Natural capital and performance data sharing system based on Internet + government affairs
Through the natural fund and performance data sharing system based on Internet + government affairs, the lack of performance data sharing and supervision closed loop in the existing technology from the perspective of capital cycle is solved, data synchronization and intelligent analysis are realized, and regulatory efficiency and decision-making level are improved. .
Patent Information
- Application Number
- CN202110098524.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-01-25
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-01-25
AI Technical Summary
The existing regulatory system lacks performance data sharing and regulatory closed loop from the perspective of fund cycles, resulting in data fragmentation, inability to perform intelligent analysis, and ineffective traceability of funds and projects.
A natural funding and performance data sharing system based on Internet + government affairs was designed, including a data processing center and core business subsystem. Data storage, analysis and synchronization are achieved through a service-oriented architecture, using Hadoop + Spark architecture and HiTSDB timing database. , combined with BI reports and GIS modules, realize visual display and intelligent analysis of data.
It has achieved information synchronization and collaborative work between departments at all levels, broken the data separation between business departments, provided intelligent auxiliary supervision decision-making, and improved the efficiency of fund supervision and performance management level.
Smart Images

Figure CN112801768B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of Internet data monitoring technology, and in particular to a natural capital and performance data sharing system based on Internet + government affairs. Background Art
[0002] The statements in this section merely mention background technology related to the present application and do not necessarily constitute prior art.
[0003] Currently, there is no national fund supervision system that takes performance as the main line of supervision from the perspective of the fund cycle. Other existing supervision systems have the following problems:
[0004] (1) Limitations of data and business areas.
[0005] In recent years, business regulatory departments at all levels in various industries have built a large number of business information systems with complex fields around the core business of their business departments. These systems are generally highly professional and have limited regulatory scope. The data collected is limited to the project supervision of a certain business department or business office (section, section), so it is more like an information recording tool for single business data. This has led to a phenomenon of numerous business systems and data fragmentation between business departments.
[0006] (2) The supervision process is short and cannot form a data closed loop.
[0007] The core concerns of various business-centered regulatory systems are focused on the management of projects before, during, and after the project, and they are unable to trace the origins of funds and projects before entering the business regulatory process. Various regulatory systems centered on finance and auditing only record the accounting and auditing information of fund blocks, and lack project execution data. This kind of data cannot form a closed loop of the process due to process segmentation, and the phenomenon of "each cleaning up the snow in front of his own door" is prominent.
[0008] (3) The data volume is small and the dimensions are few, making it impossible to effectively apply advanced data technologies such as intelligent analysis.
[0009] Data becoming "infrastructure" is an important sign of the switch from IT to DT era in information construction. Traditional regulatory systems are limited by business departments and process fragmentation, unable to form a large data warehouse with rich dimensions, lacking the application value of intelligent data analysis, and therefore unable to use advanced data technologies such as intelligent analysis. As a result, the system can only provide traditional tool functions and cannot lead departments to take proactive actions and intelligently assist regulatory decision-making. Summary of the invention
[0010] In order to address the deficiencies of the prior art, this application provides a natural fund and performance data sharing system and method based on the Internet + government affairs;
[0011] This application provides a natural funding and performance data sharing system based on the Internet + government affairs;
[0012] The natural capital and performance data sharing system based on Internet + government affairs includes:
[0013] The data processing center is used for data storage and processing analysis. Data storage is used to store and manage geographic information, performance indicators, and funding data. Processing analysis is used to analyze the stored data to collect, supervise, distribute funds, and display map information, thereby achieving information synchronization, collaborative work, and collaborative supervision between departments at all levels.
[0014] The core business subsystem is used to receive, allocate, issue, report and review the central special funds and performance targets: the central client receives the issued special funds and performance target information; allocates funds and performance indicators according to the actual situation of each region; and issues the special funds allocated by the supervision center client and the performance indicators to be achieved to the local clients;
[0015] The core business subsystem collects basic information data, financial data and performance data of the project, and stores them in the database of the data processing center; it automatically controls the status according to the progress of the project reporting; after the data is stored, the data processing center realizes data call and processing, and displays the processing results through visualization technology; after the data is stored, it conducts an audit of the financial situation and the completion of performance indicators.
[0016] Compared with the prior art, the beneficial effects of this application are:
[0017] (1) The project adopts a service-oriented architecture. It improves software quality and speeds up software development efficiency through reuse, loose coupling, interoperability (standards) and other mechanisms. It provides a simple, consistent, integrated development and operation environment, simplifies the design, programming and management of distributed systems, and enables the developed products to be integrated with each other and flexibly adapt to changes, thus solving the four core problems in software development: quality, efficiency, interoperability, and flexible construction. The architecture has the following advantages: shielding heterogeneity, achieving interoperability, achieving software reuse, and achieving complete decoupling of business logic from network connection and data conversion.
[0018] The basic services of this platform include data services, communication services, process services, operation and maintenance services, and interface services. Taking full account of the openness and scalability of the system, the processing mechanism is separated from the application data, and an intermediate platform is established to centrally manage the communication technology processing, business-driven processing, interface specification, data centralized management, and underlying information configuration in the system. The application data field only needs to care about the needs of business data rather than the data processing process. The spingMVC and Springboot development frameworks are used. The front end uses layui technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The drawings in the specification, which constitute a part of the present application, are used to provide further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.
[0020] Figure 1 This is a diagram of the steps for implementing the business-finance collaboration supervision model of the first embodiment;
[0021] Figure 2 It is a schematic diagram of the budget performance management model based on the PDCA cycle of the first embodiment;
[0022] Figure 3 This is a schematic diagram of the overall architecture of the fund performance management solution of the first embodiment;
[0023] Figure 4 The core business subsystem structure and business process of the first embodiment;
[0024] Figure 5 It is a schematic diagram of the overall process of the central project reserve management system of the first embodiment;
[0025] Figure 6 The basic principle of the balanced scorecard (BCS) of the first embodiment;
[0026] Figure 7 The data processing center module of the first embodiment is constituted;
[0027] Figure 8 It is composed of a configuration management module of the first embodiment;
[0028] Fig. 9 It is composed of the modules of the rights management system of the first embodiment;
[0029] Fig.10 This is the technical architecture diagram of the system. DETAILED DESCRIPTION
[0030] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.
[0031] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0032] In the absence of conflict, the embodiments in this application and the features in the embodiments may be combined with each other.
[0033] Embodiment 1
[0034] This embodiment provides a natural fund and performance data sharing system based on Internet + government affairs;
[0035] The natural capital and performance data sharing system based on Internet + government affairs includes:
[0036] The data processing center is used for data storage and processing analysis. Data storage is used to store and manage geographic information, performance indicators, and funding data. Processing analysis is used to analyze the stored data to collect, supervise, distribute funds, and display map information, thereby achieving information synchronization, collaborative work, and collaborative supervision between departments at all levels.
[0037] The core business subsystem is used to receive, allocate, issue, report and review the central special funds and performance targets: the central client receives the issued special funds and performance target information; allocates funds and performance indicators according to the actual situation of each region; and issues the special funds allocated by the supervision center client and the performance indicators to be achieved to the local clients;
[0038] The core business subsystem collects basic information data, financial data and performance data of the project, and stores them in the database of the data processing center; it automatically controls the status according to the progress of the project reporting; after the data is stored, the data processing center realizes data call and processing, and displays the processing results through visualization technology; after the data is stored, it conducts an audit of the financial situation and the completion of performance indicators.
[0039] Furthermore, the system further comprises:
[0040] The core tool is used for permission management. Different pages and financial permissions are limited according to roles and functions. Different accounts correspond to different departments, roles and functions. Roles are divided into national-level operation roles, provincial-level operation roles, and municipal-level operation roles. Functions include finance, ecology, geological exploration, and remediation. Different roles and functions correspond to different pages and functions that can be operated.
[0041] As one or more embodiments, the data processing center includes:
[0042] The database is used to store special funds, performance indicators, and geographic location information data. All systems at all levels share the same database to store the above data, which enables data sharing and avoids the need to create separate data files for each system at all levels, thus reducing a large amount of duplicate data and data redundancy. The system builds an authoritative natural resource environment data center based on the Hadoop+Spark architecture and the HiTSDB time series database;
[0043] A decision-making support tool used to integrate and compile data on funds and performance indicators collected from the entire business process of fund receipt, allocation, issuance, reporting, and review. It also conducts evaluation and analysis based on performance indicator data and realizes data visualization through BI reports.
[0044] Furthermore, the auxiliary decision-making tool includes:
[0045] BI reports: for configured data sources, multi-dimensional data analysis, graphical modeling, and drag-and-drop self-service analysis functions are implemented;
[0046] GIS One Map module implements top-level design based on one map, including data organization and storage, data stratification and attributes, data service release, data application interface, data update, integration of natural resource capital information, governance, monitoring multi-source data; establishes a data exchange system, and provides data exchange capabilities with other systems;
[0047] The special performance evaluation module adopts performance evaluation based on the hierarchical analysis method. According to the approved performance targets, it breaks down and improves the performance targets step by step, improves the quantifiability of the performance targets, ensures that the performance targets and funds are issued simultaneously, and urges lower-level departments to report the details in a timely manner.
[0048] Furthermore, the core business subsystem includes:
[0049] The special reserve warehouse module is used to manage the application, filing and outbound information of projects. Projects are applied for through the provincial entry management module, and the system submits the project application information to the central reserve warehouse management module for review. After the review is passed, the system transfers the project to the filing stage. After the filing is completed, the project is transferred to the outbound stage through the central reserve warehouse management module;
[0050] The special allocation module manages the amount of funds and performance targets through the central allocation management module and the local allocation management module, and realizes the detailed allocation of funds and the decomposition and hierarchical allocation of performance targets through subsystems at all levels;
[0051] The project management module is used to further decompose the funds into several specific projects according to the performance indicators given by the project and the actual situation, report the detailed decomposition results and the necessary information such as the project execution progress and fund use, and review the reporting situation step by step through the local system review module, and the final review is for the provincial and ministerial systems;
[0052] The execution management module is used to fill in the completion status of performance targets after the project implementation period ends and report to the superior management subsystem in the system.
[0053] Furthermore, the core tools include:
[0054] The configuration management module is used to enable the central, provincial, municipal and county governments to independently configure their own performance and special indicators and units.
[0055] The permission management module is used to set page permissions for all accounts with a certain role.
[0056] Furthermore, the special reserve library module includes:
[0057] The provincial warehousing management unit is used to declare projects and modify and improve them according to the review results.
[0058] The central reserve management unit is used to review projects and decide whether to return them for modification. Projects that pass the review enter the filing stage.
[0059] Furthermore, the provincial warehousing management unit includes:
[0060] The application information management subunit is used to manage the submitted application materials and update the status of the project before and after application;
[0061] The key performance management subunit is used to manage the performance indicators of the project as the criteria for audit.
[0062] Special attachment management sub-unit is used to upload project application materials.
[0063] Competitive review subunit, used to conduct project review.
[0064] Furthermore, the central reserve management unit includes:
[0065] The entry audit subunit is used to determine whether the item meets the entry conditions based on the audit standards.
[0066] The return management subunit is used to return for modification or record return when the review fails.
[0067] The reserve-to-special management sub-unit is used to manage the outbound and return of projects that have completed filing, and to classify the funds issued according to the actual amount issued.
[0068] Furthermore, the special project allocation module includes:
[0069] The central government’s issuance management unit is used to upload approval documents for special funds, fill in and issue funding amounts and performance targets to the task provinces.
[0070] Local management units are used to log into the system, review documents, and verify funding and performance targets; refine funding amounts, break down performance targets, and issue funding amounts and performance targets to the next level.
[0071] Furthermore, the central issuing management unit includes:
[0072] The central funds allocation management sub-unit is used to realize special project creation, selection of allocation units and allocation of funds.
[0073] The central performance distribution management sub-unit is used for performance allocation.
[0074] Furthermore, the local administrative unit includes:
[0075] The local fund management subunit is used for local implementation of special projects, selection of issuing units and allocation of funds;
[0076] The local performance management subunit is used for the allocation of local special performance;
[0077] The fund performance distribution management sub-unit is used to allocate performance to the next level.
[0078] The local special management sub-unit is used to copy the special funds and performance target information in the system to the cities where the relevant counties are located for their knowledge.
[0079] Furthermore, the project management module includes:
[0080] The project reporting management unit is used to report the detailed decomposition results and necessary project information after the funding and performance targets are further broken down into several specific projects.
[0081] The reporting and review unit is used to manage the reporting and review at each level.
[0082] Furthermore, the project reporting management unit includes:
[0083] The project funding reporting sub-unit is used to complete the funding execution status report and report to the next higher level.
[0084] The project performance reporting sub-unit is used to report the completion of performance targets and report to the next higher level management.
[0085] The project GIS management subunit is used to manage the geographic information of project resources to facilitate evaluation.
[0086] The project file management subunit is used to manage the files involved in the project.
[0087] Furthermore, the reporting and review unit includes:
[0088] The fund audit and review sub-unit is used to review all reported data by systems at all levels when funds are released.
[0089] The performance audit review sub-unit is used to review the performance indicators of each project during the implementation process.
[0090] Other information review and verification sub-unit is used to review the information involved in the process of funding or performance issuance.
[0091] Furthermore, the execution management module includes:
[0092] Execution progress management unit, used to check the progress of the project during execution;
[0093] The reporting cycle management unit is used to set the reporting deadline during the execution of fund release.
[0094] Furthermore, the execution progress management unit includes:
[0095] The fund execution progress subunit is used to check the progress of the use of special funds during the execution process;
[0096] The performance execution progress subunit is used to view the completion progress of the performance during the project execution process;
[0097] The visual progress management subunit is used to check the improvement of the status of natural resources during the implementation of each project.
[0098] Figure 3 This is a schematic diagram of the overall architecture of the fund performance management solution of the first embodiment; Figure 4The core business subsystem structure and business process of the first embodiment; Figure 5 It is a schematic diagram of the overall process of the central project reserve management system of the first embodiment; Figure 6 The basic principle of the balanced scorecard (BCS) of the first embodiment; Figure 7 The data processing center module of the first embodiment is constituted; Figure 8 It is composed of a configuration management module of the first embodiment; Fig. 9 It is composed of the modules of the rights management system of the first embodiment; Fig.10 This is the technical architecture diagram of the system.
[0099] This application discloses a national natural resource fund performance management solution based on Internet + government affairs, including a series of management mechanisms and models and a natural resource fund monitoring and supervision system. The process includes five links: reserve warehouse entry management, fund issuance management, fund reporting management, fund execution management, and execution assessment and evaluation, and constitutes a PDCA supervision closed loop. The specific steps are as follows:
[0100] According to the path of fund flow, special related units are divided into four types: initiating units, handling units, executing units and non-handling related units.
[0101] The natural resources departments and marine bureaus of each province (autonomous region, municipality directly under the central government, and independently planned city) shall apply for reserve projects based on the actual situation in their respective jurisdictions. The Ministry of Natural Resources and the Ministry of Finance shall review the inclusion and approval amount of reserve projects in each province based on the expert review opinions and the performance evaluation scores of each province in the previous year. The application for reserve projects shall include the performance targets to be completed by the project plan.
[0102] The Department of Finance and Funding of the Ministry of Natural Resources, based on documents from the Ministry of Finance, issues approved funds to each province through the system as well as performance targets required by the central government to be achieved by local governments.
[0103] The provincial handling units receive funding and performance requirements in the system, enter the amount of provincial fiscal funding to support the central special project and the performance targets attached by the province to funding execution units at all levels, and then break down the funding and performance requirements.
[0104] After receiving the funds, the lower level will enter the financial and social contributions at this level into the system and continue to decompose them according to the actual situation until the funding performance is passed to the executing unit.
[0105] After receiving the funds, the executing unit will report the planned use of funds and performance targets according to the specific project through the system fund reporting link. After the data is submitted, the superior unit will review it step by step, and the provincial competent unit will make the final confirmation.
[0106] The executing unit will regularly report the progress of fund execution and achievement of performance targets until all projects are accepted and completed.
[0107] The system automatically conducts performance evaluations on units at all levels by type, year, and project, and provides a basis for the next round of project applications.
[0108] In addition, through data statistics and authority systems, the system breaks down the barriers and time differences in information transmission between governments at all levels, improves regulatory efficiency by eliminating information asymmetry, and prevents capital from settling. Through the new model of "issue + execution", the process separation between the financial department and the business department is broken, and a new mechanism of "integrated supervision" of finance and business is established with budget performance as the main line.
[0109] (1) Industry-finance collaboration supervision model
[0110] In the monitoring and supervision process of the central special project, a business-finance collaboration supervision model that eliminates the boundaries between business and financial departments has been established based on the natural resource fund monitoring and supervision system. Figure 1 shown.
[0111] Central allocation management (special project initiation) link. The central allocation management system determines and enters the amount of special project approvals from each province and carries out related work through the local allocation management system; the performance targets of each province are entered through the central performance allocation subsystem and carried out related work through the local performance allocation subsystem. Through industry-finance collaboration, the funds and performance targets, which are two sides of the central special project, are simultaneously allocated to each province.
[0112] Local allocation management link: The funds and performance targets of central special projects are broken down and allocated through the local allocation management system.
[0113] Project reporting management link. Report the use plan of funds for specific projects through the project management subsystem, and report the performance goals of each project in the project reporting management subsystem according to the project funding plan of the finance department.
[0114] Reporting and review stage. The project reporting status is reviewed step by step in the reporting and review system. The funding review unit reviews the project funding, and the performance review unit reviews the project performance. This solves the problem of slow progress in traditional project review due to insufficient information.
[0115] Execution progress management link. The execution progress supervision link is equivalent to the traditional business department project supervision system, focusing on statistics and supervision of the execution of funds and project progress. This link completes data statistics and entry in the execution management subsystem, which can solve the problems of insufficient classification of fund data and delayed data statistics caused by the traditional system being operated only by the business department.
[0116] (2) Data permission mechanism for review by the handling unit and disclosure by relevant units
[0117] The natural resource funds monitoring and supervision system covers all types of funds in the field of natural resources across the country. There are many realistic factors and the actual business processes are complicated. For example, in some areas where the provincial-county reform is implemented, the central and provincial special financial funds must be directly allocated to the county finances. The municipal and state governments do not know the specific allocation of funds, nor do they need to review the projects reported by the directly-managed counties. However, according to the principle of territoriality, cities and states must assume the responsibility for supervising the execution of funds in directly-managed counties, and are therefore also related units of the funds. In order to solve similar situations where the right to review and supervise funds is separated, the fund monitoring and supervision system creatively communicates the regulatory information gap between the handling units and the related units through the data authority mechanism, and straightens out the regulatory dilemma under the separation of the two powers. The specific steps are:
[0118] According to the system operation principle of "whoever executes shall report, whoever handles shall review", funds and performance are first decomposed and issued to the local distribution management subsystem through the central distribution management subsystem step by step; the decomposition of funds to projects is reported and submitted for review through the local distribution management subsystem; and reviewed step by step in the reporting and review subsystem. The above three steps constitute the data collection closed loop of the capital investment plan. After the reporting and review are passed, the executing unit regularly reports the execution of funds and performance to realize the data collection of capital execution.
[0119] During the flow of business processes, the system summarizes the collected capital planning investment data and execution data in real time, and opens it to relevant departments with regulatory rights based on the data permission mechanism, thereby realizing regulatory data support for non-handling relevant departments.
[0120] The data authority mechanism is implemented by three modules: "Organization Authority Management", "Account Function Management" and "Business Process Management". Organization Authority Management is used to determine all related units of the execution unit; Account Function Management implements data authority filtering based on account functions; Business Process Management implements the allocation of fund review rights in the business process.
[0121] (3) Budget performance management model based on PDCA cycle
[0122] The information system is not only a digital mapping of the actual business process, but also a management tool for reconstructing the actual business process. In order to improve the efficiency of fund use and continuously and steadily improve the level of performance management, the construction of the natural resource fund monitoring and supervision system incorporates the management concept based on the PDCA cycle.
[0123] PDCA is a modern quality management tool that promotes the upward evolution of the system with feedback by cyclically executing the four steps of Plan, Do, Check and Adjust.
[0124] In the system, the special allocation subsystem is responsible for the step-by-step allocation of funds and performance, and the project management subsystem is responsible for the reporting and review of the allocation of funds to projects. The two subsystems work together to implement the planned investment of funds, forming the Plan link of PDCA.
[0125] The execution management subsystem is used to report the use of funds, record the progress of performance implementation during project execution, and constitute the Do link of PDCA.
[0126] The data collected in the above two links are processed by the performance evaluation module of the data processing center to form a capital performance evaluation report, which constitutes the Check link of PDCA.
[0127] The performance evaluation report of the previous year will serve as an important basis for the review of the new year's special reserve pool projects, and provide data guidance for the direction of central government investment in the new year in terms of funding demand, performance cost performance, etc., forming the Adjustment link of PDCA. Figure 2 shown.
[0128] Natural Resources Fund Monitoring and Supervision System
[0129] (1) System Introduction
[0130] The natural resource funds monitoring and supervision system includes business units such as special reserve units, special allocation units, project management units, and execution management units; core tools such as configuration management modules and authority management systems; databases; and a data processing center composed of auxiliary measurement tools such as BI intelligent reports, data GIS display, and special performance evaluation.
[0131] This application combines the actual business of natural resource management units at all levels and recreates the online and offline business processes of fund and performance supervision from the perspective of fund flow. At the same time, it makes full use of BI, GIS one map, intelligent evaluation and other technologies to integrate statistics, evaluate and analyze the data collected from the entire business process, and visualize it, breaking through the information barriers between the central government and management units at all levels, and between finance and various business departments, and providing strong data support for national natural resource fund supervision and policy formulation.
[0132] The first step is special reserve warehouse management.
[0133] Project reserve management is divided into three stages: declaration, filing, and release.
[0134] 1) The application stage is divided into the project application of the application unit and the review stage of the central database review. The application unit submits the application materials as the node. Before submission, the project is in the "project application" status; after submission, the project is in the "application pending confirmation" status. If the central review fails, the project will be divided into "not admitted to the database" and "returned for modification" according to the central review conclusion. If the central review passes, the project will be in the "record maintenance" status and enter the record stage.
[0135] 2) During the filing stage, the applicant must complete the project information. After resubmission, the project will be in the "filing pending confirmation" status. According to the central review conclusion, the project is divided into two statuses: "filing returned" and "filing completed". Among them, the project in the "filing returned" status can be modified and submitted again.
[0136] 3) The projects that have completed filing enter the stage of outbound delivery. Outbound delivery is divided into two situations: outbound delivery of funds and outbound delivery of funds after expiration. Among them, outbound delivery of funds can be divided into two states according to the actual amount of funds delivered, namely, "partial delivery" and "full delivery".
[0137] The second step is the management of fund allocation. Fund allocation management mainly realizes the refinement and allocation of funds and the decomposition and allocation of performance targets.
[0138] 1) The Ministry of Natural Resources uploads the approval documents for special funds, fills in and issues funding amounts and performance targets to the task provinces.
[0139] 2) The task province logs into the system, reviews documents, and verifies funding and performance targets; in conjunction with the provincial fiscal work, refines funding amounts, breaks down performance targets, and issues funding amounts and performance targets to municipal or county-level natural resources departments. At the same time, uploads funding approval documents issued by the provincial finance department.
[0140] 3) The municipal natural resources department logs into the system and repeats the above operation. In the case where the provincial finance department directly issues funds to the county finance department, the special funds and performance target information can be copied to the relevant county city in the system in accordance with the provincial work rules.
[0141] The third step is fund reporting and review.
[0142] 1) Whether the special funds are allocated by the factor method or the project method, they will be implemented on specific projects. After receiving the funds, the executing unit will further decompose the funds and performance targets into several specific projects and report the decomposition results and necessary project information.
[0143] 2) After the report is submitted, the higher-level unit will log in to the system and review the report step by step. The final review unit is the provincial department.
[0144] Step 4: Report on the implementation of funding and performance targets.
[0145] The project undertaking unit is responsible for filling in the project execution status report. It is initially scheduled to complete the filling in of the fund execution status report within 10 days after the end of each quarter and report to the superior management department in the system. After the project implementation period is over, the performance target completion status is filled in and reported to the superior management department in the system.
[0146] Step 5: Monitoring and evaluation of the implementation of funding and performance targets
[0147] 1) Based on the financial department’s regulations on the management of surplus funds, statistics are compiled on funds that meet the requirements for recovery, and funds are dispatched to urge the task provinces to promptly refine the allocation of funds and supervise the implementation of funds.
[0148] 2) Carry out performance evaluation based on the degree of achievement of performance goals after the project is completed, combined with the geographic information system and funding execution.
[0149] (3) Performance evaluation system based on BCS
[0150] Any indicator should be based on the combination of theory and practice. The special performance evaluation indicator system involving different businesses must be applicable to the characteristics of each business. For different special projects, the steps to determine the evaluation system are as follows:
[0151] First, the evaluation system is divided into three levels: target layer, standard layer, and indicator layer.
[0152] The second step is to classify the performance indicators required by the Ministry of Finance and the Ministry of Natural Resources according to the four dimensions of "financial indicators", "beneficiary indicators", "internal management indicators" and "reform and improvement indicators" based on the actual situation of each special project.
[0153] Usually, "financial indicators" correspond to "cost indicators", "economic benefit indicators", and some "social benefit indicators" in the indicator system of the Ministry of Finance.
[0154] The "beneficiary indicators" correspond to some of the "quantity indicators", some of the "quality indicators", "ecological benefit indicators", some of the "social benefit indicators", some of the "sustainable impact indicators" and "service recipient satisfaction indicators" in the indicator system of the Ministry of Finance.
[0155] “Internal management indicators” correspond to the “timeliness indicators”, some “quantity indicators” and some “quality indicators” in the indicator system of the Ministry of Finance.
[0156] “Reform and improvement indicators” correspond to some “quantity indicators”, some “quality indicators” and some “sustainable impact indicators” in the indicator system of the Ministry of Finance.
[0157] The third step is to score each individual indicator of the fund’s own performance based on the performance execution progress reported by each unit in the execution and reporting phase.
[0158] The fourth step is to add evaluation indicators at the standard layer and indicator layer in addition to the performance indicators that come with the funds when they are allocated, based on the actual situation of each special project and expert opinions, to enrich the indicators in the four dimensions of "financial indicators", "beneficiary indicators", "internal management indicators" and "reform and improvement indicators".
[0159] The fifth step is to obtain the scores of the supplementary evaluation indicators through the "data processing center" analysis based on the supplementary evaluation indicators.
[0160] The sixth step is to assign weights to each indicator based on expert opinions. The overall evaluation score is calculated based on the weights of each indicator, and an evaluation radar chart based on the four-dimensional indicators of the target layer is obtained.
[0161] The seventh step is to form a personalized performance evaluation report based on the total score and the ranking of each individual score among all participating units. Taking some indicators of a central special project in a certain province as an example, we can get:
[0162] Table 1
[0163]
[0164] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. The natural capital and performance data sharing system based on Internet + government affairs is characterized by: include: The data processing center is used for data storage and processing and analysis, where data storage is used to store and manage geographic information, performance indicators, and funding data; processing and analysis is used to analyze the stored data to collect, supervise, distribute funds, and display map information, thereby realizing information synchronization, collaborative work, and collaborative supervision functions among departments at all levels; the data processing center contains a database for storing special funds, performance indicators, and geographic location information data. Systems at all levels share the same database to store the above data, realizing data sharing and avoiding the establishment of data files for systems at all levels, reducing a large amount of duplicate data and thus reducing data redundancy; it also contains a special performance evaluation module, which uses performance evaluation based on the hierarchical analysis method. According to the approved performance targets, the performance targets are decomposed and improved step by step to improve the quantifiability of performance targets, ensure that performance targets and funds are issued simultaneously, and urge lower-level departments to report and refine the details in a timely manner; The core business subsystem is used to receive, allocate, issue, report and review the central special funds and performance targets: the central client receives the issued special funds and performance target information; allocates funds and performance indicators according to the actual situation of each region; and issues the special funds allocated by the supervision center client and the performance indicators to be achieved to the local clients; The core business subsystem collects basic information data, funding data and performance data of the project and stores them in the database of the data processing center; it automatically controls the status according to the progress of the project reporting; after the data storage is completed, the data processing center realizes data call and processing, and displays the processing results through visualization technology; After the data is stored, the funding situation and the completion of performance indicators will be reviewed; The core business subsystem includes: The special reserve warehouse module is used to manage the application, filing and outbound information of projects. Projects are applied for through the provincial entry management module, and the system submits the project application information to the central reserve warehouse management module for review. After the review is passed, the system transfers the project to the filing stage. After the filing is completed, the project is transferred to the outbound stage through the central reserve warehouse management module; The special allocation module manages the amount of funds and performance targets through the central allocation management module and the local allocation management module, and realizes the detailed allocation of funds and the decomposition and hierarchical allocation of performance targets through subsystems at all levels; The project management module is used to further decompose the funds into several specific projects according to the performance indicators given by the project and the actual situation, report the detailed decomposition results and the necessary information on the implementation progress of the project and the use of funds, and review the reporting situation step by step through the local system review module, and the final review is for the provincial and ministerial systems; The execution management module is used to fill in the completion status of performance targets after the project implementation period is over and report to the superior management subsystem in the system; The special reserve library module includes: The provincial warehousing management unit is used to apply for projects and modify and improve them according to the review results; The central reserve management unit is used to review the projects and decide whether to return them for modification. The projects that pass the review will enter the filing stage. The provincial warehousing management unit includes: The application information management subunit is used to manage the submitted application materials and update the status of the project before and after application; Key performance management subunit, used to manage the performance indicators of the project as the criteria for audit; Special attachment management subunit, used to upload project application materials; Competitive review subunit, used to conduct project review; The central reserve warehouse management unit includes: The entry review subunit is used to determine whether the item meets the entry conditions according to the review criteria; The return management subunit is used to return for modification or filing when the review fails; The reserve-to-special management subunit is used to manage the outbound and return of projects that have completed filing, and to classify the funds issued according to the actual amount issued; The special project allocation module includes: The central government’s issuance management unit is used to upload the approval documents for special funds, fill in and issue the funding quota and performance targets to the task provinces; Local distribution management units are used for local login systems, reviewing documents, and verifying funding and performance targets; detailing funding amounts, breaking down performance targets, and distributing funding amounts and performance targets to the next level; The central issuing management unit includes: The central funds allocation management subunit is used to realize the creation of special projects, the selection of allocation units, and the allocation of funds; The central performance distribution management sub-unit is used for the distribution of performance; The local administrative units include: The local fund management subunit is used for local implementation of special projects, selection of issuing units and allocation of funds; The local performance management subunit is used for the allocation of local special performance; The fund performance distribution management subunit is used to distribute performance to the next level; The local special management sub-unit is used to copy the special funds and performance target information in the system to the cities where the relevant counties are located for their information; The project management module includes: The project reporting management unit is used to report the detailed results and necessary project information after the funding and performance targets are further broken down into several specific projects; The reporting and review unit is used to manage the reporting and review at each level; The project filing management unit includes: The project fund reporting sub-unit is used to complete the filling of fund execution status and report to the next higher level; Project performance reporting sub-unit, used to report the completion of performance targets and report to the next level management; The project GIS management subunit is used to manage the geographic information of project resources to facilitate evaluation; The project file management subunit is used to manage the files involved in the project; The reporting and review unit includes: The fund review and verification sub-unit is used to review all reported data at all levels of systems when funds are issued; The performance review subunit is used to review the performance indicators of each project during its execution; Other information review and verification sub-units are used to review the information involved in the process of issuing funds or performance; The execution management module includes: Execution progress management unit, used to check the progress of the project during execution; The reporting cycle management unit is used to set the reporting deadline during the execution of fund release; The execution progress management unit includes: The fund execution progress subunit is used to check the progress of the use of special funds during the execution process; The performance execution progress subunit is used to view the completion progress of the performance during the project execution process; The visual progress management subunit is used to check the improvement of the status of natural resources during the implementation of each project; The system builds a new mechanism combining finance and business with budget performance as the main line; The new mechanism includes: business-finance collaboration supervision model; data authority mechanism for review by the handling unit and disclosure by the relevant units; budget performance management model based on the PDCA cycle; The above-mentioned industry-finance collaboration supervision model, through industry-finance collaboration, will simultaneously deliver the funds and performance targets of the central special project to each province; solve the problem of slow progress of project review due to insufficient information; The data authority mechanism for review by the handling units and disclosure by the relevant units is as follows: funds and performance are first decomposed and distributed to the local distribution management subsystem level by level through the central distribution management subsystem; the distribution of funds to projects is reported and submitted for review through the local distribution management subsystem; and reviewed level by level in the reporting and review subsystem; The system breaks down the barriers and time differences in information transmission between governments at all levels, improves regulatory efficiency and prevents capital accumulation by eliminating information asymmetry; The performance evaluation system based on the balanced scorecard includes: The evaluation system is divided into three levels: target level, standard level, and indicator level; According to the four dimensions of "financial indicators", "beneficiary indicators", "internal management indicators" and "reform and improvement indicators", the performance indicators required to be completed by the Ministry of Finance and the Ministry of Natural Resources are classified according to the actual situation of each special project; among them, "financial indicators" correspond to "cost indicators", "economic benefit indicators" and part of "social benefit indicators" in the indicator system of the Ministry of Finance; "beneficiary indicators" correspond to part of "quantity indicators", part of "quality indicators", "ecological benefit indicators", part of "social benefit indicators", part of "sustainable impact indicators" and "service object satisfaction indicators" in the indicator system of the Ministry of Finance; "internal management indicators" correspond to "timeliness indicators", part of "quantity indicators" and part of "quality indicators" in the indicator system of the Ministry of Finance; "reform and improvement indicators" correspond to part of "quantity indicators", part of "quality indicators" and part of "sustainable impact indicators" in the indicator system of the Ministry of Finance; Score each individual indicator of the fund's own performance based on the performance execution progress reported by each unit in the execution and reporting phase; In addition to the performance indicators that come with the funds when they are allocated, we will add evaluation indicators at the standard level and indicator level based on the actual situation of each project and the opinions of experts, enriching the indicators in the four dimensions of "financial indicators", "beneficiary indicators", "internal management indicators" and "reform and improvement indicators"; The scores of the additional evaluation indicators obtained through the analysis of the "Data Processing Center" around the additional evaluation indicators; According to the opinions of experts, weights are assigned to each indicator; the overall evaluation score is calculated based on the weights of each indicator, and an evaluation radar chart based on the four-dimensional indicators of the target layer is obtained; According to the ranking of the total score and individual scores among all participating units, a personalized performance evaluation report is formed; The data processing center comprises: A decision-making support tool that integrates and compiles data on funds and performance indicators collected from the entire business process of fund receipt, allocation, issuance, filing, and review. It also conducts evaluation and analysis based on performance indicator data and visualizes data through BI reports. The decision-making support tool includes: BI reports: for configured data sources, multi-dimensional data analysis, graphical modeling, and drag-and-drop self-service analysis functions are implemented; The GIS one-map module implements top-level design based on one map, including data organization and storage, data stratification and attributes, data service release, data application interface, data update, and integration of natural resource financial information, governance, and monitoring multi-source data; establishes a data exchange system to provide data exchange capabilities with other systems.
2. The natural capital and performance data sharing system based on Internet + government affairs as claimed in claim 1 is characterized in that: The system further comprises: The core tool is used for permission management. Different pages and financial permissions are limited according to roles and functions. Different accounts correspond to different departments, roles and functions. Roles are divided into national-level operation roles, provincial-level operation roles, and municipal-level operation roles. Functions include finance, ecology, geological exploration, and remediation. Different roles and functions correspond to different pages and functions that can be operated.
3. The natural capital and performance data sharing system based on Internet + government affairs as claimed in claim 2 is characterized in that: The core tools include: Configuration management module, used to enable the central, provincial, municipal and county governments to independently configure their own performance and special indicators and units; The permission management module is used to set page permissions for all accounts with a certain role.