A hydrogen storage material multiple performance testing system and testing method
By designing multiple performance testing systems for hydrogen storage materials, the problem that the existing technology cannot measure the performance and cycle life of hydrogen storage materials under different initial hydrogen purities is solved, and a comprehensive measurement of the performance and hydrogen purity changes of hydrogen storage materials are achieved, improving the The accuracy and efficiency of the test are met to meet the needs of high-purity hydrogen.
Patent Information
- Application Number
- CN202011284527.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-17
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2040-11-17
AI Technical Summary
The existing hydrogen storage material testing system cannot measure the performance and cycle life of hydrogen storage materials under different initial hydrogen purities at the same time, and ignores the impact of changes in hydrogen purity on the performance of hydrogen storage materials, and cannot meet the requirements for use of high-purity hydrogen.
A variety of performance testing systems for hydrogen storage materials were designed, including main pipeline, high-pressure gas source subsystem, gas storage subsystem, reaction subsystem, temperature control subsystem, thermal conductivity monitoring subsystem, exhaust subsystem and data acquisition The treatment subsystem determines the performance parameters of hydrogen storage materials under different initial hydrogen purities by changing the flow rate of hydrogen gas and carbon dioxide, and determines the cycle life and hydrogen purity changes of hydrogen storage materials through cycle tests.
A comprehensive measurement of the performance of hydrogen storage materials under different initial hydrogen purities has been achieved, which improves the accuracy and efficiency of testing, can better evaluate the hydrogen storage/release capacity and cycle life of hydrogen storage materials, and meets the use needs of high-purity hydrogen. .
Smart Images

Figure CN112326501B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of hydrogen storage material performance testing, and in particular to a hydrogen storage material multiple performance testing system and testing method. Background Art
[0002] As a clean energy, hydrogen has the characteristics of large reserves, easy preparation, and no pollution. In the context of building a resource-saving and environmentally friendly society, hydrogen has great potential as a new energy source to replace traditional energy. The production, storage and transportation of hydrogen are all key issues in the use of hydrogen energy.
[0003] Existing hydrogen storage technologies can be divided into three types: gaseous hydrogen storage technology, which compresses hydrogen and stores it in a high-pressure container; liquid hydrogen storage technology, which liquefies hydrogen at low temperature and high pressure and stores it in an insulated container; and solid hydrogen storage technology, which combines hydrogen with solid hydrogen storage materials in a physical or chemical way. All three methods are widely used in different fields. The emergence of various hydrogen storage materials has also promoted the continuous improvement of hydrogen storage material testing methods.
[0004] Application number: 201210462073.3, Patent name: A new method for characterizing the PCT curve of hydrogen storage material absorption and desorption and its testing device, discloses a testing device that can characterize the PCT curve of hydrogen storage material absorption and desorption, the device is mainly used for hydrogen storage material absorption and desorption performance testing, but the device can only obtain the performance parameters of hydrogen storage materials under a single hydrogen purity, and cannot explore the impact of different initial hydrogen purities on the performance of hydrogen storage materials. Application number: 201811635247.5, Patent name: A hydrogen storage material cycle life automatic tester and testing method, discloses a hydrogen storage material cycle life automatic tester, the device is mainly used for automatic testing of the cycle life of hydrogen storage materials, and can be set by computer to automatically test the changes in the charging and desorption performance of hydrogen storage materials under different cycles, but ignores whether the hydrogen after multiple cycles will cause the hydrogen purity to decrease so that it cannot meet the needs of production and design.
[0005] The hydrogen storage and decomposition performance of hydrogen storage materials, the cycle life of hydrogen storage materials, and the change in hydrogen purity before and after the use of hydrogen storage technology are all important parameters for testing whether hydrogen storage materials can be put into use. The pressure-composition isotherm (PCT curve) is an important characteristic curve for considering the performance of hydrogen storage materials. It can obtain the adsorption amount of hydrogen storage materials and the decomposition pressure value of hydrides at a certain temperature. Hydrogen storage materials will undergo disproportionation reactions during repeated use, resulting in the condensation of a small amount of powder. This process is irreversible and greatly reduces the hydrogen storage capacity and service life of hydrogen storage materials. Therefore, the cycle life of the material is also an important parameter. The decrease in hydrogen purity makes it impossible for hydrogen to meet design requirements and production safety, and cannot meet the user's requirements for the use of high-purity hydrogen. Therefore, it is necessary to test the changes in hydrogen purity before and after hydrogen storage and decomposition to find out whether there are any reasons that affect the purity of hydrogen, so as to find improvement measures.
[0006] Therefore, it is essential to design a hydrogen storage material performance testing system that can adapt to a variety of situations and measure multiple parameters simultaneously. Summary of the invention
[0007] The purpose of the present invention is to overcome the deficiencies of the above prior art and provide a hydrogen storage material multiple performance testing system for testing the performance of hydrogen storage materials under different initial hydrogen purities, detecting the hydrogen storage / release capacity, cycle life and hydrogen purity changes before and after the reaction of hydrogen storage materials. The present invention also provides a method for testing multiple properties of hydrogen storage materials, which has simple steps and is easy to implement.
[0008] The object of the present invention is achieved through the following technical solutions: a hydrogen storage material multiple performance testing system, comprising a main pipeline, a high-pressure gas source subsystem, a gas storage subsystem, a reaction subsystem, a temperature control subsystem, a thermal conductivity monitoring subsystem, an exhaust subsystem, a data acquisition and processing subsystem, a first pressure sensor and a second pressure sensor; the high-pressure gas source subsystem comprises a pure argon gas cylinder, a pure helium gas cylinder, a high-pressure hydrogen gas cylinder, a pure carbon dioxide steel cylinder, a first filter, a first stop valve, a second stop valve, a first electric control valve and a second electric control valve; the outlet ends of the pure argon gas cylinder, the pure helium gas cylinder, the high-pressure hydrogen gas cylinder and the pure carbon dioxide steel cylinder are all equipped with a first filter, the pure argon gas cylinder is connected to the main pipeline through the first stop valve, the pure helium gas cylinder is connected to the second stop valve, the high-pressure hydrogen gas cylinder is connected to the first electric control valve and the pure carbon dioxide steel cylinder is connected to the second electric control valve, and the pure argon gas cylinder is connected to the second electric control valve and is located in front of the third electric control valve on the main pipeline;
[0009] The gas storage subsystem comprises a first gas tank, a second gas tank, a second filter, a fifth electric control valve and a sixth electric control valve; the first gas tank and the second gas tank are provided with a second filter at their open ends, wherein the open end of the first gas tank is connected to the main pipeline via the fifth electric control valve, and the open end of the second gas tank is connected to the main pipeline via the sixth electric control valve, and the connection points between the first gas tank and the second gas tank and the main pipeline are located in sequence behind the third electric control valve;
[0010] The reaction subsystem comprises a reaction chamber, a third filter, a fourth electric control valve and a third stop valve; the air inlet of the reaction chamber is connected to the main pipeline and is located between the connection between the first gas storage tank and the main pipeline and the connection between the second gas storage tank and the main pipeline; the third filter, the fourth electric control valve and the third stop valve are sequentially installed between the air inlet of the reaction chamber and the main pipeline; the first pressure sensor is installed on the main pipeline and is located between the first gas storage tank and the reaction chamber; the second pressure sensor is installed between the fourth electric control valve and the third stop valve; the temperature control subsystem is connected to the reaction chamber;
[0011] A seventh electric control valve is also provided on the main pipeline, and the seventh electric control valve is located behind the connection between the second gas storage tank and the main pipeline. The exhaust subsystem and the thermal conductivity monitoring subsystem are both connected to the main pipeline and are located behind the seventh electric control valve. The temperature control subsystem, the thermal conductivity monitoring subsystem, the exhaust subsystem, the first electric control valve, the second electric control valve, the third electric control valve, the fourth electric control valve, the fifth electric control valve, the sixth electric control valve, the seventh electric control valve, the first pressure sensor and the second pressure sensor are all connected to the data acquisition and processing subsystem.
[0012] Furthermore, the reaction chamber includes a sample chamber and a jacketed heat exchanger; the jacketed heat exchanger is coated on the outer periphery of the sample chamber, an air inlet is opened at the top of the sample chamber, a high-temperature steam inlet is opened at the top of one side of the jacketed heat exchanger, a cooling water inlet is opened at the bottom, a cooling water outlet is opened at the top of the other side, and a condensed water outlet is opened at the bottom, and the high-temperature steam inlet and the cooling water inlet are connected to the temperature control subsystem.
[0013] Furthermore, the thermal conductivity monitoring subsystem includes a heat pipe line connected to the main line, a fourth stop valve, a first heater and a thermal conductivity cell are sequentially installed on the heat pipe line, and the first heater and the thermal conductivity cell are both connected to the data acquisition and processing subsystem.
[0014] Furthermore, the exhaust subsystem includes an emptying part and a vacuum part, both of which are connected to the main line and are connected in parallel; the emptying part includes a first branch and a second branch, both of which are connected to the main line, the first branch is equipped with a first flow limiting valve, and the second branch is equipped with a fifth stop valve and a carbon dioxide cylinder in sequence; the vacuum part includes a vacuum pumping pipeline connected to the main line and an eighth electric control valve, a second flow limiting valve and a vacuum pump arranged in sequence on the vacuum pumping pipeline, and the eighth electric control valve is connected to the data acquisition and processing subsystem.
[0015] Furthermore, the temperature control subsystem includes a second heater and a cooler, and the second heater and the cooler are both connected to the reaction chamber and the data acquisition and processing subsystem.
[0016] Furthermore, the data acquisition and processing subsystem includes a computer and a hub; the first electric control valve, the second electric control valve, the third electric control valve, the fourth electric control valve, the fifth electric control valve, the sixth electric control valve, the seventh electric control valve, the thermal conductivity monitoring subsystem, the exhaust subsystem, the temperature control subsystem, the first pressure sensor, and the second pressure sensor are all connected to the computer through the hub.
[0017] Furthermore, the first gas storage tank and the second gas storage tank in the gas storage subsystem are both equipped with safety valves.
[0018] A method for testing a hydrogen storage material multiple performance testing system comprises the following steps:
[0019] S101. Vacuum the test system: put the sample in the sample chamber, place it in the jacketed heat exchanger, connect the third filter and the fourth electric control valve, connect the test system through the third stop valve, open the seventh electric control valve, the eighth electric control valve, and the second flow limiting valve, close the first stop valve, the second stop valve, the fourth stop valve, the first electric control valve, the second electric control valve, and the first flow limiting valve, and turn on the vacuum pump to evacuate for about 15 to 20 minutes.
[0020] S201. Volume calibration of the test system: close all valves, open the first stop valve, the third electric control valve, and the fifth electric control valve, introduce pure argon into the system, and use the first pressure sensor to record the pressure in the system at this time to obtain P1; open the third stop valve and the fourth electric control valve to allow the argon in the circulation system to enter the sample chamber, and record the reading of the second pressure sensor at this time to obtain P2.
[0021] The existing gas state equation PV=nZRT, where P is the pressure, V is the volume of the reaction chamber, n is the amount of argon, R is the gas molar constant, and Z is the compression factor:
[0022] By P2V s=(P1-P2)V1Z2 / Z1, the volume V of the reaction chamber can be obtained s , where V1 is the volume of the first hydrogen storage bottle. Under constant temperature conditions, the compression factors Z1 and Z2 are functions of pressure;
[0023] Repeat step S201 several times to obtain multiple V s And find the average value to reduce the error;
[0024] S202: Close all valves, open the second stop valve, the third electric control valve, and the fifth electric control valve, and introduce pure helium into the system. The pressure in the system at this time is recorded by the first pressure sensor; open the third stop valve and the fourth electric control valve to allow the helium in the circulation system to enter the sample chamber, and record the reading of the second pressure sensor at this time.
[0025] Repeat step S202 as above and obtain V from PV=nZRT t And find the average value. Under normal circumstances, V s With V t The average values are basically equal.
[0026] S301, test system leakage rate test: open the first electric control valve, the third electric control valve, the fourth electric control valve, the third stop valve, close the seventh electric control valve, introduce 8~15MPa hydrogen into the system, close the first electric control valve and the third electric control valve, run at room temperature for 10~20h, monitor the pressure changes of the sample room, the first gas tank and the second gas tank during this process, perform linear fitting on the pressure data of all measuring points, and obtain the leakage rate. Under normal circumstances, the leakage rate of a well-sealed container should be within 10 -8 mol / s or less.
[0027] S401. After completing S101~S301, the test system can perform the following parameter measurements:
[0028] Determine the purity of initial hydrogen:
[0029] Close all valves; open the high-pressure hydrogen cylinder, the pure carbon dioxide cylinder, the first to third electric control valves, and the fifth electric control valve; use a computer to control the first electric control valve and the second electric control valve to adjust the flow rates of hydrogen and carbon dioxide to change the purity of hydrogen in the hydrocarbon mixture; hydrogen and carbon dioxide enter the system through the first filter to mix, flow into the first gas storage tank and wait for a period of time to allow them to be evenly mixed; then close the third electric control valve, open the seventh electric control valve and the fourth stop valve; the hydrocarbon mixture is heated to a high temperature of 300-500°C through the first heater and enters the thermal conductivity cell; record the thermal conductivity λ1 at this time.
[0030] Determination of hydrogen storage / release performance of hydrogen storage materials:
[0031] Hydrogen absorption: close the fourth electric control valve, the third stop valve, the sixth electric control valve, and the seventh electric control valve, open the high-pressure hydrogen cylinder, the first electric control valve, and the fifth electric control valve, and the hydrogen enters the system through the first filter and flows into the first gas tank. Wait for a period of time, monitor the pressure change through the first pressure sensor, and then open the third stop valve and the fourth electric control valve. Use a cooler to keep the sample chamber temperature at a suitable low temperature T1. At this time, hydrogen flows into the reaction chamber, and the second pressure sensor records the pressure change over time during the hydrogen absorption process. The pressure continues to increase, and then a hydrogen absorption platform appears. After that, the pressure rises again, and the hydrogen absorption platform pressure is recorded.
[0032] Hydrogen release: Close the fifth electric control valve, open the sixth electric control valve, use the second heater to keep the sample chamber temperature at a suitable high temperature T2, and the hydrogen in the sample chamber flows into the second gas storage tank. When the pressure displayed by the first pressure sensor is close to that displayed by the second pressure sensor, open the fifth stop valve, the seventh electric control valve, and the first flow limiting valve to slowly discharge the hydrogen in the second gas storage tank into the air. The second pressure sensor records the data of system pressure changes over time to obtain the PCT curve.
[0033] Determination of the performance of hydrogen storage materials at different initial hydrogen purities:
[0034] Hydrogen absorption: close the fourth electric control valve, the third stop valve, the sixth electric control valve, and the seventh electric control valve, open the high-pressure hydrogen cylinder, the pure carbon dioxide cylinder, the first electric control valve, the second electric control valve, and the fifth electric control valve, and hydrogen and carbon dioxide enter the main pipeline through the first filter and mix, and flow into the first gas storage tank. After waiting for a period of time, the mixture is evenly mixed, and the pressure change is monitored by the first pressure sensor. Then open the third stop valve and the fourth electric control valve, and use the cooler to keep the temperature of the reaction chamber at a suitable low temperature T1. At this time, the hydrocarbon mixture flows into the reaction chamber, and the second pressure sensor records the change of pressure over time during the hydrogen absorption process. The pressure continues to increase, and a hydrogen absorption platform appears, and the hydrogen absorption platform pressure is recorded;
[0035] Hydrogen release: close the fifth electric control valve, open the sixth electric control valve, use the second heater to keep the temperature of the reaction chamber at a suitable high temperature T2, and the hydrocarbon mixture in the reaction chamber flows into the second gas tank. When the pressure displayed by the first pressure sensor is close to that displayed by the second pressure sensor, open the fifth stop valve, the seventh electric control valve, and the first flow limiting valve to slowly discharge the hydrocarbon mixture in the second gas tank into the air. The second pressure sensor records the change of system pressure over time to obtain the pressure-composition isotherm (PCT curve) at this hydrogen purity.
[0036] The flow rates of hydrogen and carbon dioxide were adjusted by computer so that the purity of hydrogen in the hydrocarbon mixture was 95%, 90%, 75% and 50% respectively for testing.
[0037] Determination of the cycle life of hydrogen storage materials at different initial hydrogen purities:
[0038] Step 1: Close the third stop valve, the sixth electric control valve, and the seventh electric control valve, open the high-pressure hydrogen cylinder, the pure carbon dioxide cylinder, the first electric control valve, the second electric control valve, the third electric control valve, and the fifth electric control valve, and use a computer to control the first electric control valve and the second electric control valve to adjust the flow of hydrogen and carbon dioxide to change the purity of hydrogen in the hydrocarbon mixed gas. Hydrogen and carbon dioxide enter the system through the first filter and mix, and flow into the first gas storage tank. After waiting for a period of time, they are evenly mixed. The pressure change is monitored by the first pressure sensor. After the pressure reaches a certain value, the third electric control valve is closed, and the system pressure P3 at this time is recorded. The third stop valve and the second electric control valve are opened, and the hydrocarbon mixed gas flows into the reaction chamber. The temperature of the reaction chamber is maintained at a low temperature T1 by a cooler. At this time, the sample begins to absorb hydrogen. The pressure change is monitored by the second pressure sensor, and the pressure P4 is recorded after it stabilizes.
[0039] Step 2: Close the fifth electric control valve, open the sixth electric control valve, and use the second heater to maintain the temperature of the reaction chamber at a high temperature T2. The hydrocarbon mixture in the reaction chamber flows to the second gas storage tank, and the system pressure decreases. The pressure change is monitored by the second pressure sensor, and the pressure P5 at this time is recorded. The seventh electric control valve, the fifth stop valve, and the first limiting valve are opened. After the hydrocarbon mixture is mixed with carbon dioxide, the purity of hydrogen is reduced, and the gas in the system is discharged into the air. Then, the fifth stop valve and the first limiting valve are closed, and the eighth electric control valve and the second limiting valve are opened. The system is evacuated for 15-20 minutes.
[0040] Set the number of cycles in the computer, and repeat steps 1 and 2 for multiple times. When the number of cycles is reached, the process stops automatically and the data is recorded.
[0041] Determine the change in hydrogen purity before and after the cycle:
[0042] Initial hydrogen purity test steps:
[0043] Close all valves; open the high-pressure hydrogen cylinder, the pure carbon dioxide cylinder, the first to third electric control valves, and the fifth electric control valve; use a computer to control the first electric control valve and the second electric control valve to adjust the flow rates of hydrogen and carbon dioxide to change the purity of hydrogen in the hydrocarbon mixture; hydrogen and carbon dioxide enter the system through the first filter respectively to mix, flow into the first gas storage tank, wait for a period of time to allow them to be evenly mixed, then close the third electric control valve, open the seventh electric control valve and the fourth stop valve; the hydrocarbon mixture is heated to a high temperature of 300-500°C through the first heater, enters the thermal conductivity cell, and the thermal conductivity λ1 at this time is recorded.
[0044] Steps for testing the purity of hydrogen after circulation:
[0045] Only the fourth electric control valve, the third stop valve, the seventh electric control valve and the fourth stop valve are opened, and the hydrocarbon mixture flows out of the sample chamber, is heated to a high temperature of 300-500°C by the first heater, and then enters the thermal conductivity cell, and the thermal conductivity λ2 at this time is recorded.
[0046] The present invention has the following advantages over the prior art:
[0047] 1. This test system can adapt to a variety of situations and measure the performance of multiple parameters of hydrogen storage materials at the same time. The high-pressure gas source of this test system is composed of four gases. By changing the flow rate of hydrogen and carbon dioxide to change the purity of hydrogen in the hydrocarbon mixture entering the system, the performance parameters of hydrogen storage materials under different initial hydrogen purities can be obtained. This test system combines the hydrogen absorption and desorption test subsystem with the thermal conductivity monitoring subsystem. Through program settings, it can measure a variety of properties of hydrogen storage materials. It is convenient and safe to use, and the monitoring parameters are comprehensive and sufficient. The pressure sensor, electric control valve, and temperature control subsystem of this test system are connected to the data acquisition and processing subsystem. During the cycle, the hydrogen charging and discharging temperature and valve opening and closing can be automatically controlled. It can be operated for a long time, reduce manual operation, and improve test efficiency and test accuracy.
[0048] 2. The testing process of this test system is controlled by a computer, which is easy to operate, has complete measurement parameters and high accuracy, and can better obtain the performance of hydrogen storage materials under different hydrogen charging purities. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0050] Figure 1 It shows a schematic structural diagram of a system for testing various properties of hydrogen storage materials according to the present invention;
[0051] Figure 2 A schematic diagram of the structure of the reaction chamber according to the present invention is shown;
[0052] In the figure, 1 is the main line; 101 is the third electric control valve; 102 is the seventh electric control valve; 2 is the high-pressure gas source subsystem; 201 is the pure argon gas cylinder; 202 is the pure helium gas cylinder; 203 is the high-pressure hydrogen gas cylinder; 204 is the pure carbon dioxide gas cylinder; 205 is the first filter; 206 is the first stop valve; 207 is the second stop valve; 208 is the first electric control valve; 209 is the second electric control valve; 3 is the gas storage subsystem; 301 is the first gas storage tank; 302 is the second gas storage tank; 303 is the second filter; 304 is the fifth electric control valve; 305 is the sixth electric control valve; 4 is the reaction subsystem; 401 is the reaction chamber; 402 is the third filter; 403 is the fourth electric control valve; 404 is the third stop valve; 405 is the sample chamber; 406 is the jacketed heat exchanger; 4 07 is the air inlet; 408 is the high-temperature steam inlet; 409 is the cooling water inlet; 410 is the cooling water outlet; 411 is the condensate outlet; 5 is the temperature control subsystem; 501 is the second heater; 502 is the cooler; 6 is the thermal conductivity monitoring subsystem; 601 is the heat pipe line; 602 is the fourth stop valve; 603 is the first heater; 604 is the thermal conductivity pool; 7 is the exhaust subsystem; 701 is the first branch; 702 is the first flow limiting valve; 703 is the second branch; 704 is the fifth stop valve; 705 is the carbon dioxide cylinder; 706 is the vacuum line; 707 is the eighth electric control valve; 708 is the second flow limiting valve; 709 is the vacuum pump; 8 is the first pressure sensor; 9 is the second pressure sensor; 10 is the computer; 11 is the hub; 12 is the safety valve; 13 is the sample to be tested. DETAILED DESCRIPTION
[0053] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0054] like Figure 1A hydrogen storage material multiple performance testing system shown in the figure includes a main line 1, a high-pressure gas source subsystem 2, a gas storage subsystem 3, a reaction subsystem 4, a temperature control subsystem 5, a thermal conductivity monitoring subsystem 6, an exhaust subsystem 7, a data acquisition and processing subsystem, a first pressure sensor 8 and a second pressure sensor 9; the high-pressure gas source subsystem 2 includes a pure argon gas cylinder 201, a pure helium gas cylinder 202, a high-pressure hydrogen gas cylinder 203, a pure carbon dioxide gas cylinder 204, a first filter 205, a first stop valve 206, a second stop valve 207, a first electric control valve 208 and a second electric Control valve 209; the outlet ends of the pure argon gas cylinder 201, the pure helium gas cylinder 202, the high-pressure hydrogen gas cylinder 203, and the pure carbon dioxide gas cylinder 204 are all installed with a first filter 205, the pure argon gas cylinder 201 is connected to the main line 1 through the first stop valve 206, the pure helium gas cylinder 202 is connected to the second stop valve 207, the high-pressure hydrogen gas cylinder 203 is connected to the first electric control valve 208, and the pure carbon dioxide gas cylinder 204 is connected to the second electric control valve 209, and are located in front of the third electric control valve 101 on the main line 1; the high-pressure gas source subsystem provides a stable flow rate of gas for the test system. The pure argon cylinder 201, pure helium cylinder 202, high-pressure hydrogen cylinder 203 and pure carbon dioxide cylinder 204 are all 140mm in diameter and 580mm in height, and can withstand 10~30MPa. The purity of the hydrogen, carbon dioxide, helium and argon sources is not less than 99.999%, 99.999%, 99.999% and 99.999% respectively. A filter is provided between the gas storage cylinder and the valve to ensure that no impurities are introduced into the detection system.
[0055] The gas storage subsystem 3 includes a first gas tank 301, a second gas tank 302, a second filter 303, a fifth electric control valve 304 and a sixth electric control valve 305; the first gas tank 301 and the second gas tank 302 are provided with a second filter 303 at their open ends, wherein the open end of the first gas tank 301 is connected to the main pipeline 1 through the fifth electric control valve 304, and the open end of the second gas tank 302 is connected to the main pipeline 1 through the sixth electric control valve 305, and the connection points between the first gas tank 301 and the second gas tank 302 and the main pipeline 1 are located behind the third electric control valve 101 in sequence; the gas storage subsystem 3 is used to temporarily store the hydrocarbon mixed gas entering from the high-pressure gas source subsystem 2, so that the hydrogen and carbon dioxide to be tested are evenly mixed and the pressure is stable before the mixed gas is passed into the reaction chamber 401 for absorption to ensure the accuracy of the test. The diameter of the two gas tanks is 108mm, the height is 150mm, and they can withstand 10~30MPa. The pressure change in the first gas storage tank can be monitored by the first pressure sensor. At the same time, the two gas storage tanks are respectively connected to the safety valve 12, which will automatically open and discharge the gas when the pressure is too high to prevent safety accidents caused by excessive pressure. The fifth electric control valve 304 and the sixth electric control valve 305 are connected to the hub 11, and semi-automatic operation can be achieved through computer program control. The hydrocarbon mixture entering the test system from the high-pressure gas source subsystem 2 first enters the first gas storage tank 301 for uniform mixing, and then enters the reaction subsystem 4 after stabilization.
[0056] The reaction subsystem 4 includes a reaction chamber 401, a third filter 402, a fourth electric control valve 403 and a third stop valve 404. The air inlet 407 of the reaction chamber 401 is connected to the main line 1 and is located between the connection between the first gas tank 301 and the main line 1 and the connection between the second gas tank 302 and the main line 1. The third filter 402, the fourth electric control valve 403 and the third stop valve 404 are installed in sequence between the air inlet 407 of the reaction chamber 401 and the main line 1; the first pressure sensor 8 is installed on the main line 1 and is located between the first gas tank 301 and the reaction chamber 401; the second pressure sensor 9 is installed between the fourth electric control valve 403 and the third stop valve 404; the temperature control subsystem 5 is connected to the reaction chamber 401.
[0057] A seventh electric control valve 102 is also provided on the main line 1, and the seventh electric control valve 102 is located behind the connection between the second gas storage tank 302 and the main line 1. The exhaust subsystem 7 and the thermal conductivity monitoring subsystem 6 are both connected to the main line 1 and are located behind the seventh electric control valve 102. The temperature control subsystem 5, the thermal conductivity monitoring subsystem 6, the exhaust subsystem 7, the first electric control valve 208, the second electric control valve 209, the third electric control valve 101, the fourth electric control valve 403, the fifth electric control valve 304, the sixth electric control valve 305, the seventh electric control valve 102, the first pressure sensor 8 and the second pressure sensor 9 are all connected to the data acquisition and processing subsystem.
[0058] like Figure 2 As shown, the reaction chamber 401 includes a sample chamber 405 and a jacketed heat exchanger 406; the jacketed heat exchanger 406 and the sample chamber 405 adopt an S-1L double-layer glass reactor, the top of the sample chamber 405 is provided with an air inlet 407, the top of one side of the jacketed heat exchanger 406 is provided with a high-temperature steam inlet 408, the bottom of the jacketed heat exchanger 406 is provided with a cooling water inlet 409, the top of the other side is provided with a cooling water outlet 410, and the bottom of the jacketed heat exchanger is provided with a condensed water outlet 411, and the high-temperature steam inlet 408 and the cooling water inlet 409 are connected to the temperature control subsystem. Figure 2 The hydrogen storage material (test sample 13) is placed in the sample chamber 405, and the mixed gas of hydrogen and carbon dioxide enters the reaction subsystem 4 from the air inlet 407. When the reaction subsystem 4 is cooled, cooling water flows from the cooling water inlet 409 from bottom to top to the cooling water outlet 410; when the reaction subsystem 4 is heated, high-temperature water vapor flows from the high-temperature steam inlet 408 from top to bottom to the condensed water outlet 411. The reaction subsystem 4 is connected to the temperature control subsystem 5, and the temperature is controlled to control the hydrogen storage / release operation. During the hydrogen storage material absorbing hydrogen, the cooler 502 is opened to pass cooling water so that the jacketed heat exchanger 406 is at a low temperature T1. During the hydrogen storage material releasing hydrogen, the second heater 501 is opened to pass high-temperature water vapor so that the jacketed heat exchanger 406 is at a high temperature T2. The jacketed heat exchanger 406 plays a role in heat preservation.
[0059] The thermal conductivity monitoring subsystem 6 includes a heat pipe line 601 connected to the main line 1, and a fourth stop valve 602, a first heater 603 and a thermal conductivity cell 604 are sequentially installed on the heat pipe line 601, and the first heater 603 and the thermal conductivity cell 604 are both connected to the computer 10. The gas to be tested passing through the first heater 603 will be heated to a high temperature of 300-500° C. and enter the thermal conductivity cell 604. The detection principle is: the temperature of the thermistor changes according to the concentration change of the gas to be tested, thereby causing the resistance to change, and the Wheatstone bridge loses balance to generate an electrical signal.
[0060] The exhaust subsystem 7 includes an emptying part and a vacuum part, both connected to the main line 1 and connected in parallel; the emptying part includes a first branch 701 and a second branch 703, both connected to the main line 1, a first flow limiting valve 702 is installed on the first branch 701, and a fifth stop valve 704 and a carbon dioxide cylinder 705 are installed in sequence on the second branch 703; the vacuum part includes a vacuum pumping pipeline 706 connected to the main line 1 and an eighth electric control valve 707, a second flow limiting valve 708 and a vacuum pump 709 are sequentially arranged on the vacuum pumping pipeline 706, and the eighth electric control valve 707 is connected to the computer. The exhaust subsystem 7 is connected to the main line 1 through the seventh electric control valve 102. The exhaust subsystem consists of an emptying part and a vacuum part, and the two parts are connected in parallel. The emptying part is provided with a carbon dioxide cylinder 705, and the carbon dioxide discharged from it is mixed with the hydrogen discharged from the test system, and then discharged into the air to prevent the hydrogen concentration from being too high and causing an explosion. The vacuum part is provided with a vacuum pump 709, which extracts the gas in the system before the test to eliminate interference from other impurities (such as water vapor) and ensure that the experiment is carried out with a precisely proportioned mixed gas; the eighth electric control valve 707 in the vacuum line 706 is connected to the second flow limiting valve 708, which can effectively control the gas flow during vacuuming and prevent the sample in the reaction chamber from being sucked back and causing loss.
[0061] The temperature control subsystem 5 includes a second heater 501 and a cooler 502. The second heater 501 (existing electric steam generator) and the cooler 502 (existing cooling water circulation device) are both connected to the reaction chamber 401 and the computer 10. The computer 10 controls the reaction chamber 401 to provide hot steam or cold flow required for the test.
[0062] The data acquisition and processing subsystem includes a computer 10 and a hub 11; the first to eighth electric control valves, the first pressure sensor 8, the second pressure sensor 9, the first and second heaters, the cooler 502, and the thermal conductivity cell 604 are all connected to the computer 10 through the hub 11. It is used to record parameters such as hydrogen purity, system pressure, and temperature during the storage / release of hydrogen. Specifically: the computer is connected to the thermal conductivity cell 604, the first and second pressure sensors to monitor changes in hydrogen purity and system pressure during the storage / release of hydrogen; the computer is connected to the second heater 501 and the cooler 502 to change the storage / release state of the material by changing the temperature; at the same time, the computer is connected to the first to eighth electric control valves, and the opening and closing of the valves can be controlled according to the program settings.
[0063] A method for testing a hydrogen storage material multiple performance testing system comprises the following steps:
[0064] S101. Vacuum the test system: put the sample 13 to be tested in the sample chamber, place the sample chamber in the jacketed heat exchanger, connect the third filter and the fourth electric control valve, connect the test system through the third stop valve, open the seventh electric control valve, the eighth electric control valve, and the second flow limiting valve, close the first stop valve, the second stop valve, the fourth stop valve, the first electric control valve, the second electric control valve, and the first flow limiting valve, and turn on the vacuum pump to evacuate for about 15 to 20 minutes.
[0065] S201, volume calibration of the test system: close all valves, open the first stop valve, the third electric control valve, and the fifth electric control valve, and introduce pure argon into the system. The first pressure sensor records the pressure in the system at this time to obtain P1; open the third stop valve and the fourth electric control valve to allow the argon in the circulation system to enter the sample chamber, and record the reading of the second pressure sensor at this time to obtain P2. Pure helium and pure argon are used during volume calibration to prevent the material in the reaction chamber from inhaling hydrogen in advance and affecting subsequent tests.
[0066] The existing gas state equation PV=nZRT, where P is the pressure, V is the volume of the reaction chamber, n is the amount of argon, R is the gas molar constant, and Z is the compression factor:
[0067] By P2V s =(P1-P2)V1Z2 / Z1, the volume V of the reaction chamber can be obtained s , where V1 is the volume of the first hydrogen storage bottle. Under constant temperature conditions, the compression factors Z1 and Z2 are functions of pressure;
[0068] Repeat step S201 several times to obtain multiple V s And find the average value to reduce the error;
[0069] S202: Close all valves, open the second stop valve, the third electric control valve, and the fifth electric control valve, and introduce pure helium into the system. The pressure in the system at this time is recorded by the first pressure sensor; open the third stop valve and the fourth electric control valve to allow the helium in the circulation system to enter the sample chamber, and record the reading of the second pressure sensor at this time.
[0070] Repeat step S202 as above and obtain V from PV=nZRT t And find the average value. Under normal circumstances, V s With V t The average values are basically equal.
[0071] S301, test system leakage rate test: open the first electric control valve, the third electric control valve, the fourth electric control valve, the third stop valve, close the seventh electric control valve, introduce 8~15MPa hydrogen into the system, close the first electric control valve and the third electric control valve, run at room temperature for 10~20h, monitor the pressure changes of the sample room, the first gas tank and the second gas tank during this process, perform linear fitting on the pressure data of all measuring points, and obtain the leakage rate. Under normal circumstances, the leakage rate of a well-sealed container should be within 10 -8 mol / s or less.
[0072] S401. After completing S101~S301, the test system can perform the following parameter measurements:
[0073] Determine the purity of initial hydrogen:
[0074] Close all valves; open the high-pressure hydrogen cylinder, the pure carbon dioxide cylinder, the first to third electric control valves, and the fifth electric control valve; use a computer to control the first electric control valve and the second electric control valve to adjust the flow rates of hydrogen and carbon dioxide to change the purity of hydrogen in the hydrocarbon mixture; hydrogen and carbon dioxide enter the system through the first filter to mix, flow into the first gas storage tank and wait for a period of time to allow them to be evenly mixed; then close the third electric control valve, open the seventh electric control valve and the fourth stop valve; the hydrocarbon mixture is heated to a high temperature of 300-500°C through the first heater and enters the thermal conductivity cell; record the thermal conductivity λ1 at this time.
[0075] Determination of hydrogen storage / release performance of hydrogen storage materials:
[0076] Hydrogen absorption: close the fourth electric control valve, the third stop valve, the sixth electric control valve, and the seventh electric control valve, open the high-pressure hydrogen cylinder, the first electric control valve, and the fifth electric control valve, and the hydrogen enters the system through the first filter and flows into the first gas tank. Wait for a period of time, monitor the pressure change through the first pressure sensor, and then open the third stop valve and the fourth electric control valve. Use a cooler to keep the sample chamber temperature at a suitable low temperature T1. At this time, hydrogen flows into the reaction chamber, and the second pressure sensor records the pressure change over time during the hydrogen absorption process. The pressure continues to increase, and then a hydrogen absorption platform appears. After that, the pressure rises again, and the hydrogen absorption platform pressure is recorded.
[0077] Hydrogen release: Close the fifth electric control valve, open the sixth electric control valve, use the second heater to keep the sample chamber temperature at a suitable high temperature T2, and the hydrogen in the sample chamber flows into the second gas storage tank. When the pressure displayed by the first pressure sensor is close to that displayed by the second pressure sensor, open the fifth stop valve, the seventh electric control valve, and the first flow limiting valve to slowly discharge the hydrogen in the second gas storage tank into the air. The second pressure sensor records the data of system pressure changes over time to obtain the PCT curve.
[0078] Performance test of hydrogen storage materials at different initial hydrogen purities:
[0079] Hydrogen absorption: close the fourth electric control valve, the third stop valve, the sixth electric control valve, and the seventh electric control valve, open the high-pressure hydrogen cylinder, the pure carbon dioxide cylinder, the first electric control valve, the second electric control valve, and the fifth electric control valve, and hydrogen and carbon dioxide enter the main pipeline through the first filter and mix, and flow into the first gas storage tank. After waiting for a period of time, the mixture is evenly mixed, and the pressure change is monitored by the first pressure sensor. Then open the third stop valve and the fourth electric control valve, and use the cooler to keep the temperature of the reaction chamber at a suitable low temperature T1. At this time, the hydrocarbon mixture flows into the reaction chamber, and the second pressure sensor records the change of pressure over time during the hydrogen absorption process. The pressure continues to increase, and a hydrogen absorption platform appears, and the hydrogen absorption platform pressure is recorded;
[0080] Hydrogen release: close the fifth electric control valve, open the sixth electric control valve, use the second heater to keep the temperature of the reaction chamber at a suitable high temperature T2, and the hydrocarbon mixture in the reaction chamber flows into the second gas tank. When the pressure displayed by the first pressure sensor is close to that displayed by the second pressure sensor, open the fifth stop valve, the seventh electric control valve, and the first flow limiting valve to slowly discharge the hydrocarbon mixture in the second gas tank into the air. The second pressure sensor records the change of system pressure over time to obtain the PCT curve under the hydrogen purity.
[0081] The flow rates of hydrogen and carbon dioxide were adjusted by computer so that the purity of hydrogen in the hydrocarbon mixture was 95%, 90%, 75% and 50% respectively for testing.
[0082] Tests to determine the cycle life of hydrogen storage materials at different initial hydrogen purities:
[0083] Step 1: Close the third stop valve, the sixth electric control valve, and the seventh electric control valve, open the high-pressure hydrogen cylinder, the pure carbon dioxide cylinder, the first electric control valve, the second electric control valve, the third electric control valve, and the fifth electric control valve, and use a computer to control the first electric control valve and the second electric control valve to adjust the flow of hydrogen and carbon dioxide to change the purity of hydrogen in the hydrocarbon mixed gas. Hydrogen and carbon dioxide enter the system through the first filter and mix, and flow into the first gas storage tank. After waiting for a period of time, they are evenly mixed. The pressure change is monitored by the first pressure sensor. After the pressure reaches a certain value, the third electric control valve is closed, and the system pressure P3 at this time is recorded. The third stop valve and the second electric control valve are opened, and the hydrocarbon mixed gas flows into the reaction chamber. The temperature of the reaction chamber is maintained at a low temperature T1 by a cooler. At this time, the sample begins to absorb hydrogen. The pressure change is monitored by the second pressure sensor, and the pressure P4 is recorded after it stabilizes.
[0084] Step 2: Close the fifth electric control valve, open the sixth electric control valve, and use the second heater to maintain the temperature of the reaction chamber at a high temperature T2. The hydrocarbon mixture in the reaction chamber flows to the second gas storage tank, and the system pressure decreases. The pressure change is monitored by the second pressure sensor, and the pressure P5 at this time is recorded. The seventh electric control valve, the fifth stop valve, and the first limiting valve are opened. After the hydrocarbon mixture is mixed with carbon dioxide, the purity of hydrogen is reduced, and the gas in the system is discharged into the air. Then, the fifth stop valve and the first limiting valve are closed, and the eighth electric control valve and the second limiting valve are opened. The system is evacuated for 15-20 minutes.
[0085] Set the number of cycles in the computer, and repeat steps 1 and 2 for multiple times. When the number of cycles is reached, the process stops automatically and the data is recorded.
[0086] Determine the change in hydrogen purity before and after the cycle:
[0087] Initial hydrogen purity test steps:
[0088] Close all valves; open the high-pressure hydrogen cylinder, the pure carbon dioxide cylinder, the first to third electric control valves, and the fifth electric control valve; use a computer to control the first electric control valve and the second electric control valve to adjust the flow rates of hydrogen and carbon dioxide to change the purity of hydrogen in the hydrocarbon mixture; hydrogen and carbon dioxide enter the system through the first filter respectively to mix, flow into the first gas storage tank, wait for a period of time to allow them to be evenly mixed, then close the third electric control valve, open the seventh electric control valve and the fourth stop valve; the hydrocarbon mixture is heated to a high temperature of 300-500°C through the first heater, enters the thermal conductivity cell, and the thermal conductivity λ1 at this time is recorded.
[0089] Steps for testing the purity of hydrogen after circulation:
[0090] Only the fourth electric control valve, the third stop valve, the seventh electric control valve and the fourth stop valve are opened, and the hydrocarbon mixture flows out of the sample chamber, is heated to a high temperature of 300-500°C by the first heater, and then enters the thermal conductivity cell, and the thermal conductivity λ2 at this time is recorded.
[0091] For specific use, please refer to the following operations:
[0092] Preparation before system testing:
[0093] The pure argon gas bottle and the first filter are connected to the first stop valve, the pure helium gas bottle and the first filter are connected to the second stop valve, the high-pressure hydrogen gas bottle and the first filter are connected to the first electric control valve, the pure carbon dioxide steel cylinder and the first filter are connected to the second electric control valve, and the main pipeline is connected through the third electric control valve, as a high-pressure gas source that provides a stable flow rate of gas to the system. The first gas storage tank and the second gas storage tank are connected to the main pipeline through the fifth electric control valve and the sixth electric control valve, respectively, to temporarily store gas to ensure the accuracy of the test. The sample chamber is placed in a jacketed heat exchanger, connected to the main pipeline through the fourth electric control valve and the third stop valve, and the jacketed heat exchanger is connected to the second heater and the cooler at the same time. The water vapor and cooling water provided by the second heater and the cooler respectively control the hydrogen storage / release operation by controlling the temperature of the reaction subsystem. The exhaust subsystem is connected to the main pipeline through the seventh electric control valve, the exhaust pipeline is connected to the carbon dioxide steel cylinder, and is connected to the outside world through the first limiting valve (for easy discharge into the air), and the vacuum pipeline is connected to the vacuum pump through the eighth electric control valve and the second limiting valve. The computer is connected to the heat conduction cell, the cooler, the first heater, the second heater, the first pressure sensor, and the second pressure sensor through a connection hub to record parameters such as hydrogen purity, system pressure, and temperature during the hydrogen storage / release process.
[0094] Curve test:
[0095] Put the sample to be tested in the sample chamber, put it in the jacketed heat exchanger, connect the third filter and the fourth electric control valve, connect the test system through the third stop valve, connect the jacketed heat exchanger to the cooler, the cooling temperature is 20°C, close all valves first, then open the high-pressure hydrogen cylinder, the pure carbon dioxide cylinder, the first to third electric control valves, and the fifth electric control valve, and control the flow of hydrogen and carbon dioxide to make the purity of hydrogen in the hydrocarbon mixed gas reach 95%, and then the hydrocarbon mixed gas flows to the first gas storage tank. When the set pressure is reached, close the third electric control valve and open the third stop valve and the fourth electric control valve. At this time, the hydrocarbon mixed gas flows into the sample chamber, and the pressure change of the reaction chamber is monitored by the second pressure sensor. The PCT curve is made by the computer to record the pressure of the hydrogen absorption and desorption platform; when the sample is saturated with hydrogen absorption, close the cooler, open the second heater, set the heating temperature to 100°C, close the fifth electric control valve, open the sixth electric control valve, let the hydrocarbon mixed gas in the sample chamber flow to the second gas storage tank, monitor the pressure change through the second pressure sensor, and the volume of the released hydrogen can be obtained from the gas state equation.
[0096] Cycle life test:
[0097] Step 1: Place the sample to be tested in the sample chamber, place it in the jacketed heat exchanger, connect the third filter and the fourth electric control valve, connect the test system through the third stop valve, and the temperatures of the cooler and the second heater are 20℃ and 100℃ respectively.
[0098] Step 2: After the system is evacuated to a vacuum, close all valves, then open the high-pressure hydrogen cylinder and the first to third electric control valves, and control the flow of hydrogen and carbon dioxide to make the purity of hydrogen in the hydrocarbon mixture reach 95%. Then the hydrocarbon mixture flows into the first gas storage tank. After the two gases are evenly mixed and the pressure reading of the first pressure sensor is stable, turn on the cooler, set the cooling temperature to 20°C, open the third stop valve and the fourth electric control valve, let the hydrocarbon mixture flow into the sample chamber, the sample absorbs hydrogen, and the pressure change in the sample chamber is monitored by the second pressure sensor.
[0099] Step 3: When the pressure in the sample chamber reaches the hydrogen absorption and desorption platform pressure, turn on the second heater, set the heating temperature to 100°C, close the fifth electric control valve, open the sixth electric control valve, and let the hydrocarbon mixture gas in the sample chamber flow to the second gas storage tank. After the pressure of the first and second pressure sensors stabilize, open the seventh electric control valve, the fifth stop valve, and the first flow limiting valve. The hydrocarbon mixture gas combines with the carbon dioxide discharged from the carbon dioxide cylinder, and the purity of the hydrogen is reduced, and then discharged into the air. When the system pressure drops to about 0.2MPa, close the fifth stop valve and the first flow limiting valve, open the eighth electric control valve and the second flow limiting valve, and turn on the vacuum pump to evacuate the system for 20 minutes.
[0100] Through the data acquisition and processing subsystem, the number of cycles is set, and steps 2 to 3 are cycled 200, 500, and 1000 times in sequence to monitor the changes in hydrogen storage capacity during the cycle.
[0101] Through the data acquisition and processing subsystem, the hydrogen purity was set to 90%, 75%, and 50%, respectively, and the changes in hydrogen storage capacity during the cycle under different initial hydrogen purities were measured to explore the impact of different hydrogen purities on the cycle life of hydrogen storage materials.
[0102] Hydrogen purity test before and after circulation
[0103] The sample to be tested is placed in the sample chamber, placed in the jacketed heat exchanger, the third filter and the fourth electric control valve are connected, and the test system is connected through the third stop valve. The temperatures of the cooler and the second heater are 20°C and 100°C respectively. After the system is evacuated to vacuum, all valves are closed, and then the high-pressure hydrogen cylinder, the first electric control valve, the third electric control valve, the seventh electric control valve, and the fourth stop valve are opened. The hydrogen is heated to 400°C through the second heater and enters the thermal conductivity cell. The thermal conductivity λ1 at this time is recorded. After the sample to be tested has been circulated for 200, 500, and 1000 times, the third electric control valve, the fifth electric control valve, and the sixth electric control valve are closed, and the fourth electric control valve, the seventh electric control valve, the third stop valve, and the fourth stop valve are opened. The hydrogen flows out of the sample chamber, is heated to 400°C through the first heater, and then enters the thermal conductivity cell. The thermal conductivity λ2 at this time is recorded, and the changes of λ1 and λ2 are compared.
[0104] Socio-economic benefit analysis
[0105] The present invention adopts the volumetric method as the basis, and can perform multiple performance tests on the same sample, and can continuously measure the hydrogen storage / release performance, cycle life, and hydrogen purity changes before and after hydrogen storage of the hydrogen storage material under different initial hydrogen purities. The decomposition pressure of the sample at any temperature can be obtained through the PCT curve. The PCT curve is an important indicator of the performance of hydrogen storage materials and is also a theoretical basis for exploring new hydrogen storage materials. Conventionally, the scanning electron microscope analysis method is used to obtain the hydrogen storage / release performance by knowing the surface structure morphology and surface composition of the sample before and after hydrogen storage / release. This method is expensive and cannot obtain multiple parameters; the weight method obtains the hydrogen storage performance by measuring the mass change before and after hydrogen storage / release or making a weight loss curve, but the sample is easily contaminated during transfer. This method has limited application only in alloy hydrogen storage.
[0106] The first and second pressure sensors, the first heater, the second heater and the cooler, and the first to eighth electric control valves are connected through a computer, and then parameters are set in the computer program, including the heating temperature of the reaction chamber, the cooling temperature, the heating temperature of the heat conduction subsystem, the number of cycles, and the corresponding valve opening and closing. The computer program can automatically perform cycle life detection under different hydrogen purities, greatly saving the trouble of manual operation.
[0107] The above specific implementation modes are preferred embodiments of the present invention and cannot be used to limit the present invention. Any other changes or other equivalent replacement methods that do not deviate from the technical solution of the present invention are included in the protection scope of the present invention.
Claims
1. A hydrogen storage material multiple performance testing system, characterized by: It includes a main pipeline, a high-pressure gas source subsystem, a gas storage subsystem, a reaction subsystem, a temperature control subsystem, a thermal conductivity monitoring subsystem, an exhaust subsystem, a data acquisition and processing subsystem, a first pressure sensor and a second pressure sensor; the high-pressure gas source subsystem includes a pure argon gas cylinder, a pure helium gas cylinder, a high-pressure hydrogen gas cylinder, a pure carbon dioxide gas cylinder, a first filter, a first stop valve, a second stop valve, a first electric control valve and a second electric control valve; the outlet ends of the pure argon gas cylinder, the pure helium gas cylinder, the high-pressure hydrogen gas cylinder and the pure carbon dioxide gas cylinder are all equipped with a first filter, the pure argon gas cylinder is connected to the main pipeline through the first stop valve, the pure helium gas cylinder is connected to the second stop valve, the high-pressure hydrogen gas cylinder is connected to the first electric control valve and the pure carbon dioxide gas cylinder is connected to the second electric control valve, and the filter is located in front of the third electric control valve on the main pipeline; The gas storage subsystem comprises a first gas tank, a second gas tank, a second filter, a fifth electric control valve and a sixth electric control valve; the first gas tank and the second gas tank are provided with a second filter at their open ends, wherein the open end of the first gas tank is connected to the main pipeline via the fifth electric control valve, and the open end of the second gas tank is connected to the main pipeline via the sixth electric control valve, and the connection points between the first gas tank and the second gas tank and the main pipeline are located in sequence behind the third electric control valve; The reaction subsystem comprises a reaction chamber, a third filter, a fourth electric control valve and a third stop valve; the air inlet of the reaction chamber is connected to the main pipeline and is located between the connection between the first gas storage tank and the main pipeline and the connection between the second gas storage tank and the main pipeline; the third filter, the fourth electric control valve and the third stop valve are sequentially installed between the air inlet of the reaction chamber and the main pipeline; the first pressure sensor is installed on the main pipeline and is located between the first gas storage tank and the reaction chamber; the second pressure sensor is installed between the fourth electric control valve and the third stop valve; the temperature control subsystem is connected to the reaction chamber; A seventh electric control valve is also provided on the main pipeline, and the seventh electric control valve is located behind the connection between the second gas storage tank and the main pipeline. The exhaust subsystem and the thermal conductivity monitoring subsystem are both connected to the main pipeline and are located behind the seventh electric control valve. The temperature control subsystem, the thermal conductivity monitoring subsystem, the exhaust subsystem, the first electric control valve, the second electric control valve, the third electric control valve, the fourth electric control valve, the fifth electric control valve, the sixth electric control valve, the seventh electric control valve, the first pressure sensor and the second pressure sensor are all connected to the data acquisition and processing subsystem. The reaction chamber comprises a sample chamber and a jacketed heat exchanger; the jacketed heat exchanger is coated on the periphery of the sample chamber, an air inlet is provided at the top of the sample chamber, a high-temperature steam inlet is provided at the top of one side of the jacketed heat exchanger, a cooling water inlet is provided at the bottom, a cooling water outlet is provided at the top of the other side, and a condensed water outlet is provided at the bottom, and the high-temperature steam inlet and the cooling water inlet are connected to the temperature control subsystem; The exhaust subsystem includes an emptying part and a vacuum part, both of which are connected to the main line and in parallel; the emptying part includes a first branch and a second branch, both of which are connected to the main line, the first branch is equipped with a first flow limiting valve, and the second branch is equipped with a fifth stop valve and a carbon dioxide cylinder in sequence; the vacuum part includes a vacuum pumping pipeline connected to the main line and an eighth electric control valve, a second flow limiting valve and a vacuum pump arranged in sequence on the vacuum pumping pipeline, and the eighth electric control valve is connected to the data acquisition and processing subsystem.
2. The hydrogen storage material multiple performance testing system according to claim 1, characterized in that: The thermal conductivity monitoring subsystem includes a heat pipe line connected to the main line, a fourth stop valve, a first heater and a thermal conductivity cell are sequentially installed on the heat pipe line, and the first heater and the thermal conductivity cell are both connected to the data acquisition and processing subsystem.
3. The hydrogen storage material multiple performance testing system according to claim 2, characterized in that: The temperature control subsystem includes a second heater and a cooler, and the second heater and the cooler are both connected to the reaction chamber and the data acquisition and processing subsystem.
4. The hydrogen storage material multiple performance testing system according to claim 3, characterized in that: The data acquisition and processing subsystem includes a computer and a hub; the first electric control valve, the second electric control valve, the third electric control valve, the fourth electric control valve, the fifth electric control valve, the sixth electric control valve, the seventh electric control valve, the thermal conductivity monitoring subsystem, the exhaust subsystem, the temperature control subsystem, the first pressure sensor, and the second pressure sensor are all connected to the computer through the hub.
5. A testing method based on the hydrogen storage material multiple performance testing system according to claim 4, characterized in that: The steps include: S101, vacuum the test system; S201, volume calibration of the test system; S301, test system leakage rate test; S401. After completing S101~S301, the test system can perform the following parameter measurements: Determine the purity of initial hydrogen; Determine the hydrogen storage / release performance of hydrogen storage materials; Determine the performance of hydrogen storage materials at different initial hydrogen purities; Determine the cycle life of hydrogen storage materials at different initial hydrogen purities; Determine the change in hydrogen purity before and after the cycle.
6. The method for testing various properties of hydrogen storage materials according to claim 5, characterized in that: The performance test steps of the hydrogen storage material under different initial hydrogen purities are as follows: Hydrogen absorption: close the fourth electric control valve, the third stop valve, the sixth electric control valve, and the seventh electric control valve, open the high-pressure hydrogen cylinder, the pure carbon dioxide cylinder, the first electric control valve, the second electric control valve, and the fifth electric control valve, and hydrogen and carbon dioxide enter the main pipeline through the first filter and mix, and flow into the first gas storage tank. After waiting for a period of time, the mixture is evenly mixed, and the pressure change is monitored by the first pressure sensor, and then the third stop valve and the fourth electric control valve are opened. The temperature of the sample chamber is maintained at a suitable low temperature T1 by a cooler. At this time, the hydrocarbon mixed gas formed by hydrogen and carbon dioxide flows into the sample chamber, and the second pressure sensor records the change of pressure over time during the hydrogen absorption process. The pressure continues to increase, and a hydrogen absorption platform appears, and the hydrogen absorption platform pressure is recorded; Hydrogen discharge: close the fifth electric control valve, open the sixth electric control valve, use the second heater to keep the sample chamber temperature at a suitable high temperature T2, and the hydrocarbon mixture in the sample chamber flows into the second gas storage tank. When the pressure displayed by the first pressure sensor is close to that displayed by the second pressure sensor, open the fifth stop valve, the seventh electric control valve, and the first flow limiting valve to slowly discharge the hydrocarbon mixture in the second gas storage tank into the air. The second pressure sensor records the change of system pressure over time to obtain the pressure-component isotherm under the hydrogen purity; The flow rates of hydrogen and carbon dioxide were adjusted by computer so that the purity of hydrogen in the hydrocarbon mixture was 95%, 90%, 75% and 50% respectively for testing.
7. The method for testing various properties of hydrogen storage materials according to claim 5, characterized in that: The test steps of the cycle life of the hydrogen storage material under different initial hydrogen purities are as follows: Step 1: close the third stop valve, the sixth electric control valve, and the seventh electric control valve, open the high-pressure hydrogen cylinder, the pure carbon dioxide cylinder, the first electric control valve, the second electric control valve, the third electric control valve, and the fifth electric control valve, and use a computer to control the first electric control valve and the second electric control valve to adjust the flow of hydrogen and carbon dioxide to change the purity of hydrogen in the hydrocarbon mixed gas. Hydrogen and carbon dioxide enter the system through the first filter and mix, and flow into the first gas storage tank. After waiting for a period of time, they are mixed evenly. The pressure change is monitored by the first pressure sensor. After the pressure reaches a certain value, the third electric control valve is closed, and the system pressure P3 at this time is recorded. The third stop valve and the second electric control valve are opened, and the hydrocarbon mixed gas flows into the sample chamber. The temperature of the sample chamber is maintained at a low temperature T1 by a cooler. At this time, the sample begins to absorb hydrogen. The pressure change is monitored by the second pressure sensor, and the pressure P4 is recorded after it stabilizes; Step 2: close the fifth electric control valve, open the sixth electric control valve, use the second heater to keep the sample chamber temperature at high temperature T2, then the hydrocarbon mixture in the sample chamber flows to the second gas storage tank, the system pressure decreases, the pressure change is monitored by the second pressure sensor, the pressure P5 at this time is recorded, the seventh electric control valve, the fifth stop valve, and the first flow limiting valve are opened, the hydrocarbon mixture is mixed with carbon dioxide to reduce the purity of hydrogen, the gas in the system is discharged into the air, then the fifth stop valve and the first flow limiting valve are closed, the eighth electric control valve and the second flow limiting valve are opened, and the system is evacuated for 15-20 minutes; Set the number of cycles in the computer, and repeat steps 1 and 2 for multiple cycles. When the number of cycles is reached, the process stops automatically and the data is recorded.
8. The method for testing various properties of hydrogen storage materials according to claim 5, characterized in that: The test steps for determining the purity change of hydrogen before and after the cycle are as follows: Initial hydrogen purity test steps: Close all valves; open the high-pressure hydrogen cylinder, the pure carbon dioxide cylinder, the first to third electric control valves, and the fifth electric control valve, and use a computer to control the first electric control valve and the second electric control valve to adjust the flow of hydrogen and carbon dioxide to change the purity of hydrogen in the hydrocarbon mixed gas. Hydrogen and carbon dioxide enter the system through the first filter and mix, and flow into the first gas storage tank. After waiting for a period of time, they are evenly mixed, and then the third electric control valve is closed, and the seventh electric control valve and the fourth stop valve are opened. The hydrocarbon mixed gas is heated to a high temperature of 300~500℃ through the first heater and enters the thermal conductivity cell, and the thermal conductivity λ1 at this time is recorded; Steps for testing the purity of hydrogen after circulation: Only the fourth electric control valve, the third stop valve, the seventh electric control valve and the fourth stop valve are opened, and the hydrocarbon mixture flows out of the sample chamber, is heated to a high temperature of 300-500°C by the first heater, and then enters the thermal conductivity cell, and the thermal conductivity λ2 at this time is recorded.
Citation Information
Patent Citations
New method and testing device for characterizing PCT curve of hydrogen absorption and desorption of hydrogen storage material
CN102928315A
Hydrogen storage alloy performance test device
CN101419149A
High-precision PCT test instrument and method for testing PCT of hydrogen storage alloy material
CN104155425A
Automatic hydrogen storage material cycle life tester and testing method
CN109781579A
Large-scale low-energy-consumption step hydrogen storage system and method