A cooling system for delayed coking coke drum

By designing the refrigerated coke system of the delayed coke tower, the cooling tower is used to recover the waste heat in the coke tower, the problems of large water consumption and sewage treatment load in the refrigerated coke treatment of the coke tower are solved, and the optimization of thermal energy utilization and environmental protection effect is achieved.

CN112251254BActive Publication Date: 2024-12-03WUHAN POLYTECHNIC UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011288830.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-18
Publication Date
2024-12-03
Estimated Expiration
2040-11-18

AI Technical Summary

Technical Problem

In the prior art, the coke tower requires a large amount of cooling water during the recoking treatment, resulting in an increase in water consumption, the waste heat in the coke tower is not fully utilized, and the cold coke water treatment causes excessive sewage treatment load.

Method used

A cold coking system for delayed coking coke tower is designed, including cooling tower, coke tower, cooling water tank, return pipeline, water inlet pump, water replenishment pipeline, steam outlet pipeline and oil and gas pipeline. By recovering waste heat in the coke tower and reducing cold coke Evaporation of water reduces the need for fresh water replenishment and optimizes sewage treatment.

Benefits of technology

The effective utilization of waste heat in the coke tower is achieved, the demand for fresh water replenishment and sewage treatment load is reduced, and the environmental protection effect is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112251254B_ABST
    Figure CN112251254B_ABST
Patent Text Reader

Abstract

The present invention discloses a delayed coking coke tower cooling system, which relates to the field of petrochemical technology. The delayed coking coke tower cooling system comprises: a cooling tower, a coke tower, a cooling water tank, a reflux pipeline, a water inlet pump, a water supply pipeline, a steam outlet pipeline, an oil and gas pipeline, and a feed pipeline. Compared with the prior art, the delayed coking coke tower cooling system described in the embodiment of the present invention can recover a large amount of waste heat in the old tower after the coke tower is switched, making the thermal energy utilization more reasonable. At the same time, during the cooling process, the evaporation of cold coke water caused by the vaporization of part of the cold coke water due to the high temperature in the tower is reduced, so that a large amount of fresh water is not needed for replenishment, which correspondingly reduces the load of cold coke wastewater treatment and improves the environmental protection effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of petrochemical industry, in particular to a coke cooling system of a delayed coking coke tower. Background Art

[0002] Delayed coking is a heavy oil processing unit in the petrochemical industry, which has both continuous and intermittent production characteristics. When one coke tower is in production (hereinafter referred to as the old tower), another coke tower is undergoing cold coking treatment (hereinafter referred to as the new tower). When the cold coking treatment is completed, it is switched to the new tower for operation, and the production is carried out in a cycle in sequence. Therefore, when the coke tower is undergoing cold coking, a large amount of cold coke water is required to cool the coke in the coke tower, and a large amount of fresh water is required to supplement it accordingly. At the same time, a large amount of waste heat in the old tower is not fully utilized.

[0003] In the process of implementing the present invention, the inventors found that there are at least the following problems in the prior art:

[0004] 1. A large amount of cooling water is required to cool the coke in the coke tower. Each cooling will consume some cooling water, and the consumed cooling water needs to be supplemented with fresh water, thereby increasing water consumption;

[0005] 2. Since the temperature in the coke tower is 490℃ in the early stage of the tower switching, this part of the heat needs to be cooled by steam and cold coke water, and the waste heat in the coke tower is not fully utilized;

[0006] 3. The large amount of cold coking water produced during the cold coking process is difficult to treat in the sewage treatment plant, resulting in an increase in the sewage treatment load. Summary of the invention

[0007] In order to overcome the deficiencies of related products in the prior art, the present invention proposes a coke cooling system for a delayed coking coke drum.

[0008] The present invention provides a coke cooling system for a delayed coking coke tower, comprising: a cooling tower, a coke tower, a cooling water tank, a reflux pipeline, a water inlet pump, a water supply pipeline, a steam outlet pipeline, an oil and gas pipeline and a feed pipeline; the cooling tower is arranged around the outside of the coke tower, the bottom of the cooling tower is connected to the cooling water tank through the reflux pipeline, and the top of the cooling tower is connected to the steam outlet pipeline; one side of the cooling water tank is connected to the water supply pipeline to replenish deoxygenated water, and the other side of the cooling water tank is connected to the cooling tower through the water inlet pump; the bottom of the coke tower is connected to the feed pipeline, and the top of the coke tower is connected to the oil and gas pipeline.

[0009] In certain embodiments of the present invention, a gate valve is provided on the reflux pipeline.

[0010] In certain embodiments of the present invention, a vent pipe is further provided on the top of the cooling water tank.

[0011] Compared with the prior art, the present invention has the following advantages:

[0012] Compared with the prior art, the cooling system of the delayed coking coke tower described in the embodiment of the present invention can recover a large amount of waste heat in the old tower after the coke tower is switched, making the thermal energy utilization more reasonable. At the same time, during the cooling process, the evaporation of cold coke water caused by the vaporization of part of the cold coke water due to the high temperature in the tower is reduced, so that a large amount of fresh water is not needed for replenishment, which correspondingly reduces the load of cold coke wastewater treatment and improves the environmental protection effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0014] Figure 1 The schematic diagram of the principle structure of the cooling coke system of the delayed coking coke tower of the present invention.

[0015] Description of reference numerals:

[0016] 1. Cooling tower; 2. Coke tower; 3. Cooling water tank; 4. Reflux pipe; 5. Gate valve; 6. Water inlet pump; 7. Water supply pipeline; 8. Steam outlet pipeline; 9. Oil and gas pipeline; 10-Feed pipeline; 11. Vent pipe. DETAILED DESCRIPTION

[0017] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiment of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiment of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments, and the preferred embodiments of the present invention are shown in the accompanying drawings. The present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present invention more thorough and comprehensive.

[0018] See also Figure 1As shown, the cooling system of the delayed coking coke tower 2 includes a cooling tower 1, a coke tower 2, a cooling water tank 3, a reflux pipe 4, a water inlet pump 6, a water supply pipeline 7, a steam outlet pipeline 8, an oil and gas pipeline 9 and a feed pipeline; the cooling tower 1 is arranged around the outside of the coke tower 2, the bottom of the cooling tower 1 is connected to the cooling water tank 3 through the reflux pipe 4, and the top of the cooling tower 1 is connected to the steam outlet pipeline 8; one side of the cooling water tank 3 is connected to the water supply pipeline 7 to supplement deoxygenated water, and the other side of the cooling water tank 3 is connected to the cooling tower 1 through the water inlet pump 6; the bottom of the coke tower 2 is connected to the feed pipeline 10, and the top of the coke tower 2 is connected to the oil and gas pipeline 9.

[0019] The return pipe 4 is provided with a gate valve 5 to control the return flow rate of the cooling water in the return pipe 4 .

[0020] A vent pipe line 11 is also provided on the top of the cooling water tank 3 .

[0021] In the delayed coking coke tower 2 described in the embodiment of the present invention, when the coke tower 2 is switched from the old tower to the new tower, the old tower starts to operate with a small steam supply. After the small steam supply is completed, when the old tower is operated with a large steam supply, the water inlet pump 6 is started to slowly pump water into the cooling tower 1 to slowly cool the outer wall of the coke tower 2, and the steam from the cooling tower 1 is incorporated into the saturated steam network through the steam outlet pipeline 8. When the temperature in the coke tower 2 drops to about 200°C, the coke tower 2 is changed to cold coke water for cold coke operation, and then the condensed water in the cooling tower 1 is discharged into the cooling water tank 3 through the reflux pipe 4 for storage, and is continued to be used for the next cold coke operation.

[0022] Compared with the prior art, the cooling system of the delayed coking coke tower 2 described in the embodiment of the present invention can recover a large amount of waste heat in the old tower after the coke tower 2 is switched, making the thermal energy utilization more reasonable. At the same time, during the cooling process, the evaporation of cold coke water caused by the vaporization of part of the cold coke water due to the high temperature in the tower is reduced, so that a large amount of fresh water is not needed for replenishment, which correspondingly reduces the load of cold coke wastewater treatment and improves the environmental protection effect.

[0023] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field. The above are only embodiments of the present invention, but do not limit the patent scope of the present invention. Although the present invention is described in detail with reference to the aforementioned embodiments, for those skilled in the art, they can still modify the technical solutions recorded in the aforementioned specific implementation methods, or replace some of the technical features therein with equivalents. Any equivalent structure made using the contents of the present specification and drawings, directly or indirectly used in other related technical fields, is also within the scope of patent protection of the present invention.

Claims

1. A cooling coke system for a delayed coking coke drum, characterized in that: include: A cooling tower, a coke tower, a cooling water tank, a reflux pipe, a water inlet pump, a water supply pipeline, a steam outlet pipeline, an oil and gas pipeline and a feed pipeline; the cooling tower is arranged around the outside of the coke tower, the bottom of the cooling tower is connected to the cooling water tank through the reflux pipe, and the top of the cooling tower is connected to the steam outlet pipeline; one side of the cooling water tank is connected to the water supply pipeline to replenish deoxygenated water, and the other side of the cooling water tank is connected to the cooling tower through the water inlet pump; the bottom of the coke tower is connected to the feed pipeline, and the top of the coke tower is connected to the oil and gas pipeline.

2. The cooling coke system of the delayed coking coke drum according to claim 1, characterized in that: A gate valve is arranged on the reflux pipeline.

3. The cooling coke system of the delayed coking coke drum according to claim 1, characterized in that: A venting pipeline is also provided on the top of the cooling water tank.