a, and one end of the grouting pipe a away from the caulking d extends out of the precast concrete panel 4. In this embodiment, the grouting process can be performed on the precast interface through the grouting pipe a, and the grouting pipe a extends out of the precast concrete panel 4 to facilitate the introduction of slurry. Preferably, the caulking is a polysulfide sealant caulking.

[0032] To further optimize the above solution, please refer to Figure 4 , the middle section of the caulking is provided with an elastic rubber b. In this embodiment, the elastic rubber b is provided in the caulking, and the elastic rubber b is provided so that the structure has a certain elastic margin. Preferably, the elastic rubber is an elastic rubber that swells when exposed to water.

[0033] As an optimization solution of the embodiment of the present invention, please refer to Figure 4 The opening caulked outside the prefabricated blocking plate is blocked with a steel plate c. In this embodiment, an inner sealing steel plate is applied to the inner interface portion of the prefabricated concrete slab 4.

[0034] As an optimization solution of the embodiment of the present invention, please refer to Figure 2 The future underground structure 1 includes a future underground structure top plate 9, a future underground structure bottom plate 10 and a future underground structure side wall 2. Embodiment 2

[0035] The embodiment of the present invention provides a construction method of an underground engineering system with a reserved interface, comprising the following steps: S1, constructing the main body 7 of the current underground structure, and making a precast concrete slab 4, an interface frame beam 5 and an interface frame column 6 on the main body at a position for docking with the future underground structure 1; S2, reserving steel bars around the precast concrete slab 4, anchoring them into the outer frame beam 3, and casting them at the same time as the main body, the precast concrete slab 4 is connected to the outer frame beam 3, so that the precast concrete slab 4 is embedded in the groove formed by the interface frame beam 5 and the outer frame beam 3. In this embodiment, a reserved interface is set at the docking point of the current underground structure and the future underground structure 1, and the precast concrete slab 4 is only connected to the outer frame beam 3, and is not connected to the interface frame beam 5, so that when it is subsequently broken, it is convenient to remove the precast concrete slab 4 and then dock with the future underground structure 1. In this structure, the interface frame beam 5 and the outer frame beam 3 are enclosed to form a groove, and the precast concrete slab 4 can be embedded in it. This spliced ​​structure is conducive to subsequent precise chiseling, and no large-scale chiseling is required. On the one hand, the disturbance is small and will not affect the existing passages or underground spaces, reducing the risk of interface chiseling and the use of existing underground structures. On the other hand, it also avoids the difficulty of cleaning and transportation caused by large-scale chiseling in the later stage.

[0036] Specifically, the main body of the underground structure is constructed first, and the steel bars are tied and the concrete is poured. Precast concrete slabs 4, interface frame beams 5 and interface frame columns 6 are set at the interface of the future underground structure 1, and water-stopping measures are set between the precast concrete slabs 4, interface frame beams 5 and interface frame columns 6. Then, steel bars are reserved around the precast concrete slabs 4, anchored into the outer frame beams 3, and poured at the same time as the current underground structure. The precast concrete slabs 4 are only connected to the outer frame beams 3, and not to the interface frame beams 5. When making the precast concrete slabs 4 (including the first precast slabs 41, the second precast slabs 42 and the third precast slabs 43), the range interface part is connected by a socket joint, and the interface is respectively provided with a grouting pipe a, a water-expanding elastic rubber b, and a polysulfide sealant caulking d, and at the same time, an inner sealing steel plate c is applied to the inner interface part of the precast concrete slab 4. Then, connectors are reserved in the future underground structure 1, the future underground structure 1 bottom plate and the interface frame beam 5 for connection. At the same time, grouting pipes a, water-stop glue and other water-stopping measures are buried in the interface range of the outsourced frame beam 3, the interface frame beam 5 and the future underground structure 1 top plate and the future underground structure 1 bottom plate.

[0037] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An underground engineering system with a reserved interface, including a current underground structure, characterized in that: The current underground structure has a reserved interface for docking with a future underground structure, the reserved interface includes a precast concrete slab, an interface frame beam and an outsourced frame beam, the outsourced frame beam is arranged on the side of the interface frame beam facing the future underground structure, and the interface frame beam and the outsourced frame beam are enclosed to form a groove for the precast concrete slab to be embedded, the precast concrete slab is connected to the outsourced frame beam, the reserved interface also includes an interface frame column, the outsourced frame beam is clamped between the interface frame columns, the outsourced frame beam is arranged on the interface frame column, water stop parts are arranged between the precast concrete slab and the interface frame beam, between the precast concrete slab and the interface frame column, and between the interface frame beam and the interface frame column, the water stop parts include water stop strips and water stop glue, and the precast concrete slab is a divided precast slab.

2. The underground engineering system with a reserved interface according to claim 1, characterized in that: The partitioned prefabricated panel comprises a plurality of panel bodies, and each of the panel bodies is arranged side by side between the interface frame columns.

3. The underground engineering system with a reserved interface as claimed in claim 2, characterized in that: There is a caulking between two adjacent plate bodies, and the caulking is connected with a grouting pipe, and one end of the grouting pipe away from the caulking extends out of the precast concrete plate.

4. The underground engineering system with a reserved interface as claimed in claim 3, characterized in that: The middle section of the caulking is provided with elastic rubber.

5. The underground engineering system with a reserved interface as claimed in claim 3, characterized in that: The opening caulked outside the precast concrete slab is sealed with a steel plate.

6. A construction method for an underground engineering system with a reserved interface as claimed in any one of claims 1 to 5, characterized in that: The steps include: S1, construct the main body of the current underground structure, and set precast concrete slabs, interface frame beams and interface frame columns on the main body at the position for docking with the future underground structure; S2, reserving steel bars around the precast concrete slab, anchoring them into the outer frame beam, and casting them simultaneously with the main body, the precast concrete slab is connected to the outer frame beam, so that the precast concrete slab is embedded in the groove formed by the interface frame beam and the outer frame beam.

Citation Information

Patent Citations

  • Underground engineering system with reserved interface

    CN214657216U