Assembly structure and construction method of subway wind shelter

By connecting the prefabricated ventilation shaft body with the cast-in-place wet structure of the ventilation duct roof, the problem of cast-in-place reinforced concrete construction is solved, enabling rapid and efficient construction of prefabricated subway ventilation shafts and improving structural quality and load-bearing capacity.

CN112177045BActive Publication Date: 2024-11-08CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202011046624.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-29
Publication Date
2024-11-08
Estimated Expiration
2040-09-29

AI Technical Summary

Technical Problem

The existing low-rise ventilation shafts in subways are constructed using cast-in-place reinforced concrete, which results in a poor construction environment, complex procedures, slow construction speed, and the generation of construction waste, affecting construction quality and schedule.

Method used

The prefabricated ventilation shaft body and the top slab of the ventilation duct are connected by a cast-in-place wet structure. The ventilation shaft body is a prefabricated structure, and the outer wall and the top slab of the ventilation duct are pre-reserved with assembly steel bars. The cast-in-place wet structure achieves a rigid connection.

Benefits of technology

It enables construction without formwork and scaffolding, improves construction speed and quality, enhances structural load-bearing capacity and durability, reduces construction waste, and promotes industrialized production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112177045B_ABST
    Figure CN112177045B_ABST
Patent Text Reader

Abstract

The present invention relates to an assembly structure of a subway wind pavilion, including a wind pavilion shaft body and an air duct roof plate of a subway auxiliary air duct, wherein the wind pavilion shaft body is a prefabricated structure, the wind pavilion shaft body is arranged above the air duct roof plate and the two are connected by a cast-in-place wet structure. In addition, it also relates to a construction method for the assembly structure of the above-mentioned subway wind pavilion. In the present invention, the wind pavilion shaft body is prefabricated, which can realize formwork-free, scaffold-free, and steel bar binding-free installation and construction, with fast construction speed and high on-site construction efficiency, which can effectively save construction period; prefabrication production can improve the quality of wind pavilion components, facilitate industrialized production, and ensure the structural quality of subway wind pavilions; the wind pavilion shaft body and the air duct roof plate are connected by a cast-in-place wet structure, which can improve the structural bearing capacity and durability of the prefabricated subway wind pavilion.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of subway engineering, and in particular relates to an assembly structure of a subway wind shelter and a construction method thereof. Background Art

[0002] At present, the low-rise wind shelter structures of subways are mostly constructed using cast-in-place reinforced concrete. The construction environment is poor, the process is complicated, the speed is slow, and the construction quality is affected by many factors and is difficult to guarantee. At the same time, a lot of abandoned construction waste is generated during the construction process, which not only wastes resources but also pollutes the environment.

[0003] Problems in the construction of cast-in-place low wind pavilions:

[0004] (1) The low wind shelter is located above the roof of the subway auxiliary wind duct and needs to be constructed after the roof structure of the wind duct is completed. During the later construction of the low wind shelter, the scaffolding for the roof of the auxiliary wind duct has been removed, and the scaffolding and formwork need to be re-erected, which is time-consuming, labor-intensive and costly.

[0005] (2) The on-site casting of low wind pavilions is time-consuming, labor-intensive, and requires a large investment. In addition, the duct top plate structure must be cast separately after completion, which prolongs the construction period. Construction units have always been reluctant to do so. Summary of the invention

[0006] The invention relates to an assembly structure of a subway wind shelter and a construction method thereof, which can at least solve some defects of the prior art.

[0007] The invention relates to an assembly structure of a subway wind pavilion, comprising a wind pavilion shaft body and a wind duct top plate of a subway auxiliary wind duct, wherein the wind pavilion shaft body is a prefabricated structure, the wind pavilion shaft body is arranged above the wind duct top plate and the two are connected by a cast-in-place wet structure.

[0008] As one of the implementation modes, the outer wall surface of the wind pavilion shaft body and / or the upper plate surface of the air duct top plate are reserved with protruding assembly steel bars, and the cast-in-place wet structure is in contact with the upper plate surface of the air duct top plate and the outer wall surface of the wind pavilion shaft body respectively and the assembly steel bars are consolidated inside.

[0009] As one of the implementation modes, the wind pavilion shaft body is formed by splicing together a plurality of prefabricated wind pavilion shaft walls.

[0010] As one of the implementation modes, a hoisting hole is reserved on the wall of each wind pavilion.

[0011] As one of the implementation modes, the wind pavilion well body is a rectangular well, and each wind pavilion well wall is an L-shaped prefabricated component; or, the wind pavilion well body is a circular well, and each wind pavilion well wall is an arc-shaped prefabricated component.

[0012] As one of the implementation methods, two adjacent wind pavilion shaft walls are spliced ​​together using a tongue-and-groove splicing structure.

[0013] As one of the implementation modes, in the tongue-and-groove splicing structure, a force transmission pad is sandwiched between the tongue-and-groove mortise and the tongue-and-groove groove.

[0014] As one of the implementation modes, a sealing groove is formed at each joint and a waterproof sealing gasket is embedded in the sealing groove.

[0015] The present invention also relates to a construction method for the assembly structure of the subway wind shelter as described above, comprising:

[0016] Hoist the prefabricated wind pavilion shaft body above the top plate of the wind duct;

[0017] A cast-in-place wet node area is established and concrete is cast in-place to achieve a rigid connection between the wind pavilion well body and the wind duct top plate.

[0018] As one of the implementation modes, when the wind pavilion well body is prefabricated in blocks, the method includes:

[0019] After each prefabricated wind pavilion shaft wall is hoisted into place, a cast-in-place wet node area is established and concrete is cast in-situ to form a hoop beam around the wind pavilion shaft body to achieve a rigid connection between the wind pavilion shaft body and the air duct top plate.

[0020] The present invention has at least the following beneficial effects:

[0021] In the present invention, the wind pavilion shaft body is prefabricated, which can realize the installation construction without formwork and scaffolding, and without steel bar binding, with fast construction speed, high on-site construction efficiency, and can effectively save construction period; prefabrication production can improve the quality of wind pavilion components, facilitate industrial production, and ensure the structural quality of subway wind pavilions. The wind pavilion shaft body and the air duct top plate are connected by a cast-in-place wet structure, which can improve the structural bearing capacity and durability of the prefabricated subway wind pavilion. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0023] Figure 1 A schematic diagram of the installation of an assembled subway wind shelter provided in an embodiment of the present invention;

[0024] Figure 2 A schematic diagram of the structure of a rectangular wind pavilion structure shaft provided by an embodiment of the present invention;

[0025] Figure 3 for Figure 2The enlarged structural diagram of part I;

[0026] Figure 4 A schematic diagram of the structure of a circular wind pavilion structure well provided in an embodiment of the present invention;

[0027] Figure 5 for Figure 4 Enlarged structural diagram of the M part. DETAILED DESCRIPTION

[0028] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] Embodiment 1

[0030] like Figure 1 An embodiment of the present invention provides an assembly structure of a subway wind pavilion, including a wind pavilion shaft body 1 and an air duct top plate 2 of a subway auxiliary air duct, wherein the wind pavilion shaft body 1 is a prefabricated structure, the wind pavilion shaft body 1 is arranged above the air duct top plate 2 and the two are connected by a cast-in-place wet structure 3.

[0031] The wind pavilion shaft body 1 is prefabricated, which can realize formwork-free, scaffold-free, and steel bar-free installation and construction, with fast construction speed, high on-site construction efficiency, and effective construction time saving; prefabrication production can improve the quality of wind pavilion components, facilitate industrialized production, and ensure the structural quality of subway wind pavilions. The wind pavilion shaft body 1 is connected to the air duct top plate 2 through a cast-in-place wet structure 3, which can improve the structural bearing capacity and durability of the prefabricated subway wind pavilion.

[0032] In one embodiment, the outer wall surface of the wind pavilion shaft body 1 and / or the upper plate surface of the air duct top plate 2 are reserved with protruding assembly steel bars 16, and the cast-in-place wet structure 3 is in contact with the upper plate surface of the air duct top plate 2 and the outer wall surface of the wind pavilion shaft body 1 respectively and the assembly steel bars 16 are fixed inside. During the construction of the above-mentioned cast-in-place wet structure 3, the wind pavilion shaft body 1 can act as a template; after the cast-in-place wet structure 3 is fixed, due to its certain height and contact with the outer wall surface of the wind pavilion shaft body 1, a hoop beam can be formed on the periphery of the wind pavilion shaft body 1, which can play a role of radial support and limit for the wind pavilion shaft body 1, further improving the structural bearing capacity and structural reliability of the subway wind pavilion. Among them, since pouring cast-in-place concrete on the duct top plate 2 is easier to operate and has better structural stability, it is preferred that at least on the outer wall surface of the wind pavilion shaft body 1, the assembly steel bar 16 is reserved, and the assembly steel bar 16 extends into the shaft cavity. When the cast-in-place concrete poured on the duct top plate 2 consolidates the assembly steel bar 16, the wind pavilion shaft body 1 and the duct top plate 2 can be better connected as a whole, and the rigid connection between the wind pavilion shaft body 1 and the duct top plate 2 is achieved. A more preferred solution is that the outer wall surface of the wind pavilion shaft body 1 and the upper plate surface of the duct top plate 2 are both reserved with assembly steel bars 16, and the assembly steel bars 16 of the two are inserted into each other to form stirrups similar to hoop beams. It is further preferred to insert steel bars into the four corners of the cross section of the stirrups to form the main beam reinforcement to ensure the structural strength of the hoop beam.

[0033] During the construction of the above-mentioned cast-in-place wet structure 3, the cast-in-place concrete can engage with the concrete surfaces of the wind pavilion shaft body 1 and the air duct top plate 2; in a further preferred scheme, a plurality of engaging grooves can be opened at the bottom of the outer wall of the wind pavilion shaft body 1 and the top surface of the air duct top plate 2, and the cast-in-place concrete of the cast-in-place wet structure 3 also enters these engaging grooves, which can improve the connection integrity between the air duct top plate 2-cast-in-place wet structure 3-wind pavilion shaft body 1.

[0034] In another embodiment, a cast-in-place through hole is reserved on the wind pavilion shaft body 1, and the cast-in-place through hole passes through the upper and lower ends of the wind pavilion shaft body 1, and consolidation steel bars are reserved on the air duct top plate 2; when the wind pavilion shaft body 1 is installed, the consolidation steel bars extend into the cast-in-place through hole of the wind pavilion shaft body 1, and then the above-mentioned cast-in-place wet structure 3 is formed by casting concrete into the cast-in-place through hole, so as to realize the integral connection between the wind pavilion shaft body 1 and the air duct top plate 2. This scheme is easy to operate, and there is no need to set up a template separately, etc.; the coordinated force bearing between the air duct top plate 2-cast-in-place wet structure 3-wind pavilion shaft body 1 is better. In particular, combined with the above-mentioned method of casting concrete on the air duct top plate 2, the cast-in-place wet structure 3 not only plays a consolidation role from the inside of the wind pavilion shaft body 1, but also consolidates from the outside of the wind pavilion shaft body 1, which can significantly improve the stability and reliability of the installation structure of the subway wind pavilion, as well as the structural bearing capacity and durability of the subway wind pavilion.

[0035] The above-mentioned wind pavilion shaft body 1 can be an integrated prefabricated structure or a block prefabricated structure. In the present embodiment, a block prefabricated structure is adopted, and the wind pavilion shaft body 1 is formed by splicing together a plurality of prefabricated wind pavilion shaft walls. For the block prefabricated wind pavilion shaft body 1, in a further preferred scheme, a cast-in-place through groove can be reserved at the bottom of the wind pavilion shaft wall 11, and the cast-in-place through groove is a U-shaped groove with the notch facing downward and passes through the two splicing ends of the wind pavilion shaft wall 11, and is connected with the above-mentioned cast-in-place through hole; after each wind pavilion shaft wall 11 is spliced ​​in place, each cast-in-place through groove is connected in turn, and then cast-in-place concrete is poured into each cast-in-place through hole, and the cast-in-place concrete fills each cast-in-place through hole and cast-in-place through groove to form the above-mentioned cast-in-place wet structure 3. This scheme not only realizes the integrated connection between the wind pavilion shaft body 1 and the air duct top plate 2, but also connects each wind pavilion shaft wall 11 into an integrated structure, so that the subway wind pavilion has better integrity, better structural bearing capacity and structural reliability.

[0036] Embodiment 2

[0037] like Figure 2-Figure 4 This embodiment provides a subway wind shelter, and its wind shelter shaft body 1 can be used as the block prefabricated wind shelter shaft body 1 described in the above embodiment 1. The subway wind shelter includes a plurality of wind shelter shaft walls 11, each of which is a prefabricated component and is sequentially spliced ​​to form the above wind shelter shaft body 1.

[0038] Generally, the subway wind shelter adopts a reinforced concrete structure, and the above-mentioned wind shelter shaft wall 11 corresponds to a reinforced concrete prefabricated component; in addition to the above-mentioned wind shelter shaft body 1, other wind shelter accessory components (the subway wind shelter can be a fresh air shelter, an exhaust wind shelter or a piston wind shelter, and the accessory components can be configured accordingly) and the corresponding installation structure are conventional technologies in the field and will not be described here. The block division, size and reinforcement 112 of the wind shelter shaft wall 11 can be determined according to the structural design calculation of the subway wind shelter; preferably, each wind shelter shaft wall 11 adopts the same specifications, that is, has the same shape and size, which is conducive to the standardization of the size of the wind shelter shaft wall 11, reduces the production cost of prefabricated components, improves the quality of prefabricated components, and is conducive to industrialized production.

[0039] In one embodiment, if Figure 2 The wind pavilion well body 1 is a rectangular well, and accordingly, each wind pavilion well wall 11 is an L-shaped prefabricated component, which can avoid splicing two adjacent wind pavilion well walls 11 at the corner, thereby ensuring the quality of the splicing and the efficiency of on-site assembly, and the structural strength of the spliced ​​wind pavilion well body 1 is also higher.

[0040] In another embodiment, Figure 4 The wind pavilion well body 1 is a circular well, and each wind pavilion well wall 11 is an arc-shaped prefabricated component; the central angles corresponding to each arc-shaped wind pavilion well wall 11 are preferably the same.

[0041] The adjacent wind pavilion shaft walls 11 are preferably connected by bolts, which are easy to operate and have high connection reliability.

[0042] For the rectangular wind pavilion well body 1, Figure 2 and Figure 3 Preferably, both ends of each wind pavilion shaft wall 11 are provided with an arc-shaped first bolt through hole, and the two first bolt through holes of two adjacent wind pavilion shaft walls 11 are connected and connected by an arc-shaped stud bolt 12; and / or, both ends of each wind pavilion shaft wall 11 are provided with a straight hole-shaped second bolt through hole, and the two second bolt through holes of two adjacent wind pavilion shaft walls 11 are connected and connected by bolts 13. The above-mentioned arc-shaped stud bolts 12 can adopt the stud bolts commonly used in shield segment connection, and their specific structure is not repeated here; the use of stud bolts 12 can improve the reliability of the splicing structure and is also easy to operate; in one of the embodiments, a groove is opened on the wind pavilion shaft wall 11 to facilitate the fixation of the end of the above-mentioned arc-shaped stud bolt 12, that is, the locking nut of the arc-shaped stud bolt 12 is accommodated in the opened groove. The bolts in the above-mentioned second bolt through holes can adopt ordinary single-headed bolts 13, or stud bolts 13; preferably, as Figure 2 and Figure 3 When both ends of each wind pavilion shaft wall 11 are provided with a second bolt through hole, both ends of the wind pavilion shaft wall 11 are provided with a mounting boss 113, and the mounting boss 113 is formed on the inner wall surface of the corresponding wind pavilion shaft wall 11 (that is, the wall surface of the wind pavilion shaft wall 11 facing the shaft cavity), and the second bolt through hole is formed on the mounting boss 113; based on the setting of the mounting boss 113, the arrangement and installation operation of the bolt 13 in the second bolt through hole can be facilitated, thereby ensuring the quality of the connection structure. In a preferred solution, as Figure 2 and Figure 3 Each wind pavilion shaft wall 11 is provided with a first bolt through hole and a second bolt through hole at both ends, which can fully ensure the reliability and safety of the splicing structure between two adjacent wind pavilion shaft walls 11; in this solution, the second bolt through hole is located on the side of the first bolt through hole close to the shaft cavity, which is convenient for the design of the above-mentioned assembly boss 113.

[0043] For the circular wind pavilion well body 1, Figure 4 and Figure 5 The two adjacent wind pavilion shaft walls 11 are preferably fixed with arc-shaped stud bolts 12, and the bolt connection structure is not described in detail here.

[0044] It can be understood that the wind pavilion shaft body 1 has a certain depth, and each joint is preferably connected by multiple bolts in sequence from top to bottom.

[0045] Further optimize the above subway wind shelter, such as Figure 3 and Figure 5The adjacent two wind pavilion shaft walls 11 are spliced ​​with a tongue-and-groove splicing structure; the tongue-and-groove splicing structure facilitates the alignment splicing between the two wind pavilion shaft walls 11, and on the other hand, can better limit the relative displacement between the two adjacent wind pavilion shaft walls 11, thereby improving the splicing quality and splicing efficiency. In the vertical direction, multiple tongue-and-groove tenons can be formed at one end of the wind pavilion shaft wall 11, and the tongue-and-groove splicing structure has better stability.

[0046] Further preferably, in the above-mentioned tongue-and-groove joint structure, a force transmission pad 14 is sandwiched between the tongue-and-groove tenon and the tongue-and-groove groove to improve the coordinated force bearing between the two adjacent wind pavilion walls 11, while avoiding damage caused by hard contact between the two wind pavilion walls 11. In one embodiment, the above-mentioned force transmission pad 14 is made of nitrile cork rubber, and the force transmission pad 14 with a thickness of about 1.5 mm is clamped and compressed by the two wind pavilion walls 11 to a thickness of about 1 mm. It not only plays the above-mentioned force transmission role, but also has good waterproofness, thereby improving the waterproof performance of the joint.

[0047] Further optimize the above subway wind shelter, such as Figure 3 and Figure 5 Each joint is formed with a sealing groove and a waterproof sealing pad 15 is embedded in the sealing groove. In one embodiment, the waterproof sealing pad 15 is made of EPDM rubber, which has good waterproof performance. The sealing groove is preferably arranged near the outer wall of the wind pavilion shaft wall 11 to block the surrounding water seepage outside the joint as much as possible.

[0048] Since the above-mentioned wind pavilion shaft wall 11 is a prefabricated component, for the convenience of installation, a hoisting hole 111 is reserved on each wind pavilion shaft wall 11. The hoisting operation of the wind pavilion shaft wall 11 can be completed by using ordinary lifting equipment, which is convenient for on-site installation, convenient construction, and fast construction speed.

[0049] Embodiment 3

[0050] The embodiment of the present invention provides a construction method for the assembly structure of the above-mentioned subway wind shelter, comprising:

[0051] Hoist the prefabricated wind pavilion shaft 1 above the wind duct top plate 2;

[0052] A cast-in-place wet node area is established and concrete is cast in-place to achieve a rigid connection between the wind pavilion well body 1 and the wind duct top plate 2.

[0053] For the solution where the above-mentioned cast-in-place wet structure 3 is located outside the wind pavilion well 1, the above-mentioned cast-in-place wet node area can be formed on the wind duct top plate 2, and the corresponding template can be set up to achieve it. For the solution where the above-mentioned cast-in-place wet structure 3 is located inside the wind pavilion well 1, the above-mentioned cast-in-place wet node area can be formed by enclosing the wind duct top plate 2 and the wind pavilion well 1.

[0054] Furthermore, when the wind pavilion shaft body 1 is prefabricated in blocks, the method includes:

[0055] After each prefabricated wind pavilion shaft wall 11 is hoisted into place, a cast-in-place wet node area is established and concrete is cast in-place to form a hoop beam around the wind pavilion shaft body 1 to achieve a rigid connection between the wind pavilion shaft body 1 and the wind duct top plate 2.

[0056] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. An assembly structure of a subway wind pavilion, comprising a wind pavilion shaft and a wind duct top plate of a subway auxiliary wind duct, characterized in that: The wind pavilion well body is a prefabricated structure, the wind pavilion well body is arranged above the wind duct top plate and the two are connected by a cast-in-place wet structure; The outer wall surface of the wind pavilion well body and / or the upper plate surface of the wind duct top plate are reserved with outwardly extending assembly steel bars, the cast-in-place wet structure is respectively in contact with the upper plate surface of the wind duct top plate and the outer wall surface of the wind pavilion well body and the assembly steel bars are consolidated therein, after the cast-in-place wet structure is consolidated, it has a certain height and is in contact with the outer wall surface of the wind pavilion well body, forming a hoop beam on the periphery of the wind pavilion well body; A cast-in-place through hole is reserved on the wind pavilion well body, and the cast-in-place through hole passes through the upper and lower ends of the wind pavilion well body. Consolidation steel bars are reserved on the top plate of the air duct; when the wind pavilion well body is installed, the consolidation steel bars extend into the cast-in-place through hole of the wind pavilion well body, and then concrete is cast into the cast-in-place through hole.

2. The assembly structure of the subway wind shelter according to claim 1, characterized in that: The wind pavilion well body is formed by splicing together a plurality of prefabricated wind pavilion well walls.

3. The assembly structure of the subway wind shelter according to claim 2, characterized in that: A hoisting hole is reserved on the wall of each wind pavilion.

4. The assembly structure of the subway wind shelter according to claim 2, characterized in that: The wind pavilion well body is a rectangular well, and each wind pavilion well wall is an L-shaped prefabricated component; or, the wind pavilion well body is a circular well, and each wind pavilion well wall is an arc-shaped prefabricated component.

5. The assembly structure of the subway wind shelter according to claim 2, characterized in that: The two adjacent wind pavilion shaft walls are joined together using a tongue-and-groove joint structure.

6. The assembly structure of the subway wind shelter according to claim 5, characterized in that: In the tongue-and-groove splicing structure, a force transmission pad is sandwiched between the tongue-and-groove convex tenon and the tongue-and-groove groove.

7. The assembly structure of a subway wind shelter according to claim 2 or 5, characterized in that: A sealing groove is formed at each joint and a waterproof sealing pad is embedded in the sealing groove.

8. The construction method of the subway wind shelter assembly structure according to any one of claims 1 to 7, characterized in that: include: Hoist the prefabricated wind pavilion shaft body above the top plate of the wind duct; A cast-in-place wet node area is established and concrete is cast in-place to achieve a rigid connection between the wind pavilion well body and the wind duct top plate.

9. The construction method according to claim 8, characterized in that: When the wind pavilion well body is prefabricated in blocks, the method includes: After each prefabricated wind pavilion shaft wall is hoisted into place, a cast-in-place wet node area is established and concrete is cast in-situ to form a hoop beam around the wind pavilion shaft body to achieve a rigid connection between the wind pavilion shaft body and the air duct top plate.

Citation Information

Patent Citations

  • Prefabricated water-collecting sump structure and construction method thereof

    CN110397148A

  • Cable tunnel ventilation pavilion

    CN207686750U

  • Three-cabin symmetrical prefabricated comprehensive pipe gallery

    CN209975578U

  • Assembly structure of subway ventilation pavilion

    CN213836738U