An integrated ground processing device and method for shale oil testing and flowback stage

By designing the ground treatment integrated device for the shale oil trial and discharge stage, the well site dehydration and associated gas recovery are achieved, and the problems of inability to recover associated gas in shale oil well site and large heating energy consumption in downstream stations are solved, and the oil production efficiency and System efficiency.

CN112343550BActive Publication Date: 2024-11-12CHANGQING ENGINEERING DESIGN CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011283469.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-17
Publication Date
2024-11-12
Estimated Expiration
2040-11-17

AI Technical Summary

Technical Problem

The associated gas in the shale oil well site cannot be recovered, and the heating energy consumption of downstream stations is too large, resulting in a reduced oil production efficiency and an increase in system load.

Method used

Design a ground treatment integrated device for the shale oil trial and discharge stage, including well site incoming liquid pipes, well site incoming liquid reflux treatment integrated device, buffer and boosting integrated device, water storage device and dirty oil recovery The integrated integrated device realizes crude oil dehydration and associated gas recovery through valve and pipeline connection, reduces moisture content and stores the produced water back to a nearby fracturing well site.

Benefits of technology

The well site is dehydrated, and the crude oil moisture content is reduced to below 35%, and then collected or transported to the ground system. The produced water is stored on site and recycled, effectively achieving associated gas recovery, reducing heating energy consumption at the downstream station, and the equipment occupying land Small area, short construction period, and easy operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112343550B_ABST
    Figure CN112343550B_ABST
Patent Text Reader

Abstract

The present invention provides an integrated ground processing device and method for the shale oil test return stage, the device includes a well site liquid manifold, a well site return liquid processing integrated integrated device, a buffer boost integrated integrated device, a buffer boost integrated integrated device output pipeline, a venting manifold, a well site casing gas manifold, an associated gas output manifold, a water storage tank and a waste oil recovery integrated integrated device. The present invention can complete dehydration at the well site, reduce the water content of crude oil to below 35%, and then collect or transport it to the ground system. The produced water is stored on-site in the large well group and reused in the nearby fracturing well site. The device adopts a skid-mounted design, occupies a small area, has a short construction period, and is easy to operate. In the later stage, the device can be moved to other newly developed blocks for recycling according to actual needs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of crude oil processing in shale oil fields, and in particular relates to an integrated ground processing device and method for shale oil in the oil testing and flowback stage. Background Art

[0002] The shale oil in Changqing Oilfield is developed by horizontal well fracturing. At present, the produced materials in the initial blowdown stage of the oil wells have high water content and high liquid volume (the maximum single well is about 100m 3 / d), the initial stage is long (up to 239 days), the produced water content is high (50%~100%), and the composition is complex (including fracturing fluid and various agents, etc.). The ground system is difficult to operate, and a large amount of produced water cannot be recycled and directly transported to downstream stations, which will increase the load of downstream stations and reduce the efficiency of the gathering and transportation system. Summary of the invention

[0003] In order to overcome the problems that the associated gas in the existing shale oil well site cannot be recovered and the heating energy consumption of the downstream station is too high, the present invention provides a ground processing integrated device and method in the shale oil test return stage. The present invention is suitable for the production of shale oil horizontal wells with high pressure, large liquid volume fluctuation and high water content in the early stage. Dehydration is completed at the well site, and the water content of the crude oil is reduced to below 35%, and then it is gathered or transported to the ground system. The produced water is stored on-site in the large well group and reused in the nearby fracturing well site.

[0004] The technical solution adopted by the present invention is:

[0005] A ground processing integrated device for shale oil test flowback stage, comprising a well site liquid manifold, a well site flowback liquid processing integrated integrated device, a buffer boost integrated integrated device, an output pipeline of the buffer boost integrated integrated device, a venting manifold, a well site casing gas manifold, an associated gas output manifold, a water storage device and a waste oil recovery integrated integrated device;

[0006] The well site inlet fluid manifold is connected to the well site return fluid processing integrated device through a pipeline, a filter and a first pressure reducing valve are sequentially arranged on the pipeline, a first valve and a second valve are respectively arranged at both ends of the filter, and the first valve, the filter and the second valve are connected in series and then connected in parallel with a third valve;

[0007] The outlet at the side end of the well site flowback fluid processing integrated device is connected to the buffer boost integrated device through a second pressure reducing valve, and the side outlet of the buffer boost integrated device is connected to the output pipeline of the buffer boost integrated device, and a first insulating joint is provided on the pipeline;

[0008] An outlet at the lower end of the well site flowback fluid treatment integrated device is connected to the water storage tank;

[0009] Another outlet at the lower end of the well site return fluid treatment integrated device is connected to the inlet at the upper end of the waste oil recovery integrated device, and the side outlet of the waste oil recovery integrated device is connected to the inlet of the buffer booster integrated device; the lower end outlet of the buffer booster integrated device is connected to the inlet of the waste oil recovery integrated device;

[0010] An outlet at the upper end of the integrated well site flowback fluid treatment device is connected to a venting main pipe through a venting pipeline of the integrated well site flowback fluid treatment device, and a flame arrester is provided on the venting main pipe;

[0011] Another outlet at the upper end of the well site flowback fluid treatment integrated device is connected to the associated gas output manifold;

[0012] The gas pipe outlet from the well site casing is divided into three pipelines. The first pipeline is connected to the associated gas output main pipe, and the sixth valve, flow meter and seventh valve are arranged on the pipeline in sequence; the second pipeline is arranged in parallel with the first pipeline, and the fifth valve is arranged on the second pipeline; the fourth valve is arranged on the third pipeline, and the third pipeline is connected to the venting main pipe and the connection point is located upstream of the flame arrester.

[0013] The well site return fluid treatment integrated integrated device is connected to the associated gas output main pipe through the well site return fluid treatment integrated integrated device associated gas output pipeline; the well site return fluid treatment integrated integrated device associated gas output pipeline is provided with a second insulating joint.

[0014] A third insulating joint is provided on the associated gas output manifold, and the associated gas output pipeline of the well site return fluid treatment integrated device is connected to the inlet end of the third insulating joint.

[0015] The water outlet of the wellsite flowback fluid treatment integrated device is connected to the water storage device through a wellsite flowback fluid treatment integrated device water pipeline.

[0016] One side of the wellfield return fluid treatment integrated integrated device is provided with a total liquid inlet of the wellfield return fluid treatment integrated integrated device, and the other side is provided with a total outlet of the wellfield return fluid treatment integrated device; the top of the wellfield return fluid treatment integrated device is provided with an associated gas outlet of the wellfield return fluid treatment integrated device and a safety valve vent of the wellfield return fluid treatment integrated device; the bottom is provided with a sewage outlet of the wellfield return fluid treatment integrated device and a water outlet of the wellfield return fluid treatment integrated device.

[0017] One side of the buffering and boosting integrated device is provided with a total crude oil inlet of the buffering and boosting integrated device, and the other side is provided with a total outlet of the buffering and boosting integrated device; the top of the buffering and boosting integrated device is provided with an associated gas outlet, and the bottom is provided with a sewage outlet.

[0018] The total outlet of the wellsite flowback fluid processing integrated device is connected to the total crude oil inlet of the buffering and pressurizing integrated device through the second pressure reducing valve and the total outlet output pipeline of the wellsite flowback fluid processing integrated device.

[0019] The sewage outlet of the wellfield flowback fluid treatment integrated device is connected to the waste oil recovery integrated device inlet of the waste oil recovery integrated device through the wellfield flowback fluid treatment integrated device sewage pipeline.

[0020] A ground processing method for shale oil in the oil test flowback stage, the specific steps are: open the well site inlet manifold, the first valve, the filter, the second valve, the first pressure reducing valve, and close the third valve at the same time, the crude oil enters the well site flowback liquid treatment integrated device from the total inlet of the well site flowback liquid treatment integrated device, flows out from the total oil outlet of the well site flowback liquid treatment integrated device after treatment, enters the buffer boosting integrated device through the output pipeline of the well site flowback liquid treatment integrated device and the total crude oil inlet of the buffer boosting integrated device after pressure reduction by the second pressure reducing valve, flows out from the total crude oil outlet of the buffer boosting integrated device after pressure increase, and is transported or pulled to the ground system through the first insulating joint and the output pipeline of the buffer boosting integrated device;

[0021] Open the well site casing gas manifold, the sixth valve, the flow meter, the seventh valve, and close the fifth valve at the same time. After metering, the casing gas passes through the well site casing gas associated gas output pipeline, the third insulating joint enters the associated gas output main pipe and is transported to the light hydrocarbon plant or LNG blending plant.

[0022] The beneficial effects of the present invention are:

[0023] The present invention can complete dehydration at the well site, reduce the water content of crude oil to below 35%, and then collect or transport it to the ground system. The produced water is stored on-site in the large well group and reused in the nearby fracturing well site. The device adopts a skid-mounted design, with a small footprint, short construction period, and convenient operation. It can effectively realize the recovery of associated gas in shale oil well sites and reduce the heating energy consumption of downstream stations. It has a good prospect for promotion and application.

[0024] The following is a further description with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the integrated surface treatment method during the shale oil testing and flowback stage.

[0026] In the figure, the reference numerals are: 1, well site liquid manifold; 2, first valve; 3, filter; 4, second valve; 5, first pressure reducing valve; 6, third valve; 7, well site return liquid treatment integrated device; 8, second pressure reducing valve; 9, buffer boost integrated device; 10, first insulating joint; 11, buffer boost integrated device output pipeline; 12, flame arrester; 13, venting main manifold; 14, second insulating joint; 15, fourth valve; 16, fifth valve; 17, well site casing gas manifold; 18, sixth valve; 19, flow meter; 20, seventh valve; 21, third insulating joint; 22, companion Gas output manifold; 23. Water storage tank; 24. Integrated device for waste oil recovery; 25. Total inlet of integrated device for treatment of wellfield return fluid; 26. Total outlet of integrated device for treatment of wellfield return fluid; 27. Associated gas outlet of integrated device for treatment of wellfield return fluid; 28. Safety valve vent of integrated device for treatment of wellfield return fluid; 29. ​​Drain outlet of integrated device for treatment of wellfield return fluid; 30. Water outlet of integrated device for treatment of wellfield return fluid; 31. Total crude oil inlet of integrated device for buffering and boosting; 32. Total crude oil outlet of integrated device for treatment of buffering and boosting; 33. 3. Associated gas outlet of integrated device for chemical treatment; 34. Sewage outlet of integrated device for buffering and boosting; 35. Associated gas output pipeline of integrated device for wellfield flowback treatment; 36. Vent pipeline of integrated device for wellfield flowback treatment; 37. Sewage pipeline of integrated device for wellfield flowback treatment; 38. Inlet of integrated device for waste oil recovery; 39. Water pipeline of integrated device for wellfield flowback treatment; 40. Sewage pipeline of integrated device for buffering and boosting; 41. Outlet pipeline of integrated device for waste oil recovery; 42. Vent pipeline of integrated device for buffering and boosting; 43. Associated gas output pipeline of casing gas in wellfield; 44. The total outlet output pipeline of the integrated integrated device for processing return fluid at the well site; 45. The outlet of the integrated integrated device for recycling waste oil; 46. The eighth valve; 47. The return fluid processing device; 48. The thirteenth valve; 49. The tenth valve; 50. The eleventh valve; 51. The twelfth valve; 52. The ninth valve; 53. The first electric valve; 54. The separation buffer tank; 55. The second electric valve; 56. The third electric valve; 57. The first single screw pump; 58. The third electric valve; 59. The second flow meter; 60. The second single screw pump; 61. The fifth electric valve; 62. The second flow meter; 63. The leakage-proof explosion-proof waste oil recovery device; 64. The fourteenth valve. DETAILED DESCRIPTION

[0027] Embodiment 1:

[0028] In order to overcome the problems that the associated gas in the existing shale oil well field cannot be recovered and the downstream station heating energy consumption is too large, the present invention provides the following Figure 1The device and method for ground processing during the oil testing and flowback stage of shale oil are shown. The present invention is suitable for the production of shale oil horizontal wells with high pressure, large liquid volume fluctuations, and high water content in the early stage. Dehydration is completed at the well site, and the water content of the crude oil is reduced to below 35% before being collected or transported to the ground system. The produced water is stored on-site in the large well group and reused in the nearby fracturing well site.

[0029] A ground processing integrated device for shale oil test flowback stage, comprising a well site liquid manifold 1, a well site flowback liquid processing integrated integrated device 7, a buffer boost integrated integrated device 9, an output pipeline 11 of the buffer boost integrated integrated device, a venting manifold 13, a well site casing gas manifold 17, an associated gas output manifold 22, a water storage tank 23, and a waste oil recovery integrated integrated device 24;

[0030] The well site inlet fluid manifold 1 is connected to the well site return fluid processing integrated device 7 through a pipeline, and a filter 3 and a first pressure reducing valve 5 are sequentially arranged on the pipeline, and a first valve 2 and a second valve 4 are respectively arranged at both ends of the filter 3. The first valve 2, the filter 3 and the second valve 4 are connected in series and then connected in parallel with a third valve 6;

[0031] The outlet of the side end of the well site return fluid processing integrated device 7 is connected to the buffer boost integrated device 9 through the second pressure reducing valve 8, and the side outlet of the buffer boost integrated device 9 is connected to the output pipeline 11 of the buffer boost integrated device, and the pipeline is provided with a first insulating joint 10;

[0032] An outlet at the lower end of the well site flowback fluid treatment integrated device 7 is connected to the water storage tank 23;

[0033] Another outlet at the lower end of the well site flowback fluid treatment integrated device 7 is connected to the inlet at the upper end of the waste oil recovery integrated device 24, and the side outlet of the waste oil recovery integrated device 24 is connected to the inlet of the buffer boost integrated device 9; the lower end outlet of the buffer boost integrated device 9 is connected to the inlet of the waste oil recovery integrated device 24;

[0034] An outlet at the upper end of the well site flowback fluid treatment integrated device 7 is connected to the venting main pipe 13 through the well site flowback fluid treatment integrated device venting pipeline 36, and the venting main pipe 13 is provided with a flame arrester 12;

[0035] Another outlet at the upper end of the well site flowback fluid treatment integrated device 7 is connected to the associated gas output manifold 22;

[0036] The outlet of the well site casing gas manifold 17 is divided into three pipelines. The first pipeline is connected to the associated gas output main pipe 22, and the sixth valve 18, flow meter 19 and seventh valve 20 are arranged on the pipeline in sequence; the second pipeline is arranged in parallel with the first pipeline, and the fifth valve 16 is arranged on the second pipeline; the fourth valve 15 is arranged on the third pipeline, and the third pipeline is connected to the vent main pipe 13 and the connection point is located upstream of the flame arrester 12.

[0037] In the present invention, the wellfield return fluid treatment integrated device 7 is provided with a wellfield return fluid treatment integrated device total liquid inlet 25 on one side, and a wellfield return fluid treatment integrated device total outlet 26 on the other side, and a wellfield return fluid treatment integrated device associated gas outlet 27 and a wellfield return fluid treatment integrated device safety valve vent 28 are provided on the top of the wellfield return fluid treatment integrated device 7, and a wellfield return fluid treatment integrated device sewage outlet 29 and a wellfield return fluid treatment integrated device water outlet 30 are provided on the bottom. The buffering and pressurizing integrated device 9 is provided with a buffering and pressurizing integrated device crude oil total inlet 31 on one side, and a buffering and pressurizing integrated device crude oil total outlet 32 ​​on the other side, and a buffering and pressurizing integrated device associated gas outlet 33 is provided on the top of the buffering and pressurizing integrated device 9, and a buffering and pressurizing integrated device sewage outlet 34 is provided on the bottom. An integrated waste oil recovery device inlet 38 is provided on the upper part of the integrated waste oil recovery device 24, and an integrated waste oil recovery device outlet 45 is provided on one side of the integrated waste oil recovery device 24. The well site casing gas manifold 17 connected in sequence through the pipeline valve assembly is connected to the third insulating joint 21 and the associated gas output manifold 22 through the sixth valve 18, the flow meter 19, the seventh valve 20, and the well site casing associated gas output pipeline 43. The well site casing gas manifold 17 is provided with a fourth valve 15 connected to the venting manifold 13 through a pipeline.

[0038] In the present invention, the well site return fluid treatment integrated integrated device 7, the buffer boost integrated integrated device 9 and the waste oil recovery integrated integrated device 24 that can be directly purchased on the market are used in conjunction with pipelines and valves to carry out ground treatment in the shale oil test return stage. Through this device, dehydration is completed at the well site, and the water content of the crude oil is reduced to below 35% before being collected or transported to the ground system. The produced water is stored on-site in the large well group and reused in the nearby fracturing well site. The device adopts a skid-mounted design, occupies a small area, has a short construction period, is easy to operate, can effectively realize the recovery of associated gas in shale oil well sites, and reduce the heating energy consumption of downstream stations, and has good prospects for promotion and application. The well site return fluid treatment integrated integrated device 7, the buffer boost integrated integrated device 9 and the waste oil recovery integrated integrated device 24 in the present invention are all prior art and will not be further described in the present invention.

[0039] In the present invention, the waste oil recovery integrated device 24 is a leak-proof explosion-proof waste oil recovery integrated device, which can be of the WYH series.

[0040] The device provided by the present invention is suitable for the production of shale oil horizontal wells with high pressure, large liquid volume fluctuation and high water content in the early stage. In the later stage, the device can be moved to other newly developed blocks for recycling according to actual needs.

[0041] Embodiment 2:

[0042] Based on Example 1, in this embodiment, preferably, the well site return fluid treatment integrated integrated device 7 is connected to the associated gas output manifold 22 through the well site return fluid treatment integrated device associated gas output pipeline 35; the well site return fluid treatment integrated device associated gas output pipeline is provided with a second insulating joint 14.

[0043] Preferably, a third insulating joint 21 is provided on the associated gas output manifold 22 , and the associated gas output pipeline 35 of the well site flowback fluid treatment integrated device is connected to the inlet end of the third insulating joint 21 .

[0044] Preferably, the wellsite flowback fluid treatment integrated device water outlet 30 of the wellsite flowback fluid treatment integrated device 7 is connected to the water storage tank 23 via a wellsite flowback fluid treatment integrated device water pipeline 39 .

[0045] Preferably, one side of the wellfield return fluid treatment integrated integrated device 7 is provided with a wellfield return fluid treatment integrated integrated device total liquid inlet 25, and the other side is provided with a wellfield return fluid treatment integrated device total outlet 26; the top of the wellfield return fluid treatment integrated device is provided with a wellfield return fluid treatment integrated device associated gas outlet 27 and a wellfield return fluid treatment integrated device safety valve vent 28; the bottom is provided with a wellfield return fluid treatment integrated device sewage outlet 29 and a wellfield return fluid treatment integrated device water outlet 30.

[0046] Preferably, the buffering and boosting integrated device 9 is provided with a total crude oil inlet 31 on one side, and a total crude oil outlet 32 ​​on the other side; the buffering and boosting integrated device 9 is provided with an associated gas outlet 33 of the buffering and boosting integrated device on the top, and a sewage outlet 34 of the buffering and boosting integrated device on the bottom.

[0047] Preferably, the total outlet 26 of the wellsite flowback fluid treatment integrated device 7 is connected to the total crude oil inlet 31 of the buffering and pressurizing integrated device 9 through the second pressure reducing valve 8 and the total outlet output pipeline 44 of the wellsite flowback fluid treatment integrated device.

[0048] Preferably, the wellsite flowback fluid treatment integrated integrated device sewage outlet 29 of the wellsite flowback fluid treatment integrated integrated device 7 is connected to the waste oil recovery integrated integrated device inlet 38 of the waste oil recovery integrated integrated device 24 through the wellsite flowback fluid treatment integrated integrated device sewage pipeline 37.

[0049] The working process of the present invention is:

[0050] Open the well site inlet manifold 1, the first valve 2, the filter 3, the second valve 4, the first pressure reducing valve 5, and close the third valve 6 at the same time. The crude oil enters the well site return fluid treatment integrated device 7 from the well site return fluid treatment integrated device inlet total inlet 25, flows out from the well site return fluid treatment integrated device oil total outlet 26 after treatment, and enters the buffer boosting integrated device 9 through the well site return fluid treatment integrated device output pipeline 44 and the buffer boosting integrated device crude oil total inlet 31 after pressure reduction by the second pressure reducing valve 8. After pressurization, it flows out from the buffer boosting integrated device crude oil total outlet 32 ​​and is transported or pulled to the ground system through the first insulating joint 10 and the buffer boosting integrated device output pipeline 11.

[0051] The operation process of the integrated device 7 for treating the well-site return fluid is as follows: the eighth valve 46 is opened, and the liquid enters the return fluid treatment device 47, i.e., the three-phase separator for treating the return fluid. The treated low-water crude oil enters the total outlet 26 of the integrated device for treating the well-site return fluid through the ninth valve 52, and the associated gas enters the associated gas outlet 27 of the integrated device for treating the well-site return fluid through the tenth valve 49. The vented air enters the safety valve vent 28 of the integrated device for treating the well-site return fluid through the eleventh valve 50, and the treated produced water enters the water outlet 30 of the integrated device for treating the well-site return fluid through the twelfth valve 51, and the treated dirty oil enters the sewage outlet 29 of the integrated device for treating the well-site return fluid through the thirteenth valve 48.

[0052] The buffering and pressurizing integrated device 9 includes a first electric valve 53, a crude oil inlet separation buffer tank 54 and a second flow meter 62. Two pipelines are arranged between the crude oil inlet separation buffer tank 54 and the second flow meter 62. One of the pipelines is provided with a second electric valve 55, a single screw pump 1 57 and a third electric valve 58 in sequence; the other pipeline is provided with a fourth electric valve 59, a single screw pump 2 60 and a fifth electric valve 61 in sequence. The buffering and pressurizing integrated device is also provided with a bypass valve 56. One side of the pipeline where the bypass valve 56 is located is connected to the first electric valve 53, and the other side is connected to the second flow meter 62; the top of the buffering and pressurizing integrated device 9 is provided with a buffering and pressurizing integrated device associated gas outlet 33, and the bottom is provided with a buffering and pressurizing integrated device buffering and pressurizing integrated device sewage outlet 34.

[0053] Operation process of buffer boost integrated device 9: open the first electric valve 53, crude oil enters the separation buffer tank 54, open the second electric valve 55, single screw pump 1 57, third electric valve 58, flow meter 2 62, crude oil enters the crude oil total outlet 32 ​​of the buffer boost integrated device; close the fourth electric valve 59, single screw pump 2 60, and fifth electric valve 61. The second electric valve 55, single screw pump 1 57, third electric valve 58 and the fourth electric valve 59, single screw pump 2 60, and fifth electric valve 61 are standby for each other. When the single screw pump 1 57 is overhauled, close the second electric valve 55, single screw pump 1 57, and third electric valve 58, and open the fourth electric valve 59, single screw pump 2 60, and fifth electric valve 61. Vice versa.

[0054] The operation process of the integrated device for recycling waste oil 24 is as follows: the waste oil enters the leak-proof explosion-proof waste oil recycling device 63 through the inlet, and the waste oil enters the outlet 45 of the integrated device for recycling waste oil through the fourteenth valve 64; wherein, the leak-proof explosion-proof waste oil recycling device 63 is a prior art and will not be further described in this embodiment.

[0055] After being treated by the buffering and pressurizing integrated device 9, the wastewater is discharged from the wastewater outlet 29 of the well site return fluid treatment integrated device, and is connected to the wastewater recovery integrated device inlet 38 of the wastewater recovery integrated device 24 through the wastewater pipeline 37 of the well site return fluid treatment integrated device; the oil recovered by the wastewater recovery integrated device 24 enters the buffering and pressurizing integrated device 9 again for subsequent treatment. After being treated by the buffering and pressurizing integrated device 9, the associated gas passes through the associated gas outlet 33 of the buffering and pressurizing integrated device, the venting pipeline 42 of the buffering and pressurizing integrated device, the flame arrester 12, and reaches the venting main pipe 13. The waste oil treated by the buffering and pressurizing integrated device 9 reaches the wastewater recovery integrated device inlet 38 of the wastewater recovery integrated device 24 through the wastewater outlet 34 of the buffering and pressurizing integrated device and the wastewater pipeline 40 of the buffering and pressurizing integrated device.

[0056] The water from the lower part of the wellsite flowback fluid treatment integrated device 7 is transported to the water storage tank 23 through the wellsite flowback fluid treatment integrated device water outlet 30 and the wellsite flowback fluid treatment integrated device water pipeline 39 .

[0057] If filtering is not required, close the first valve 2, the filter 3, the second valve 4, and open the third valve 6.

[0058] Open the well site casing gas manifold 17, the sixth valve 18, the flow meter 19, the seventh valve 20, and close the fifth valve 16 at the same time. After being metered by the pipe and valve assembly, the casing gas passes through the well site casing gas associated gas output pipeline 43, the third insulating joint 21, and enters the associated gas output main pipe 22 for external transmission to the light hydrocarbon plant or LNG blending plant.

[0059] The safety valve vent port 28 of the wellsite return fluid treatment integrated device 7 is connected to the vent main pipe 13 through the wellsite return fluid treatment integrated device vent pipeline 36, and the flame arrester 12; the associated gas treated by the wellsite return fluid treatment integrated device 7 is connected from the wellsite return fluid treatment integrated device associated gas outlet 27 through the second insulating joint 14, the wellsite return fluid treatment integrated device associated gas output pipeline 35, and the third insulating joint 21 to the associated gas output main pipe 22.

[0060] Embodiment 3:

[0061] Based on Example 1 or 2, a ground processing method for shale oil test return stage is provided in this embodiment, and the specific steps are: open the well site inlet manifold 1, the first valve 2, the filter 3, the second valve 4, the first pressure reducing valve 5, and close the third valve 6 at the same time, the crude oil enters the well site return liquid treatment integrated device 7 from the well site return liquid treatment integrated device inlet total inlet 25, and flows out from the well site return liquid treatment integrated device oil total outlet 26 after treatment, and enters the buffer boosting integrated device 9 through the well site return liquid treatment integrated device output pipeline 44 and the buffer boosting integrated device crude oil total inlet 31 after pressure reduction by the second pressure reducing valve 8, and flows out from the buffer boosting integrated device crude oil total outlet 32 ​​after pressurization, and is transported or pulled to the ground system through the first insulating joint 10 and the buffer boosting integrated device output pipeline 11;

[0062] Open the well site casing gas manifold 17, the sixth valve 18, the flow meter 19, the seventh valve 20, and close the fifth valve 16 at the same time. After metering, the casing gas passes through the well site casing gas associated gas output pipeline 43, the third insulating joint 21, enters the associated gas output main pipe 22 and is exported to the light hydrocarbon plant or LNG mixed hydrocarbon plant.

[0063] The present invention can complete dehydration at the well site, reduce the water content of crude oil to below 35%, and then collect or transport it to the ground system. The produced water is stored on-site in the large well group and reused in the nearby fracturing well site. The device adopts a skid-mounted design, with a small footprint, short construction period, and easy operation. In the later stage, the device can be moved to other newly developed blocks for recycling according to actual needs.

[0064] The above examples are merely illustrative of the present invention and do not constitute a limitation on the protection scope of the present invention. Any design that is the same or similar to the present invention belongs to the protection scope of the present invention. The device structure and method steps not described in detail in the present invention are all prior art and will not be further described in the present invention.

Claims

1. A ground processing integrated device for shale oil testing and flowback stage, characterized by: It comprises a well site fluid manifold (1), a well site return fluid treatment integrated device (7), a buffer boost integrated device (9), an output pipeline of the buffer boost integrated device (11), a venting manifold (13), a well site casing gas manifold (17), an associated gas output manifold (22), a water storage tank (23) and a waste oil recovery integrated device (24); The well site inlet fluid manifold (1) is connected to the well site return fluid processing integrated device (7) via a pipeline, a filter (3) and a first pressure reducing valve (5) are sequentially arranged on the pipeline, a first valve (2) and a second valve (4) are respectively arranged at both ends of the filter (3), and the first valve (2), the filter (3) and the second valve (4) are connected in series and then connected in parallel to a third valve (6); The outlet at the side end of the well site return fluid treatment integrated device (7) is connected to the buffer boost integrated device (9) via a second pressure reducing valve (8); the side outlet of the buffer boost integrated device (9) is connected to the buffer boost integrated device output pipeline (11), on which a first insulating joint (10) is provided; the well site return fluid treatment integrated device (7) is connected to the associated gas output manifold (22) via the well site return fluid treatment integrated device associated gas output pipeline (35); the well site return fluid treatment integrated device associated gas output pipeline is provided with a second insulating joint (14); An outlet at the lower end of the wellsite return fluid treatment integrated device (7) is connected to the water reservoir (23); a wellsite return fluid treatment integrated device water outlet (30) of the wellsite return fluid treatment integrated device (7) is connected to the water reservoir (23) via a wellsite return fluid treatment integrated device water pipeline (39); Another outlet at the lower end of the well site return fluid treatment integrated device (7) is connected to the inlet at the upper end of the waste oil recovery integrated device (24); the side outlet of the waste oil recovery integrated device (24) is connected to the inlet of the buffer boost integrated device (9); the lower end outlet of the buffer boost integrated device (9) is connected to the inlet of the waste oil recovery integrated device (24); An outlet at the upper end of the well site return fluid treatment integrated device (7) is connected to a venting main pipe (13) through a well site return fluid treatment integrated device venting pipeline (36), and a flame arrester (12) is provided on the venting main pipe (13); Another outlet at the upper end of the well site flowback fluid treatment integrated device (7) is connected to the associated gas output manifold (22); The outlet of the well site casing gas manifold (17) is divided into three pipelines, the first pipeline is connected to the associated gas output manifold (22), and a sixth valve (18), a flow meter (19) and a seventh valve (20) are arranged on the pipeline in sequence; the second pipeline is arranged in parallel with the first pipeline, and a fifth valve (16) is arranged on the second pipeline; the third pipeline is provided with a fourth valve (15), and the third pipeline is connected to the venting manifold (13), and the connection point is located upstream of the flame arrester (12).

2. The integrated surface processing device for shale oil testing and flowback according to claim 1, characterized in that: The associated gas output manifold (22) is provided with a third insulating joint (21), and the associated gas output pipeline (35) of the well site flowback fluid treatment integrated device is in communication with the inlet end of the third insulating joint (21).

3. The integrated surface processing device for shale oil testing and flowback according to claim 1, characterized in that: The wellsite return fluid treatment integrated device (7) is provided with a wellsite return fluid treatment integrated device liquid inlet (25) on one side, and a wellsite return fluid treatment integrated device total outlet (26) on the other side; the wellsite return fluid treatment integrated device associated gas outlet (27) and the wellsite return fluid treatment integrated device safety valve vent (28) are provided at the top; and the wellsite return fluid treatment integrated device sewage outlet (29) and the wellsite return fluid treatment integrated device water outlet (30) are provided at the bottom.

4. The integrated surface processing device for shale oil testing and flowback according to claim 1, characterized in that: The buffering and pressurizing integrated device (9) is provided with a total crude oil inlet (31) on one side of the buffering and pressurizing integrated device, and a total crude oil outlet (32) on the other side of the buffering and pressurizing integrated device; an associated gas outlet (33) is provided at the top of the buffering and pressurizing integrated device (9), and a sewage outlet (34) is provided at the bottom.

5. The integrated surface processing device for shale oil testing and flowback according to claim 1 is characterized by: The wellsite flowback fluid treatment integrated device total outlet (26) of the wellsite flowback fluid treatment integrated device (7) is connected to the buffering and pressurizing integrated device crude oil total inlet (31) of the buffering and pressurizing integrated device (9) via a second pressure reducing valve (8) and a wellsite flowback fluid treatment integrated device total outlet output pipeline (44).

6. The integrated surface processing device for shale oil testing and flowback according to claim 1, characterized in that: The wellsite flowback fluid treatment integrated device sewage outlet (29) of the wellsite flowback fluid treatment integrated device (7) is connected to the waste oil recovery integrated device inlet (38) of the waste oil recovery integrated device (24) via the wellsite flowback fluid treatment integrated device sewage pipeline (37).

7. A method for surface treatment of shale oil in the oil testing and flowback stage using the integrated surface treatment device for shale oil in the oil testing and flowback stage according to any one of claims 1 to 6, characterized in that: The specific steps are as follows: opening the well site inlet manifold (1), the first valve (2), the filter (3), the second valve (4), the first pressure reducing valve (5), and closing the third valve (6) at the same time, the crude oil enters the well site return fluid treatment integrated device (7) from the total inlet (25) of the well site return fluid treatment integrated device, flows out from the total outlet (26) of the well site return fluid treatment integrated device after treatment, enters the buffer boosting integrated device (9) through the output pipeline (44) of the well site return fluid treatment integrated device and the total crude oil inlet (31) of the buffer boosting integrated device after pressure reduction by the second pressure reducing valve (8), flows out from the total crude oil outlet (32) of the buffer boosting integrated device after pressure increase, and flows out through the first insulating joint (10) and the output pipeline (11) of the buffer boosting integrated device to be transported or pulled to the ground system; The casing gas manifold (17), the sixth valve (18), the flow meter (19), and the seventh valve (20) of the well site are opened, and the fifth valve (16) is closed at the same time. After metering, the casing gas passes through the well site casing gas associated gas output pipeline (43), the third insulating joint (21), and enters the associated gas output main manifold (22) to be exported to the light hydrocarbon plant or the LNG blending plant.